Skip to the record
Noosa's #1 Council Tracker.

Original source · versioned page text

Compiled Approved Plans & Documents OPW18-0341 .01pdf

of 47

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (18.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 36, section 1. The text section number identifies this passage in the reader.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Ecological Management Plan — Grasstree Court — Lot 6

4. RECEIVING SITE REHABILITATION

4.1 Description and Tenure

 

The receiver site is located within the Girraween Sports Complex and Nature Refuge located at 100 Eenie
Creek Road; Noosa Heads (off Wallum Lane) and formally known as Lot 1SP239726. This area is owned by
Council ensuring that the rehabilitation efforts will be preserved indefinitely and located within close
proximity to the translocation site. A formal survey has located the boundaries for the receiver site and
treatment areas (FIGURE B2).

4.2 Treatment Areas

 

The area designated within this lot to receive the translocation treatments is approximately 3ha of
degraded land mapped as Category X (i.e. non-remnant) vegetation under Queensland state mapping.

The site currently consists of a bare hillside in the southern portion (T1). The balance area comprises a
weed infested area with scattered/few emergent trees (T2).

The total area of the receiver site is approximately 3ha.

e T1 area is approximately 3000m?.
o Consists of dune hillside, bare of vegetation with sandy, low nutrient soil.

e 712 area is approximately 27000m’.
o Consists of slight slope, dominated with weedy understory and few emergent trees.

The surrounding vegetation consists of a similar regional ecosystem composition to the subject land. It is
made up of a 50/50 ratio of RE12.2.5 and RE12.2.9.

Proximity to the development site, similar land zone, similar surrounding ecology, opportunities/desire® for

rehabilitation and long-term ecological benefit and protection justifies the suitability of the rehabilitation
site.

4.3 Receiving Site Preparation

 

The receiver site is to be prepared prior to any clearing works at the Lot 6 of the subject land. The overall
works involve weed removal from the surrounding buffer areas, weed removal from the T2 area, scraping
away the top layer of organic material at T2 area to expose clean soil substrate, installation of a mulch bund
along the bottom of the hillside to T2 area and placement of coir logs over T1 area to aid soil retention.
Once translocated soil is placed over entire T1 and T2 area, an irrigation watering system is to be installed.

Access is to be granted from Council. Areas to be designated for equipment storage, staff parking,
emergency meeting point and emergency access will be set up and signed. The TPZ of trees outside the
boundary will have fenced temporary with “NO GO” or similar signage.

The T1 area requires an access track to be installed so that machinery is able to enter the area and spread
out the live top soil. Coir logs will be placed along contours of the T1 area and secured with stakes. This will
aid in retaining the live soil mix once placed on the hillside.

The T2 area will undergo extensive weed removal. An excavator will be used to remove the bulk of the
weedy lantana which will be mulched on site. Native trees will be retained with minimum diameter at
breast height (DBH) of 25cm. TP2Z’s will be established as per AS4970: Protection of Trees on Development
Sites to ensure their survival throughout the works.

© Note: part areas identified by Council as in need/preferred for rehabilitation.
27
Log in to download the original file

Compiled Approved Plans & Documents OPW18-0341 .01pdf.pdf · 18.9 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.