Council archive · source document
Decision Notice - DBW23 0092 [As Published] · DBW23/0092
Currency Period
2. This development approval lapses if the works have not substantially started by 21
November 2025, unless an application to extend the currency period is approved by Council.
Approved Plans
3. Development authorised by this approval must be undertaken generally in accordance with
the Approved Plans listed in the table below
Plan No. Rev. Plan/Document Name Date
CD 01A A Lower Ground Floor Plan, prepared by Tim -
Ditchfield Architects
CD 02A A Ground Floor Plan, prepared by Tim -
Ditchfield Architects
CD 03A A First Floor Plan, prepared by Tim Ditchfield -
Architects
CD 04A A Section, prepared by Tim Ditchfield -
Architects
CD 05A A Elevations, prepared by Tim Ditchfield -
Architects
CD 06A A Elevations, prepared by Tim Ditchfield -
Architects
CD 07A A Elevations, prepared by Tim Ditchfield -
Architects
CD 08A A Elevations, prepared by Tim Ditchfield -
Architects
External Colours & Finishes
4. External colours and finishes must be of muted environmental tones that blend with the
surrounding vegetation and landscape, with broad expanses of a single colour or reflective
surfaces not permitted.
Performance Bond
5. Security in the form of a cash bond or trading bank guarantee to the sum of $5,000 must be
submitted to Council, to secure performance of all conditions of this approval, prior to the
issue of a Development Permit for Building. The cash bond or trading bank guarantee will be
returned on performance of the conditions of approval less any costs incurred by Council in
respect of enforcing performance of this permit. Council reserves the right to call upon the
bond or guaranteed sum to effect compliance with conditions.
Protection of Privacy
6. The new stair glazing located on the southern building face must either be translucent or
include fixed external screens, positioned in such a way to obscure direct views into the
habitable room windows or private open space areas of the adjoining property.
Environment
7. Sediment or any other material including building materials or waste products must not be
deposited or released into the road reserve, stormwater drain or adjacent properties.
Page 2 of 5
Document Set ID: 22701544
Version: 2, Version Date: 28/11/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - DBW23 0092 [As Published].pdfRelated documentApplication case desk ↗
About this file
- File size
- 162 KB (small file)
- File type
No other editions are linked here.