PLANNING & ENVIRONMENT COMMITTEE MEETING MINUTES 9 MARCH 2021
like) may stay at the site at any one time.
4. Visitor stays shall not exceed 7 consecutive nights.
5. Wastewater from communal ablutions, laundry, kitchen facilities, and the like,
must be directed to holding tanks for disposal offsite. Appropriate plumbing
approvals must be held for the associated wastewater system.
6. No on-site release of grey water is permitted.
7. The storage of vehicles (RV’s, caravans, motorhomes or the like) must not
exceed a total of three at any one time.
Visitor Education
8. Visitors must be advised of the following requirements:
a. No on-site release of grey water or other waste
b. Location of nearest dump point and potable water supply
c. All dogs must be on a leash when walked in the area and must be
restrained at all times during the stopover period
d. Owners must pick up and collect their dogs’ faeces
e. Consideration be given for residents and road users when walking in
the area
f. Noise must be minimised after 8.30pm
Street Identification
9. The street address of the development must be clearly visible from the Holts
Road frontage of the site by the provision of a street number.
10. Access to the site must be clearly signed with a sign of up to 4m2.
Site Access and Driveways
11. Sealed access driveways must be provided from Holts Road to all parking
and manoeuvring areas of the development. The driveways must be
generally in accordance with Council standard drawing RS-056 and
maintained by the property owner
Car Parking
12. All car parking areas and access driveways must be maintained exclusively
for vehicle parking and manoeuvring and kept in a tidy and safe condition at
all times.
13. Directional signage must be provided to direct visitors and customers to the
car parking spaces provided on site.
Stormwater Drainage
14. Stormwater runoff from the development must be disposed of on-site without
causing scour or damage to the subject site or any adjoining property.
15. Stormwater drainage works and water quality devices and measures must
be provided and maintained generally in accordance with the Stormwater
Quality Management Plan included in the Stormwater Drainage for No 154
Holts Rd Cooroy Report dated 26 September 2014, Ref No: 1432 IWMP.doc,
prepared by Callaghan & Toth. Particular attention must be given to the
construction and maintenance regime of the two proposed Sediment Basins.
Earthworks and Retaining Walls
16. All earthworks and associated batters must be contained entirely within the
Page 4 of 8