GENERAL NOTES
1. ALL WORKMANSHIP SHALL BE CARRIED OUT TO THE BEST TRADE
STANDARDS AND MATERIAL FIXED IN ACCORDANCE WITH SPECIFIED
DETAIL AND MANUFACTURER'S RECOMMENDATIONS.
2. THE FOLLOWING DOCUMENTS FORM PART OF THE DOCUMENTATION
NOOSA DRIVE
FOR THIS PROJECT:
A.S. 1684.2 TIMBER FRAMED CONSTRUCTION CODE
No 15
3. THE ABOVE DOCUMENTS SHOULD BE KEPT ON SITE DURING
CONSTRUCTION ALONG WITH THE COPY OF THE LOCAL APPROVED
PLANS AND SPECIFICATIONS. CONSTRUCTION MUST NOT VARY FROM
THE ABOVE DOCUMENTATION WITHOUT WRITTEN APPROVAL FROM
THE OWNER AND THE LOCAL AUTHORITY.
ROAD
4. FIGURED DIMENSIONS TAKE PRECEDENCE OVER SCALING OFF
PLAN. DO NOT SCALE. ANY DISCREPANCIES FOUND BUT THE BUILDER
/ OWNER SHOULD BE BROUGHT TO THE ATTENTION OT THE DESIGNER
PRIOR TO CONSTRUCTION OR FABRICATION OF ANY ITEM.
5. RETAIN ALL EXISTING VEGETATION AND MATURE TREES WHERE
POSSIBLE.
6. STRUCTURE SHALL NOT EXCEED 7.9m ABOVE NATURAL GROUND.
7. CHECK ALL DIMENSIONS OF WORKS ON SITE PRIOR TO
COMMENCEMENT OF CONSTRUCTION OR FABRICATION OF ANY ITEM.
LOCATION PLAN REFER DISCREPANCIES TO DESIGNER BEFORE CONSTRUCTION OR
FABRICATION.
8. COMPLY WITH THE BUILDING CODE OF AUSTRALIA (BCA), RELEVANT
5 EXTENT OF PROPOSED AUSTRALIAN STANDARDS AND LOCAL COUNCIL BUILDING CODES.
RP91777 NEW 90/90/90 FIRE WALL
SHOWN DOTTED BCA NOTES
CLASSIFICATION: CLASS 6 - SHOP
90° 00' 00" ADJACENT SHOP RISE IN STOREYS: ONE
CONSTRUCTION REQ'D: TYPE C
0 FRL TO WALLS : 0m TO 1.5m=90/90/90 1.5m TO 3m=60/60/60 >3m=NIL
30.900 m BUP103167 FRL TO ROOFS: NIL
3000
MIN
333 00 m
11.
STORMWATER DRAINAGE NOTES
°4
2
6' 2
NO
1. DP - 90mm DIA DOWNPIPES TO STORMWATER PIPES 100mm MIN
COVER. 1 IN 100 MIN FALL.
5"
180° 00' 00"
OSA
10.047 m
2. ONE DOWNPIPE PER 12m OF GUTTER. REDUCE BY 1m FOR EACH
BEND IN GUTTER.
DRI
3. STORMWATER PIPES SHALL BE CONNECTED TO KERB AND
CHANNEL TO LOCAL AUTHORITY REQUIREMENTS.
VE
270° 00' 00"
FIRE WALL NOTES
26.000 m
FRL90/90/90 200mm CORE FILLED BLOCK WALLS ON
REINFORCED CONCRETE FOOTING ALL TO ENGINEER'S
DETAILS IS THE RECOMMENDED FIRE WALL SYSTEM.
ROAD NORTH
DETAILS ON ALTERNATIVE LIGHT-WEIGHT FRL90/90/90 WALL
SYSTEMS HAVE BEEN PROVIDED AS A PRICING
ALTERNATIVE. HOWEVER, THESE WALL SYSTEMS MUST BE
APPROVED BY THE CERTIFIER FOR USE IN THIS SITUATION
C:\Users\Paul Hindes\Dropbox\Projects\1109 Golden Breed\J1109 Golden Breed.rvt
PRIOR TO FINALISING CONTRACTS OR COMMENCING
SITE PLAN CONSTRUCTION.
1 1 : 200
REV DATE DESCRIPTION SPECIFICATION NOTES DRAWING TITLE
A 24-1-15 ISSUED FOR COMMENTS 1. FIGURED DIMENSIONS TO BE TAKEN IN PREFERENCE TO SCALED READINGS
2. ALL DIMENSIONS TO BE CHECKED AND VERIFIED ON SITE BEFORE
PROPOSED SHOP ADDITIONS TEL: (07) 5455 3651 SITE PLAN
A3
COMMENCING FABRICATION
[email protected]
3. ALL CONSTRUCTION TO COMPLY WITH THE BUILDING CODE OF AUSTRALIA,
RELEVANT S.A.A STANDARDS AND LOCAL AUTHORITY REQUIREMENTS WWW.SOULSPACE.COM.AU
DRAWN PROJECT No PLOT DATE SCALE
4. WATER CLOSET DOORS OPENING INWARDS TO BE FITTED WITH LIFT OFF LOT6 on N21827 Paul Hindes
24/02/2015 As
HINGES TO ALLOW THE DOOR TO BE REMOVED WHEN CLOSED. QBSA Lic 1160074 ‐ ABN 81600841459 1109 5:16:40 PM indicated
5. REFER ANY ERRORS TO THE DESIGNER BEFORE COMMENCEMENT OF 15 NOOSA DRIVE, NOOSA HEADS 23 PALUMA ST SUNRISE BEACH QLD 4567 DRAWING No REVISION
CONSTRUCTION
6. THIS DRAWING IS COPYRIGHT AND MUST NOT BE RETAINED, COPIED OR
USED WITHOUT THE CONSENT OF THE AUTHOR.
FOR CAMMERAY INVESTMENTS PTY LTD Exclusive Residential and Commercial Designs by Paul Hindes WD01 A
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 7 pages
Page 2
NEW 90/90/90 FIRE WALL TO 600mm
ABOVE ROOF FRAMING
A
WD05 ADJACENT SHOP RENDER & PAINT TO ACCESSIBLE AREAS OF
THE NEW EXTERIOR WALLS
NEW DOWNPIPE FROM BOX NEW DOWNPIPE FROM BOX
GUTTER OVER. CONNECT TO GUTTER OVER. CONNECT TO
STREET OUTLET STREET OUTLET
DP DP
1750 200 NEW 90/90/90 FIRE WALL TO 600mm
ABOVE ROOF FRAMING
SHOP
MI
2990
REMOVE EXISTING STUD WALL & DOOR
N
30
AND REPLACE WITH 90/90/90 FIRE WALL TO RL. 9.651
SH
00
U/S ROOF SHEETING. NEW FIRE DOOR REMOVE EXISTING STUD
IE
WALLS AND REPLACE WITH
LD
90/90/90 FIRE WALL TO U/S
IN
G
ROOF SHEETING
REMOVE EXISTING TIMBER
DECKING AND REPLACE WITH
NEW "MOD-WOOD" OR EQUAL SHOP STORE
DECKING. REPLACE DAMAGED RL. 9.630
NO
SUBSTRATE TIMBERS AS
REQUIRED. ENSURE FINISHED
OSA
DECK IS LEVEL & SMOOTH
DRI
SHOP OFFICE
RL. 10.000
VE
REMOVE STORAGE SHED
DOTTED
ROAD
NORTH
FLOOR PLAN
1
C:\Users\Paul Hindes\Dropbox\Projects\1109 Golden Breed\J1109 Golden Breed.rvt
1 : 100
REV DATE DESCRIPTION SPECIFICATION NOTES DRAWING TITLE
A 24-1-15 ISSUED FOR COMMENTS 1. FIGURED DIMENSIONS TO BE TAKEN IN PREFERENCE TO SCALED READINGS
2. ALL DIMENSIONS TO BE CHECKED AND VERIFIED ON SITE BEFORE
PROPOSED SHOP ADDITIONS TEL: (07) 5455 3651 GROUND FLOOR PLAN
A3
COMMENCING FABRICATION
[email protected]
3. ALL CONSTRUCTION TO COMPLY WITH THE BUILDING CODE OF AUSTRALIA,
RELEVANT S.A.A STANDARDS AND LOCAL AUTHORITY REQUIREMENTS WWW.SOULSPACE.COM.AU
DRAWN PROJECT No PLOT DATE SCALE
4. WATER CLOSET DOORS OPENING INWARDS TO BE FITTED WITH LIFT OFF LOT6 on N21827 Paul Hindes
24/02/2015
HINGES TO ALLOW THE DOOR TO BE REMOVED WHEN CLOSED. QBSA Lic 1160074 ‐ ABN 81600841459 1109 5:16:40 PM 1 : 100
5. REFER ANY ERRORS TO THE DESIGNER BEFORE COMMENCEMENT OF 15 NOOSA DRIVE, NOOSA HEADS 23 PALUMA ST SUNRISE BEACH QLD 4567 DRAWING No REVISION
CONSTRUCTION
6. THIS DRAWING IS COPYRIGHT AND MUST NOT BE RETAINED, COPIED OR
USED WITHOUT THE CONSENT OF THE AUTHOR.
FOR CAMMERAY INVESTMENTS PTY LTD Exclusive Residential and Commercial Designs by Paul Hindes WD02 A
Page 3
REMOVE EXISTING ROOF FRAMING AND
TEMPORARY ROOFING AND REPLACE
WITH NEW ROOF FRAMING TO ENG'S
A DETAILS. EXTEND EXISTING ROOF
WD05 ADJACENT SHOP SHEETING OVER AREA SHOWN TONED
NEW ZINCALUME BOX GUTTER OPEN AT
EACH END TO HYD ENG'S DETAILS
200
NEW FIRE WALL PARAPET ABOVE BOX GUTTER
150mm DIA 150mm DIA DP
APPROX
1350
DP
AWNING
BUILDING BELOW
EXISTING ROOFING
DOTTED
5.25°
NO
OSA
DRI
VE
AWNING
ROAD
NORTH
ROOF PLAN
1
C:\Users\Paul Hindes\Dropbox\Projects\1109 Golden Breed\J1109 Golden Breed.rvt
1 : 100
REV DATE DESCRIPTION SPECIFICATION NOTES DRAWING TITLE
A 24-1-15 ISSUED FOR COMMENTS 1. FIGURED DIMENSIONS TO BE TAKEN IN PREFERENCE TO SCALED READINGS
2. ALL DIMENSIONS TO BE CHECKED AND VERIFIED ON SITE BEFORE
PROPOSED SHOP ADDITIONS TEL: (07) 5455 3651 ROOF PLAN
A3
COMMENCING FABRICATION
[email protected]
3. ALL CONSTRUCTION TO COMPLY WITH THE BUILDING CODE OF AUSTRALIA,
RELEVANT S.A.A STANDARDS AND LOCAL AUTHORITY REQUIREMENTS WWW.SOULSPACE.COM.AU
DRAWN PROJECT No PLOT DATE SCALE
4. WATER CLOSET DOORS OPENING INWARDS TO BE FITTED WITH LIFT OFF LOT6 on N21827 Paul Hindes
24/02/2015
HINGES TO ALLOW THE DOOR TO BE REMOVED WHEN CLOSED. QBSA Lic 1160074 ‐ ABN 81600841459 1109 5:16:40 PM 1 : 100
5. REFER ANY ERRORS TO THE DESIGNER BEFORE COMMENCEMENT OF 15 NOOSA DRIVE, NOOSA HEADS 23 PALUMA ST SUNRISE BEACH QLD 4567 DRAWING No REVISION
CONSTRUCTION
6. THIS DRAWING IS COPYRIGHT AND MUST NOT BE RETAINED, COPIED OR
USED WITHOUT THE CONSENT OF THE AUTHOR.
FOR CAMMERAY INVESTMENTS PTY LTD Exclusive Residential and Commercial Designs by Paul Hindes WD03 A
Page 4
EXTEND EXISTING ROOF
ROOF
PARAPET WALL ALONG EXTENSION PARAPET WALL ALONG
LINE OF BOX GUTTER LINE OF BOX GUTTER
CLG CLG
BOUNDARY
RL 12.400 RL 12.400
REMOVE EXISTING WALL AND
REPLACE WITH NEW 90/90/90 FIRE REMOVE EXISTING / PART EXISTING
WALL TO U/S OF ROOF SHEETING WALLS AND REPLACE WITH NEW
OR AS PARAPET 90/90/90 FIRE WALL TO U/S OF ROOF
SHEETING OR AS PARAPET
DP FLOOR DP FLOOR
RL 10.000 RL 10.000
FOOTINGS TO ENG'S DETAILS
NEW FIRE RATED DOOR
NEW FOOTINGS TO ENG'S
DETAILS
West Eelvation East Elevation
4 1 : 100
1 1 : 100
REMOVE PART EXISTING WALLS AND
REPLACE WITH NEW 90/90/90 FIRE WALL
TO U/S OF ROOF SHEETING
PARAPET WALL ALONG
LINE OF BOX GUTTER
REMOVE EXISTING / PART EXISTING
WALLS AND REPLACE WITH NEW
90/90/90 FIRE WALL TO U/S OF ROOF
SHEETING OR AS PARAPET
DP
NEW FOOTINGS TO ENG'S DETAILS
North Elevation
2 1 : 100
REMOVE SHED DOTTED
CLG
RL 12.400
FLOOR
RL 10.000
C:\Users\Paul Hindes\Dropbox\Projects\1109 Golden Breed\J1109 Golden Breed.rvt
South Elevation
3 1 : 100
REV DATE DESCRIPTION SPECIFICATION NOTES DRAWING TITLE
A 24-1-15 ISSUED FOR COMMENTS 1. FIGURED DIMENSIONS TO BE TAKEN IN PREFERENCE TO SCALED READINGS
2. ALL DIMENSIONS TO BE CHECKED AND VERIFIED ON SITE BEFORE
PROPOSED SHOP ADDITIONS TEL: (07) 5455 3651 ELEVATIONS
A3
COMMENCING FABRICATION
[email protected]
3. ALL CONSTRUCTION TO COMPLY WITH THE BUILDING CODE OF AUSTRALIA,
RELEVANT S.A.A STANDARDS AND LOCAL AUTHORITY REQUIREMENTS WWW.SOULSPACE.COM.AU
DRAWN PROJECT No PLOT DATE SCALE
4. WATER CLOSET DOORS OPENING INWARDS TO BE FITTED WITH LIFT OFF LOT6 on N21827 Paul Hindes
24/02/2015
HINGES TO ALLOW THE DOOR TO BE REMOVED WHEN CLOSED. QBSA Lic 1160074 ‐ ABN 81600841459 1109 5:16:41 PM 1 : 100
5. REFER ANY ERRORS TO THE DESIGNER BEFORE COMMENCEMENT OF 15 NOOSA DRIVE, NOOSA HEADS 23 PALUMA ST SUNRISE BEACH QLD 4567 DRAWING No REVISION
CONSTRUCTION
6. THIS DRAWING IS COPYRIGHT AND MUST NOT BE RETAINED, COPIED OR
USED WITHOUT THE CONSENT OF THE AUTHOR.
FOR CAMMERAY INVESTMENTS PTY LTD Exclusive Residential and Commercial Designs by Paul Hindes WD04 A
Page 5
NEW 90/90/90 FIRE RATED
BOUNDARY
WALL
BOX GUTTER DESIGNED BY
HYDRAULIC ENGINEER
EXTENDED ROOF SHEETING
NEW TIMBER ROOF FRAMING TO
ENG'S DETAILS
6OO
CLG
RL 12.400
CONFIRM ON SITE
CONFIRM ON SITE
2900
3200
ADJACENT SHOP SHOP
SHOP
FLOOR
RL 10.000
R.CONC FOOTING TO
ENG'S DETAILS
SECTION A
A 1 : 50
C:\Users\Paul Hindes\Dropbox\Projects\1109 Golden Breed\J1109 Golden Breed.rvt
REV DATE DESCRIPTION SPECIFICATION NOTES DRAWING TITLE
A 24-1-15 ISSUED FOR COMMENTS 1. FIGURED DIMENSIONS TO BE TAKEN IN PREFERENCE TO SCALED READINGS
2. ALL DIMENSIONS TO BE CHECKED AND VERIFIED ON SITE BEFORE
PROPOSED SHOP ADDITIONS TEL: (07) 5455 3651 SECTIONS
A3
COMMENCING FABRICATION
[email protected]
3. ALL CONSTRUCTION TO COMPLY WITH THE BUILDING CODE OF AUSTRALIA,
RELEVANT S.A.A STANDARDS AND LOCAL AUTHORITY REQUIREMENTS WWW.SOULSPACE.COM.AU
DRAWN PROJECT No PLOT DATE SCALE
4. WATER CLOSET DOORS OPENING INWARDS TO BE FITTED WITH LIFT OFF LOT6 on N21827 Paul Hindes
24/02/2015
HINGES TO ALLOW THE DOOR TO BE REMOVED WHEN CLOSED. QBSA Lic 1160074 ‐ ABN 81600841459 1109 5:16:42 PM 1 : 50
5. REFER ANY ERRORS TO THE DESIGNER BEFORE COMMENCEMENT OF 15 NOOSA DRIVE, NOOSA HEADS 23 PALUMA ST SUNRISE BEACH QLD 4567 DRAWING No REVISION
CONSTRUCTION
6. THIS DRAWING IS COPYRIGHT AND MUST NOT BE RETAINED, COPIED OR
USED WITHOUT THE CONSENT OF THE AUTHOR.
FOR CAMMERAY INVESTMENTS PTY LTD Exclusive Residential and Commercial Designs by Paul Hindes WD05 A
Page 6
ALTERNATIVE 90/90/90 TIMBER STUD WALL DETAIL ALTERNATIVE 90/90/90 TIMBER STUD WALLDETAIL - BORAL OUTRWALL
01 REFER: http://wespine.com.au/downloads/mrtfc/external-90-90-90-fire-rated-plywood-faced-wall-system.pdf
NOTE: EXTERIOR CLADDING MUST BE FIXED TO STUD WALLS ON BOUNDARY PRIOR TO STANDING UP WALL IN FINAL LOCATION.
03 REFER: http://www.boral.com.au/brochures/ordering/html_version/outrwall/outrwall_4.htm
NOTE: EXTERIOR CLADDING MUST BE FIXED TO STUD WALLS ON BOUNDARY PRIOR TO STANDING UP WALL IN FINAL LOCATION.
NOTE ALSO THE NAIL LAMINATED DOUBLE WALL STUDS
FIRE WALL NOTES
FRL90/90/90 200mm CORE FILLED BLOCK WALLS ON REINFORCED
CONCRETE FOOTING ALL TO ENGINEER'S DETAILS IS THE
RECOMMENDED FIRE WALL SYSTEM.
DETAILS ON ALTERNATIVE LIGHT-WEIGHT FRL90/90/90 WALL
SYSTEMS HAVE BEEN PROVIDED AS A PRICING ALTERNATIVE.
HOWEVER, THESE WALL SYSTEMS MUST BE APPROVED BY THE
CERTIFIER FOR USE IN THIS SITUATION PRIOR TO FINALISING
ALTERNATIVE 90/90/90 TIMBER STUD WALL DETAIL - JAMES HARDIE SCYON CONTRACTS OR COMMENCING CONSTRUCTION.
02
C:\Users\Paul Hindes\Dropbox\Projects\1109 Golden Breed\J1109 Golden Breed.rvt
REFER: http://www.scyon.com.au/uploads/assets/file/FireRatedWallsDES.pdf
NOTE: EXTERIOR CLADDING MUST BE FIXED TO STUD WALLS ON BOUNDARY PRIOR TO STANDING UP WALL IN FINAL LOCATION.
REV DATE DESCRIPTION SPECIFICATION NOTES DRAWING TITLE
A 24-1-15 ISSUED FOR COMMENTS 1. FIGURED DIMENSIONS TO BE TAKEN IN PREFERENCE TO SCALED READINGS
2. ALL DIMENSIONS TO BE CHECKED AND VERIFIED ON SITE BEFORE
PROPOSED SHOP ADDITIONS TEL: (07) 5455 3651 ALTERNATIVE FIRE WALL
A3
COMMENCING FABRICATION
[email protected] SYSTEMS
3. ALL CONSTRUCTION TO COMPLY WITH THE BUILDING CODE OF AUSTRALIA,
RELEVANT S.A.A STANDARDS AND LOCAL AUTHORITY REQUIREMENTS WWW.SOULSPACE.COM.AU
DRAWN PROJECT No PLOT DATE SCALE
4. WATER CLOSET DOORS OPENING INWARDS TO BE FITTED WITH LIFT OFF LOT6 on N21827 Paul Hindes
24/02/2015
HINGES TO ALLOW THE DOOR TO BE REMOVED WHEN CLOSED. QBSA Lic 1160074 ‐ ABN 81600841459 1109 5:16:42 PM 1:1
5. REFER ANY ERRORS TO THE DESIGNER BEFORE COMMENCEMENT OF 15 NOOSA DRIVE, NOOSA HEADS 23 PALUMA ST SUNRISE BEACH QLD 4567 DRAWING No REVISION
CONSTRUCTION
6. THIS DRAWING IS COPYRIGHT AND MUST NOT BE RETAINED, COPIED OR
USED WITHOUT THE CONSENT OF THE AUTHOR.
FOR CAMMERAY INVESTMENTS PTY LTD Exclusive Residential and Commercial Designs by Paul Hindes WD06 A
Page 7
ADJACENT SHOP
SHOP
RL. 9.651
SHOP STORE
RL. 9.630
NO
OSA
DRI
SHOP OFFICE
RL. 10.000
VE
ROAD
NORTH
EXISTING FLOOR PLAN
C:\Users\Paul Hindes\Dropbox\Projects\1109 Golden Breed\J1109 Golden Breed.rvt
1 1 : 100
REV DATE DESCRIPTION SPECIFICATION NOTES DRAWING TITLE
A 24-1-15 ISSUED FOR COMMENTS 1. FIGURED DIMENSIONS TO BE TAKEN IN PREFERENCE TO SCALED READINGS
2. ALL DIMENSIONS TO BE CHECKED AND VERIFIED ON SITE BEFORE
PROPOSED SHOP ADDITIONS TEL: (07) 5455 3651 EXISTING FLOOR PLAN
A3
COMMENCING FABRICATION
[email protected]
3. ALL CONSTRUCTION TO COMPLY WITH THE BUILDING CODE OF AUSTRALIA,
RELEVANT S.A.A STANDARDS AND LOCAL AUTHORITY REQUIREMENTS WWW.SOULSPACE.COM.AU
DRAWN PROJECT No PLOT DATE SCALE
4. WATER CLOSET DOORS OPENING INWARDS TO BE FITTED WITH LIFT OFF LOT6 on N21827 Paul Hindes
24/02/2015
HINGES TO ALLOW THE DOOR TO BE REMOVED WHEN CLOSED. QBSA Lic 1160074 ‐ ABN 81600841459 1109 5:16:43 PM 1 : 100
5. REFER ANY ERRORS TO THE DESIGNER BEFORE COMMENCEMENT OF 15 NOOSA DRIVE, NOOSA HEADS 23 PALUMA ST SUNRISE BEACH QLD 4567 DRAWING No REVISION
CONSTRUCTION
6. THIS DRAWING IS COPYRIGHT AND MUST NOT BE RETAINED, COPIED OR
USED WITHOUT THE CONSENT OF THE AUTHOR.
FOR CAMMERAY INVESTMENTS PTY LTD Exclusive Residential and Commercial Designs by Paul Hindes WD07 A
Page 8
2. FALLING OBJECTS 5. MANUAL TASKS 7. CONFINED SPACES
WHS Report Notes
1. FALLS, SLIPS, TRIPS LOOSE MATERIALS OR SMALL OBJECTS Components within this design with a mass in excess of 25kg should be lifted EXCAVATION
Construction, maintenance or demolition work on or around this building is by two or more workers or by mechanical lifting device. Where this is not Construction of this building and some maintenance on the building will require
a) WORKING AT HEIGHTS likely to involve persons working above ground level or above floor levels. practical, suppliers or fabricators should be required to limit the component excavation and installation of items within excavations. Where practical,
Where this occurs one or more of the following measures should be taken to mass. installation should be carried out using methods which do not require workers to
DURING CONSTRUCTION avoid objects falling from the area where the work is being carried out onto All material packaging, building and maintenance components should clearly enter the excavation. Where this is not practical, adequate support for the
Wherever possible, components for this building should be prefabricated off- persons below. show the total mass of packages and where practical all items should be stored excavated area should be provided to prevent collapse. Warning signs and
site or at ground level to minimise the risk of workers falling more than two 1. Prevent or restrict access to areas below where the work is on site in a way which minimises bending before lifting. Advice should be barriers to prevent accidental or unauthorised access to all excavations should
metres. However, construction of this building will require workers to be being carried out. provided on safe lifting methods in all areas where lifting may occur. be provided.
working at heights where a fall in excess of two metres is possible and injury 2. Provide toeboards to scaffolding or work platforms. Construction, maintenance and demolition of this building will require the use of ENCLOSED SPACES
is likely to result from such a fall. The builder should provide a suitable barrier 3. Provide protective structure below the work area. portable tools and equipment. These should be fully maintained in accordance Enclosed spaces within this building may present a risk to persons entering for
wherever a person is required to work in a situation where falling more than 4. Ensure that all persons below the work area have Personal with manufacturer’s specifications and not used where faulty or (in the case of construction, maintenance or any other purpose. The design documentation
two metres is a possibility. Protective Equipment. electrical equipment) not carrying a current electrical safety tag. All safety calls for warning signs and barriers to unauthorised access. These should be
guards or devices should be regularly checked and Personal Protective maintained throughout the life of the building. Where workers are required to
DURING OPERATION OR MAINTENANCE BUILDING COMPONENTS Equipment should be used in accordance with manufacturer’s specification. enter enclosed spaces, air testing equipment and Personal Protective
During construction, renovation or demolition of this building, parts of the Equipment should be provided.
Cleaning and maintenance of windows, walls, roof or other components of this structure including fabricated steelwork, heavy panels and many other 6. HAZARDOUS SUBSTANCES
building will require persons to be situated where a fall from a height in excess components will remain standing prior to or after supporting parts are in place.
of two metres is possible. Where this type of activity is required, scaffolding, Contractors should ensure that temporary bracing or other required support is ASBESTOS 8. PUBLIC ACCESS
ladders or trestles should be used in accordance with relevant codes of in place at all times when collapse which may injure persons in the area is a This building may have been constructed prior to 1990 and therefore may Public access to construction and demolition sites and to areas under
practice, regulations or legislation. possibility. contain asbestos either in cladding material or in fire retardant insulation maintenance causes risk to workers and public. Warning signs and secure
Mechanical lifting of materials and components during construction, material. The builder should check and, if necessary, take appropriate action barriers to unauthorised access should be provided. Where electrical
b) SLIPPERY OR UNEVEN SURFACES maintenance or demolition presents a risk of falling objects. Contractors before demolishing, cutting, sanding, drilling or otherwise disturbing the existing installations, excavations, plant or loose materials are present they should be
should ensure that appropriate lifting devices are used, that loads are properly structure. secured when not fully supervised.
FLOOR FINISHES secured and that access to areas below the load is prevented or restricted. POWDERED MATERIALS
Many materials used in the construction of this building can cause harm if 9. OPERATIONAL USE OF BUILDING
The owner is responsible for the selection of surface finishes in the pedestrian inhaled in powdered form. Persons working on or in the building during
trafficable areas of this building. Surfaces should be selected in accordance 3. TRAFFIC MANAGEMENT construction, operational maintenance or demolition should ensure good This building has been designed to requirements of the classification identified
with AS HB 197:1999 and AS/NZ 4586:2004. ventilation and wear Personal Protective Equipment including protection against on the drawings. The specific use of the building is not known at the time of the
Parking of vehicles or loading/unloading of vehicles on this roadway may inhalation while using powdered material or when sanding, drilling, cutting or design and a further assessment of the workplace health and safety issues
STEPS, LOOSE OBJECTS AND UNEVEN SURFACES cause a traffic hazard. During construction, maintenance or demolition of this otherwise disturbing or creating powdered material. should be undertaken at the time of fit-out for the end-user.
Due to design restrictions for this building, steps and/or ramps are included in building designated parking for workers and loading areas should be provided. TREATED TIMBER
the building which may be a hazard to workers carrying objects or otherwise Trained traffic management personnel should be responsible for the The design of this building includes provision for the inclusion of treated timber 10. OTHER HIGH RISK ACTIVITY
occupied. Steps should be clearly marked with both visual and tactile warning supervision of these areas. within the structure. Dust or fumes from this material can be harmful. Persons All electrical work should be carried out in accordance with Code of Practice:
during construction, maintenance, demolition and at all times when the building working on or in the building during construction, operational maintenance or Managing Electrical Risks at the Workplace, AS/NZ 3012 and all licensing
operates as a workplace. Construction of this building will require loading and unloading of materials on demolition should ensure good ventilation and wear Personal Protective requirements.
Building owners and occupiers should monitor the pedestrian access ways the roadway. Deliveries should be well planned to avoid congestion of loading Equipment including protection against inhalation of harmful material when All work using Plant should be carried out in accordance with Code of Practice:
and in particular access to areas where maintenance is routinely carried out areas and trained traffic management personnel should be used to supervise sanding, drilling, cutting or using treated timber in any way that may cause Managing Risks of Plant at the Workplace.
to ensure that surfaces have not moved or cracked so that they become loading/unloading areas. harmful material to be released. Do not burn treated timber. All work should be carried out in accordance with Code of Practice: Managing
uneven and present a trip hazard. Spills, loose material, stray objects or any VOLATILE ORGANIC COMPOUNDS Noise and Preventing Hearing Loss at Work.
other matter that may cause a slip or trip hazard should be cleaned or Busy construction and demolition sites present a risk of collision where Many types of glue, solvents, spray packs, paints, varnishes and some cleaning Due to the history of serious incidents it is recommended that particular care be
removed from access ways. deliveries and other traffic are moving within the site. A traffic management materials and disinfectants have dangerous emissions. Areas where these are exercised when undertaking work involving steel construction and concrete
Contractors should be required to maintain a tidy work site during construction, plan supervised by trained traffic management personnel should be adopted used should be kept well ventilated while the material is being used and for a placement. All the above applies.
maintenance or demolition to reduce the risk of trips and falls in the workplace. for the work site. period after installation. Personal Protective Equipment may also be required.
Materials for construction or maintenance should be stored in designated The manufacturer’s recommendations for use must be carefully considered at
areas away from access ways and work areas. 4. SERVICES all times.
SYNTHETIC MINERAL FIBRE
Rupture of services during excavation or other activity creates a variety of Fibreglass, rockwool, ceramic and other material used for thermal or sound
risks including release of hazardous material. Existing services are located on insulation may contain synthetic mineral fibre which may be harmful if inhaled or
or around this site. Where known, these are identified on the plans but the if it comes in contact with the skin, eyes or other sensitive parts or the body.
exact location and extent of services may vary from that indicated. Services Personal Protective Equipment including protection against inhalation of
should be located using an appropriate service (such as Dial Before You Dig), harmful material should be used when installing, removing or working near bulk
appropriate excavation practice should be used and, where necessary, insulation material.
specialist contractors should be used. TIMBER FLOORS
This building contains timber floors which have an applied finish. Areas where
finishes are applied should be kept well ventilated during sanding and
Overhead power lines are near or on this site. These pose a risk of application and for a period after installation. Personal Protective Equipment
electrocution if struck or approached by lifting devices or other plant and may also be required. The manufacturer’s recommendations for use must be
persons working above ground level. Where there is a danger of this carefully considered at all times.
occurring, power lines should be, where practical, disconnected or relocated.
Where this is not practical adequate warning in the form of bright coloured
tape or signage should be used or a protective barrier provided.
C:\Users\Paul Hindes\Dropbox\Projects\1109 Golden Breed\J1109 Golden Breed.rvt
REV DATE DESCRIPTION SPECIFICATION NOTES DRAWING TITLE
A 24-1-15 ISSUED FOR COMMENTS 1. FIGURED DIMENSIONS TO BE TAKEN IN PREFERENCE TO SCALED READINGS
2. ALL DIMENSIONS TO BE CHECKED AND VERIFIED ON SITE BEFORE
PROPOSED SHOP ADDITIONS TEL: (07) 5455 3651 SAFE DESIGN REPORT
A3
COMMENCING FABRICATION
[email protected]
3. ALL CONSTRUCTION TO COMPLY WITH THE BUILDING CODE OF AUSTRALIA,
RELEVANT S.A.A STANDARDS AND LOCAL AUTHORITY REQUIREMENTS WWW.SOULSPACE.COM.AU
DRAWN PROJECT No PLOT DATE SCALE
4. WATER CLOSET DOORS OPENING INWARDS TO BE FITTED WITH LIFT OFF LOT6 on N21827 Paul Hindes
24/02/2015
HINGES TO ALLOW THE DOOR TO BE REMOVED WHEN CLOSED. QBSA Lic 1160074 ‐ ABN 81600841459 1109 5:16:43 PM 1 : 200
5. REFER ANY ERRORS TO THE DESIGNER BEFORE COMMENCEMENT OF 15 NOOSA DRIVE, NOOSA HEADS 23 PALUMA ST SUNRISE BEACH QLD 4567 DRAWING No REVISION
CONSTRUCTION
6. THIS DRAWING IS COPYRIGHT AND MUST NOT BE RETAINED, COPIED OR
USED WITHOUT THE CONSENT OF THE AUTHOR.
FOR CAMMERAY INVESTMENTS PTY LTD Exclusive Residential and Commercial Designs by Paul Hindes WD08 A