Council archive · source document
MCU14/0067 Town Planning Report
PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES COMMENT
defined storm tide event.
AND
AO2.4 Essential community service Not Applicable
infrastructure is: The site is not located within a coastal
(1) located so that it is not inundated hazard area.
by a recommended storm tide
event specified for that
infrastructure, or
(2) located and designed to ensure
any components of the
infrastructure that are likely to fail
to function or may result in
contamination when inundated by
a storm tide (for example,
electrical switch gear and motors,
water supply pipeline air valves)
are:
(a) located above the peak
water level for a
recommended storm tide
event, or
(b) designed and constructed to
exclude storm tide intrusions
or infiltration (including by
being located in the ground),
or
(c) able to temporarily stop
functioning during a
recommended storm tide
event without causing
significant adverse impacts
to the infrastructure or the
community.
AND
AO2.5 Emergency services Not Applicable
infrastructure and emergency shelters,
police facilities, and hospitals and The site is not located within a coastal
associated facilities have an emergency hazard area.
rescue area above the peak water level
for a recommended storm tide event.
PO3 Development directly, indirectly AO3.1 Development avoids increasing Not Applicable
and cumulatively avoids an the number of premises from which
people would need to be evacuated to The site is not located within a coastal
unacceptable increase in the severity of hazard area.
the coastal hazard, and does not prevent death or injury from a defined
significantly increase the potential for storm tide event.
damage on the premises or to other
premises.
PO4 Development avoids the release of AO4.1 Development that involves the Not Applicable
hazardous materials as a result of a manufacture or storage of hazardous The site is not located within a coastal
natural hazard event. materials in bulk are designed to: hazard area.
Editor’s note: Applications should: (1) prevent the intrusion of waters
from a defined storm tide event
(1) assess the risk of storm tide into structures or facilities
inundation releasing or otherwise containing the hazardous
exposing hazardous materials, materials, or
including appropriate emergency (2) ensure hazardous materials remain
planning and contingency secured despite inundation,
measures. including secure from the effects of
(2) applications are to be supported by hydrodynamic forcing associated
a report certified by a Registered with wave action or flowing water.
Professional Engineer of
Queensland (RPEQ) that
demonstrates this performance
outcome will be achieved.
PO5 Natural processes and the AO5.1 Development in an erosion Not Applicable
protective function of landforms and prone area within the coastal The site is not located within an erosion
vegetation are maintained in coastal management district: prone area.
hazard areas. (1) maintains vegetation on coastal
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
MCU14/0067 Town Planning ReportRelated documentApplication case desk ↗
About this file
- File size
- 895 KB (small file)
- File type
No other editions are linked here.