                      AGENDA


         General Committee
              Meeting


              Monday, 16 March 2020

                   commencing at 10am
         Council Chambers, 9 Pelican Street, Tewantin



Committee:   Crs Frank Wilkie (Chair), Jess Glasgow, Ingrid Jackson,
             Joe Jurisevic, Brian Stockwell, Tony Wellington



                   “Noosa Shire – different by nature”
Log in to download the original file

2020-03-16 General Committee Agenda(PDF, 1MB).pdf · 1.5 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 28 sections

Section 2

GENERAL COMMITTEE MEETING AGENDA                                                   16 MARCH 2020


TABLE OF CONTENTS

ITEM                                                                                       PAGE


ATTENDANCE & APOLOGIES                                                                          -

PRESENTATIONS                                                                                   -

DEPUTATIONS                                                                                     -

ITEMS REFERRED FROM PLANNING & ENVIRONMENT COMMITTEE                                           2

1      MCU19/0134 DEVELOPMENT APPLICATION FOR MATERIAL CHANGE OF USE
       - ENTERTAINMENT & DINING BUSINESS TYPE 3 BAR AT 5 TAYLOR COURT,
       COOROY
       (Planning & Environment Committee Agenda, 10 March 2020, Item 1, Page 3)
       Reason for referral – for further consideration.


2      132006.1395.05 MINOR CHANGE TO DEVELOPMENT PERMIT FOR MATERIAL
       CHANGE OF USE - MULTIPLE DWELLING (10 UNITS) AT 142 NOOSA DRIVE,
       NOOSA HEADS
       (Planning & Environment Committee Agenda, 10 March 2020, Item 2, Page 23)
       Reason for referral – for a further report.

ITEMS REFERRED FROM SERVICES & ORGANISATION COMMITTEE                                           -
Nil

REPORTS DIRECT TO GENERAL COMMITTEE                                                            3

3      FURTHER REPORT - 132006.1395.05 MINOR CHANGE TO DEVELOPMENT
       PERMIT FOR MATERIAL CHANGE OF USE - MULTIPLE DWELLING (10 UNITS)
       AT 142 NOOSA DRIVE, NOOSA HEADS                                                         3

4      FURTHER REPORT - MCU18/0015 & RAL18/0001 - DEVELOPMENT
       APPLICATION FOR MATERIAL CHANGE OF USE (2 DETACHED HOUSES AND
       12 MULTIPLE HOUSING - TYPE 4 CONVENTIONAL) AND RECONFIGURATION
       OF A LOT (1 INTO 4 LOTS PLUS EASEMENT) AT 27 ATTUNGA HEIGHTS,
       NOOSA HEADS                                                                             6

5      CATEGORY D BUSHFIRE RECOVERY                       EXCEPTIONAL       ASSISTANCE
       IMMEDIATE SUPPORT PACKAGE                                                              10

6      FINANCIAL PERFORMANCE REPORT - FEBRUARY 2020                                           17

CLOSED SESSION                                                                            -




                                                                                     Page 2 of 29

Section 3

GENERAL COMMITTEE MEETING REPORT                                               16 MARCH 2020


REPORTS DIRECT TO GENERAL COMMITTEE

3    FURTHER REPORT - 132006.1395.05 MINOR CHANGE TO DEVELOPMENT PERMIT
     FOR MATERIAL CHANGE OF USE - MULTIPLE DWELLING (10 UNITS) AT 142 NOOSA
     DRIVE, NOOSA HEADS

Author            Coordinator Planning, Patrick Murphy
                  Environment and Sustainable Development Department

Index             ECM / Application / 132006.1395.05

Attachments       Nil


EXECUTIVE SUMMARY
Not applicable.

RECOMMENDATION
That Council note the report by the Coordinator Panning to the General Meeting dated 16 March
2020 regarding Application No. 132006.1395.05 for a minor change to an existing approval for
Material Change Of Use – Multiple Dwelling (10 Units) situated at 142 Noosa Drive, Noosa Heads
and:
A.   Refuse the change for the following reasons:
     1.    The proposal is contrary to schedule 11, part 2, section 7 of the Planning Regulation
           2017 as the development is situated in a koala assessable development area and does
           not provide for habitat connectivity or safe koala movement.
     2.    The proposal is inconsistent with biodiversity assessment benchmarks (1), (2), (4) and
           (5) of Part E of the State Planning Policy as the development will adversely impact
           upon koala habitat and linkages, with koala populations recognised as being matters
           of both national and state environmental significance.
     3.    The proposal is inconsistent with water quality assessment benchmarks (1) and (2) of
           Part E of the State Planning Policy as the development has not adequately
           demonstrated that water quality objectives will be achieved.
     4.    The proposed development will adversely impact upon the site’s ecological values,
           including koala habitat and linkage for koala movement throughout the site contrary to
           Overall Outcomes 13.7.2a)i, 13.7.2a)iii, 13.7.2a)iv, 13.7.2b), 13.7.2c), 13.7.2d)i,
           13.7.2d)vii, 13.7.2e), 13.7.2g), and Specific Outcomes O1a, O3, O4, O5, O7, O10,
           O11, O16, O17, O18a), O18b), O18e), O18h), O19b), O19c), O19g) and O19i) of the
           Biodiversity Overlay Code.
     5.    The proposed development is inconsistent with the Noosa Heads Locality Code as the
           proposal will adversely impact on the site’s environmental values contrary to Overall
           Outcome 9.7.2a)iv and Specific Outcomes O3 and O20.
     6.    The proposed Bushfire Management Plan proposes vegetation removal and
           management within a part of the site which is zoned Open Space Conservation and is
           intended to be protected and managed to the exclusion of development.
     7.    The proposed development is contrary to Overall Outcome 13.30.2(h) of the Natural
           Hazards Overlay Code as bushfire mitigation measures do not avoid or minimise
           impacts on the natural environment and ecological processes.



                                                                                   Page 3 of 29

Section 4

GENERAL COMMITTEE MEETING REPORT                                                     16 MARCH 2020


      8.     The proposed development is contrary to Overall Outcomes 14.157.2(b) and (d) and
             Specific Outcomes 1, 8 and 10 of the Water Sensitive Design Code as modelling for
             stormwater treatment has not included all relevant run-off areas.
      9.     Insufficient detail has been provided to demonstrate the extent and potential impact of
             the proposed height variation for the dwelling units.
      10.    The proposed development is contrary to the draft Noosa Plan provisions, which
             reinforce the current Noosa Plan’s requirements for an appropriate response to the
             site’s natural hazards and protection of the site’s environmental values including
             vegetation retention.
B.    Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.


REPORT
1     Background
A report on this application was prepared for the Planning and Environment Committee Meeting
on 10 March 2020 recommending that the application be refused.
Assessment within the original report determined that the application was not a minor change given
a number of parking spaces were partly located outside the easement on adjoining land which did
not previously form part of the original application.
The Planning Act 2016 defines a minor change as:
(a)   for a development application –
      (i)    does not result in substantially different development; and
      (ii)   if the application, including the change, were made when the change is made—would
             not cause -
             (A)   the inclusion of prohibited development in the application; or
             (B)   referral to a referral agency if there were no referral agencies for the development
                   application; or
             (C)   referral to extra referral agencies; or
             (D)   a referral agency, in assessing the application under section 55(2), to assess the
                   application against, or have regard to, a matter, other than a matter the referral
                   agency must have assessed the application against, or had regard to, when the
                   application was made; or
             (E)   public notification if public notification was not required for the development
                   application;…
The Development Assessment Rules (DA Rules) note that a change may be considered to result
in a substantially different development if any of the following apply to the proposed change:
(a)   involves a new use; or
(b)   results in the application applying to a new parcel of land; or
(c)   dramatically changes the built form in terms of scale, bulk and appearance; or
(d)   changes the ability of the proposed development to operate as intended; 27 or
(e)   removes a component that is integral to the operation of the development; or
(f)   significantly impacts on traffic flow and the transport network, such as increasing traffic to the
      site; or
(g)   introduces new impacts or increase the severity of known impacts; or


                                                                                         Page 4 of 29

Section 5

GENERAL COMMITTEE MEETING REPORT                                                     16 MARCH 2020


(h)    removes an incentive or offset component that would have balanced a negative impact of
       the development; or
(i)    impacts on infrastructure provisions.
After the officer report had been completed the applicant provided legal advice stating that despite
the application applying to a new parcel of land the application could still be considered to be a
minor change.
Council officers subsequently sought legal advice as to whether the new parcel, not the subject of
the original development approval, and which is to be used for the development or an aspect
thereof, necessarily dictates that it is not a minor change and results in a substantially different
development.
In summary, the advice notes that the DA Rules state a change application involving a new parcel
of land may be considered to result in a substantially different development. The DA Rules do not
mandate such a change to be substantially different because it applies to new land; it still remains
a matter of assessment. In this regard, the parking area is substantially provided within the
easement and, to the extent that cars may be intended to park outside the easement, is to assist
in providing protection to vegetation (on the subject site) and in terms of additional area will not be
extensive. Therefore, it is concluded that this aspect of the application by itself would unlikely
amount to a ‘substantially different development’ in terms of the DA Rules and the application
should be accepted as a minor change.
Accordingly, it is recommended that the grounds of refusal be amended to delete the ground
relating to the application not being a minor change. Furthermore, the grounds of refusal have
been reviewed by Council’s planning solicitor and minor changes have been made to re-numbered
grounds 7 and 8 to identify the relevant Overall and Specific Outcomes.

Departments/Sections Consulted:

      Chief Executive Officer       Community Services                        Corporate Services
      Executive Officer             Director                                  Director
      Executive Support             Community Development                     Financial Services
                                    Community Facilities                      ICT
                                    Libraries & Galleries                     Procurement & Fleet
                                    Local Laws                                Property
                                    Waste & Environmental Health              Revenue Services

      Executive Services        X   Environment & Sustainable Development     Infrastructure Services
      Director                      Director                                  Director
      Community Engagement          Building & Plumbing Services              Asset Management
      Customer Service          x   Development Assessment                    Buildings and Facilities
      Governance                    Economic Development                      Civil Operations
      People and Culture            Environmental Services                    Disaster Management
                                    Strategic Land Use Planning               Infrastructure Planning,
                                                                              Design and Delivery




                                                                                           Page 5 of 29

Section 6

GENERAL COMMITTEE MEETING REPORT                                                 16 MARCH 2020


4    FURTHER REPORT - MCU18/0015 & RAL18/0001 - DEVELOPMENT APPLICATION FOR
     MATERIAL CHANGE OF USE (2 DETACHED HOUSES AND 12 MULTIPLE HOUSING -
     TYPE 4 CONVENTIONAL) AND RECONFIGURATION OF A LOT (1 INTO 4 LOTS PLUS
     EASEMENT) AT 27 ATTUNGA HEIGHTS, NOOSA HEADS

Author             Coordinator Planning, Patrick Murphy
                   Environment and Sustainable Development Department

Index              ECM / Application / MCU18/0015 and RAL18/0001

Attachments        1.   Officer Report & Attachments from 11 June 2019 Planning and
                        Environment Committee Meeting (84 page Attachment provided
                        separately to this agenda)



EXECUTIVE SUMMARY
Not applicable.

RECOMMENDATION
That Council note the report by the Contract Planner to the Planning & Environment Committee
Meeting dated 11 June 2019 and the Further Report to the General Committee Meeting dated 16
March 2020 regarding Application No. MCU18/0015 for a Development Permit for Material Change
of Use (2 Detached Houses and Multiple Housing – type 4 Conventional – 12 Units) and
Reconfiguring a Lot (1 into 4 lots plus Access Easement) situated at 27 Attunga Heights, Noosa
Heads and:
A.   Refuse the application for the following reasons:
     1.    The proposed development is contrary to the Noosa Plan’s Strategic Framework and
           the Desired Environmental Outcomes as
           (i)     The proposal does not satisfactorily protect the site’s significant environment
                   values.
           (ii)    The proposal does not maintain a satisfactory wildlife corridor through the site
                   and intrudes into the riparian buffer to the site’s watercourse.
     2.    The proposed development is contrary to the Overall and Specific Outcomes of the
           Noosa Heads Locality Code as
           (i)     The proposed uses are inconsistent with and therefore strongly inappropriate in
                   the Open Space Conservation Zone. .
           (ii)    The applicant has not satisfactorily demonstrated the proposed development
                   footprint is commensurate with the site’s constraints and values.
           (iii)   The proposal will adversely impact on the sites and the adjoining road reserve’s
                   scenic and environmental values.
           (iv)    The proposed built form will adversely impact on the visual amenity of nearby
                   properties in Attunga Heights.
           (v)     The proposed development does not respect the scale and character of the
                   surrounding development.
     3.    The proposed development is contrary to the Specific Outcomes of the Noosa Heads
           Locality Code for population density, gross floor area, site cover, building height and
           setbacks.



                                                                                     Page 6 of 29

Section 7

GENERAL COMMITTEE MEETING REPORT                                                    16 MARCH 2020


     4.    The proposed development is contrary to the Biodiversity Overlay Code as the
           proposal does not satisfactorily manage, minimise or mitigate its impacts on the site’s
           ecologically important areas, ecological linkages for the koala population and the site’s
           watercourse with the development resulting in excessive clearing of protected
           vegetation.
     5.    The proposed subdivision is contrary to the Reconfiguring a Lot Code as:
           (i)     The proposed lots and lot boundaries fragment the site’s wildlife corridor and the
                   riparian buffer to the site’s watercourse.
           (ii)    The proposal is to subdivide land in the Open Space Conservation zone.
           (ii)    The applicant has not demonstrated appropriate access for Lot 3 for construction
                   purposes is available or achievable.
           (iii)   The proposed parkland lot, Lot 4, includes part of the bushfire protection zone for
                   the multiple dwelling units and steep slopes which will require ongoing monitoring
                   and future management, inappropriately burdening Council’s resources.
     6.    The proposed development has not been designed to avoid any potential instability
           and associated problems and seeks to clear excessive vegetation that assists in
           stabilising the site and the development in the long term contrary to the Natural
           Hazards Overlay Code and Reconfiguration of Lot Code.
     7.    The proposed development will adversely impact on the vegetated character of the
           adjoining pedestrian path in Edgar Bennett Avenue road reserve enjoyed by residents
           and visitors to the area due to the scale and extent of development proposed along
           this boundary and limited landscape opportunities to screen the development. The
           proposed works for the driveway and associated retaining walls are also likely to
           adversely impact on the vegetation within the road reserve and result in the removal of
           some existing mature vegetation.
     8.    The proposed stormwater management strategies for water quality for the multiple
           housing development on lot 1 conflict with the Water Sensitive Design Code, which
           requires natural treatment strategies and systems and are contrary to the
           Reconfiguration of Lot Code.
     9.    The proposed proprietary device has not been accepted by Stormwater Australia as a
           satisfactory water quality treatment system for this area. Therefore, the proposed
           development may adversely impact on the downstream ecosystem due to changes in
           water quality.
     10.   The proposed development is contrary to the draft Noosa Plan provisions which are
           more protective of the site’s environment values and consequently more restrictive of
           development.
     11.   The application attracted a considerable number of public submissions raising valid
           grounds of objection to the development.
     12.   The proposed development is contrary to Schedule 10 Division 3 of the Planning
           Regulation 2017 as the development is situated in a koala assessable development
           area and does not avoid, minimise or mitigate interfering with koala habitat or propose
           a satisfactory offset to address any significant residual impact.
     13.   The proposal is contrary to the State Planning Policy as the proposed development will
           adversely impact on koala habitat, with koala populations recognised as being matters
           of both national and state environmental significance.
B.   Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.




                                                                                        Page 7 of 29

Section 8

GENERAL COMMITTEE MEETING REPORT                                                16 MARCH 2020


REPORT
1      Background
A report on this application was presented to the Planning and Environment Committee Meeting
on 11 June 2019 recommending that the application be refused.
The grounds of refusal within the Planning and Environment Meeting report generally related to
the application’s non-compliance with the following:
    Strategic Framework and Desired Environmental Outcomes
    Overall and Specific Outcomes of the Noosaville Locality Code;
    Biodiversity Overlay Code;
    Reconfiguring a Lot Code;
    Stormwater Management; and the
    Draft Noosa Plan.
The item was referred to the General Committee on 17 June 2019 due to the significance of the
application. On 13 June 2019 the applicant stopped the decision making period for 130 business
days to allow for representations to be made by the applicant to Council officers regarding the
application.
On 23 October 2019 an email with an attached letter was received from the applicant, with the
letter raising a number of questions relating to the application and requesting a meeting with
Council officers.
On 13 November a meeting was held between Council officers and the applicant to review the
outstanding issues. At this meeting Council officers reiterated the issues associated with the
grounds of refusal recommended by officers. At the conclusion of the meeting the applicant advised
that they would discuss these concerns with the property owner and seek direction on providing
amended plans.
After a number of follow up calls and emails by Council officers seeking advice on the applicant’s
intention with the application, the applicant advised on 4 March 2020 that they would not be
submitting further information and would like the application decided in its current form.
Given no further details have been provided by the applicant the original report assessing the
application is provided as Attachment 1 for Council’s consideration.
2      Changes to Planning Framework – South East Queensland Koala Conservation
       Strategy 2019 - 2024
The Nature Conservation (Koala) Conservation Plan 2017 was amended by the Nature
Conservation and Other Legislation (Koala Protection) Amendment Regulation 2020 SL No. 9 and
commenced on 7 February 2020. The amendments included changes to the Environmental Offsets
Act 2014, Nature Conservation Act 1992, Planning Regulation 2017 and Vegetation Management
Act 1999. The purpose for these amendments was to bring into effect the South East Queensland
Koala Conservation Strategy 2019-2024 and the associated statutory mapping. The new planning
framework implements new clearing restrictions, prohibiting clearing of koala habitat areas (KHA)
within Koala Priority Areas (KPA). The State Government will assume responsibility for assessing
development proposing clearing of koala habitat areas outside Koala Priority Areas, against a new
State code for Development in South East Queensland Koala Habitat Areas. For developments
that don’t involve clearing of koala habitat but are within Koala Priority Areas, the Local
Government is required to assess the proposal against new assessment benchmarks.
Under the new South East Queensland Koala Conservation Strategy 2019-2024 mapping, the site
is mapped as a koala habitat area. As such, if an application was lodged today, the mapping
requires any new application to avoid, minimise and mitigate interference with koala habitat. Any
significant residual impact would require the proponent to provide environmental offsets in
accordance the Environmental Offsets Act 2014. The assessment benchmarks which would apply

                                                                                    Page 8 of 29

Section 9

GENERAL COMMITTEE MEETING REPORT                                                 16 MARCH 2020


if an application were made under the new framework would also require the proponent to ensure
safe koala movement and avoid fragmentation of koala habitat.
Accordingly given the Planning Act 2016 provides that Council may give weight to amended or
replaced assessment benchmarks after the change application is made but before it is decided,
additional grounds of refusal have been included for Council’s consideration.
3      Conclusion
In the absence of a suitable resolution of issues it is therefore recommended that Council now
decide the application and refuse the application given it’s inconsistency with the planning
requirements for the site.

Departments/Sections Consulted:

    Chief Executive Officer       Community Services                      Corporate Services
    Executive Officer             Director                                Director
    Executive Support             Community Development                   Financial Services
                                  Community Facilities                    ICT
                                  Libraries & Galleries                   Procurement & Fleet
                                  Local Laws                              Property
                                  Waste & Environmental Health            Revenue Services

    Executive Services        X   Environment & Sustainable Development   Infrastructure Services
    Director                  x   Director                                Director
    Community Engagement          Building & Plumbing Services            Asset Management
    Customer Service          x   Development Assessment                  Buildings and Facilities
    Governance                    Economic Development                    Civil Operations
    People and Culture            Environmental Services                  Disaster Management
                                  Strategic Land Use Planning             Infrastructure Planning,
                                                                          Design and Delivery




                                                                                       Page 9 of 29

Section 10

GENERAL COMMITTEE MEETING REPORT                                                    16 MARCH 2020


5     CATEGORY D BUSHFIRE RECOVERY EXCEPTIONAL ASSISTANCE IMMEDIATE
      SUPPORT PACKAGE

Author            Community Services Director/Local Disaster Recovery Coordinator, Kerri
                  Contini
                  Community Services Department

Index             ECM/ Subject/18.15 Recovery

Attachments       1.    Proposed Program of Works – Category D Bushfire Recovery
                        Exceptional Assistance
                  2.    2019 Bushfires – Local Recovery Plan


EXECUTIVE SUMMARY
Not applicable

RECOMMENDATION
That Council note the report by the Community Services Director to the General Committee
Meeting dated 16 March 2020 and approve the Program of Works as detailed in Attachment 1 to
the report to be submitted to the Queensland Reconstruction Authority as a condition of the
Category D Bushfire Recovery Funding.

REPORT
1.    Background
In recognition of the severity, scale, and duration of the 2019-2020 bushfire season,
Commonwealth and State Governments, not-for-profit organisations and industry bodies, have
released a wide range of funding packages to support the recovery of impacted communities.
In January 2020, the Commonwealth Government announced immediate exceptional assistance
payments for highly impacted communities, of which five local governments in Queensland were
included: Noosa, Sunshine Coast, Livingstone, Scenic Rim and Southern Downs. Noosa Council
has received $1,275,000 as part of this funding package.
The Queensland Reconstruction Authority (QRA) is administering the funding under Category D
Exceptional Assistance Funding of the Disaster Recovery Funding Arrangements. The funding
guidelines state that it is to be used for projects and activities that councils deem essential for the
recovery and renewal of their communities, which may include, but not limited to:
(a)   Rebuilding damaged or destroyed council assets such as key local roads, bridges and
      community facilities;
(b)   Employing additional local staff to take on specialist recovery or planning roles to help
      coordinate and plan the rebuilding effort;
(c)   Hosting new public activities and events to bring communities together and attract visitors
      back to affected regions;
(d)   Activities and measures to support local economic recovery; and
(e)   Immediate maintenance and repairs to relief and evacuation centres.
As a condition of the funding, Noosa Council is required to submit a Program of Works to the
Queensland Reconstruction Authority no later than 27 March 2020. The allowable time limit for
expenditure of the $1,275,000 is 30 June 2022.


                                                                                       Page 10 of 29

Section 11

GENERAL COMMITTEE MEETING REPORT                                                      16 MARCH 2020


2.       Program of Works
The Category D Exceptional Assistance funding does not require an application or assessment
process as its purpose is to support each highly impacted local government’s individual recovery
needs. The required Program of Works is therefore a brief overview of the proposed expenses and
forecast budget required.
Nonetheless, Council officers have undertaken a thorough process within the time available to
develop a broad program of works, which will deliver benefits to the impacted and wider Noosa
communities.
Once Council has endorsed the Program of Works, it will be lodged with the QRA. The Program of
Works will be updated as required as the feasibility of each project or activity is determined and in
recognition of the emerging recovery needs of the community and other funding streams becoming
available. The final Program of Works will form the basis of reporting and acquittal of the
$1,275,000 funding.

3.       Stakeholder Engagement
To identify the best use of the funding, Council officers consulted widely with internal officers,
external agencies, impacted residents, community organisations and the wider public. This
included:
        workshops with internal officers to identify and collate recovery needs including infrastructure
         that was damaged as a result of the bushfire, high priority recovery activities and support
         required for specific sectors;
        a survey of residents with over 260 responses received;
        consultation with highly impacted residents;
        a “bushfire roundtable meeting” with key stakeholders, emergency agencies, community
         organisations and Council staff.
The high level of engagement through the consultation process elicited a diverse spectrum of over
400 ideas and suggestions including repairing or constructing physical infrastructure, building
community capacity and undertaking environmental regeneration projects. It was also evident
there is a high degree of concern regarding bushfires and the community’s desire to be better
prepared through hazard management and emergency evacuation procedures.
The survey responses showed the highest levels of support for rebuilding damaged Council assets,
helping prepare the community for future disaster events and supporting environmental recovery.


Supporting groups undertaking wildlife
 rescue and environmental recovery

     Conducting activities and projects to
      support the recovery of the local
                 economy
     Conducting activities and projects to                                        Not important
       bring community together and
                                                                                  Moderately important
             increase resilience
                                                                                  Important
Helping to prepare the community for
        future disaster events

       Rebuilding damaged or destroyed
                Council assets

                                         0.00%   20.00%   40.00%   60.00%    80.00%



                                                                                         Page 11 of 29

Section 12

GENERAL COMMITTEE MEETING REPORT                                                          16 MARCH 2020


4.       Project Selection
Attendees at the Bushfire Roundtable developed criteria to review the numerous suggestions and
create a shortlist of potential projects. Accordingly, it was agreed projects should be prioritised for
funding from the Category D $1,275,000 where it can be demonstrated that they will:
        deliver outcomes included in the Noosa 2019 Bushfires Recovery Plan;
        rebuild or repair bushfire damaged or destroyed Council assets/infrastructure where there is
         a need;
        assist in the operation, management, health and safety of evacuation centres; or
        aid Council to plan and prepare for future disasters including supporting community
         preparedness
In addition, projects should:
     have no identified alternative external funding available;
     normally be considered a Council responsibility;
     have immediate and/or sustainable benefit to the community;
     have minimal to no ongoing maintenance or resourcing required post funding period; and
     be able to be delivered by June 30, 2022.
The shortlist of proposed projects have been further reviewed by Council staff regarding feasibility,
preliminary costing and community benefit. A proposed Program of Works for submission to the
QRA has been finalised within the $1,275,000 funding amount – refer Attachment 1, noting the
format of the table is as provided by QRA.
The Program of Works includes four categories:
    Category                 Description of Projects                                            Allocation
    Infrastructure           Projects that rebuild damaged or destroyed Council                 $410,000
                             infrastructure and build new infrastructure to meet identified
                             community need
    Environment & Hazard     Projects that support the impacted environment and projects        $300,000
    Management               that aid Council in hazard management in preparedness for
                             future disasters
    Community Connection     Projects that help the community recover, prepare the              $350,000
    & Resilience             community for future disasters, build resilience and bring
                             people together
    Contingency              Projects that are emergent and support the recovery and            $225,000
                             renewal of communities
Prioritised project examples have been grouped under these headings and an amount allocated to
each category based on early costings. The specific projects selected to proceed in each category
will depend on further detailed assessment of feasibility and costing, ongoing assessment of
community need and priorities, and whether alternate funding streams become available.

Previous Council Consideration
Nil

Finance
In recognition of the severity, scale, and duration of the 2019-2020 bushfire season, the
Commonwealth Government has provided an immediate support payment of $1,275,000 to
severely affected councils activated under Category D funding of the Disaster Recovery Funding
Arrangements. This funding has already been received by Council from the QRA. It does not
require any matched funding by Council.
The ongoing maintenance and on costs associated with any improvements will need to be
considered in future budgets.
Current resources do not allow the project management to implement the suggested projects. It is
anticipated that ten (10) per cent of the project costs would be required, being approximately
$127,500 which has been factored into the forecast budgets.
                                                                                              Page 12 of 29

Section 13

GENERAL COMMITTEE MEETING REPORT                                                         16 MARCH 2020


Risks & Opportunities
There are no legal implications associated with the consideration of this matter. Staffing
implications cannot be determined until the program of works has been identified.
Governance requirements of the Commonwealth Disaster Recovery Funding Arrangements
includes the public acknowledgements of Commonwealth assistance under the Section 5.2 of the
Commonwealth Guidelines of the Natural Disaster Relief and Recovery Arrangements 2018.
This $1,275,000 funding provides a significant opportunity to support the recovery of the Noosa
community following the 2019 bushfires. It allows Council to remedy physical infrastructure and
environmental damage as well as support the ongoing human social recovery.
As there were approximately 400 ideas put forward for consideration during the consultation
process it is not possible that everyone’s idea will be included in the funded projects. There is
therefore a risk that some residents and key stakeholders may be disappointed with the outcome.

Consultation
External Consultation - Community & Stakeholder
        Press release and social media post seeking input from residents.
        Online survey – over 260 resident responses received to date.
        Letter to directly impacted residents seeking input.
        Bushfire Roundtable meeting held on the 25 February 2020 with key stakeholders and
         community groups which included representatives from Qld Police Service, QFES, Rural Fire
         Brigades, SES, Lions Clubs, Rotary Clubs, wildlife representatives and many more .
Internal Consultation
This report has been developed in consultation with staff across Council including representatives
from the following areas:
                                                          Property and Facilities
     Disaster Management
                                                          Libraries and galleries
     Community Development
                                                          Local Laws
     Community Facilities
                                                          Waste and Environmental Health
     Financial Services
                                                          Economic Development
     Infrastructure Services
                                                          Community Engagement
     Environmental Services


Departments/Sections Consulted:

    x   Chief Executive Officer   x   Community Services                      x   Corporate Services
        Executive Officer         x   Director                                    Director
        Executive Support         x   Community Development                       Financial Services
                                  x   Community Facilities                        ICT
                                  x   Libraries & Galleries                       Procurement & Fleet
                                  x   Local Laws                              x   Property
                                  x   Waste & Environmental Health                Revenue Services

    x   Executive Services        x   Environment & Sustainable Development   x   Infrastructure Services
        Director                  x   Director                                x   Director
    x   Community Engagement      x   Building & Plumbing Services            x   Asset Management
        Customer Service              Development Assessment                  x   Buildings and Facilities
        Governance                x   Economic Development                    x   Civil Operations
        People and Culture        x   Environmental Services                  x   Disaster Management
                                      Strategic Land Use Planning             x   Infrastructure Planning,
                                                                                  Design and Delivery




                                                                                             Page 13 of 29

Section 14

GENERAL COMMITTEE MEETING REPORT   16 MARCH 2020


                                                    Attachment 1




                                    Page 14 of 29

GENERAL COMMITTEE MEETING REPORT                                                                                       16 MARCH 2020

                                                                                                                                                                                                          Attachment 1

                                                          CATEGORY D BUSHFIRE RECOVERY EXCEPTIONAL ASSISTANCE - PROGRAM OF WORKS
                                                                                                                                Contact Details.     name:
                                                                                                                                                     phone no:          Is3296365
                                                                                                                                                     email :

                                                                                              Estimated start     Estimated          Category D         Other fundin                  .             Estimated Total Project
    Priority         Brief Project Description                  Recovery Outcomes                 date         completion date       component            5) geanot 6      Other funding source              Cost
                                                                                               (éd/mm/yy) |      (dd/mm/yy)              (s)             (9) speeate!             foie                        (s)
             Infrastructure - Projects that rebuild  Restored Council infrastructure to pre-         1/04/20           30/06/22] $       410,000.00 | $               -                            $410,000
             bushfire damaged or destroyed Council   disaster state such as park and recreation
             infrastructure and build new infrastructure |equipment, fencing, roads and access
             to meet identified community recove:    tracks
             Environment & Hazard Management -       Regenerated natural environment through         1/04/20           30/06/22] $       300,000.00 | $              -                             $300,000
             Projects that support the impacted      supportive projects such as removal of
             environment and projects that aid Council |dangerous burnt vegetation, control of
             in hazard managementin preparedness     _|post-fire weeds, tree planting, nesting
             for future disasters                    boxes and wildlife rehabilitation
                                                     Improved hazard management planning
             Community Connection & Resilience -     Restored psycho-social state of community       1/04/20           30/06/22] $       350,000.00 | $              -                             $350,000
             Projects that help the community recover, |and improved resilience of community
             prepare the community for future        through projects such as creation of places
             disasters, build resilience and bring people |for community to come together,
             together                                documenting the bushfire story of the
                                                     community, bushfire preparedness
                                                     education and evacuation planning
                                                     particularly for vulnerable communities
  I rl A
             and support the recovery and renewal of |Plan 2019
  ro                                                                                                                                gta cco fg                                                    oss                    |

                                                                                                                           Page 14 of 29

Section 15

GENERAL COMMITTEE MEETING AGENDA   16 MARCH 2020


                                                    Attachment 2




                                    Page 15 of 29

Attachment 2
                                                                                                                                            ee)             NOOSA                           COUNCIL
(Approved)
        About our community                                                                                                   Human and social                                      ©   Resource informing community about Council's fire
        Situated at the northem tip of Queensland’s Sunshine Coast, Noosa Shire covers an area of 871km2 and is home to       *  Evacuation centres established quickly to provide safe management plan as well as the purpose of hazard
        more than 54,000 people. The Traditional Owners and original custodians of the land are the Kabi Kabi/Gubbi Gubbi        refuge.                                                reduction bums outside of fire season has been
       people.                                                                                                                ©  Immediate post-disaster community support provided    Produced and released.
        Noosa Shire has an economy that is diversifying beyond a thriving tourism industry. It is recognised as a UNESCO         to impacted people including assistance with      Building
        Biosphere and has a proud history of preserving its natural environment. Thirty-five per cent of the Shire is protected  emergency hardship Payments. .                     °   An impact assessment to understand damage to
        as either national park, reserve or conservation area.                                                                ©  Follow-up community activities implemented to          properties has been completed.
                      .                                                                                                          monitor mental health implications and provide     ©   The community has been supported with the
    am About the disaster event                                                                                         a        support where required.                                facilitation of the reconstruction of homes where
  ° Pa  In Ser  per ene      mber oe Noose Sue ewe            cee unprecede: bli weather se  mons. which arribures      (3    ©  ~The community kept up-to-date with key information    necessary.
  %     x severe ‘th loc: enue     in .   eh    ese  nity bea    oharth ties, Pu oe     c .  ely sooo uctur wle we      5        during the recovery process.                       e   Animpact assessment to understand damage to
         usinesses,  the local environment and the community. As a result of these impacts, approxima’ people were                       -     a                      .                              ce
  ; oa                                                                                                                          Com                                                                   I                      .
  “w    evacuated from their properties and additional firefighting resources from the surrounding area were deployed to i”          munity resilience and preparedness increased for . community faci ities has oe completed    .
  o     FF   nd to these bushfires.                                                                                      Ww      future disasters.                                      Damage to community facilities has been repaired.
  =                             :                                                                                      a      Economic                                              © = The Queensland Building and Construction
  =     A total of 13,700 hectares was burnt during this period across the Noosa Shire.                                (@)    ©  Impact assessment for businesses und  ken.             Commission Bushfire Rebuild Register has been
   ai   Local Recovery Group                                                                                            29    ©  Support provided for affected businesses.              shared with the community.
   4    Chaired by: Cr Joe Jurisevic  /    7                                                                           Ned    ©  Media campaigns to build on confidence in the      Roads and transport
 ros   Local Recovery Coordinator: Kerri Contini                                                                       =y        tourism sector particularly those businesses that  ©   Impact assessment of the road transport network
  *s)_) Human Social: Alison Hamblin                                                                                    7)       were impacted developed and delivered.                 has been completed.
 cB)    wes sstructure Aen even                                                                                       bi      Environment                                           *   Allroads have been reopened.
 joa    Economic: anthony D                                                                                            >      ©  Environmental impact assessment for flora and fauna
                 -                                                                                                               has been completed.
        Key sta keholders                                                                                                     ¢  Environmental impact assessment for wildlife has
        Noosa Shire Council                                                                                                      been completed.
       Queensland Police Service          .                                                                                   ©  Review of Council’s fire management plan has been
        Queensland Fire and Emergency Services                                                                                  completed.
       Department of Communities, Disability Services and Seniors                                                             ©  Envir    ental waste has been disposed of safely.
        Australian Red Cross
        Lifeline
        @)  All evacuated residents are returned to their homes safely.
        ® Restoration of essential services - Power, water, waste, and telecommunications.                                                                    ere cat
        ® Mental health and community well-being support for community.
  wn    ® Support and assist people to access emergency hardship grants and funding approvals.                         rt
  2     © Utilise community events to engage with the community and provide further mental health support as needed.    =     Human and social         G) ® © ®                           © ©                              ®
 rar    © Maintain community messaging to provide updates during recovery.
  (s)   @ Build community resilience for future disasters (all hazards).                                               He
  )     @)_ Undertake economic impact assessment.                                                                      —              .              ©) © (9)             ()                       (2)                (4)
‘co     ® Support primary producers.                                                                                    w     Economic               ()            (‘9)                                      «
  fe)   @®  Restore and build confidence in the tourism market in effected areas e.g. camping, retreats etc.           ‘=
        (@) Restore and build on confidence in the tourism market for the Noosa Shire.                                 oa
   eS   @ Support small business.                                                                                       >     Environment                          ©                                               «)
   Vv   @®  Empower local businesses to improve their resilience to disasters.                                          —
r3      @) Build on the confidence in the tourism market.                                                               Y
 rs)    ® Undertake environmental impact assessment.                                                                   fe)    Building
  eB)   @®  Establish provisions for environmental rehabilitation in burnt areas.                                       YU
 [aa    @®  Review fire management plans and develop community resilience and awareness.                               2
        @ Undertake impact assessments of damaged properties and infrastructure.                                                                      @)
        ® Restoration of community facilities and networks.                                                                   Roads and transport      (29)
        @)  Undertake impact assessment of road transport network.

                                                                                                                                               Page 15 of 29

Section 16

GENERAL COMMITTEE MEETING AGENDA   16 MARCH 2020




                                    Page 16 of 29

Noosa               Shire           Council

           Peregian Beach Bushfires - September              Cooroibah/Noosa North Shore Bushfires —                         Human and social                                      Building
           2019                                               November 2019                                                  e  Establish community recovery hub for people who    ©  Conduct an impact assessment to understand
                                                                                                                                require support including assistance with emergency   damage to properties.
                                                                                                                                hardshi        its.                                                      i    i    ilitati   i
           ©   Direct impact on residents in the entire Peregian © Residents in the northern area of Cooroibah, Noosa        .  -   fe community outreach for those people who     ° support    ion of hands where necenen
              Beach suburb and   neighbouri   burb i            Banks, Daintree Estate, Forest Links Estat:                                                                                                                 :
             Sunshine coset toh       uring suburd in            vel      an owe Pelacioast, Kurrajong) Noosa North             are not in a position to access recovery centre    ©  Conduct an impact assessment to understand
           +   nde mpac on resents aos Si                        Sore     kiran rive eteen ronson onan                       aera eee                                              eee. ee a                         cies
                      i                :                         Louis B     Dri       ated       imately 6000                                                                                                              ”
           .   aarti num i -220                    \                 a        rive) evacu   approximately                       implications and provide support as required.      e  Share the Queensland Building and Construction
                  o The \ ss, neople .         People        .   Indirect impact on residents across Shire                   e  Keep the community up-to-date with key milestones     Commission Bushfire Rebuild Register with the
                   °                  ”                      o£        tion Centre Numbers                                      during recovery.                                      community to ensure building codes are met.
                                                                     ©  Noosaville Library — 35 people                       ©  Develop a community messaging campaign focusing    ©  Undertake audit of evacuation centre operations
                                                                                -                                               on building resilience for future disasters from an all and improve capabili
                                                                     ©  Noosa Leisure Centre — 350   le                                                                                     Pri     pability
           *   Power outage to Peregian Beach commercial                The)   ilo     seooke   Peop                            hazards approach.
                istri                                                °       —110  peop                                                       o.                     oe
           .  rood oss to retail and hospitality businesses          ©  Cooroy Library — 20 people                           *  Support the resiisnce of the community 2           Roads and transport
                                   }Osp'              a              ©  Christian Outreach Church — 90 people                   pngerstanding and responding to increasing threatOf . Conduct an impact assessment of the road
                                                                     ©  Girraween Sports Complex — 2 people                         res.        :      Se                             transport network.
           *   Local wildlife’  ed                           ©   Power outage to Cooroibah (232 properties), Ringtail        *  Support community organisations in their recovery  *  Reopen roads that were closed during the events.
                    wialite impact -                             Creek (39 properties) and Tewantin (3 houses).                 efforts.
           ©   366 hectares burnt in Peregian area.
                                                                                                                             Economic
                                           |                 ©   Noosa North Shore ferry operations impacted.          wn    . work    oye mares igencies and collect impact
           ©   One house destroyed, low level infrastructure ©   Cancellation of bookings to North Shore              ae,              r rural reside properties.       ;
              damage to several properties e.g. fence            accommodation and hospitality                         ‘     *° =6Work closely with State agencies and collect impact
              destruction.                                                       “          co                         oO       data for primary producer properties.
                                                             ©   Closure of Tewantin commercial district for 24 hours. Par                  “       ~        ~               .
                                                                                                                             ©  Develop media campaigns to build on confidence in
                                                                                                                       -        the tourism sector particularly businesses that were
                  ,                                                                                                             impacted.
           *   David Low Way closed.                         *   Local wildlife impacted.                              Y
                                                             ©   1,100 hectares burnt in Cooroibah.                    Oo    Environment
                                                                                                                       12)
                                                                                                                       ro    °  Conduct an environmental impact assessment for
                                                                        .                          -                  ac        flora and fauna.
                                                             *   Power disconnected to the pump stations on                  ©  Conduct an environmental impact assessment for
                                                                Lakeway Drive Cooroibah.                                       wildlife.
                                                             *   One house destroyed, two unapproved dwellings               ©  Conduct a review of Council’s fire management plan.
                                                                 destroyed and four sheds impacted.                          ©  Create a resource that informs community on what
                                                                                                                                Council’s fire management plan entails as well as the
                                                                                                                                purpose of hazard reduction burns outside of fire
                                                             @   McKinnon Drive closed north from Butler Street.                season.
                                                                                                                             ©  Disposal of environmental waste.

                                                                                                                                        Page 16 of 29

Section 17

GENERAL COMMITTEE MEETING AGENDA                                                               16 MARCH 2020


6      FINANCIAL PERFORMANCE REPORT - FEBRUARY 2020

Author                Manager Financial Services, Trent Grauf
                      Corporate Services Department

Index                 ECM/ Subject/ 22.09 – Monthly Financial Performance Report

Attachments           1.      Statement of Income and Expenditure (Profit & Loss and Capital)
                      2.      Statement of Financial Position
                      3.      Statement of Cash Flows

EXECUTIVE SUMMARY
Year to date (YTD) operating performance against current budget as at 29 February 2020 is
positive, with operating revenue continuing to track above budget and operating expenditure below
budget. The YTD operating position, both budget and actual, is high reflecting the recognition of
revenue associated with rates and charges levied in January. This position will continue to degrade
over the next four months as services funded by rates and charges are delivered.

 YTD Financial Performance Summary
                              Budget                     Actual        Variance     Variance
                                                                                                  Status
                                 $m                         $m               $m            %
 Operating Revenue             $88.5                      $89.4             $0.9        1.1%     On Track
 Operating Expense             $64.3                      $62.8             $1.6        2.4%     On Track
 Operating Position            $24.2                      $26.7             $2.5      10.4%
 Capital Revenue                $3.7                       $6.2             $2.5      68.8%    Above Budget
 Capital Expenditure*          $16.8                      $13.8             $3.0      17.9%    Below Budget
* Reflects constructed assets and intangibles only (excludes contributed)


Financial statements including Statement of Income & Expenditure, Statement of Financial
Position (balance sheet), and Statement of Cash Flows are included as attachments for information
for Council.

Figure 1: Actual Performance Compared to Budget

    $100
                                       $89.4        YTD Budget ($m)
                           $88.5
     $90
                                                    YTD Actual ($m)
     $80
                                                                            $64.3
     $70                                                                            $62.8
     $60
     $50
     $40
     $30
     $20
     $10
      $-
                       Operating Revenue                              Operating Expenditure

YTD performance against Council’s key measures of financial sustainability have been calculated
as at February 2020. These indicators enable the reader to assess Council’s success in managing
its budget, cash and debt as well as undertaking sustainable asset management.

                                                                                                 Page 17 of 29

Section 18

GENERAL COMMITTEE MEETING AGENDA                                                           16 MARCH 2020


The table below contains a snapshot of a number of key measures, with full detail included in the
report.

 YTD Measures of Financial Sustainability
                                   Target          Target         Current         Actual          Status
                                   Value            Date          Budget           YTD
 Operating Surplus Ratio           0-10%         30 June 2020       0.0%          29.8%          On Track
 Net Financial Liabilities Ratio   <60%            Ongoing         -9.4%          -45.9%       Above Target
 Cash Cover Ratio                  3 months        Ongoing       6.6 months    11.9 months     Above Target
 Asset Sustainability Ratio        > 90%         30 June 2020      108%           47.1%          On Track


RECOMMENDATION
That Council note the report by the Manager Financial Services to the General Committee Meeting
dated 16 March 2020 outlining February 2020 year to date financial performance against budget,
including key financial sustainability indicators.

REPORT
Operating Revenue (YTD Benchmark 66.7%)
Council has received 90% ($89.4 million) of its operating revenue budget ($99.9 million).
Commentary on each revenue category is provided below.

 Category              Summary                      Comments
 Rates and Levies      $69.3 million (101%) of         General rates $138k above YTD budget (100% or
                       the annual budget of             $51.1 million of $51.0 million budget earned)
                       $68.7 million has been          Waste utility charges $329k above YTD budget
                       earned                           (103% or $13.1 million of $12.8 million budget
                                                        earned)
 Fees and              $4.9 million (74%) of the       Plumbing application fees $108k above YTD
 Charges               $6.7 million annual              budget (84% or $818k of $971k budget earned)
                       budget has been earned          Cemetery fees $64k above YTD budget (95% or
                                                        $217k of $229k budget earned)
                                                       Community land use permits $43k above YTD
                                                        budget (85% or $348k of $410k budget earned)
                                                       Building application fees $45k below YTD budget
                                                        (61% or $442k of $730k budget spent)
                                                       Development related fees $68k below YTD budget
                                                        (62% or $1.0 million of $1.6 million budget earned)
                                                        – reduced performance from January report due to
                                                        withdrawal of major development application
 Sale of Goods         $6.4 million (63%) of the       Noosa Leisure Centre $51k above YTD budget
 and Services          $10.1 million budget has         (73% or $422k of $575k budget earned)
                       been received                   Waste management disposal fees and recyclable
                                                        sales $159k below YTD budget (62% or $2.7
                                                        million of $4.3 million budget earned)
                                                       Holiday Park sales $81k below YTD budget (61%
                                                        or $1.9 million of $3.1 million budget earned) – 1
                                                        month delay in planned opening of North Shore
                                                        Campground offset by lower expenditure
                                                       Noosa Aquatic Centre admission and other
                                                        revenue $22k below YTD budget (63% or $951k of
                                                        $1.5 million budget earned)

                                                                                            Page 18 of 29

Section 19

GENERAL COMMITTEE MEETING AGENDA                                                                               16 MARCH 2020


 Category              Summary                               Comments
 Interest              $1.1 million (78%) of the                   Interest on overdue rates and charges $86k above
 Received              $1.4 million annual                          YTD budget (82% or $326k of $400k budget
                       budget has been earned                       earned)
                                                                   Investment revenue $67k above YTD budget (76%
                                                                    or $769k of $1.0 million budget earned)
                                                                   Recent downward movements in interest rates will
                                                                    be monitored for any negative impact on the
                                                                    overall interest revenue budget
 Rental and Lease      $1.7 million (77%) of the                   On track
 / Other Revenue       $2.3 million budget has
                       been earned
 Operating             $3.1 million (62%) of the                   50% or $1.1 million of the financial assistance
 Grants,               $5.0 million budget has                      grant was again prepaid in June 2019 and may
 Subsidies             been received                                impact on Council’s 2019/20 final operating
                                                                    position if the prepayment approach is
                                                                    discontinued by the Australian government
                                                                   All other operating grants are in line with budget
                                                                    forecasts at this stage
 Unitywater            On track                                    Unitywater distributions are fixed each year so
 Distributions                                                      little budget variance risk

Figure 2: Operating Revenue Position by Type (Excluding Rates)

  $7.0                                      $6.5 $6.4

  $6.0
                                                                            YTD Budget ($m)
         $4.8 $4.9
  $5.0                                                                      YTD Actual ($m)

  $4.0
                                                                                    $3.0 $3.1   $2.9 $2.9
  $3.0

  $2.0                               $1.1
                       $0.9                             $0.9 $0.9
  $1.0                                                                 $0.7 $0.8


  $0.0
                                             Goods &




                                                         Income




                                                                           Other
             Charges




                                                                                       Grants




                                                                                                  Unitywater
                                             Services
                                             Sales of




                                                          Rental
                          Interest
             Fees &




                                                                                                   Share of




Operating Expenditure (YTD Benchmark 66.7%)
Actual operating expenditure is currently 63% ($62.8 million) of full year budget ($99.8 million).
Detailed commentary for each expenditure category is provided below.
 Category              Summary                                     Comments
 Employee Costs        $21.0 million (63%) of the                      Under expenditure for permanent staff salaries
                       annual budget of $33.5                           and wages ($2.0 million) partially offset by
                       million has been expended                        additional spend on casual staff and external
                                                                        labour hire ($741k)
                                                                       Employee overtime and allowances $316k
                                                                        above YTD budget (100% or $956k of $953k
                                                                        budget spent) in part due to recent fire events
                                                                       Staff training $34k below budget (32% or
                                                                        $107k of $337k budget spent)

                                                                                                                Page 19 of 29

Section 20

GENERAL COMMITTEE MEETING AGENDA                                                  16 MARCH 2020


Category         Summary                       Comments
Materials and    $28.1 million (61%) of the         Waste Management materials and services
Services         $45.9 million annual budget         $361k below YTD budget (61% or $6.5 million
                 has been expended.                  of $10.6 million budget spent) primarily due to
                                                     landfill and collection contract under
                                                     expenditure
                                                    Canals and Waterways $121k below YTD
                                                     budget (20% or $34k of $166k budget spent) –
                                                     timing of contracted canal dredging works
                                                    Community Properties $118k below YTD
                                                     budget (34% or $150k of $444k budget spent)
                                                     – timing of maintenance and utility charges
                                                    Library services $135k below YTD budget
                                                     (48% or $512k of $1.1 million budget spent) –
                                                     timing of library collection purchases and
                                                     programs
                                                    Parks & Gardens operations and maintenance
                                                     programs $94k below YTD budget (59% or
                                                     $2.6 million of $4.3 million budget spent) –
                                                     arborist work and park maintenance pending
                                                     wet weather events
                                                    Holiday Parks $78k below YTD budget (59% or
                                                     $816k of $1.4 million budget spent) – delay in
                                                     planned opening of North Shore Campground
                                                     offset by lower revenue
                                                    Public Amenity materials and services $65k
                                                     below YTD budget (57% or $282k of $495k
                                                     budget spent)
                                                    Disaster Management $100k above YTD
                                                     budget (419% or $100k of $27k budget spent)
                                                     –traffic control and other contract costs
                                                     associated with fire events. QRA grant claim
                                                     has been submitted to partially recover costs.
                                                    Hasting Street Maintenance Levy $255k above
                                                     YTD budget (212% or $478k of $225k budget
                                                     spent) – tree lighting replacement program to
                                                     be funded from reserve in BR3
                                                    Development assessment legal appeals costs
                                                     $249k above YTD budget (73% or $727k of
                                                     $1.0 million budget spent)
Finance Costs    On track                      Nil
Depreciation     On track                      Nil
Other Expenses   On track                      Nil




                                                                                     Page 20 of 29

Section 21

GENERAL COMMITTEE MEETING AGENDA                                                                                                                            16 MARCH 2020


Figure 3: Operating Expenditure Position by Type

$35.0
                                                  $29.1 $28.1                                       YTD Budget ($m)
$30.0
                                                                                                    YTD Actual ($m)
$25.0      $21.6 $21.0
$20.0

$15.0                                                                                                $12.5 $12.5

$10.0

 $5.0
                                                                    $1.0 $1.0                                                                $0.1 $0.1
 $0.0
                                                      Materials




                                                                             Finance Costs




                                                                                                         Depreciation
               Employees




                                                                                                                                                    Other
Capital Revenue
YTD capital revenue of $6.2 million received comprises cash contributions from developers ($1.5
million) and capital grants ($4.5 million). Included in capital revenue is an unbudgeted grant for
bushfire disaster recovery ($1.3 million) and an early milestone grant payment for Orealla Bridge
($1.4 million).

Note that the timing of capital grant receipts are generally dependent on the timing of grant
conditions and also capital delivery performance, and that the timing of the receipt of developer
contributions (both cash and contributed) is unpredictable.

Figure 4: Capital Revenue by Type

 $5.0                                                                                        $4.5
 $4.5
                                                                                                         YTD Budget ($m)
 $4.0
                                                                                                         YTD Actual ($m)
 $3.5
 $3.0
 $2.5                                                             $2.2
 $2.0                                      $1.5
                  $1.4
 $1.5
 $1.0
 $0.5                                                                                                                   $0.1                 $0.1
 $0.0
                           Contributions




                                                                         Subsidies




                                                                                                                               Contributed
                                                                          Grants /




                                                                                                                                 Assets
                              Cash




Capital Program
Actual capital expenditure (excluding contractual commitments) is $13.8 million (YTD budget $16.8
million). Detailed discussion of progress in the delivery of the capital works program is provided
through a separate report by the Asset Planning Manager however recent wet weather has
impacted on capital delivery.


                                                                                                                                                             Page 21 of 29

Section 22

GENERAL COMMITTEE MEETING AGENDA                                                         16 MARCH 2020


Figure 5: Capital Program Delivery Performance

$16.0
                   $14.1                                      YTD Budget ($m)
$14.0
                                $12.1
                                                              YTD Actual ($m)
$12.0

$10.0

 $8.0

 $6.0

 $4.0                                                      $2.7
                                                                         $1.7
 $2.0

 $0.0
                     Capital works                           Other capital




Cash Management and Investment Performance
Total cash on hand at the end of February was $79 million, including funds held in trust and for
restricted purposes (e.g. unexpended levy and grant funds), the prepaid financial assistance grant,
January rate levy funds received as well as any other unspent monies committed for funding capital
projects which are underway and will continue during the financial year.

The following pie charts present the mix of cash held at February 2020 by agency (graph on the
left) and by credit risk rating (graph on the right). All funds have been invested in accordance with
the Investment Policy and in consideration of the principles of ethical investment, preservation of
capital, return on investment and counterparty thresholds.

Figure 6: Closing Cash Held by Agency and Credit Rating


                     Bendigo                                                    A3
                       3%                                                    (Bendigo)
             CBA
                                                                  A1 +          3%
             11%
                                                              (CBA + NAB +
                                                                Wpac)…




                                                                                          A1 +
                                     QTC                                                 (QTC)
                                     87%                                                  87%




The following chart monitors the 12-month trend on total cash and the agencies invested.
Payments received in February from bi-annual rates generated a significant increase in cash,
which was has been invested in short term QTC deposits in line with Council’s Investment Policy.




                                                                                            Page 22 of 29

Section 23

GENERAL COMMITTEE MEETING AGENDA                                                                                  16 MARCH 2020


Figure 7: 12 Month Trend of Cash Invested by Agency
 90,000,000


 80,000,000


 70,000,000


 60,000,000


 50,000,000


 40,000,000


 30,000,000


 20,000,000


 10,000,000


         -
             Mar-19   Apr-19   May-19   Jun-19   Jul-19   Aug-19    Sep-19   Oct-19   Nov-19   Dec-19    Jan-20    Feb-20


              Bendigo TD         Westpac TD        NAB TD          Suncorp TD         CBA TD       QTC        CBA Operating



Measures of Financial Sustainability
The following table incorporates a set of financial sustainability indicators to further assist in
managing Council financial performance. There are no current material emerging risks regarding
performance to date for the financial year.

 Category                                                                                Comments
 Operating Surplus Ratio                                                                      Intent: Identifies the extent to
                                                                                               which revenues cover
                                                                                               operational expenses, to ensure
                                                                                               community equity is not
                                                                                               degraded
                                                                                              Target: 0 – 10%
                                                                                              Target Date: 30 June
                                                                                              Result: 29.8%
                                                                                              Comment: The ratio will decline
                                                                                               from February to June as the
                                                                                               January rates is expended on
                                                                                               delivery of Council services.




                                                                                                                    Page 23 of 29

Section 24

GENERAL COMMITTEE MEETING AGENDA                   16 MARCH 2020


Category                           Comments
Cash Expense Cover                    Intent: Indicates how long
                                       council can continue paying its
                                       day-to-day expenses from cash
                                       at bank without needing
                                       additional cash flows
                                      Target: > 3 months
                                      Target Date: Ongoing
                                      Result: 11.9 months
                                      Comment: Council is forecast
                                       to remain above target for the
                                       financial year and remain
                                       fiscally flexible to accommodate
                                       unforeseen events. Peaks will
                                       occur following rating periods

Asset Sustainability Ratio            Intent: Measures the extent to
                                       which assets are being replaced
                                       as their condition degrades to
                                       ensure service potential is
                                       maintained
                                      Target: 90% of depreciation
                                       budget spent on renewals
                                       annually
                                      Target Date: 30 June
                                      Result: In line with budget
                                      Comment: The actual result will
                                       progressively increase each
                                       month as expenditure on
                                       renewal projects occurs.
Net Financial Liabilities Ratio       Intent: Outlines the level that
                                       net Council debt can be
                                       serviced by operating revenues.
                                       A ratio below zero implies that
                                       liabilities are less than cash
                                       (and other current assets) and
                                       there is adequate borrowing
                                       capacity available if needed.
                                      Target: less than 60%
                                      Target Date: Ongoing
                                      Result: (45.9%)
                                      Comment: Council has low
                                       debt levels and strong cash
                                       holdings reflected in the YTD
                                       result.




                                                      Page 24 of 29

Section 25

GENERAL COMMITTEE MEETING AGENDA                                                 16 MARCH 2020


 Category                                                        Comments
 Investment Return                                                  Intent: Ensure appropriate
                                                                     return on investment yield for
                                                                     cash at bank.
                                                                    Target: 0.25% above current
                                                                     Bloomberg commonwealth 10
                                                                     year bond rate yield (February =
                                                                     0.97%)
                                                                    Target Date: Ongoing
                                                                    Result: 1.47%
                                                                    Comment: Regardless of the
                                                                     steady decline in long term
                                                                     bond rates (due to international
                                                                     market factors), Council’s
                                                                     investment return still remains
                                                                     above target
 Rates in Arrears                                                   Intent: Ensuring that the
                                                                     amount of unpaid rates remains
                                                                     sustainable and does not
                                                                     negatively impact cash flows
                                                                    Target: 5% industry benchmark
                                                                    Target Date: Ongoing
                                                                    Result: 10.3%
                                                                    Comment: Arrears have again
                                                                     peaked as per trend following
                                                                     the expiry of the due date for
                                                                     January rates. Debt recovery
                                                                     measures are continuing.




Previous Council Consideration
Nil.

Finance
As above.

Risks & Opportunities
Council’s risk register includes a number of risks that could impact on ongoing financial
sustainability. Effective budget management and reporting is an important risk mitigation tool.

Consultation
External Consultation - Community & Stakeholder
Nil.

Internal Consultation
All areas of Council are consulted as part of the regular monitoring of budget performance.




                                                                                    Page 25 of 29

Section 26

GENERAL COMMITTEE MEETING AGENDA                                                       16 MARCH 2020


Departments/Sections Consulted:

 X   Chief Executive Officer   X   Community Services                      X   Corporate Services
     Executive Officer             Director                                X   Director
     Executive Support             Community Development                   X   Financial Services
                                   Community Facilities                        ICT
                                   Libraries & Galleries                       Procurement & Fleet
                                   Local Laws                                  Property
                                   Waste & Environmental Health                Revenue Services

 X   Executive Services        X   Environment & Sustainable Development   X   Infrastructure Services
     Director                      Director                                    Director
     Community Engagement          Building & Plumbing Services                Asset Management
     Customer Service              Development Assessment                      Buildings and Facilities
     Governance                    Economic Development                        Civil Operations
     People and Culture            Environmental Services                      Disaster Management
                                   Strategic Land Use Planning                 Infrastructure Planning,
                                                                               Design and Delivery




                                                                                          Page 26 of 29

Section 27

GENERAL COMMITTEE MEETING AGENDA   16 MARCH 2020


                                     Attachment 1




                                    Page 27 of 29

GENERAL COMMITTEE MEETING AGENDA                                                                           16 MARCH 2020

                                                                                                                 Attachment 1

  Profit and Loss Statement

  Revenue
     Recurrent Revenue
     Rates, levies and charges                            68,702          68,702          69,257             555        101%
     Fees and charges                                       6,642           4,792           4,941            149        74%
     Interest received                                      1,410            943            1,096            153        78%
     Sale of Goods and major services                      10,127           6,546           6,350           (196)       63%
     Sale of contract and recoverable works                   23                -               1              4         4%
     Rental & lease income                                  1,296            924             912             (12)       70%
     Other income                                            985            689                              150        85%
     Grants, subsidies, contributions and donations         4,999           2,969           3,102            133        62%
     Unitywater Distributions                               5,650           2,938          2,938                -       52%
                                                          99,833          88,502          89,435            933         90%
  Expenses
     Recurrent Expenses
    Employee benefits                                     33,517           21,625         20,964            (661)       63%
     Materials and services                                45,863         29,059          28,096            (963)       61%
     Finance costs                                          1,528           1,019           1,044             25        68%
    Depreciation                                           18,713          12,476          12,504             28        67%
    Other expenses                                            188             148            146              (1)       78%
                                                          99,809          64,326          62,754           (1,571)      63%
OperatingResuit                                                              TE           2668                0B
  Summary of Capital Revenue and Expenditure
  Capital Funding
     Capital cash contributions and infrastructure charges 2,134            1,351           1,523            172        71%
     Contributed assets                                    2,000              118            118                -        6%
     Capital grants and subsidies                           5,281           2,185           4,526           2,341       86%
     Cash / revenue                                        27,337          17,126          13,122          (4,004)      48%
     New loan borrowings                                        -               -               -               -        0%
     Other capital revenue                                      -               -               -               -        0%
 TotalCapitalRevenue                                      3675S           20,780          19,200           AA)
  Capital Expenditure
     Contributed assets                                    2,000              118            118                -        6%
     Capital works - constructed assets                   26,091           14,066          12,104          (1,962)      46%
     Capital works - other capital                          4,781           2,716           1,671          (1,044)      35%
     Loan repayments                                       3,880            3,880           3,950            70         102%
     Other capital expenses                                     -               -           1,445           1,445        0%
Total Capital Expenditure                                 36,753          20,780          198,200          AT)

                                                                                                                Page 27 of 29

Section 28

GENERAL COMMITTEE MEETING AGENDA   16 MARCH 2020


                                     Attachment 2




                                    Page 28 of 29

GENERAL COMMITTEE MEETING AGENDA                                                                     16 MARCH 2020

                                                                                                         Attachment 2

 Current Assets
       Cash and cash equivalents                                    43,942                 78,966                 55,981
       Trade and other receivables                                   9,290                 12,898                  6,666
       Inventories                                                     198                  204                     198
       Other current assets                                          2,466                  3,265                  4,541
                                                                    55,897                95,333                  67,386
       Non Current Assets held for sale                                   -                     -                      -
 Total Current Assets                                               55,897                 95,333                 67,386
 Non Current Assets
       Trade and other receivables                                  49.718                 49,718                49,718
       Other non current Assets                                           -                     -                      -
       Investments                                                  60,978                60,978                  60,978
       Investment property                                           3,300                 3,300                   3,300
      Property, plant and equipment                                916,382               885,272                885,912
       Intangible assets                                            7,170                   6,489                  5,953
 Total Non Current Assets                             4,037,548
5	1	1	1	18	6	1635	1509	44	48	54	~~
5	1	1	1	18	7	1514	1515	633	37	0	+4;~005,7562~—CS~S~*«é«~C:«SSi«CH
5	1	1	1	18	8	2175	1509	48	48	54	TS
4	1	1	1	19	0	290	1595	1932	47	-1	
5	1	1	1	19	1	275	1591	216	63	71	TotalAssets
5	1	1	1	19	2	1220	1591	80	63	10	TT
5	1	1	1	19	3	1330	1591	153	63	0	1093,445
5	1	1	1	19	4	1661	1591	185	63	35	107,089
5	1	1	1	19	5	2065	1591	159	63	29	1,073,247.
4	1	1	1	20	0	295	1688	265	25	-1	
5	1	1	1	20	1	295	1688	114	25	96	Current
5	1	1	1	20	2	418	1688	142	25	96	Liabilities
4	1	1	1	21	0	371	1716	1841	49	-1	
5	1	1	1	21	1	371	1716	87	49	96	Trade
5	1	1	1	21	2	461	1716	58	49	95	and
5	1	1	1	21	3	518	1716	83	49	95	other
5	1	1	1	21	4	608	1716	132	49	96	payables
5	1	1	1	21	5	1383	1716	96	49	95	5,078
5	1	1	1	21	6	1747	1716	99	49	72	11,822
5	1	1	1	21	7	2133	1730	79	29	81	9,594
4	1	1	1	22	0	369	1758	1843	48	-1	
5	1	1	1	22	1	369	1758	172	48	95	Borrowings
5	1	1	1	22	2	1400	1758	76	48	75	2,414
5	1	1	1	22	3	1825	1771	18	25	96	3
5	1	1	1	22	4	2134	1771	78	29	94	3,112
4	1	1	1	23	0	366	1797	1846	48	-1	
5	1	1	1	23	1	366	1797	164	48	96	Provisions
5	1	1	1	23	2	1399	1797	80	48	92	4,630
5	1	1	1	23	3	1763	1797	74	48	92	3,251
5	1	1	1	23	4	2132	1810	80	29	77	4,918
4	1	1	1	24	0	369	1838	1843	48	-1	
5	1	1	1	24	1	369	1838	92	48	96	Other
5	1	1	1	24	2	1400	1838	76	48	88	2,778
5	1	1	1	24	3	1765	1838	76	48	80	1,755
5	1	1	1	24	4	2133	1851	79	30	94	2,768
4	1	1	1	25	0	294	1882	1928	37	-1	
5	1	1	1	25	1	294	1890	75	25	96	Total
5	1	1	1	25	2	378	1890	114	25	96	Current
5	1	1	1	25	3	501	1890	142	25	96	Liabilities
5	1	1	1	25	4	1151	1882	338	37	0	44900
5	1	1	1	25	5	1575	1877	44	48	40	~~
5	1	1	1	25	6	1514	1882	708	37	0	~3)—~<S83200—~<“«*‘i(COt;é*‘:«‘«‘;*‘«
5	1	1	1	25	7	2139	1877	24	48	35	YC
4	1	1	1	26	0	296	1976	333	25	-1	
5	1	1	1	26	1	296	1976	59	25	96	Non
5	1	1	1	26	2	364	1976	115	25	96	Current
5	1	1	1	26	3	487	1976	142	25	96	Liabilities
4	1	1	1	27	0	380	2017	1833	30	-1	
5	1	1	1	27	1	380	2017	83	25	96	Trade
5	1	1	1	27	2	471	2018	53	24	96	and
5	1	1	1	27	3	532	2018	74	24	96	other
5	1	1	1	27	4	613	2017	125	30	96	payables
5	1	1	1	27	5	1467	2030	12	4	92	-
5	1	1	1	27	6	1831	2030	12	4	92	-
5	1	1	1	27	7	2201	2030	12	4	92	-
4	1	1	1	28	0	369	2045	1843	48	-1	
5	1	1	1	28	1	369	2045	172	48	96	Borrowings
5	1	1	1	28	2	1384	2045	95	48	95	19,555
5	1	1	1	28	3	1745	2045	96	48	95	21,120
5	1	1	1	28	4	2115	2058	97	30	95	21,120
4	1	1	1	29	0	366	2087	1847	48	-1	
5	1	1	1	29	1	366	2087	164	48	96	Provisions
5	1	1	1	29	2	1384	2087	95	48	96	12,054
5	1	1	1	29	3	1747	2087	95	48	85	11,523
5	1	1	1	29	4	2117	2100	96	29	95	11,523
4	1	1	1	30	0	294	2128	1919	48	-1	
5	1	1	1	30	1	294	2141	75	25	96	Total
5	1	1	1	30	2	379	2141	59	25	96	Non
5	1	1	1	30	3	447	2141	115	25	96	Current
5	1	1	1	30	4	570	2141	143	25	96	Liabilities
5	1	1	1	30	5	1382	2128	96	48	96	31,608
5	1	1	1	30	6	1745	2128	100	48	96	32,643
5	1	1	1	30	7	2115	2141	98	29	95	32,643
4	1	1	1	31	0	290	2216	1932	46	-1	
5	1	1	1	31	1	270	2212	99	62	76	Total
5	1	1	1	31	2	373	2212	177	62	28	Liabilities:
5	1	1	1	31	3	1381	2212	120	62	30	565080
5	1	1	1	31	4	1701	2212	172	62	31	9S
5	1	1	1	31	5	2094	2212	115	62	43	55,035
4	1	1	1	32	0	290	2297	1932	48	-1	
5	1	1	1	32	1	270	2293	422	64	74	NetCommunityAssets
5	1	1	1	32	2	1320	2293	166	64	42	0,046,937
5	1	1	1	32	3	1672	2293	182	64	52	1,050,614
5	1	1	1	32	4	2040	2293	177	64	63	1,020,212
4	1	1	1	33	0	295	2390	275	30	-1	
5	1	1	1	33	1	295	2390	173	30	96	Community
5	1	1	1	33	2	475	2390	95	30	96	Equity
4	1	1	1	34	0	380	2418	1833	48	-1	
5	1	1	1	34	1	380	2432	81	24	96	Asset
5	1	1	1	34	2	469	2431	164	25	96	Revaluation
5	1	1	1	34	3	643	2431	107	30	96	Surplus
5	1	1	1	34	4	1382	2418	96	48	96	68,337
5	1	1	1	34	5	1733	2418	108	48	94	50,809
5	1	1	1	34	6	2115	2431	98	30	94	50,809
4	1	1	1	35	0	382	2473	1831	30	-1	
5	1	1	1	35	1	382	2473	125	25	96	Retained
5	1	1	1	35	2	515	2473	309	30	92	Surplus
5	1	1	1	35	3	618	2460	24	48	92	/
5	1	1	1	35	4	642	2473	180	30	92	(Defeciency)
5	1	1	1	35	5	1467	2486	12	4	91	-
5	1	1	1	35	6	1831	2486	12	4	92	-
5	1	1	1	35	7	2201	2486	12	4	92	-
4	1	1	1	36	0	380	2499	1832	49	-1	
5	1	1	1	36	1	380	2514	75	25	96	Shire
5	1	1	1	36	2	463	2514	98	30	96	Capital
5	1	1	1	36	3	1364	2499	119	49	96	978,600
5	1	1	1	36	4	1716	2499	124	48	96	969,402
5	1	1	1	36	5	2098	2512	114	29	96	951,918
4	1	1	1	37	0	381	2540	1832	48	-1	
5	1	1	1	37	1	369	2540	116	48	93	Current
5	1	1	1	37	2	494	2540	71	48	96	Year
5	1	1	1	37	3	569	2553	50	25	93	Net
5	1	1	1	37	4	626	2553	125	30	91	Eamings
5	1	1	1	37	5	1467	2566	12	4	92	-
5	1	1	1	37	6	1745	2540	96	48	95	31,403
5	1	1	1	37	7	2117	2553	96	30	93	17,485
4	1	1	1	38	0	290	2587	1932	48	-1	
5	1	1	1	38	1	280	2583	433	64	38	TotalCommunityEquity
5	1	1	1	38	2	1320	2583	166	64	24	0,046,937
5	1	1	1	38	3	1672	2583	182	64	51	1,050,614
5	1	1	1	38	4	2040	2583	177	64	58	1,020,212
4	1	1	1	39	0	1954	3316	289	44	-1	
5	1	1	1	39	1	1954	3316	105	44	96	Page
5	1	1	1	39	2	2074	3316	49	35	96	28
5	1	1	1	39	3	2138	3316	43	35	96	of
5	1	1	1	39	4	2194	3316	49	35	96	29

Section 29

GENERAL COMMITTEE MEETING AGENDA   16 MARCH 2020


                                     Attachment 3




                                    Page 29 of 29

GENERAL COMMITTEE MEETING AGENDA                                                               16 MARCH 2020

                                                                                                       Attachment 3

Cash flows from operating activities
     Cash Flows from Operating Activities
     Receipts from Customers                                             85,969             78,921            92,597
     Payments to Suppliers and Employees                                 (84,340)          (52,394)           (78,821)
                                                                           1,629           26,527              13,776
     Investment and Interest Revenue Received                             4,010              2,292             4,763
     Rental Income                                                         1,290              912               1,281
     Non Capital Grants and Contributions                                 4976               3,102             5,447
     Income Tax Equivalent Received                                        1,200             1,096              1,754
     Income from Equity Investments                                        1,850             646                1,487
     Payments:
     Borrowing Costs                                                          -                  -                 -
     Interest Expense                                                     (1,282)              (85)             (133)
    ‘Net Cash Inflow/(Outfiow) from Operating Activities =               13,673,          34,489              28,375
Cash Flows from Investing Activities

    Proceeds of Sale of Property, Plant and Equipment                        10               38                 383
     Grants, Subsidies, Contributions and Donations                       7415               6,049             5,140
     Payments:
     Payments of Property, Plant and Equipment                          (28,809)           (12,665)           (24,848)
     Payments for Intangible Assets                                       (2,063)           (1,101)            (1,347)
     Net Movement in Loans and Advances                                       -               125               (625)
    ‘Net Cash Inflow/(Outflow) from Investing Activities =             (23,447)             (7.554)          (21,297)
Cash Flows from Financing Activities

     Proceeds from Borrowings                                                 -                  -                 -
     Payments:
     Repayment of Borrowings                                              (2,264)           (3,950)           (15,290)
    ‘Net Cash Inflow/(Outfiow) from Financing Activities = =             (2,264)           (3,950)           (15,290)
    ‘Net Increase/(Decrease) in Cash and Cash Equivalentsheld =         (12,038)          22,9850             (8,212)
     Cash and Cash Equivalents at the beginning of the reporting period  55,981            55,981             64,193
    ‘Cash and Cash Equivalents at the end of the reporting period =     43,943             78,966            55,981

                                                                                                      Page 29 of 29

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.