Original PDF page 12, section 1. The text section number identifies this passage in the reader.

 CONCLUSION
This Stormwater Management Report has outlined how the stormwater run-off from the site is to be managed to
comply with the relevant requirements and minimise any adverse impacts to the downstream catchments.

     •    The existing and proposed development site have been modelled for the critical design storm events for the
          site, which found attenuation would be required to reduce post development peak flows to pre-
          development levels. Provision of 2kL of attenuation storage per unit with a 43mm low flow orifice and 100mm
          high flow outlet was found to provide mitigate the development such that there will be no increase to existing
          peak flow discharges from the site for the modelled storm events.

     •    Run-off from the development will be managed through an internal drainage network of pits and pipes to
          capture and convey run-off to the lawful point of discharge from the development, being kerb adaptor
          outlets in the Wyandra Street frontage. Small amounts of upstream run-off, run-off from impervious areas
          and the mitigated roof run-off will be captured by inlet pits and discharged at the north-western corner of
          the site into the kerb and gutter drainage system.

     •    During construction, erosion and sediment control measures are to be implemented to minimise potential
          contaminants impacting the downstream receiving environment in line with the objectives of Appendix 2 of
          the SPP.

     •    As the development is a small residential site that does not significantly alter the pollutant generating
          characteristics of the site, stormwater quality treatment is not proposed for the development.

     •    The proposed stormwater solution is considered to minimise any adverse impacts to the downstream
          environment arising from the stormwater run-off while also meeting the stormwater objectives for the
          development.




                                                                                                       Page 12 of 15
Project number 20220214
File 20220214 12 Wyandra St SWMP.docx, 2022-09-14 Revision 1
P +61 7 5211 1003                A 75 Noosa Drive, Noosa Heads,Qld 4567   E [email protected]    recorconsulting.com
Log in to download the original file

20220214 12 Wyandra St SWMP.pdf · 12.5 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.