Harle - Early referal Response
ER2-N
Our reference: 2211-32227 SER
Your reference: 04772
28 November 2022
Simon Harle
C/- The Jetty Specialist ,
18 Ron Parkinson Cres
CORBOULD PARK QLD 4551
[email protected]
Attention: Lisa Redpath
Dear Lisa
Early referral response—with conditions
(Given under section 57 of the Planning Act 2016)
The State Assessment and Referral Agency (SARA) received your request for an early referral response
on 24 November 2022 for the proposed development application described below.
Applicant details
Applicant name: Simon Harle
Applicant contact details: C/- The Jetty Specialist ,
18 Ron Parkinson Cres
Corbould Park QLD 4551
[email protected]
Location details
Street address: 34 Cooran Court, Noosa Heads
Real property description: Lot 221 on N21857
Local government area: Noosa Shire Council
Application details
Development permit Operational work for prescribed tidal works (Removal of existing
pontoon and installation of a new pontoon system)
Referral triggers
This early referral response is given for the following provisions of the Planning Regulation 2017:
10.17.3.2.1 Tidal works or work in a coastal management district
South East Queensland (North) regional
office
Mike Ahern Building, Level 3, 12 First
Avenue, Maroochydore
Page 1 of 4 PO Box 1129, Maroochydore QLD 4558
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 6 pages
Page 2
2211-32227 SER
Conditions
Under section 56(1)(b)(i) of the Planning Act 2016 (the Act), the conditions set out in Attachment 1 must
be attached to any development approval.
Reasons for decision to impose conditions
SARA must provide reasons for the decision to impose conditions. These reasons are set out in
Attachment 2.
Approved plans and specifications
SARA requires that the plans and specifications set out below and enclosed must be attached to any
development approval.
Drawing/report title Prepared by Date Reference no. Version/issue
Aspect of development: Operational work for prescribed tidal work (removal of existing pontoon
and installation of new pontoon system)
Site Plan, Layout Plan & The Jetty Specialist 14/10/2022 TJS-04772-01 A
Water Allocation
Pursuant to section 54(4) of the Act, you will not be required to refer your application to SARA if you
submit this early referral response in its entirety when making the application to the assessment
manager, and the following conditions are satisfied:
Any changes to the proposal before the application is made to the assessment manager do not
result in a substantially different development to that which was presented to SARA with the request
for an early referral response
The development application must be made to the assessment manager within 12 months of the
date of this early referral response.
For further information please contact Danika Cowie, Principal Planning Officer, on (07) 5352 9776 or via
email [email protected] who will be pleased to assist.
Yours sincerely
Paul Gleeson
Principal Planning Officer
enc Attachment 1—Conditions to be imposed
Attachment 2—Reasons for decision to impose conditions
Approved plans and specifications
State Assessment and Referral Agency Page 2 of 4
Page 3
2211-32227 SER
Attachment 1—Conditions to be imposed
No. Conditions Condition timing
Operational work for prescribed tidal work (removal of existing pontoon and installation of new
pontoon system)
Planning Regulation 2017, Schedule 10, Part 17, Division 3, Table 2, Item 1—Tidal works or work in a
coastal management district —The chief executive administering the Planning Act 2016 nominates the
Director-General of the Department of Environment and Science to be the enforcement authority for
the development to which this development approval relates for the administration and enforcement of
any matter relating to the following conditions:
1. The development must be carried out generally in accordance with At all times
the following plan:
Site Plan, Layout Plan & Water Allocation, prepared by The
Jetty Specialist, dated 14/10/2022, drawing number TJS-
04772-01, revision A.
2. The structure must be lit/marked in accordance with the following At all times
specifications, such that it does not cause a risk to the safe
navigation of other ships:
Section 3 of AS4282-1997 Control of the obtrusive effects of
outdoor lighting.
3. The construction, operation or maintenance of the structure, and any At all times
ship berthed, moored or attached to the structure, must not:
(a) encroach into, pass over or under a navigation corridor, or
(b) be located in a high risk maritime zone.
4. Any debris or similar obstruction generated whilst undertaking the While works are
work must be removed from the waterway and suitably disposed of occurring
at the applicant’s expense.
5. All piles and/or structures to be demolished, both above and below Prior to the completion
the waterline must be completely extracted/removed. of works
State Assessment and Referral Agency Page 3 of 4
Page 4
2211-32227 SER
Attachment 2—Reasons for decision to impose conditions
The reasons for this decision are:
To ensure the development is carried out generally in accordance with the plans of development
submitted with the application.
To ensure that at all times, all lights on or above the development site do not interfere with safe
navigation in surrounding waterways.
To ensure the development does not encroach on the navigation corridor or high risk maritime
zone to ensure the safe passage of vessels.
To ensure that debris from the development does not create a hazard to navigation.
To ensure that there is no residual material that could create a hazard to navigation.
Findings on material questions of fact:
The proposed development is located in a canal.
The proposed development is for the construction of a private single vessel pontoon.
The proposed structure, including any vessel berthed, moored or attached to the structure:
will not encroach into, pass over or under a navigation corridor, and
is not located in a high risk maritime development zone.
Evidence or other material on which the findings were based:
Development application
State Development Assessment Provisions published SARA, version 3.0
Planning Act 2016
Planning Regulation 2017
SARA DA mapping system.
Human Rights Act 2019
State Assessment and Referral Agency Page 4 of 4
Page 5
Development Assessment Rules—Representations about a
referral agency response
The following provisions are those set out in sections 28 and 30 of the Development Assessment Rules1
regarding representations about a referral agency response
Part 6: Changes to the application and referral agency
responses
28 Concurrence agency changes its response or gives a late response
28.1. Despite part 2, a concurrence agency may, after its referral agency assessment period and any
further period agreed ends, change its referral agency response or give a late referral agency
response before the application is decided, subject to section 28.2 and 28.3.
28.2. A concurrence agency may change its referral agency response at any time before the application
is decided if—
(a) the change is in response to a change which the assessment manager is satisfied is a change
under section 26.1; or
(b) the Minister has given the concurrence agency a direction under section 99 of the Act; or
(c) the applicant has given written agreement to the change to the referral agency response.2
28.3. A concurrence agency may give a late referral agency response before the application is decided,
if the applicant has given written agreement to the late referral agency response.
28.4. If a concurrence agency proposes to change its referral agency response under section 28.2(a),
the concurrence agency must—
(a) give notice of its intention to change its referral agency response to the assessment manager
and a copy to the applicant within 5 days of receiving notice of the change under section 25.1;
and
(b) the concurrence agency has 10 days from the day of giving notice under paragraph (a), or a
further period agreed between the applicant and the concurrence agency, to give an amended
referral agency response to the assessment manager and a copy to the applicant.
1 Pursuant to Section 68 of the Planning Act 2016
2 In the instance an applicant has made representations to the concurrence agency under section 30,
and the concurrence agency agrees to make the change included in the representations, section
28.2(c) is taken to have been satisfied.
Page 1 of 2
Page 6
Part 7: Miscellaneous
30 Representations about a referral agency response
30.1. An applicant may make representations to a concurrence agency at any time before the application
is decided, about changing a matter in the referral agency response.3
3 An applicant may elect, under section 32, to stop the assessment manager’s decision period in which
to take this action. If a concurrence agency wishes to amend their response in relation to
representations made under this section, they must do so in accordance with section 28.
Page 2 of 2
Page 7
← →
← →
← →
FOR CONSTRUCTION
SE HARLE SITE PLAN, LAYOUT PLAN A3
LOT 221 (34) COORAN CRT
NOOSA HEADS & WATER ALLOCATION
PROPOSED PONTOON & CATWALK
18 RON PARKINSON CR BELLS CREEK QLD 4551 TJS-04772-01 A
5496 24/11/2022
1300 260 878 www.tjsmarine.com.au * [email protected]