Council archive · source document
MCU14/0067 Town Planning Report
PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES COMMENT
access is located and designed to
be consistent with (1)(a) and (b).
AND
AO10.3 Any parts of private Not Applicable
development that extend over tidal The development is not adjacent to
water are to be designed, constructed state coastal land or tidal water.
and used for marine access purposes
only.
PO11 Private marine development AO11.1 Private marine development Not Applicable
avoids structures attaching to, or and other structures such as decks or The proposal is not for private marine
extending across, non-tidal state coastal boardwalks for private use do not attach development.
land abutting tidal waters. to, or extend across state coastal land
that is situated above the high water
mark.
Editor’s note: For occupation permits or
allocations of State land, refer to the
Land Act 1994.
PO12 Further development of artificial AO12.1 The design, construction and Not Applicable
waterways avoids or minimises adverse operation of artificial tidal waterways The development does not involve an
impacts on coastal resources and their maintains the tidal prism volume of the artificial waterway.
values, and does not contribute to: natural waterway to which it is
(1) an increase in the risk of flooding connected.
or erosion AND
(2) degradation of water quality AO12.2 The design, construction and Not Applicable
(3) degradation and loss of matters of operation of artificial tidal waterways The development does not involve an
state environmental significance does not increase risk from flooding. artificial waterway.
(including, but not limited to, AND
coastal wetlands, fish habitat areas
and migratory species habitat). AO12.3 The design, construction and Not Applicable
operation of an artificial waterway in The development does not involve an
connection with the reconfiguration of a artificial waterway.
lot ensures:
(1) water inlet and outlets structures
are of sufficient capacity to
maintain the water quality within
the waterway
(2) water discharged from the artificial
waterway protects the
environmental values and water
quality objectives of the receiving
waters
(3) dredged material is not disposed of
to tidal water beyond the artificial
waterway unless there is a
beneficial reuse, e.g. beach
nourishment.
Editor’s note: For more information on
environmental values and water quality
objectives see Schedule 1 of the
Environment Protection (Water) Policy
2009.
AND
AO12.4 The location of the artificial Not Applicable
waterways avoids matters of state The development does not involve an
environmental significance, or does not artificial waterway.
result in any significant adverse impact
on matters of state environmental
significance.
PO13 Development does not involve No acceptable outcome is prescribed. Complies
reclamation of land below tidal water, The development does not involve
other than for the purposes of: reclamation of land below tidal water.
(1) coastal-dependent development,
public marine development or
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
MCU14/0067 Town Planning ReportRelated documentApplication case desk ↗
About this file
- File size
- 895 KB (small file)
- File type
No other editions are linked here.