Council archive · source document
Development Part 1 of 3 · OPW11/0335
16. List below all of the forms and supporting information that accompany this application (include all IDAS
forms, checklists, mandatory supporting information etc. that will be submitted as part of this application. Note: this
question does not apply for applications made online using Smart eDA)
Method of lodgement to
Description of attachment or title of attachment
assessment manager
1 Covering Letter over the counter
2 Tod Consulting Civil Engineering Drawings (10525 Sheets C1-C7) over the counter
3 IDAS Form 1 over the counter
4 IDAS Form 6 over the counter
5 IDAS Checklist 4 over the counter
6 Leaf and Limb Arborist Report over the counter
7 Kolala Habitat Management Plan over the counter
8 Fire Management Plan over the counter
9 Anembo Consultants Landscaping plans (LD 01 - 1 to 15) over the counter
Simmonds & Bristow Stormwater Management Planand Sediment and
10 over the counter
Erosion Control Plan ( Stage 1 )
11 Spice Consulting Hydraulic Engineering Drawing ( 964 Sheets OP1-OP4) over the counter
12 Acid Sulfate Soils Assessment by Butler Partners Project no. 07160 over the counter
13 Environmental Management Plan by RPS Report No PR 104210/01 over the counter
14 Carl Brunskill Architects Plans Nos. 20517 A 41 a over the counter
15 Contrast Constructions P/L Construction Management Plan over the counter
17. Applicant's declaration
X By making this application, I declare that all information in this application is true and correct (note: it is
q unlawful to provide false or misleading information).
JAS form I
ember 2009
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Part 1 of 3Related documentApplication case desk ↗
About this file
- File size
- 3.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.