   NOOSA COUNCIL
   APPROVED PLAN
OPW18/0155 19 SEP 2018


[OCR of page images]
   
  

ATK

lproposeo
\STAGE 4A RAPID
INFILTRATION PIT

\, (WEST) 6 OFF @
/ 1800dia x 2.4m
| DEEP ee
> REFERDETAL |”)
(
Age m

cn J

Se. Lb

HABITAT PROTECTION FENCE TO a |
BE ERECTED PRIOR TO Lot.7,-£ wt
COMMENCEMENT OF CLEARING Sp
WORKS PROVIDE SIGNAGE AT ~
50m SPACINGS " ECOLOGICAL er a
RESTORATION AREA - NO wa
ACCESS \ |
%
Sle
ry
b+
Sls
wt
Leckey

   
  
    
   
   

Vw

VEGETA’

  
 

  

{ey

 

PROPOSED ——
RAINWATER

HARVESTING —
TANK

PROPOSED
STAGE 4A
BUI

CA 4A (W)
5112m?

 
  
  
  

   
 

  

  

  
 

—

=x

 
 
   
   
 
  

       
    
   
   
   
    
 

  
 

    
 
  
  
    
  
 
   
   
   
      
     
    
   
 
 
  

 

ALL WORKS TO BE CARRIED OUT IN STRICT
ACCORDANCE WITH APPROVED SETTLERS
COVE NOOSA RESIDENTIAL HIGH DENSITY
ENVIRONMENTAL MANAGEMENT PLAN (EMP‘)
DATED 21 JULY 2005 BY WBM OCEANICS.

 

 

 

NOTE:
+ REFER TO HYDRAULIC CONSULTANT'S

DETAILS FOR ALL DOWNPIPE & STORMWATER
CONNECTIONS (PLUMBING & DRAINAGE
APPROVAL).
ALL NEW BUILDING ROOFS TO BE PIPED
TO RAINWATER HARVESTING TANKS
FOR EVENTS UP TO 10 YEAR ARI
RWH TANK OVERFLOW TO BE PIPED TO
WESTERN RIPs FOR EVENTS UP TO 10 YEAR
ARI
EASTERN AREA ROOFS AND HARD STAND TO
BE PIPED TO EASTERN RIPs FOR EVENTS UP
TO 10 YEARARI
ALL BASEMENT & CARPARK STORMWATER TO.
BE COLLECTED IN A SUMP & PUMPED TO
DISCHARGE OVER A "FOX BPT600" GROSS
POLLUTANT TRAP PRIOR TO CONNECTION TO.
R.LP.'S. BASEMENT & CARPARK DRAINAGE
DETAILS TOHYDRAULIC CONSULTANT'S
‘SPECIFICATIONS.

 

 

 

 

 

NOOSA COUNCIL
APPROVED PLAN
OPW18/0155 19 SEP 2018

 

 

  
  
  
    
 

LEGEND

 

 

 

 

 

 

 

 

 

 

 

 

of re A ~
7 7 ey A ~e PROPOSED STORMWATER DRAINAGE
/ ” we p/ a an (E) PROPOSED VEGETATED SWALE
mi
\ 7 / 903:
eT eRe oe PROPOSED OVERLAND FLOW PATH
| \\ ‘\i/ 4 ie,
| »\ ee RAINWATI
(_\ /PROPOSED WATER ° +
—+— {7 [STAGE 48 RAPID HASVESTING 3.9) PROPOSED EARTHWORKS LEVEL
| > FN neittTRATION Prt TAN
(/ (west) 4 OFF / PROPOSED \ —— — — PROPOSED BASEMENT WALL
1% wesnsorr@ if / ‘ATED STAGE 4A
a ase er WE SWALE «BUILDING ITTTTTTT PROPOSED TOP OF BATTER
\ eta, AI —------ PROPOSED TOE OF BATTER
i / (TS CA 4A (B) — — \ —\ PROPOSED SWALE
=
SP 5871. fF aes oe " — — —so—— —_ FINISHED SURFACE CONTOUR
Ree, _ 5). — EXISTING SURFACE CONTOUR
ak
7 ee) er > —— —e&—— — EXISTING ELECTRICAL RETICULATION
£4 oe (Be y K —— —t——  —_ EXISTING TELSTRA RETICULATION
ane Ty E ~ — — —p—— —_ EXISTING STORMWATER DRAINAGE
i" ‘
HABITAT PROTECTION FENCE TO |~ X , LOT 9 —— —w— — —_ EXISTING WATER RETICULATION
BE ERECTED PRIOR TO + al 5 VEGETATED SP195871 —— —s— —— _ EXISTING SEWER RETICULATION
COMMENCEMENT OF CLEARING SWALE
WORKS PROVIDE SIGNAGE AT 2
50m SPACINGS " ECOLOGICAL ® 0 4 8 2 16 20m
RESTORATION AREA - NO c R
‘ACCESS bf
~ SL ® ‘SCALE 1:200 At, 1:400 A3
NOTE: ONLY DRAWINGS MARKED "FOR CONSTRUCTION’ AND BEARING AN ORIGINAL SIGNATURE SHALL BE USED FOR CONSTRUCTION PURPOSES. f Design: Brah 101 pty Itd Va Alta Projects PROJECT: STORMWATER MANAGEMENT PLAN
Drawn:
ABN. 91 611 354 511
Date: eee Ee en They PROPOSED RESIDENTIAL DEVELOPMENT STAGE 4A & 4B =
PO Box 559, Cotton Tree, QLD, 4558
5 acini Tel (07) SaTe 4125 Fa (67) 5479 1607 | at SERENITY CLOSE, NOOSA DRAWING No: 14 640)7/48/PSMP01 B tof t
: - ] ENGINEERING : DESIGN : MANAGEMENT Email: [email protected] © This plan in Copyright. Other than for the purposes of and wubject to the conditions prescribed under the
ee aE Daun iste areata for CAPE BOUVARD DEVELOPMENTS hee Ep Ee rch gr tert ogee logy Op
rev | DATE DESCRIPTION By | cHKD "Al SHEET SIZE FLEANE aS1OTI8PSUPOL eq DATE” ZVTTI8. 26pm - XREPY aBIOTICGASE, SSIOTAXSURVEY. SOIOTLARCH encacape, SBICTXARDL HAgpeesSHt Hepes SH [Council Ref: Trareded te th Prope roperty remainy wile ALTA Proc: All enquiries should

 

 

 

 

 

 

 

 

 

 

 

 

Used in these records

About this file

File size
12.8 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Approved Plans OPW18_0155.pdf · 12.8 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.