Skip to the record
The only place to find full transcripts.

Original source · versioned page text

W7412 sl

of 6

Page text shows just the words. Original shows the document exactly as it was published.

No evidence of previous movement, seepage o r soil creep was observed in the areas.

It is our opinion that provided the site is managed & maintained in an orderly manner with
respect to surface runoff; the risk of slope instability will not increase from a “low risk”.

The following drawings by the Australian Geomechanics Society are attached to assist in
showing good hill side management.

Please find additional notes pages 174 and 175 of AUSTRALIAN GEOGUIDE LR8
(CONSTRUCTION PRACTICE by the Australian Geomechanics Society.




                                   BE Civil RPEQ
For and on behalf of Sunrise Design Qld Pty Ltd.




W7412 sl                                     3
Log in to download the original file

W7412 sl.pdf · 1.5 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.