Original source · versioned page text
Soils report for footings and effluent southern cabins
Soil Investigation Summary Client Christian Hamilton-Craig Date 12/12/2021 Site Address Lot 4, RP 852013, #53 Martins Rd, Cooroy 4563 Job No SER 2530 Design Effluent On-site effluent disposal required with tank water supply. The proposed office Remarks: and two studio cabins (east to west). Further to the west, the ridgeline broadens to a planar flank. It is understood an AES (advanced Enviroseptic system) is proposed for effluent disposal. All three proposed structures could link to a common effluent disposal network and disperse by gravity. Design effluent loadings of -: * office/cabin - 120 litres per day * studio cabin - 2 persons/ 120 litres per person per day resulting in a probable total loading of 600 litres/ day. The flank proposed for effluent land application is represented by the soil category of 4/5 - clay loam/ light clay. Detailed design report to follow, by others. 14/40 Claude Boyd Parade Office: 0413 951 991 "PRIMEX BIZ HUB" [email protected] Bells Creek QLD 4551
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.