Decision Notice - 010.2008.00000892.001 [As Published] · 142008.892
2008/892
18. The jetty shall be licensed with the Council upon completion of the structural work and shall be
licensed annually thereafter.
19. The Development Permit for operational works lapses if the works are not completed by 4
September 2010, unless an application to extend the currency is approved by Council.
5 REFERRAL AGENCY CONDITIONS
The referral agencies applicable to this application are:
Referral Trigger Referral Status Referral Agency Referral Address
Nil
6 APPROVED PLANS/DOCUMENTS
The approved plans and / or documents for this development approval are listed in the following
table:
Plan / Document No. Rev. Plan / Document Name Date
08/85-1 A Elevation 1, Framing Layout, Elevation May 2008
2 & Site Plan – John Norden &
Associates
08/85-2 Section A, Detail 1, Detail 2 & Detail 3 – May 2008
John Norden & Associates
08/85-3 Elevation, Framing Elevation, Framing May 2008
Layout & Section X - X – John Norden
& Associates
7 ADVISORY NOTES
The following Advisory Notes are for information purposes only and do not form conditions of
approval:
1. Should any changes or modifications to the approved plans be required as a result of
construction constraints, a Change to an Existing Approval Application under the Integrated
Planning Act must be made. Amended plans clearly indicating the changes must be lodged with
this application along with the appropriate fees.
2. The requirements of the Environmental Protection Amendment Regulation (No. 2) 1999 and
Local Law No. 12, prevents a builder or building contractor carrying out building work on a
building site in a way that makes or causes audible noise to be made from the building work:-
2.1. On a Sunday or public holiday, at any time; or
2.2. On a Saturday or a business day, before 7.00am or after 6.30pm.
A maximum penalty of $1,500 applies to an offence under this legislation.
3. Pursuant to the Building and Construction Industry (Portable Long Service Leave) 1991 Act if the
cost of operational works exceeds $80,000, then a portable long service leave levy is required to
be paid. In accordance with Section 77.(1) of the Act, Council is required to sight the approved
form issued by the Building and Construction Industry (Portable Long Service Leave) Authority
that confirms that the requirements of the Act have been satisfied. A statutory declaration
outlining the cost of the operational works must be submitted to Council prior to the
commencement of any works over the site.
Page 3 of 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - 010.2008.00000892.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 55 KB (small file)
- File type
No other editions are linked here.