Original source · versioned page text
Compiled Approved Plans & Documents OPW18-0341 .01pdf
The original of this document is very large (18.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 31, section 1. The text section number identifies this passage in the reader.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn
LEGEND PROPOSED WORKS
NISTING FEATURES PROPOSED IMT OF WORKS, EROSION AN SEDIMENT CONTROL
STING ROAD CENTRELINE RRORINOCOFSENG “semee” PROPOSED STORMNATERIMET PROTECTION
DISTINGRERS AND CHANNEL ‘PROPOSED AREA OF CLEARING AND GRUBEINS : PROPOSED SEDIMENT FENCE
PASTING SEWERUAN PROPOSED AREA OF GRURBING OLY
BASTING SEWER RINGUAN PROPOSED RECTION OF cLEARINGASPER
‘BUSTING TELECOMMUNCATION AT PO
‘EXISTING UNDERGROUND ELECTRICAL
ASTINGWATERVAN
‘EASTING STORMWATER
reuwrorecron
eens mow)
Sonne
| Lrowsarorormncerone \
‘Grates menu oe
\ WORK OF LOT 6 COMMENCES OR \
| Semis eseteneccin rn
Kil
\ oe
FIGURE A2-Plan 2
FOR APPROVAL a BLUE CARE SUNRISE BEACH
serewemmmmon | ss es | @BlueCare®
Live life your way,
mar |" TREE RETENTION
¢ “SES:SESS] EXTERNAL MAJOR WORKS AND CLEARING PLAN
calbre INTERSECTION MODIFICATION
© aatteaoncem eeseseauiceree: |48-001942
3001-105A A
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.