Decision Notice OPW25 0154
Plan No. Rev. Plan/Document Name Date
531-001-100 A Site Layout Plan Prepared by Bax 10/06/2025
Engineering
Annotated by Council
531-001-200 A Earthworks Layout Plan Prepared by Bax 10/06/2025
Engineering
Annotated by Council
531-001-201 A Earthworks Sections Prepared by Bax 10/06/2025
Engineering
531-001-202 A Retaining Wall Details Prepared by Bax 10/06/2025
Engineering
CURRENCY PERIOD
2. The Currency Period for this development approval lapses if the development has not
substantially started by 08/10/2027 unless an application to extend the currency period is
approved by Council.
Site Specific Conditions
Landslide Hazard
3. All works must be carried out in accordance with a site-specific Geotechnical Report
prepared by a suitably qualified person*. The site-specific Geotechnical Report must
demonstrate a low or very low risk of global slope instability.
PRIOR TO COMMENCEMENT OF WORKS
Engineering
4. Any changes to the details associated with the supervising RPEQ or Principal Contractor
during construction, must be notified to council in writing within five business days of the
change occurring.
5. Any conflict between the development and an existing or proposed service must be referred
to the relevant service authority for determination prior to commencement of works.
DURING CONSTRUCTION
Engineering
6. The developer must meet any costs to repair damage to any Council asset during
construction, where damage is a result of the development works. Damage to assets must
be repaired immediately where it creates a hazard to the community. In circumstances where
the damage does not create a hazard to the community, it must be repaired immediately on
completion of the works associated with the development.
7. All works must be supervised by a Registered Professional Engineer of Queensland (RPEQ)
who is independent of the Developer and Principal Contractor, and they must certify that all
works conform to the Operational Works permit. Where municipal works are involved, such
confirmation must be submitted for the respective hold points prior to any site inspection by
Council Officers.
8. All works must be constructed and work procedure undertaken in accordance with:
a. The approved plans/documents and conditions detailed in this Decision Notice
b. All relevant Noosa Council Planning Scheme Policies, standard drawings, standard
specifications and guidelines
Page 2 of 8