Murray Bell Planning Co. Date: 19 February 2014 Council Ref: JL013:MCU13/0261 Att: Jack Lewis Chief Executive Officer Noosa Council PO Box 141 Tewantin QLD 4565 Via Email ([email protected]) Dear Jack, RE: RESPONSE TO INFORMATION REQUEST 5 STEVENS STREET, SUNSHINE BEACH QLD 4567 Pursuant to section 278 of the Sustainable Planning Act 2009, I hereby submit a full response to the issues outlined within the Information Request received from Council on the 9 January 2014. Landscaping Please provide a detailed Landscape Plan, in accordance with Planning Scheme Policy 3 Landscaping Plants and Guidelines, which details the following requirements: Site Frontage: A continued footpath and driveway works across the frontage, locations and species of street trees, landscaping to setback areas within the front boundary, turf, location of electricity, sewer lines and connection points Please refer to the attached landscape plans, which have been revised as requested. A detailed landscape plan has also been prepared to illustrate that the location, type and size of all proposed vegetation. The proposed footpath links with the existing infrastructure provided by the adjoining development on the corner of Stevens Street and Belmore Terrace. From this point, the footpath is realigned to be closer to the kerb and channel in a manner consistent with the surrounding streetscape, including Belmore Terrace and The Esplanade. The proposed footpath design allows for landscape screening to be provided in accordance with S35.1 – S35.3 of the Eastern Beaches Locality Plan, as discussed in further detail below. The proposed landscape plan provides 8 x 100L Paperbark street trees, which meets the requirements of the Landscape Code for the 26.5m frontage. It is noted that there are three trees growing on and over the property boundary to the adjoining property at 7 Stevens Street. The removal of these trees will be dealt with in accordance with the Neighbourhood Disputes (Dividing Fences and Trees) Act 2011, which allows for these trees to be removed subject to the adjoining landowner being properly notified. Side Boundaries: Provide additional detail of plant species suitable to screen the development from adjacent residences As per the detailed landscape plan, a combination of Paperbarks, Dwarf Banksia, Tuckeroo and Pandanus are provided as screening plants along the full length of the both side boundaries. Page 1 of 4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 3 pages
Page 2
Rear Setback area: Provide an arborist report detailing the methods to be employed during earthworks and
construction to ensure the retention of the mature Tuckeroo (Cupaniopsis anacardiodes) at the rear of the site.
The report must address construction requirements for the retaining structures, removal of existing Eucalyptus sp.,
remedial pruning, root zone protection and remediation. Civil design and construction of retaining structures,
boundary fencing, drainage and other civil works within the root zone area of the Tuckeroo must be based on the
Arborist report.
The Noosa Plan does not specifically identify that the Tuckeroo must be retained by the proposal. Whilst every
effort has been made to retain the Tuckeroo that is located at the rear of the site, until construction occurs it cannot
be certain that this vegetation will unreasonably restrict site access (e.g. scaffolding), excavation, etc.
To avoid the requirement for a Permissible Change application to remove this vegetation during the construction
stage, an appropriate condition of approval would be for ‘the Tuckeroo within the rear boundary setback is to be
retained and maintained in a healthy conditions for 12 months after the use commences, or removed and replaced
with a Tuckeroo with a 100L pot size’. The amended landscape plans reflect this requirement.
Fencing
Please amend the site and landscaping plans to ensure compliance with the fencing setback and construction
provisions set out in Probable Solutions S35.1 – S35.3 of the Eastern Beaches Locality Plan.
As requested, the proposal plans have been amended to provide an average setback of 1 metre to the walls and
fencing along the street frontage. As agreed, the amended landscape plans have also included dense landscaping
to buffer and screen the 1.8m high built to boundary walls from the street.
Driveway Location
Provide the following:
a) Amended plans with a consistent location for the access driveway. Please note that it is Council’s
preference that the driveway be perpendicular to the kerb line. It is noted that this will require the removal
of the existing paperbark tree.
The landscape plans, engineering drawings and proposal plans have all been updated to accurately reflect the
location and design of the driveway crossover. The driveway is provided perpendicular to the kerb line as
requested.
b) Provide complete design plans for the access driveway. The plans are to be in accordance with Council’s
standard drawings and include:
a. A longitudinal section extending from the centreline of Stevens Street to the garaging area.
b. Cross sections in the verge area and at the property boundary. Please note that excavation in
the road reserve is to be kept to a minimum.
c. Any necessary stormwater drainage
Please refer to the amended engineering drawings, which include the requested detail on the ‘Site Earthworks’
and ‘Driveway Longitudinal Section’ plans.
c) Amended stormwater drainage design plans that include:
a. Levels of the various structures.
b. The proposed structures for the drainage of the buildings and the access driveway.
5 Stevens Street, Sunshine Beach Page 2 of 4
Page 3
c. The proposed discharge rates at each kerb outlet. Please note that Council’s maximum at any
one location is 25l/sec.
Please refer to the amended Site Drainage plan prepared by SCG Consulting Engineers, which illustrates the
proposed drainage and calculates a discharge rate of 17.01L/s for the kerb outlets.
Earthworks
Provide a geotechnical report for the proposed development works. The report must include recommendations on
the construction methods to be employed onsite to protect the stability of the adjoining properties and the retained
vegetation.
It is not necessary for a geotechnical report to be prepared in order for the retaining walls to be designed and
constructed in a manner that is structurally sound, nor cause any impact on the adjoining properties.
A Soil Test and Footing Report, Form 15 certification and engineering drawings have been provided with this
response. The Form 15 certification ensures that the design has been engineered to meet the required standards
and will be structurally sound. The engineer will be required to inspect the retaining walls during the construction
process to ensure that they have been built in accordance with this documentation. Once the retaining wall has
been constructed to the engineer’s satisfaction, they will issue a Form 16 certification. The final building approval
cannot be issued by the Building Certifier unless these inspections and certifications take place.
In the highly unlikely event that damage is caused by a structure that has been constructed in accordance with the
Registered Professional Engineer of Queensland’s (R.P.E.Q.) design documentation, the R.E.P.Q will be liable for
all costs. The documentation that has been provided therefore absolves Council of all risks associated with
approving the proposed retaining walls, and certifies that the retaining walls are structurally sound.
Provide detail of the proposed retaining wall located adjacent to the garage level turning area.
As requested, SCG Consulting Engineers have provided detailed drawings of the rock wall adjacent to the garage
level turning area. Please refer to the ‘Driveway Longitudinal Section’ for the cross section of this wall.
Carparking and Access
Provide plans that demonstrate that vehicles can access the proposed carparking spaces, reverse out and exit the
site in a total of 3 movements. Please note that when preparing the plans it must be assumed the other carspaces
are occupied.
Please refer to the amended Engineering Plans prepared by SCG Engineers, which illustrate that vehicles can
enter and exit each of the proposed car parking spaces.
QLeave Levy
Please note that prior to the issue of a development permit Council must be provided with a copy of the receipt of
payment of the applicable QLeave levy.
As detailed on IDAS Form 1, the estimated cost of constructing the assessable Operational Works components of
the proposal does not exceed $80,000. It is noted that the Building Certifier will require the Qleave Levy for the
Building Works to be paid prior to the issue of the Building Approval.
5 Stevens Street, Sunshine Beach Page 3 of 4
Page 4
Should you require any further clarification, please do not hesitate to contact the undersigned on 0438 105 799.
Yours faithfully,
Murray Bell
encl: Amended Proposal Plans
Amended Engineering Plans
Form 15 Certification of Retaining Wall
Soil Test and Footing Report
Amended Landscape Plans
5 Stevens Street, Sunshine Beach Page 4 of 4
Used in these records