Response to Info Request · MCU13/0261
Attached to the e-mail MCU13/0261 - Response to Information Request - 5 Stevens Street Sunshine Beach.
c. The proposed discharge rates at each kerb outlet. Please note that Council’s maximum at any
one location is 25l/sec.
Please refer to the amended Site Drainage plan prepared by SCG Consulting Engineers, which illustrates the
proposed drainage and calculates a discharge rate of 17.01L/s for the kerb outlets.
Earthworks
Provide a geotechnical report for the proposed development works. The report must include recommendations on
the construction methods to be employed onsite to protect the stability of the adjoining properties and the retained
vegetation.
It is not necessary for a geotechnical report to be prepared in order for the retaining walls to be designed and
constructed in a manner that is structurally sound, nor cause any impact on the adjoining properties.
A Soil Test and Footing Report, Form 15 certification and engineering drawings have been provided with this
response. The Form 15 certification ensures that the design has been engineered to meet the required standards
and will be structurally sound. The engineer will be required to inspect the retaining walls during the construction
process to ensure that they have been built in accordance with this documentation. Once the retaining wall has
been constructed to the engineer’s satisfaction, they will issue a Form 16 certification. The final building approval
cannot be issued by the Building Certifier unless these inspections and certifications take place.
In the highly unlikely event that damage is caused by a structure that has been constructed in accordance with the
Registered Professional Engineer of Queensland’s (R.P.E.Q.) design documentation, the R.E.P.Q will be liable for
all costs. The documentation that has been provided therefore absolves Council of all risks associated with
approving the proposed retaining walls, and certifies that the retaining walls are structurally sound.
Provide detail of the proposed retaining wall located adjacent to the garage level turning area.
As requested, SCG Consulting Engineers have provided detailed drawings of the rock wall adjacent to the garage
level turning area. Please refer to the ‘Driveway Longitudinal Section’ for the cross section of this wall.
Carparking and Access
Provide plans that demonstrate that vehicles can access the proposed carparking spaces, reverse out and exit the
site in a total of 3 movements. Please note that when preparing the plans it must be assumed the other carspaces
are occupied.
Please refer to the amended Engineering Plans prepared by SCG Engineers, which illustrate that vehicles can
enter and exit each of the proposed car parking spaces.
QLeave Levy
Please note that prior to the issue of a development permit Council must be provided with a copy of the receipt of
payment of the applicable QLeave levy.
As detailed on IDAS Form 1, the estimated cost of constructing the assessable Operational Works components of
the proposal does not exceed $80,000. It is noted that the Building Certifier will require the Qleave Levy for the
Building Works to be paid prior to the issue of the Building Approval.
5 Stevens Street, Sunshine Beach Page 3 of 4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Response to Info Request.pdfRelated documentApplication case desk ↗
About this file
- File size
- 256 KB (small file)
- File type
No other editions are linked here.