Original source · versioned page text
Town Planning Assessment Report
Very large file: it may take a few minutes
The original of this document is very large (15.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
3.2 ACCESS AND PARKING
The existing driveway will be maintained, and a new driveway is proposed to link to the existing
driveway and provide access to the new built form. A new gatehouse is proposed to identify access to
the site.
Table 9.4.1.4 of the Driveways and Parking code requires for the following minimum car parking rates:
● Dwelling House: 2 covered spaces.
Car parking will be located in the basement garage and is sufficient to accommodate the minimum
required car parking.
3.3 LANDSCAPING
Established vegetation will be maintained. New landscaping will be provided to complement the
proposed development. The Landscape Rehabilitation Plan within the Ecological Assessment Report
prepared by Greentape Solutions nominates four rehabilitation areas throughout the site.
3.4 INFRASTRUCTURE AND SERVICES
Waste collection will be provided as per previous arrangements.
The site can be connected to electrical and telecommunications. The existing water tank and effluent
disposal area is sufficient to service the proposed development. Please refer to the attached Effluent
Disposal Report prepared by Global Testing.
8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.