Skip to the record
The first. The best. The only NoosaWatch™.

Council archive · source document

DOC271112 · OPW12/0573

Attached to the e-mail Application for permit to damage vegetation - 2 Solway Drive Sunshine Beach.

of 12

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Ba Integrated Development Assessment System form

 

Application details—IDAS form 1

(Sustainable Planning Act z009 version 1.0 effective 18 December 2009)

You MUST complete ALL questions unless the form indicates otherwise. Incomplete forms or forms without all necessary
information and documentation will result in your application not being a properly made application.

For all development applications, you must:
¢ complete this form (Application details—IDAS form 1)
e complete any other forms relevant to your application

¢ provide any mandatory supporting information identified on the forms as being required to accompany your
application.

Attach extra pages if there is insufficient space on this form.

All terms used on this form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable Planning
Regulation 2009.

 

This form can also be completed online using Smart eDA at www.smarteda.qld.gov.au

 

 

 

 

 

 

Name/s (individual or company name in full) Noviha ate. Prravbmreent S
+ T

 

 

For companies, contact name Deller Roetrc Lp e

Postal address —_ S40 rate_
P-o Box ISU] cosa, Heads

Contact phone number O71 Su] 3 B4LDo
t

 

 

 

 

 

 

Mobile number (non-mandatory)

 

 

Fax number (non-mandatory)

 

 

e-mail address (non-mandatory) debbie ) sound berm
@ soundbem :-cm-au

 

 

 

 

Department of Infrastructure and Planning Wines

LeToheraniiarsiant

 
Full text of the other 11 pages

Page 2

OIL

| 4, What Is the

 

 

 

 

  

 

| material change of use of premises

| building work

[operational work

C] reconfiguring a lot

 

 

 

 

 

 

 

 

 

EL Yes—complete table A and then go to question 5

 

Table A—name of each local government area in which the mobile and temporary ERA is proposed to operate

 

 

 

 

 

 

Table B—street address/lot for the premises or street address/lot on plan for the land adjoining or adjacent to the
premises

street address/lot on the plan

| street address/lot on plan for the land adjoining or adjacent to the premises (appropriate for development in
water e.g. jetty, pontoon)

 

 

 

 

 

 

 

 

 

 

 

 

 

Street address Lot on plan description | Local government area
Unit | Street | Street name and official suburb/ | Post- | Lotno. | Plan type (e.g. Logan, Cairns)
no. no. locality name code and plan no.
lk | Solwow Drive |yset
Sunshine
2 Application details—IDAS form 1

Version 1.0 18 December 2009

Page 3

OOO

 

dredging in Moreton Bay)

Table C—premises coordinates (appropriate for development in remote areas, over part of a lot or in water e.g. channel

 

Coordinates

(note: place each set of coordinates in a separate row)

Zone
reference

 

Easting Northing Latitude

Longitude

Datum

Local government
area (if applicable)

 

 

 

 

 

 

C] GDA94
L] wess4
Cl other

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   

 

are

al.(

ee

 

 

‘

Ac Remove one lovoe dsodl Eucolyet ck Ho rea

 

of fle buslding

   

[no

| Yes—complete either table D, table E or table F as applicable

 

Table D

 

Name of owner/s of the land

 

I/We, the above-mentioned owner/s of the land, consent to the making of this application.

 

Signature of owner/s of the land

 

Date

 

 

 

 

Application details—IDAS form 1
Version 1.0 18 December 2009

 

 

Page 4

 

OO

Table E

 

 

Name of owner/s of the land

 

 

| The owner’s written consent is attached or will be provided separately to the assessment manager

 

 

Table F

 

Name of owner/s of the land

 

 

CJ By making this application, |, the applicant, declare that the owner has given written consent to the making of the
application.

 

 

 

 

 

 

 

 

 

[] Yes—complete table 6

 

Table G—state owned resources (provide details for each state resource in a separate table)

 

Nature of state-owned resource

 

Nature of evidence required (tick the

applicable box and attach a copy of the L] Evidence of an allocation of, or an entitlement to, the resource
evidence to this form)

Cl Evidence the chief executive of the department administering the
resource is satisfied the development is consistent with an allocation
of, or an entitlement to, the resource

LJ Evidence the chief executive of the department administering the
resource is satisfied the development application may proceed in the
absence of an allocation of, or an entitlement to, the resource

 

 

 

 

 

LC] adjacent to a water body, watercourse or aquifer (e.g. creek, river, lake, canal)—complete table H

CL on strategic port land under the Transport Infrastructure Act 1994—complete table |

| in a tidal water area—complete table |

 

Table H Name of water body, watercourse or aquifer

 

 

 

 

 

4 Application details—IDAS form 1
Version 1.0 18 December 2009

Page 5

OO

 

Table | Lot on plan description for strategic port land

Port authority for the lot

 

 

 

Table J Name of local government for the tidal area (if applicable) Port authority for the tidal area (if applicable)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

A No—go to question 15 C] Yes

 

 

 

 

 

 

of me

Yes—complete table K and submit with this application the yellow local government/private certifier’s copy of the
receipted QLeave form

 

 

Table K Amount paid Date paid

QLeave Project Number (6 digit number starting with A, B,
E, L or P)

 

 

 

 

 

 

 

[_] Yes—please provide details below

 

 

 

 

 

 

 

 

Name of local government Date of written notice given | Reference number of written notice given
by local government by local government (if applicable)
5 Application detaits—IDAS form 1

Version 1.0 18 December 2009

Page 6

 

 

 

 

Description of attachment or title of attachment Method of lodgement to
assessment manager

 

 

 

 

 

 

 

 

 

 

 

[Aey making this application, | declare that all information in this application is true and correct (note: itis unlawful to
provide false or misleading information).

 

 

 

Notes for completing this form

Question 8:

© Section 263 of the Sustainable Planning Act 2009 sets out when the consent of the owner of the land is required for an
application. Section 260(1)(e) of the Sustainable Planning Act 2009 provides that if the owner’s consent is required
under section 263, then an application must contain, or be accompanied by, the written consent of the owner, or
include a declaration by the applicant that the owner has given written consent to the making of the application.

© Owner’s consent is not required for a mobile and temporary ERA.

Question 9:

* Section 264 of the Sustainable Planning Act 2009 provides that ifa development involves a state resource, a
regulation may require the application to be supported by certain evidence prescribed under the regulation. Schedule
14 of the Sustainable Planning Regulation 2009 prescribes the state resources for which evidence is required to be
given, and the evidence required, to support the application.

Question 13:

* The Building and Construction industry (Portable Long Service Leave) Act 1991 prescribes when the portable long
service leave levy is payable.

¢ The portable long service leave levy amount and other prescribed percentages and rates for calculating the levy are
prescribed in the Building and Construction Industry (Portable Long Service Leave) Regulation 2002.

Question 14:

¢ The portable long service leave levy need not be paid when the application is made, but the Building and Construction
Industry (Portable Long Service Leave) Act 1991 requires the levy to be paid before a development permit is issued.

¢ Building and Construction Industry Notification and Payment Forms are available from any Queensland post office or
agency, on request from QLeave, or can be completed on the QLeave website at www.qleave.qld.gov.au. For further
information contact QLeave on 1800 803 481 or www.qleave.qld.gov.au.

 

6 Application details—IDAS form 1
Version 1.0 18 December 2009

Page 7

OL

Privacy—the information collected in this form will be used by the Department of Infrastructure and Planning (DIP) in
accordance with the processing and assessment of your application. Your personal details will not be disclosed for a purpose
outside of the IDAS process, except where required by legislation (including the Right to Information Act zoo9) or as required
by Parliament. This information may be stored in a departmental database. The information collected will be retained as
required by the Public Records Act 2002.

 

OFFICE USE ONLY

 

 

 

Date received

Reference numbers

 

 

 

 

NOTIFICATION OF ENGAGEMENT OF A PRIVATE CERTIFIER

 

To

 

 

 

Council. | have been engaged as the private certifier for the building work referred
to in this application

 

Date of engagement

Name

BSA Certification license number

Building
classification/s

 

 

 

 

 

QLEAVE NOTIFICATION AND PAYMENT (for completion by assessment manager or private certifier if applicable)

 

Date receipted

a QLeave Project Amount paid _, | formsighted by |Name of officer who
D
Description of the work Number () ate paid assessment sighted the form
manager

 

 

 

 

 

 

 

 

The Sustainable Planning Act 2009 (SPA) is administered by the Department of Infrastructure and Planning. This form and
all other required application materials should be sent to your assessment manager and any referral agencies.

 

Application details—IDAS form 1
Version 1.0 18 December 2009

 

 

Page 8

| | | | Integrated Development Assessment System form

 

Building or operational work assessable against
a planning scheme—IDAS form 6

(Sustainable Planning Act 2009 version 1.0 effective 18 December 2009)

This form must be completed for development applications for building works or operational work assessable against a
planning scheme.

You MUST complete ALL questions unless the form indicates otherwise. Incomplete forms or forms without all necessary
information and documentation will result in your application not being a properly made application.

For all development applications, you must:
* complete Application details—IDAS form 1
¢ complete any other forms relevant to your application

« provide any mandatory supporting information identified on the forms as being required to accompany your
application.
Attach extra pages if there is insufficient space on this form.

All terms used on this form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable Planning
Regulation 2009.

This form can also be used for development on strategic port land under the /ransport Infrastructure Act 1994.

 

 

This form can also be completed online using Smart eDA at www.smarteda.qld.gov.au

 

 

 

 

Table A

What is the nature of the building work made assessable in the planning scheme (e.g. building, repairing, altering,
underpinning, moving or demolishing a building)?

 

 

 

What type of approval is being sought? (if you have indicated multiple works in the above question, please use an
attachment to this form to detail each approval request)

C] development permit C] preliminary approval

Are there any current approvals associated with this application? (e.g. material change of use)

 

List of approval reference/s Date approved Date approval lapses

 

 

 

 

 

 

 

 

SYohicuastintcrais

Department of Infrastructure and Planning Wee

 

 

 

 

 

Page 9

LO

 

Table B
What is the nature of the operational work made assessable in the planning scheme? (tick applicable box/es)
EC] road works C] stormwater C] water infrastructure
E] drainage works [| earthworks C] sewerage infrastructure
CE] landscaping L] signage [ clearing vegetation under the planning scheme

 

C] other—provide details

 

 

 

What type of approval is being sought? (if you have indicated multiple works in the above question, please use an
attachment to this form to detail each approval request)

(y development permit C] preliminary approval im both—specify below

 

 

 

Is the operational work necessary to facilitate the creation of new lots? (e.g. subdivision)

cd No [_] Yes—specify the number of lots being created

 

 

 

 

Are tiere any current approvals associated with this application? (e.g. material change of use)
No [| Yes—provide details below

 

List of approval reference/s Date approved Date approval lapses

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Confirmation of | Method of
lodgement lodgement

 

All applications for operational works

 

site plans drawn to scale which show the following: E] confirmed

e the location and site area of the land to which the application relates
(relevant land)

e the north point

¢ the boundaries of the relevant land

e the allotment layout showing existing lots, any proposed lots (including the
dimensions of those lots), existing or proposed road reserves, building
envelopes and existing or proposed open space (note: numbering is required
for all lots)

 

 

 

 

 

 

2 Building or operational work assessable against a planning scheme—IDAS form 6
Version 1.0 18 December 2009

Page 10

LIL

 

© any existing or proposed easements on the relevant land and their function
¢ anyaccess limitation strips
e all existing and proposed roads and access points on the relevant land

 

a statement about how the proposed development addresses the local
government’s planning schemes and any other planning documents relevant to
the application

CI confirmed

 

Applications for operational works involving earthworks (filling and excavatin

8)

 

drawings showing:

¢ existing and proposed contours

e areas to be cut and filled

e the location and tevel of any permanent survey marks or reference stations
used as datum for the works

e the location of any proposed retaining walls on the relevant land and their
height

e the defined flood level (if applicable)

e the defined fill level (if applicable)

CL confirmed

 

Applications for operational works involving roadworks

 

 

drawings showing:

«existing and proposed contours

e the centreline or construction line showing chainages, bearings, offsets ifthe
construction line is not the centreline of the road and all intersection points

e information for each curve including tangent point chainages and offsets,
curve radii, arc tength, tangent length, superetevation (if applicable) and
curve widening (if applicable)

¢ kerb lines including kerb radii (where not parallel to centreline) and tangent
point changes (where not parallel to centreline)

e edge of pavement where kerb is not constructed

e position and extent of channelisation

¢ tocation and details of all traffic signs, guideposts, guardrail and other street

furniture

pavement markings including details on raised pavement markers

catchpit, manhole and pipeline locations

drainage details (if applicable)

cross road drainage culverts (if applicable)

concrete footpaths and cycle paths

location and details for access points, ramps and invert crossings

e changes in surfacing material

C] confirmed

 

 

 

 

3 Building or operational work assessable against a planning scheme—IDAS form 6

Version 1.0 18 December 2009

 

Page 11

LO

 

Applications for operational works involving stormwater drainage

 

drawings showing: | confirmed

e existing and proposed contours

e drainage locations, diameters and class of pipe, open drains and easements

e manhole location, chainage and offset or co-ordinates and inlet and outlet
invert levels

e inlet pit locations, chainage and offset or co-ordinates and invert and kerb
levels

 

Applications for operational works involving water reticulation

 

drawings showing: | confirmed
e kerb lines or edge of pavement where kerb is not constructed

e location and levels of other utility services where affected by water
reticulation works

pipe diameter, type of pipe and pipe alignment

water main alignments

water supply pump station details (if applicable)

minor reservoir details (if applicable)

conduits

location of valves and fire hydrants

¢ location of house connections (if applicable)

e location of bench marks and reference pegs

 

Applications for operational works involving sewerage reticulation

 

drawings showing: C4] confirmed
¢ tocation of all existing and proposed services

¢ location of all existing and proposed sewer lines and manhole locations
e location of all house connection branches

e kerb lines or edge of pavement where kerb is not constructed

e chainages

e design sewer invert levels

e design top of manhole levels

type of manhole and manhole cover

pipe diameter, type of pipe and pipe alignment

e location of house connections (if applicable)

© sewer pump station details (if applicable)

 

Applications for operational works involving street lighting

 

 

drawings showing: CI confirmed
e location of all light poles and service conduits

e location of all other cross road conduits

type of wattage and lighting

any traffic calming devices

additional plans for roundabouts and major roads (if applicable)
details of any variations to normal alignment

e details of lighting levels

 

 

 

 

4 Building or operational work assessable against a planning scheme—IDAS form 6
Version 1.0 18 December 2009

 

Page 12

LO

 

Applications for operational works involving public utility services

 

drawings showing: Cl confirmed
e any existing light poles and power poles

e any existing underground services
details of proposed services
alternation to existing services

 

Applications for operational works involving landscaping works

 

drawings showing: C] confirmed
e the location of proposed plant species

e aplant schedule indicating common and botanical names, pot sizes and
numbers of plants

e planting bed preparation details including topsoil depth, subgrade
preparation, mulch type and depth, type of turf, pebble, paving and garden
edge

e the location and type of any existing trees to be retained

© construction details of planter boxes, retaining walls and fences

e the proposed maintenance period

¢ irrigation system details

 

 

 

 

 

Notes for completing this form:

e This form can also be used for development applications for building works or operational works assessable against
the land use plan for Cairns airport land or Mackay airport land. Whenever a planning scheme is mentioned, take it to
mean the land use plan for the airport land.

Privacy—please refer to your assessment manager for further details on the use of information recorded in this
form.

 

OFFICE USE ONLY

 

 

Date received Reference numbers

 

 

 

 

 

 

The Sustainable Planning Act 2009 is administered by the Department of Infrastructure and Planning. This form and all other
required application materials should be sent to your assessment manager and any referral agencies.

 

g Building or operational work assessable against a planning scheme—IDAS form 6
Version 1.0 18 December 2009

Used in these records

About this file

File size
1.1 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

DOC271112.pdf · 1.1 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.