Form 6 - Decision Notice
INTEGRATED PLANNING ACT 1997, S3.5.15, IDAS DEVELOPMENT APPLICATION
File No: 2007/409 Date of Decision: 28 August 2007
1. APPLICANT DETAILS
Name: Jim Tatton Developments
Postal address: CARE Martoo Consulting Pty Ltd
PO Box 1684
NOOSA HEADS QLD 4567
Phone no: 07 5455 5425 Fax no: 07 5455 5725
2. PROPERTY DESCRIPTION
Street address: 23 James Street Noosaville
Real property Lot 1 RP 69049
description:
3. OWNER DETAILS
Name: Maclaw No. 391 Pty Ltd
Postal address: 145 Glen Iris Road
GLEN IRIS VIC 3146
4. REFERRAL AGENCIES
Referral Agency Address Basis
Nil
5. APPLICATION TYPE
Development Development Details Preliminary Development
Approval Permit
Material Change of Use Multiple Housing Type 2 - Duplex No Yes
6. DECISION DETAILS
Council decided to approve the application and grant a Development Permit, subject to conditions.
7. APPLICABLE CODES
The developer must comply with the following codes for self-assessable development related to the development
approved under this Development Permit:-
Nil.
8. SUBMISSIONS
Not Applicable.
9. CONDITIONS
The approval is subject to conditions. Noosa Council’s conditions are attached.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 11 sections
Section 2
NOOSA COUNCIL IDAS Development Application Decision Notice 2 of 12
10. FURTHER DEVELOPMENT PERMITS REQUIRED
Type of Development Permit required Subject of the required Development Permit
Development Permit for Building works All Building Works
Development Permit for Operational Works Landscaping, car parking and access, frontage works,
stormwater drainage, sewer reticulation (including new mains,
relocations, diversions) and site filling
11. RIGHTS OF APPEAL
Rights of appeal in relation to this application are attached.
12. ASSESSMENT MANAGER
Name: Noosa Council Signature: Date: 29 August 2007
AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@1006ad04\@[email protected]
Section 3
NOOSA COUNCIL IDAS Development Application Decision Notice 3 of 12
Noosa Council Conditions
INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION
Land Use
1. Development undertaken in accordance with this approval must generally comply with the approved plans
of development. The approved plans are prepared by Bennett Architects & Associates Pty Ltd and are
detailed as follows:
Titled Numbered Dated
Floor Plans DA01 (REV F) 31 July 2007
Elevations DA02 (REV F) 31 July 2007
Roof Plan & Sections DA03 (REV F) 31 July 2007
And as may be amended by the conditions herein.
2. The development must be undertaken and operated in a manner that causes no detrimental effect upon
the amenity of the neighbourhood by reason of the creation of excessive noise, lighting nuisance or other
emissions.
3. The open space and setback areas are to be landscaped in accordance with Council’s Policy on
Landscaping Guidelines and a properly prepared landscape plan prepared by a suitably qualified
Landscape Architect or Horticulturalist. Such landscaping is to be completed prior to the premises being
occupied and maintained at all times thereafter. In this regard:-
3.1. A minimum of 20% of the site shall be landscaped with deep planting.
3.2. Native screening vegetation, shall be provided along the side and rear boundaries. The vegetation
shall include understorey plantings and a diverse range of trees ranging from 45 to 75 Litres in
size.
3.3. The landscaping plan shall include details of the planter boxes to the Level 2 balcony, including
maintenance requirements.
3.4. Clothes lines, water tanks, bin enclosures and the like shall not to be located where they will
significantly reduce the effectiveness of any screening vegetation.
3.5. The two (2) Callistemon viminalis adjacent to the James Street frontage, which are indicated for
retention on the preliminary landscape plan, shall be retained.
3.6. To replace existing trees to be removed from the site the landscaping plan shall include a minimum
of one (1) native species of a minimum size of 400 Litres and four (4) native species of a minimum
size of 100 Litres.
3.7. A minimum of 2 x 45litre Banksia integrefolia street trees shall be established on the James Street
frontage within the road reserve.
4. Existing trees on the site and within road reserves are to be retained, except where required to be
removed due to building operations or the conduct of the approved use. These landscape plans required
to be submitted are to denote areas of existing vegetation or existing trees proposed or required to be
retained.
5. All side and rear boundary fencing shall not exceed 2.0m above Natural Ground Level or 1.5m above
Finished Ground Level, whichever is the higher.
6. The glazed balustrade enclosing the pool in the Elizabeth Street frontage shall be clear glass.
AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@1006ad04\@[email protected]
Section 4
NOOSA COUNCIL IDAS Development Application Decision Notice 4 of 12
7. The stone wall adjacent to the pool in the Elizabeth Street frontage shall not exceed the pool coping
height.
8. Any deck or balcony areas are not to be enclosed with shutters, glass panelling or the like, thus remaining
as open structures.
9. All hot water systems installed shall be either solar systems; electric heat pump systems; or gas systems
(LPG or natural).
10. The proposed development shall have all kitchen, laundry and bathroom fittings that comply with the AAA
Water Conservation Rating System as defined by the AS/NZS 6400 (Water Efficient Products - Rating
and Labelling 2003) and AS/NZS 3500 (National Plumbing and Drainage Standard Part 1.2), with toilets to
comply with the AAAA Water Conservation Rating System. All tap ware and shower roses shall not
exceed a maximum flow of 9 litres per min. Dishwashers and washing machines are excluded from this
requirement.
11. Security in the form of a cash bond or trading bank guarantee to the sum of $20,000 must be submitted,
to secure performance of all conditions of this approval, prior to the issue of a Development Permit for
operational works. The cash bond or trading bank guarantee will be returned on performance of the
conditions of approval less any costs incurred by Council in respect of enforcing performance of this
permit.
12. The requirements of this development approval are to be effected, prior to the use of the premises.
Council reserves the right to call upon the bond or guaranteed sum referred to in this approval to effect
compliance with conditions.
13. The Development Permit for a material change of use of premises lapses if the use has not happened by
28 August 2011, unless an application to extend the currency is approved by Council.
Building Services
Demolition
14. Infrastructure including reticulated water, sewerage, stormwater, and electricity are to be protected from
damage and made safe to the standard required by the regulatory authority;
15. All infrastructure must be disconnected, capped or sealed including:-
electricity meters removed and electrical wires disconnected; and
telephone lines are disconnected; and
high speed data cables and television provider boxes are disconnected and removed to the
standard required by the regulatory authority;
16. All building materials containing asbestos, including asbestos cement sheeting or roofing and lagging,
must be removed from the building and disposed of in accordance with industry best practice.
17. Waste generated during construction must be stockpiled in a centralised location and covered as required
to prevent material being blown onto adjoining properties including the road reserve or food waste from
generating vermin. All site waste must be disposed of to an approved waste disposal facility either directly
or via an approved waste receptacle and collection service. Storage areas are to be located near the
temporary access to the site so that access can be gained with out damage to infrastructure.
18. Any damage to footpaths, street plantings, kerb and channel or roadways at the removal site, the
relocation site or between the sites must be repaired or reinstated to at least pre-existing conditions.
19. Sediment and erosion control measures must be placed on site prior to the works commencing and shall
be maintained until all works are complete. The erosion and sediment control measures shall be in
accordance with the “Best practice guidelines for control of stormwater on building sites” prepared by
Healthy Waterways (copy attached or available at www.healthywaterways.org).
20. The transportation of all materials to and from the site must be undertaken in a manner such that no
particle matter escapes onto a public road. All vehicles carrying out materials either to or from the site
shall be covered to prevent materials including dust being windblown from the vehicle.
AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@1006ad04\@[email protected]
Section 5
NOOSA COUNCIL IDAS Development Application Decision Notice 5 of 12
21. A Waste Management Plan shall be submitted for the demolition to the Environmental Health Section of
Noosa Council, prior to the development permit for building works being issued. The Plan shall contain the
following information:-
MATERIALS ON-SITE DESTINATION
Re-use and Recycling Disposal
Expected waste Estimated volume (m³) On-site *specify Off-site *specify *Specify contractor
materials proposed reuse or contractor & & landfill site
onsite recycling recycling outlet
methods
Excavation material
Green waste
Bricks
Concrete
Timber – please
specify
Plasterboard
Metals – please
specify
Asbestos
Other – please
specify
NOTE: Details of site area to be used for onsite separation, treatment and storage (including weather
protection) shall be provided on the plan drawings accompanying your application.
Land Development
River Flooding
22. All buildings proposed on site (and areas utilised for carparking purposes associated with the buildings)
shall be constructed to comply with Council’s Minimum Floor Height requirements as defined in Council’s
Planning Scheme and on Council’s Scheme Maps at the time of issue of the Building Permit.
In this regard the site should has a Minimum Floor Height of RL 2.5 (AHD). This levels, however, is
subject to change and verification shall be made to Council’s Land Development Section prior to obtaining
a Development Permit for Building Works.
The applicant should note that compliance with these levels does not necessarily require the site to be
filled as an equal result can be achieved by suspending the lower levels of the building as opposed to
filling. To this extent excessive filling should be avoided to prevent any impacts on neighbouring
properties and minimum floor levels should be adhered to without building higher than is actually needed
to prevent flooding.
Vehicle Access
23. A vehicular access driveway shall be constructed from the James Street frontage of the site with a
maximum width of 5m.
24. The driveway shall be designed and constructed to Council’s design standards and to grades that prevent
vehicles from scraping and/or bottoming whilst also allowing pedestrians movements along the footpath
without any step or level difference. Should any driveways be constructed to grades that do not comply
with AS2890.1-2004, Council will require that the driveway be removed and reconstructed to levels that do
comply.
Please note, a step between the driveway and the footpath shall be avoided, as it is preferred to have the
footpath continues at a constant grade to minimise the potential for pedestrians to trip or fall.
25. To ensure pedestrian safety between vehicles exiting the site and pedestrians on the footpath, the
driveway and any associated fencing or vegetation near the driveway shall comply with the minimum sight
line requirements as defined in AS2890.1, section 3.2.4. The applicant shall demonstrate compliance by
illustrating these sight lines on the plans submitted for both Operational Works approval and Building
Works approval.
26. All vehicles shall enter and leave the site in a forward direction.
Car Parking
27. Carparking shall be provided within the site as shown on drawing number DA01(F) dated 31 July 2007 by
Bennet architects & associates.
28. A minimum of 4 covered carpark spaces shall be provided on site.
AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@1006ad04\@[email protected]
Section 6
NOOSA COUNCIL IDAS Development Application Decision Notice 6 of 12
29. The carparking area shall be designed to comply with the provisions of AS 2890.1-2004 for user class 1A
with allowance for vehicles to enter and leave the site in a forward gear and with a minimum head
clearance (headroom) at any point of 2.2m.
Frontage Works
30. Footpath improvements such as topsoiling, grassing, and tree planting are required to the James Street
frontage of the site in accordance with Planning Scheme Policy PSP03 Landscaping Plants & Guidelines.
Grass shall be couch, free of weeds.
31. A new 1.5m wide concrete path shall be constructed along the James Street and the Elizabeth Street
frontages of the site in accordance with Council’s design standards and to an alignment that protects any
significant vegetation or any underground services. The path shall be constructed to connect to the two
existing adjacent pram ramps on James Street and Elizabeth Street.
32. All paths, pram ramps, driveways and parking areas shall be designed and constructed to ensure
pedestrian safety using non-slip materials, to produce an evenly graded surface finish, and to be in
accordance with the Disability Discrimination Act 1992 and Australian Standard 1428.1 Design for Access
& Mobility.
33. All redundant vehicular crossings to the site shall be removed and replaced by kerb & channel, footpath
paving and landscaping such as trees and grasses in accordance with Council’s Standard specifications
prior to commencement of the use permitted by this permit.
Roof Water & Stormwater Drainage
34. Roof runoff from any new dwelling shall be directed to a rainwater storage system or tank (minimum
storage 5000 litres per dwelling) that is installed to ensure water from the tank is used for external uses
(such as watering gardens, irrigation, ornamental ponds, water features, topping-up swimming pools,
outdoor cleaning, etc) and for use in flushing of toilets internal to the dwelling. All rainwater tanks are to be
designed and installed in accordance with the Queensland Development Code (QDC), Part 25 –
Rainwater Tanks, and shall be part of the plumbing application in conjunction with the building approval.
The location and capacity of the tanks shall be clearly shown on the plans submitted for Building Works /
Operational Works approval and any overflow shall be directed to the road Kerb in James and/or
Elizabeth Street and/or the stormwater drainage system located at Elizabeth Street.
35. All stormwater drainage (including roof water overflow from the rainwater storage system) shall be
collected and discharged so there is no net increase in stormwater runoff from the site. Stormwater
drainage permitted to drain from the site shall be discharged to Council’s:
35.1. Existing drainage structure in Elizabeth Street or/and,
35.2. Existing kerb & channel street drainage system in James Street.
The maximum discharge of stormwater drainage allowable to Council’s kerb & channel street drainage
system at any one location is 25 litres/second.
Plans of the drainage design shall be prepared by a Registered Professional Civil Engineer and submitted
to Council prior to obtaining a Development Permit for Operational Works.
36. All site stormwater drainage shall be by means of a gravity system.
37. All stormwater drainage lines to be Council’s assets and inter-allotment drainage shall be inspected by
closed circuit television (CCTV) prior to commencement of the approved Use.
CCTV inspection will be carried out by Council's CCTV contractor and arranged by Council following
satisfactory completion of construction works. The developer will be responsible for the full cost of CCTV
inspection, including any additional inspection necessary following defect identification and rectification.
This charge is payable prior to the issue of Operational Works approval and will be determined on the unit
rate basis current at the time of approval.
Sewer Mains
38. The site shall be connected to Council’s existing sewerage reticulation systems and be constructed in
accordance with Council’s standards and requirements at no cost to Council.
39. A new branch of sewer main shall be constructed from the existing main located on Lot 2 RP69049 (no.
40 Elizabeth Street). The new line and shall be constructed 1.5m north and parallel to the rear boundary
of Lot 2 RP69049 at no cost to Council. The construction of two additional manholes will also be required.
Negotiation with the owner/s and any need for compensation in this regards are the responsibility of the
applicant.
AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@1006ad04\@[email protected]
Section 7
NOOSA COUNCIL IDAS Development Application Decision Notice 7 of 12
If no agreement was reached between the two parties (ie the applicant and the owner/s of no. 40
Elizabeth Street) then the existing sewer connection (approximately 13m long) shall be upgraded to sewer
main standard at the applicant’s expense.
A Development Permit for Operational Works shall be required.
40. To ensure Council’s sewer main is accessible for maintenance purposes and is protected from risk of
damage no structures requiring a building permit (eg. buildings, swimming pools, retaining walls
exceeding 1m in height, raised terraces, etc) shall be constructed within this ‘zone of influence’ or within
1.5m of the centreline of any existing or proposed sewer main, whichever is the greater. As such the
applicant shall ensure the compliance of Operational Works plans and Building plans to this requirement
Easements for Sewer
41. A registered easement shall be created over the zone of influence of all existing and proposed sewers
within the subject site including sewer manholes and over those parts of the subject site that are impacted
upon by sewers on any adjoining sites. The easements shall generally be parallel to and centred over the
sewer main and be equivalent in width to twice the depth to invert level of the sewer at the deepest point
within the allotment (measured from the finished surface) and be no less than 3.0m wide overall. In this
regard a licensed surveyor shall accurately locate all sewer mains and determine the necessary width of
the easement, which shall be shown on any plans submitted for Operational Works / Building Works
approval. To this extent the surveyor shall certify that the sewer and the zone of influence is wholly
contained within the easement to be created.
In addition to this the Applicant’s Solicitor shall give Council’s Solicitor an appropriate undertaking in
writing that the Title Deed and the easement documents will be lodged at the Land Titles Office and any
additional Titles Office forms or requisitions requiring the consent of Council will be attended to promptly.
A duly executed copy of the easement shall be submitted to Council for perusal prior to the use
commencing.
Any changes required by Council’s Solicitor must be corrected immediately.
42. No building or other structure shall be constructed or encroach over an easement.
Town Water Supply
43. The site shall be connected to Council’s existing town water supply and be constructed in accordance with
Council’s standards and requirements at no cost to Council.
44. Each individual water connection to the water reticulation system shall extend to the property boundary
and be metered. All fees for the supply of water meters shall be paid to the Council.
45. All water meters must be located outside the property boundary and in an easily assessable location to
facilitate unhindered reading by Council and/or Council’s contracted water meter readers, and not behind
fences or locked gates. In this regard approval of the water meter configuration and location must be
obtained from Council’s Water & Sewerage Capital Works Manager prior to lodgement and approval of
hydraulic drawings.
Where capable of being separately rated, each dwelling unit shall be served by individual water meter.
Earthworks
46. Filling works required on site shall be carried out in accordance with Section 3.8 of Council’s Engineering
Design Standards Manual and so as not to cause the additional ponding of water on any adjoining lands
or the blockage of, or interference with, any natural surface runoff. Detailed site surveys indicating the
existing surface levels and contours of the adjoining properties must be provided with the application for a
Development Permit for Operational Works for Filling and Drainage.
This may require the design and construction of drainage pipes and/or an overland flow-path within the
development site that caters for drainage from the adjoining sites for a design storm with an Average
Recurrence Interval of 1 in 100 years. A private easement for the Drainage of Water encompassing the
drainage pipes or overland flow-path will also be required. In this regard a Development Permit for
Operational Works shall be obtained.
Should evidence certified by a Registered Professional Engineer be provided to Council indicating that no
additional ponding of stormwater will occur on the adjoining properties the requirement for the drainage
pipes, overland flow-path and easement shall not apply.
47. Earthworks carried out on site shall not affect the structural integrity of any of the existing fences or
structures that border the development site. Fences that are affected shall be replaced prior to the
Building Certifier issuing the Certificate of Classification. In this regard any fences to be replaced shall be
clearly shown on the plans submitted for Operational Works approval.
AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@1006ad04\@[email protected]
Section 8
NOOSA COUNCIL IDAS Development Application Decision Notice 8 of 12
Acid Sulfate Soils
3
48. As the site is located below the 5m AHD, any filling works consisting of 500m or greater and with an
average depth of 0.5m or greater will need to be carried out in accordance with State Planning Policy 2/02
Planning and Managing Development Involving Acid Sulfate Soils. In this regard appropriate testing and
supporting documentation prepared by a suitably qualified specialist shall be submitted to Council for
approval prior to obtaining a Development Permit for Operational Works.
Erosion and Sediment Control
49. Any person acting on this permit shall prevent erosion and sediment export from leaving the site. Site
control measures such as silt fencing, controlled gravel access to the site and controlled disposal of
waste, will be necessary.
In this regard plans detailing the methods of controlling erosion and sediment are required to be submitted
to the Council for approval prior to obtaining a Development Permit for Operational Works.
Contributions Towards Council Infrastructure
50. Monetary contributions shall be paid to Noosa Council towards the cost of providing and/or upgrading
various infrastructure at the rates applicable at the time of payment. An estimate only of the contribution
amounts under the current Council policies and requirements is outlined in the table below:
Contribution Required For: Amount:
PSP12 – Public Open Space Contributions (Park) $2,974
PSP16 – Sewerage Headworks Contributions $2,576
PSP17 – Water Supply Headworks Contributions $3,027
PSP20 – Pathway Trunk Network Contributions $669
Stormwater Drainage Contributions in accordance with the Noosaville / Ward Park
$2,371
Tewantin Master Drainage Plan
TOTAL Contribution Amount = $11,617
Please note, that these amounts are all subject to variations in the Consumer Price Index, All Groups Brisbane
from June 2007 until the date of payment.
All contributions must be paid prior to the issue of a Development Permit for Operational Works.
General
51. For the following classes of work associated with development, a Development Permit for Operational
Works must be obtained prior to commencement of works relating to that class of work. The application
may combine any or all of these classes of work:-
51.1. Access and Carparking.
51.2. Stormwater Drainage.
51.3. Frontage Works.
51.4. Sewer reticulation (including new mains, relocations, diversions).
51.5. Site Filling.
51.6. Landscaping.
51.7. Erosion & Sediment Control
52. A suitably qualified Registered Professional Engineer shall prepare engineering drawings and
specifications for all engineering works that will become Council infrastructure, which shall be submitted in
conjunction with an application for a Development Permit for Operational Works. In this regard a
DXF/DWG file on GDA94 zone 56 grid of the proposed cadastre layout is to be submitted in conjunction
with any application for Operational Works.
53. Digital detailed designs including drawings, calculations, specifications and a schedule of works, shall be
submitted with any application for a Development Permit for Operational Works. To facilitate production of
As Constructed drawings it is suggested that all design drawings are submitted in the Asset Design and
As Constructed (ADAC) digital format. (Guidelines on the use of ADAC are available at
www.adac.com.au).
54. A construction management plan/strategy to ensure no damage occurs to Council services shall be
prepared by a suitably qualified Registered Professional Engineer and submitted to Council in conjunction
with any application for Operational Works.
AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@1006ad04\@[email protected]
Section 9
NOOSA COUNCIL IDAS Development Application Decision Notice 9 of 12
55. Any damage caused to any public utility during the course of construction shall be repaired to Council’s
standards and at no cost to Council.
56. Any alteration of any public utility or other facilities necessitated by the development of the land or
associated construction works external to the site shall be at no cost to Council.
57. The transportation of all materials to and from the site shall be undertaken in a manner such that no
particle matter escapes onto a public road. All vehicles carrying materials either to or from the site shall
be covered to prevent materials including dust being windblown from the vehicle.
58. As Constructed drawings and data shall be certified by a qualified experienced Civil Engineer for design
intent, and a Licensed Surveyor shall certify the cadastre and the location, level and type of all services
and structures. All of which shall be submitted to Council for checking and for Council’s records.
Final approval of works shall not be granted until all As Constructed information has been supplied and
accepted by Council.
Environmental Health
59. The developer must provide waste storage and disposal facilities, including an external imperviously
paved area correctly sized for all refuse and recycling containers and suitably screened from public places
and neighbouring properties.
60. Noise emission from mechanical equipment (air conditioners, refrigeration equipment or pool pumps etc)
shall comply with the following requirements:
The equipment shall be installed and located in a manner that prevents excessive noise in accordance
with Council’s Local Law No. 12 - Control of Nuisances. Infringement Notices (on-the-spot fines) may
apply for offences.
A person must not use equipment on any day if it makes or causes noise to be made –
From 10pm to 7am: More than the lower of either –
40 dB(A)
3 dB(A) above the background noise level
No audible noise for pool pumps apply during these hours.
From 7am to 7pm: More than the lower of either –
50 dB(A)
5 dB(A) above the background noise level
From 7pm to 10pm: More than 3 dB(A) above the background noise level.
AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@1006ad04\@[email protected]
Section 10
NOOSA COUNCIL IDAS Development Application Decision Notice 10 of 12
Local Laws, Policies & State
Regulation Requirements
INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION
THE FOLLOWING ADVICES ARE FOR INFORMATION PURPOSES ONLY AND DO NOT FORM
CONDITIONS OF APPROVAL
1. Pursuant to the Building and Construction Industry (Portable Long Service Leave) 1991 Act if the cost of
operational works exceeds $80,000, then a portable long service leave levy is required to be paid. In
accordance with Section 77.(1) of the Act, Council is required to sight the approved form issued by the
Building and Construction Industry (Portable Long Service Leave) Authority that confirms that the
requirements of the Act have been satisfied. A statutory declaration outlining the cost of the operational
works must be submitted to Council with the lodgement of any application for operational works over the
site.
2. The applicant is advised that development contributions and infrastructure charges applicable to this
development approval have been based on the following Uses Class/ Uses and applicable quantities:-
Existing Development Approved Development
Existing Use Class /
Existing Quantity Approved Use Class / Use Approved Quantity
Use
Multiple Housing - Type 2 –
Detached House 1 Dwelling 2 x 3 Bedroom Units
Duplex
3. The applicant is informed that approval of this development application will trigger an Infrastructure
Charge in accordance with the Coastal Major Road Network Infrastructure Charges Plan for the estimated
amount of $1036 and is subject to variations in the Consumer Price Index, All Groups Brisbane from June
2007 until the date of payment. An Infrastructure Charge Notice will be issued in accordance with
Chapter 5 of the Integrated Planning Act 1997.
4. The applicant is informed that payment via credit card transaction will not be an acceptable method of
payment for development contributions conditioned in this permit or for infrastructure charge notices
issued separately.
5. The applicant is advised that a Compliance Permit for all plumbing and drainage works within the
boundaries of the development site shall be obtained from Council’s Plumbing Services Section prior to
obtaining a Development Permit for Building Works.
6. Fencing to the swimming pool must comply with the Queensland Building Act 1975 Part 3 (as amended)
and Part 5 of Standard Building Regulation 1993 in all respects. Direct access from the dwelling to the
pool enclosure is not permitted.
7. In accordance with the Environmental Protection (Water) Policy 1997, all sand, silt, mud, paint, cement,
concrete, builder’s waste or rubbish should not be permitted to enter or be placed where it could
reasonably be expected to move into a roadside gutter, storm water drain or a watercourse. On the spot
fines apply for such offences.
AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@1006ad04\@[email protected]
Section 11
NOOSA COUNCIL IDAS Development Application Decision Notice 11 of 12
Appeal Rights
INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION
The following is an extract from the Integrated (6) If an application involves assessment against
Planning Act (Chapter 4). a concurrence agency code, appeal rights for
submitters for the application are not available
Division 8 - Appeals to court relating to against the part of the approval that represents the
development applications concurrence agency’s response for the code.
Appeals by applicants Appeals by advice agency submitters
4.1.27.(1) An applicant for a development application 4.1.29.(1) An advice agency may, within the limits of
may appeal to the court against any of the following- its jurisdiction, appeal to the court about the giving of
(a) the refusal, or the refusal in part, of a a development approval for a development
development application; application if-
(b) a matter stated in a development approval, (a) the development application involves impact
including any condition applying to the assessment; and
development, and the identification of a code (b) the advice agency told the applicant and the
1
under section 3.1.6; assessment manager to treat its response to the
(c) the decision to give a preliminary approval when a application as a submission for an appeal.
development permit was applied for; (2) The appeal must be started within 20 business
(d) the length of a currency period; days after the day the decision notice or negotiated
decision notice is given to the advice agency as a
(e) a deemed refusal. submitter.
(2) An appeal under subsection (1)(a) to (d) must Appeals for matters arising after approval given
be started within 20 business days (the “applicant’s (co-respondents)
appeal period”) after the day the decision notice or
negotiated decision notice is given to the applicant. 4.1.30.(1) For a development approval given for a
development application, a person to whom any of
(3) An appeal under subsection (1)(e) may be the following notices have been given may appeal to
started at any time after the last day a decision on the the court against the decision in the notice-
matter should have been made.
(a) a notice giving a decision on a request for
Appeals by submitters extension of the currency period for an approval;
4.1.28.(1) A submitter for a development application (b) a notice giving a decision on a request to make a
may appeal to the court about- minor change to an approval.
(a) the giving of a development approval, including (2) The appeal must be started within 20 business
any conditions (or lack of conditions) or other days after the day the notice of the decision is given
provisions of the approval; or to the person.
(b) the length of a currency period for the approval. (3) Subsection (1)(a) does not apply if the
approval resulted from a development application
(2) The appeal must be started within 20 business (superseded planning scheme) that was assessed as
days (the “submitters appeal period”) after the day if it were an application under a superseded planning
the decision notice or negotiated decision notice is scheme.
given to the submitter.
(4) Also, a person who has made a request
(3) If a person withdraws a submission before the mentioned in subsection (1) may appeal to the court
application is decided, the person may not appeal the against a deemed refusal of the request.
decision.
(5) An appeal under subsection (4) may be
(4) If an application involves both impact started at any time after the last day the decision on
assessment and code assessment, appeal rights for the matter should have been made.
submitters are available only for the part of the
application involving impact assessment. Division 9 - Appeals to court about other matters
(5) If an application is processed under section Appeals for matters arising after approval given
6.1.28(2), appeal rights for submitters for the (no co-respondents)
application are available only for the aspects of the
development that would have required public 4.1.31.(1) A person to whom any of the following
notification under the repealed Act. notices have been given may appeal to the court
against the decision in the notice-
(a) a notice giving a decision on a request to change
or cancel a condition of a development approval.
1
Section 3.1.6 (Preliminary approval may override local planning
instrument)
AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@1006ad04\@[email protected]
Section 12
NOOSA COUNCIL IDAS Development Application Decision Notice 12 of 12
2
(b) a notice under section 6.1.44 giving a decision to
change or cancel a condition of a development
approval.
(2) The appeal must be started within 20 business
days after the day the notice of the decision is given
to the person.
(3) Also, a person who has made a request
mentioned in subsection (1)(a) may appeal to the
court against a deemed refusal of the request.
(4) An appeal under subsection (3) may be
started at any time after the last day the decision on
the matter should have been made.
Appeals against decisions to change approval
conditions under the repealed Act
4.1.33A.(1) A person who is dissatisfied with a
decision made on an application to change the
conditions attached to an approval given under
section 2.19(3)or section 4.4 of the repealed Act may
appeal to the court against-
(a) the decision; or
(b) a deemed refusal of the application.
(2) An appeal under subsection (1)(a) must be
started within 20 business days after the day notice of
the decision is to be given to the person.
(3) An appeal under subsection (1)(b) may be
started at any time after the last day a decision on the
matter should have been made.
Appeals against local laws
4.1.33B.(1) An applicant who is dissatisfied with a
decision of a local government or the conditions
applied under a local law about the use of premises
or the erection of a building or other structure
permitted by the planning scheme may appeal to the
court against the decision or the conditions applied.
(2) The appeal must be started within 20 business
days after the day notice of the decision is given to
the applicant.
2
Section 6.1.44 (Conditions may be changed or cancelled by
assessment manager or concurrence agency in certain
circumstances)
AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@1006ad04\@[email protected]
Used in these records
0015E678.001.pdfRelated documentPublic source context ↗
SUPERSEDED Decision Notice - 010.2007.00000409.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 59 KB (small file)
- File type
No other editions are linked here.