Skip to the record
The gold standard in government transparency.

Original source · versioned page text

Soul space plans fire

Attached to the e-mail MCU14/0053 - 15 Noosa Drive - Response to noosa Council information request.

of 8

Page text shows just the words. Original shows the document exactly as it was published.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                                                                                                                                                                                       2. FALLING OBJECTS                                                                 5. MANUAL TASKS                                                                           7. CONFINED SPACES
                                                                                                     WHS Report Notes
                                                                                                     1. FALLS, SLIPS, TRIPS                                                                            LOOSE MATERIALS OR SMALL OBJECTS                                                   Components within this design with a mass in excess of 25kg should be lifted              EXCAVATION
                                                                                                                                                                                                       Construction, maintenance or demolition work on or around this building is         by two or more workers or by mechanical lifting device. Where this is not                 Construction of this building and some maintenance on the building will require
                                                                                                     a) WORKING AT HEIGHTS                                                                             likely to involve persons working above ground level or above floor levels.        practical, suppliers or fabricators should be required to limit the component             excavation and installation of items within excavations. Where practical,
                                                                                                                                                                                                       Where this occurs one or more of the following measures should be taken to         mass.                                                                                     installation should be carried out using methods which do not require workers to
                                                                                                     DURING CONSTRUCTION                                                                               avoid objects falling from the area where the work is being carried out onto       All material packaging, building and maintenance components should clearly                enter the excavation. Where this is not practical, adequate support for the
                                                                                                     Wherever possible, components for this building should be prefabricated off-                      persons below.                                                                     show the total mass of packages and where practical all items should be stored            excavated area should be provided to prevent collapse. Warning signs and
                                                                                                     site or at ground level to minimise the risk of workers falling more than two                     1.             Prevent or restrict access to areas below where the work is         on site in a way which minimises bending before lifting. Advice should be                 barriers to prevent accidental or unauthorised access to all excavations should
                                                                                                     metres. However, construction of this building will require workers to be                         being carried out.                                                                 provided on safe lifting methods in all areas where lifting may occur.                    be provided.
                                                                                                     working at heights where a fall in excess of two metres is possible and injury                    2.             Provide toeboards to scaffolding or work platforms.                 Construction, maintenance and demolition of this building will require the use of         ENCLOSED SPACES
                                                                                                     is likely to result from such a fall. The builder should provide a suitable barrier               3.             Provide protective structure below the work area.                   portable tools and equipment. These should be fully maintained in accordance              Enclosed spaces within this building may present a risk to persons entering for
                                                                                                     wherever a person is required to work in a situation where falling more than                      4.             Ensure that all persons below the work area have Personal           with manufacturer’s specifications and not used where faulty or (in the case of           construction, maintenance or any other purpose. The design documentation
                                                                                                     two metres is a possibility.                                                                      Protective Equipment.                                                              electrical equipment) not carrying a current electrical safety tag. All safety            calls for warning signs and barriers to unauthorised access. These should be
                                                                                                                                                                                                                                                                                          guards or devices should be regularly checked and Personal Protective                     maintained throughout the life of the building. Where workers are required to
                                                                                                     DURING OPERATION OR MAINTENANCE                                                                   BUILDING COMPONENTS                                                                Equipment should be used in accordance with manufacturer’s specification.                 enter enclosed spaces, air testing equipment and Personal Protective
                                                                                                                                                                                                       During construction, renovation or demolition of this building, parts of the                                                                                                 Equipment should be provided.
                                                                                                     Cleaning and maintenance of windows, walls, roof or other components of this                      structure including fabricated steelwork, heavy panels and many other              6. HAZARDOUS SUBSTANCES
                                                                                                     building will require persons to be situated where a fall from a height in excess                 components will remain standing prior to or after supporting parts are in place.
                                                                                                     of two metres is possible. Where this type of activity is required, scaffolding,                  Contractors should ensure that temporary bracing or other required support is      ASBESTOS                                                                                  8. PUBLIC ACCESS
                                                                                                     ladders or trestles should be used in accordance with relevant codes of                           in place at all times when collapse which may injure persons in the area is a      This building may have been constructed prior to 1990 and therefore may                   Public access to construction and demolition sites and to areas under
                                                                                                     practice, regulations or legislation.                                                             possibility.                                                                       contain asbestos either in cladding material or in fire retardant insulation              maintenance causes risk to workers and public. Warning signs and secure
                                                                                                                                                                                                       Mechanical lifting of materials and components during construction,                material. The builder should check and, if necessary, take appropriate action             barriers to unauthorised access should be provided. Where electrical
                                                                                                     b) SLIPPERY OR UNEVEN SURFACES                                                                    maintenance or demolition presents a risk of falling objects. Contractors          before demolishing, cutting, sanding, drilling or otherwise disturbing the existing       installations, excavations, plant or loose materials are present they should be
                                                                                                                                                                                                       should ensure that appropriate lifting devices are used, that loads are properly   structure.                                                                                secured when not fully supervised.
                                                                                                     FLOOR FINISHES                                                                                    secured and that access to areas below the load is prevented or restricted.        POWDERED MATERIALS
                                                                                                                                                                                                                                                                                          Many materials used in the construction of this building can cause harm if                9. OPERATIONAL USE OF BUILDING
                                                                                                     The owner is responsible for the selection of surface finishes in the pedestrian                                                                                                     inhaled in powdered form. Persons working on or in the building during
                                                                                                     trafficable areas of this building. Surfaces should be selected in accordance                     3. TRAFFIC MANAGEMENT                                                              construction, operational maintenance or demolition should ensure good                    This building has been designed to requirements of the classification identified
                                                                                                     with AS HB 197:1999 and AS/NZ 4586:2004.                                                                                                                                             ventilation and wear Personal Protective Equipment including protection against           on the drawings. The specific use of the building is not known at the time of the
                                                                                                                                                                                                       Parking of vehicles or loading/unloading of vehicles on this roadway may           inhalation while using powdered material or when sanding, drilling, cutting or            design and a further assessment of the workplace health and safety issues
                                                                                                     STEPS, LOOSE OBJECTS AND UNEVEN SURFACES                                                          cause a traffic hazard. During construction, maintenance or demolition of this     otherwise disturbing or creating powdered material.                                       should be undertaken at the time of fit-out for the end-user.
                                                                                                     Due to design restrictions for this building, steps and/or ramps are included in                  building designated parking for workers and loading areas should be provided.      TREATED TIMBER
                                                                                                     the building which may be a hazard to workers carrying objects or otherwise                       Trained traffic management personnel should be responsible for the                 The design of this building includes provision for the inclusion of treated timber        10. OTHER HIGH RISK ACTIVITY
                                                                                                     occupied. Steps should be clearly marked with both visual and tactile warning                     supervision of these areas.                                                        within the structure. Dust or fumes from this material can be harmful. Persons            All electrical work should be carried out in accordance with Code of Practice:
                                                                                                     during construction, maintenance, demolition and at all times when the building                                                                                                      working on or in the building during construction, operational maintenance or             Managing Electrical Risks at the Workplace, AS/NZ 3012 and all licensing
                                                                                                     operates as a workplace.                                                                          Construction of this building will require loading and unloading of materials on   demolition should ensure good ventilation and wear Personal Protective                    requirements.
                                                                                                     Building owners and occupiers should monitor the pedestrian access ways                           the roadway. Deliveries should be well planned to avoid congestion of loading      Equipment including protection against inhalation of harmful material when                All work using Plant should be carried out in accordance with Code of Practice:
                                                                                                     and in particular access to areas where maintenance is routinely carried out                      areas and trained traffic management personnel should be used to supervise         sanding, drilling, cutting or using treated timber in any way that may cause              Managing Risks of Plant at the Workplace.
                                                                                                     to ensure that surfaces have not moved or cracked so that they become                             loading/unloading areas.                                                           harmful material to be released. Do not burn treated timber.                              All work should be carried out in accordance with Code of Practice: Managing
                                                                                                     uneven and present a trip hazard. Spills, loose material, stray objects or any                                                                                                       VOLATILE ORGANIC COMPOUNDS                                                                Noise and Preventing Hearing Loss at Work.
                                                                                                     other matter that may cause a slip or trip hazard should be cleaned or                            Busy construction and demolition sites present a risk of collision where           Many types of glue, solvents, spray packs, paints, varnishes and some cleaning            Due to the history of serious incidents it is recommended that particular care be
                                                                                                     removed from access ways.                                                                         deliveries and other traffic are moving within the site. A traffic management      materials and disinfectants have dangerous emissions. Areas where these are               exercised when undertaking work involving steel construction and concrete
                                                                                                     Contractors should be required to maintain a tidy work site during construction,                  plan supervised by trained traffic management personnel should be adopted          used should be kept well ventilated while the material is being used and for a            placement. All the above applies.
                                                                                                     maintenance or demolition to reduce the risk of trips and falls in the workplace.                 for the work site.                                                                 period after installation. Personal Protective Equipment may also be required.
                                                                                                     Materials for construction or maintenance should be stored in designated                                                                                                             The manufacturer’s recommendations for use must be carefully considered at
                                                                                                     areas away from access ways and work areas.                                                       4. SERVICES                                                                        all times.
                                                                                                                                                                                                                                                                                          SYNTHETIC MINERAL FIBRE
                                                                                                                                                                                                       Rupture of services during excavation or other activity creates a variety of       Fibreglass, rockwool, ceramic and other material used for thermal or sound
                                                                                                                                                                                                       risks including release of hazardous material. Existing services are located on    insulation may contain synthetic mineral fibre which may be harmful if inhaled or
                                                                                                                                                                                                       or around this site. Where known, these are identified on the plans but the        if it comes in contact with the skin, eyes or other sensitive parts or the body.
                                                                                                                                                                                                       exact location and extent of services may vary from that indicated. Services       Personal Protective Equipment including protection against inhalation of
                                                                                                                                                                                                       should be located using an appropriate service (such as Dial Before You Dig),      harmful material should be used when installing, removing or working near bulk
                                                                                                                                                                                                       appropriate excavation practice should be used and, where necessary,               insulation material.
                                                                                                                                                                                                       specialist contractors should be used.                                             TIMBER FLOORS
                                                                                                                                                                                                                                                                                          This building contains timber floors which have an applied finish. Areas where
                                                                                                                                                                                                                                                                                          finishes are applied should be kept well ventilated during sanding and
                                                                                                                                                                                                       Overhead power lines are near or on this site. These pose a risk of                application and for a period after installation. Personal Protective Equipment
                                                                                                                                                                                                       electrocution if struck or approached by lifting devices or other plant and        may also be required. The manufacturer’s recommendations for use must be
                                                                                                                                                                                                       persons working above ground level. Where there is a danger of this                carefully considered at all times.
                                                                                                                                                                                                       occurring, power lines should be, where practical, disconnected or relocated.
                                                                                                                                                                                                       Where this is not practical adequate warning in the form of bright coloured
                                                                                                                                                                                                       tape or signage should be used or a protective barrier provided.
C:\Users\Paul Hindes\Dropbox\Projects\1109 Golden Breed\J1109 Golden Breed.rvt




                                                                                 REV   DATE                  DESCRIPTION                                               SPECIFICATION NOTES                                                                                                                                                                                                                                                DRAWING TITLE
                                                                                  A    24-1-15 ISSUED FOR COMMENTS                                                     1. FIGURED DIMENSIONS TO BE TAKEN IN PREFERENCE TO SCALED READINGS
                                                                                                                                                                       2. ALL DIMENSIONS TO BE CHECKED AND VERIFIED ON SITE BEFORE
                                                                                                                                                                                                                                            PROPOSED SHOP ADDITIONS                                                                                                             TEL: (07) 5455 3651                                       SAFE DESIGN REPORT
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        A3
                                                                                                                                                                       COMMENCING FABRICATION
                                                                                                                                                                                                                                                                                                                                                                                [email protected]
                                                                                                                                                                       3. ALL CONSTRUCTION TO COMPLY WITH THE BUILDING CODE OF AUSTRALIA,
                                                                                                                                                                       RELEVANT S.A.A STANDARDS AND LOCAL AUTHORITY REQUIREMENTS                                                                                                                                                WWW.SOULSPACE.COM.AU
                                                                                                                                                                                                                                                                                                                                                                                                                                          DRAWN              PROJECT No   PLOT DATE    SCALE
                                                                                                                                                                       4. WATER CLOSET DOORS OPENING INWARDS TO BE FITTED WITH LIFT OFF     LOT6 on N21827                                                                                                                                                                                Paul Hindes
                                                                                                                                                                                                                                                                                                                                                                                                                                                                          24/02/2015
                                                                                                                                                                       HINGES TO ALLOW THE DOOR TO BE REMOVED WHEN CLOSED.                                                                                                                                                      QBSA Lic 1160074 ‐ ABN 81600841459                                           1109         5:16:43 PM   1 : 200
                                                                                                                                                                       5. REFER ANY ERRORS TO THE DESIGNER BEFORE COMMENCEMENT OF           15 NOOSA DRIVE, NOOSA HEADS                                                                                                         23 PALUMA ST SUNRISE BEACH QLD 4567                       DRAWING No                                   REVISION
                                                                                                                                                                       CONSTRUCTION
                                                                                                                                                                       6. THIS DRAWING IS COPYRIGHT AND MUST NOT BE RETAINED, COPIED OR
                                                                                                                                                                       USED WITHOUT THE CONSENT OF THE AUTHOR.
                                                                                                                                                                                                                                            FOR CAMMERAY INVESTMENTS PTY LTD                                                      Exclusive Residential and Commercial Designs by Paul Hindes                                             WD08                                         A
Log in to download the original file

Soul space plans fire.pdf · 830 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.