Councirs Reference: 2008/299
Our Reference: 00786 LO8 NG

Our Project Planner. Nadine Gorton . : , mM a rto O
consulting m
pty Itd

town planners +

urban designers
11th June 2008

Chief Executive Officer
Sunshine Coast Council
PO Box 141
TEWANTIN Q 4565

 
  
   

  
      
 

RECEIVED
42 JUN 2008
SCRC - Tewantin

: Front Counter
Dear Denis, Cam

RE: Application for Development Permit for Material Change of Use of Premises for Visitor
Accommodation Type 4 - Visitor Hote! at 14-16 Duke Street and 1 - 3 Douglas Street
Sunshine Beach: Linda Staley

Attention: Denis Wallace — Land Use Section

| refer to the above development application and in particular to the request for additional information issued 7
by Noosa Council and dated 3 April 2008.

- This request listed twenty-two (22) items that Council considers it requires in order to complete its
assessment of the above application. The applicant has decided to respond to twenty-two (22) of these
items as detailed below:

Land Use
item 1: Provide details of the number of staff that will be employed to run the hostel.
Comment: Consultation with the Hostel Manager indicates that the business will continue to

operate as a family run business with all staff residing in the main home on the corner of Duke Street
and Douglas Street. The driver of the courtesy bus is generally a guest of the premises who drives the
bus in return for free board. -

item 2: The proposal indicates a shortfall in the minimum parking requirements in providing for only
6 guest spaces. Please amend the plans accordingly.

Comment: As indicated above, no separate staff are employed as part of the operations with the
owner and family members managing the premises. All family members live on site and three carparking
spaces are provided in association with the dwelling in the form of the double garage off Duke Street and
carport off Douglas Street.

The Planning Scheme details carparking requirements for Visitor Hostels as follows:

’ For Visitor hostel - 1 space per 12 guests capable of being accommodated; AND
1 space per staff member; AND

SUNSHINE COAST OFFICE GYMPIE OFFICE
1/199 GYMPIE TERRACE NOOSAVILLE - PO BOX 1684 NOOSAHEADS Q 4567 1/28 REEF STREET GYMPIE - PO BOX 391 GYMPIE Q 4570
TELEPHONE 0754555425 - FACSIMILE 07 54555725 TELEPHONE 07 54827440 - FACSIMILE 07 [email protected] [email protected]
Full text of the other 25 pages

Page 2

o

— --@ -Page2—

is

The applicant proposes to accommodate a total of 82 persons on the site which equates to a total of 7
carparking spaces. The amended plans provided in response to the information request indicate a
total of 7 carparking spaces on the northern portion of the site. Parking for a courtesy bus is located in

 

parking for a courtesy shuttle bus (no bigger than 30 seats).

front of the existing dwelling with access of Duke Street.

fem 3: Provide further analysis of the developments guest and staff parking requirements
addressing the provision of Specific Outcome O9 of the Driveways and Carparking Code.
An analysis of hostel visitor transport mode choice and current parking demand levels is
necessary and compliance with Probable Solution S9.1 may not be satisfactory. The
proposal plans should be amended to address the overall visitor requirements where

appropriate.

Comment:

tabled below.

Sunshine Beach Backpackers - Record of Guest Car Parking

 

 

 

 

 

 

 

‘Number of Guest fo ot Guasls ainving|
he No. of Guests | Number of Guests | Vehicles parked on| Number of Gust} by foat or other
lock 1 in-house arriving with a car site arriving by Bus means
[Thursday 15th May 2008 38 1 4 34 2
Friday 16th May 2003 28 9 2 18 2
[Saturday 17th May 2008 34 0 o 2 4
Sunday 18th May 2008 32 0 9 15 °
Monday 19th May 2008 38 2 2 30 9
{Tuesday 20th May 2008 4 2 2 26 o

 

Wednesday 21th May 2008

38

Qo

0

24

 

N.B. Survey of the number of vehicles parked at

backpackers undertaken at 5:00pm as the most likely time guests are in-house

Sunshine Beach Backpackers - Record of Bus Passengers

The applicant engaged Traffic Engineer Dianne Hayes to prepare a traffic report for the
proposal and to respond to the information response issued by Council.
assessment of parking demand and modal choice has been undertaken at the existing hostel site to
determine current parking and transport patterns of backpacker guests. A summary of survey data is

Ms Hayes reports that ‘an

 

Week 1

gam

gam

iam

1:30pm

3pm

5pm

 

[Thursday 15th May 2008.

10

12

32

 

Friday 16th May 2008

8

9

 

Saturday 17th May 2008.

10

10

42

 

Sunday 18th May 2008

4

 

Monday 19th May 2008

40

 

[Tuesday 20th May 2008

10

44

10

 

ednesday 21th May 2008

 

12

410

 

4

 

 

 

9

 

 

 

N.B. Survey taken for trips to Junction and Hastings Steet, it is assumed that passenger numbers on return trips are similar

 

Page 3

 

»

 

 

— .®.. Page3— —— _

As indicated in the above tables the majority of guests do not arrive with a car. The need for car trips
by hostel guests is low as the hostel is well located with excellent pedestrian links to local shops,
restaurants and cafes, patrolled beaches and Noosa National Park. The hostel bus provides regular
services into Hastings Street and the Junction and the service is well utilised by guests.

In regard to the provisions of the Driveways and Carparking Code, the requirement for Visitor
Accommodation Type 4 Conventional for visitor hostel is 1 space per 12 guests and 1 space per staff
member and parking for a courtesy shuttle bus. The hostel will provide accommodation for up to 84
guests, resulting in 7 carparking spaces. As shown on Drawing No. SD201b the site can
accommodate 12 parking spaces. Staff parking will be accommodated in the adjacent site, as the
hostel is a family run business with staff residing in the family home. On-site parking includes a
double garage with provision for additional temporary parking within the driveway as required. The
courtesy bus can manoeuvre adequately within the adjacent site as shown in the attached drawing
Plan No. 0293-DUKE-T01. The hostel bus can adequately load and unload passengers from this
location without conflicting with pedestrian movements associated with the guest car parking area. In
regard to the requirements of the Noosa Plan, the parking arrangements proposed for the site are
considered adequate sufficient for the intended use.’

As indicated in our response to item 2 the proposal complies fully with the Specific Outcomes of the
carparking code in relation to carparking numbers.

Item 4; The current operation of the hostel utilises the parking bays of the units as part of the
common/ recreation areas. Please provide details of how these areas will be replaced or
transposed within the new development so that the vehicles parking areas will not be used
in this way. .

Comment: The applicant indicates that they are removing and disposing of the old pool table from the
site. The existing development does not have a large common area and any furniture that is in a reasonable
condition will be located in these new common lounge areas. The existing surfboard racks are to be
removed from the site due to recent theft of the boards.

item §: Provide details of how the unformed laneway between the allotments will be adequately
managed in association with the development. The current access restriction to the
laneway are unlawful. During a site visit the applicant indicated an intention to ratify use of
the area through either the purchase of the land or an exclusive use rights agreement with
the Department of Natural Resources & Water. Please provide correspondence from the
Department indicating their willingness to enter either agreement. Alternatively the
proposal plans should be amended to adequately address the secure access to the
allotments and remove the current unlawful access restrictions to the public laneway

Comment: The applicant indicates that the existing unformed laneway is never locked and is always
accessible. All gates are able to be removed to provide public access. With regard to security, each room is
able to be locked and secured.

item 6: The manoeuvring area indicated: within the laneway is unsatisfactory and should be
amended unless the owner can confirm exclusive use rights over the area.

Comment: The applicant's traffic engineer states ‘There is no requirement to use the laneway for
manoeuvring. The mini bus servicing the hostel can manoeuvre in the existing driveway of the
adjacent hostel manager's property, providing secure off-street parking. Refer to the attached drawing
Plan No. 0293-DUKETO1. This location allows for safe loading and unloading of bus passengers
where pedestrian movements are separated from the hostel parking area and noise to adjacent guest

Page 4

o lin
oe 2 Page 4 ee aoe

 

 

 

facilities is minimised. The bus provides up to 10 trips per day into Hastings Street and the Junction
and survey data indicated it is a well utilised service’.

 

 

 

item 7: Provide details of any anticipated pick up services (third party tours) from the site.
Comment: Any third party tours will operate as per any other unit development in the area. The tour
company will pick up any patrons at a prearranged time from the site as for other accommodation houses in
the area.
Item 8: Please provide workings for the population density calculated for the proposal on
page 10 of the Proposal! Report.
Comment: In accordance with the Planning Scheme, Visitor hostel or dormitory beds, where
double beds are classified as 2 beds have an equivalent population density of 0.6 persons per bed.
Northern site Southern site
Ground floor 8 x Dorm (bunk x2) = 8 x(1.2x2) = 19.2 2x dble bed = 2.4
1x dble bed = 1.2
Upper floor 7x Dorm (bunk x2) = 7 x (1.2 x2) = 16.8 5x dble bed =6
1.x Dorm (bunk x3) = 1x 3.6 = 3.6

 

 

 

 

 

Item 9: Please provide the Survey Plans referred to on the Architectural drawings.
Comment: Survey Plan attached as part of amended plans.
Item 10: Provide the following details of the services to be provided to guests:

10.1. What goods and services be offered for sale on site?

10.2. Will meals be offered for sale to guests?

10.3. Will alcohol be sold on the premises?

10,4. What are the proposed hours of operation of any on site services?

Comment: No on site services are to be provided on site. No meals or alcohol will be provided.

Item 11: Provide details of the extent of interference with the existing vegetation on the site that
will be required to complete the development.

Comment: Amended plans are provided which indicate the amount of vegetation to be retained.

As indicated by these plans no trees are to be removed. As part of building works some trees may be
required to be trimmed.

Land Development

Item 12; Demonstrate compliance with Council’s Engineering Works Codes, particularly the:
12.1. Driveways & Carparking Code,
12.2. Existing Services Code.
12,3. Transport? Roads & Drainage Code,
12.4. Water Sensitive Design Code
Whilst a detailed assessment of these Codes will take place at the Operational Works

Page 5

 

 

-@_..Page-5. =

Stage, it is important that they are considered Prior to obtaining a Maternal Change of
Use approval, as they may impact on the proposal.

Comment: The applicant Traffic engineer has responded as follows:

A report outlining the compliance with the driveways and parking code is attached. In regard fo the
existing services code, there are no extensions impacting on existing or proposed services. The
existing stormwater pit located in the kerb on Ferguson Street adjacent to the existing driveway will
remain. Further details regarding water reticulation and sewerage will be provided at detailed design
with the Operational Works. In regard to the Transport, Roads & Drainage Code, the proposed
development will not generate significant traffic on the external road network. As shown in the survey
data obtained from the existing site, guests utilise the shuttle bus service, with very few guests arriving
with a car. The hostel is well located for tourist activities and provides excellent options for alternative
modes of transport to reduce car trips on the local road network.

Item 13: Please demonstrate that sufficient rainwater tanks will be provided on site to
service the toilets in the new building and the landscaping areas. To this end the
overall tank(s) capacity should be based on 12 litres/rn2 of roof area or at least one
5000-litre tank, whichever is the greater.

Comment: Amended plans are provided that demonstrate the location of rainwater tanks on site.
These tanks are located at the rear of the site.

Item 14: Provide drainage assessment prepared by a qualified registered engineer to estimate
the depth of stormwater ponding on the site during the 1 in 100 Average Recurrence
Interval (ARI) storm event and demonstrate what measures (such as raised floor
levels, waterproof flooring etc) to be implemented on the development site to alleviate
flooding of the premises during 1 in 100 year ARI.

Comment: The applicant has submitted numerous complaints to Council over the years as to the
problems associated with stormwater ponding in the street and flooding the subject site. The
photographs below detail recent flooding of Ferguson Street and demonstrates that the existing
stormwater systems are not able to cope with the flows of the surrounding area.

 

Page 6

 

As demonstrated by these photographs the subject site floods due to the inadequacy of the existing
Council infrastructure. The applicant does not intend to alter the existing floor levels and intends to
renovate and extend the existing structure on site.

Item 15:

Comment:

Demonstrate that there will be no net increase in run-off from the site as a result of the
development. To this end the use of larger rainwater tanks or stormwater holding
tanks may be needed and these will need to be shown on the proposal plan.

The amended proposal plans detail rainwater tanks on site. As indicated above the

applicant does not intend to alter the existing surface levels and therefore will not alter run off from the

site.

Item 16:

Comment:

As Noosa Council is actively improving pedestrian and bicycle facilities to encourage
mode shift (from private vehicles to non motorized transport means), demonstrate the
adequate provision of bike racks/rails for guests and for staff.

Due to potential public liability issues the applicant does not provide bicycles for

patrons. Bike racks are detailed on the amended proposal plans.

Item 17:

Comment:

Details of the carparking to be provided with the development, demonstrating:

17.1. The ability for vehicles to be able to turn around on site.

17.2. Compliance with Australian Standard AS2890.1 Parking Facilities: Off-street car
parking.

17.3, The types of vehicles servicing the development site.

17.4. Shuttle bus parking and manoeuvring details.

The amended plans detail.carparking and manoeuvring areas.

Environmental Health

Item 18:

An acoustic report prepared by a registered professional Acoustic Consultant shail be
submitted assessing all potential noise sources such as:

18.1. Air-conditioning and pool pumps;

18.2. Laundry Equipment;

18.3. The use of the indoor common areas;

18.4. The use of the outside pool and recreation areas;

18.5. The use of dormitories, bathroom and kitchens; &

18.6. Any other anticipated noise sources. |

and demonstrate how the development will not cause —

Page 7

 

* Excessive noise under Council's Local Law No. 12 — Control of Nuisances.
¢ Unlawful environmental nuisance under the Environmental Protection
Regulation 1998.

Comment: The applicant submits that the site has been used for holiday units for many years and
the noise associated with the conversion of the site to a backpackers will not significantly differ from
the current use.

All air-conditioning units and pool pumps will comply with relevant requirements.

The applicant notes that the communal kitchen and lounge areas are located well away from
residential properties and are closer to the Duke Street frontage. Further as part of operational aspects
associated with the Backpackers, the on site Manager is able to monitors noise levels to minimise
impacts.

Item 19: Submit details on laundry facilities eg: number of washing machines, dryers and
outdoor clothes drying areas for an 80 bed hostel (It is noted that there is no laundry
shown at the house refurbishment site of the development).

Comment: Laundry facilities have been detailed on the amended proposal plans.

Item 20: Communal kitchens shail be constructed to a commercial standard and with
mechanical exhaust ventilation aver the cooking equipment. Detail of intended fit out
shail be supplied showing adequate refrigeration, storage etc for 72 quests.

Comment: No cooking facilities are to be provided as part of the communal kitchen. No ovens
will be provided as the applicant considers them as a fire hazard. The applicant intends however to
provide a sink , microwave, toaster and kettle.

Item 21: Commercial kitchens are to have the liquid waste connected to a Trade Waste line,
that discharges to an approved grease arrestor in accordance with Council's Trade
Waste Policy. Details of the location of the grease arrestor, is required for servicing
purposes.

Comment: The applicant indicates that as no commercial kitchen in being provided a grease
arrestor is not required.

Item 22: The developer must provide waste storage and disposal facilities, including an
external imperviously paved area correctly sized for all refuse and recycling containers
and suitably screened from public places and neighbouring properties. Detailed plans
are required on the number of bins (refuse & recycling) and storage and collection
locations for the site, and bin wash facility. Provide details on a storage area for
cleaning materials and equipment.

Comment: The amended plans indicate the waste storage and bin areas.

The supply of this additional information completes the applicant's response to Council's above request for
additional information in relation to this development application. Could you please forward a copy of the
adjoining owners so we can commence public notification of the application.

It is requested that Noosa Council completes its assessment of the above application as soon as possible
now that the decision making period has commenced under the /ntegrated Planning Act 1997.

Page 8

 

 

Traffic Engineering Report

Access Assessment

Proposed Hostel Development
14-18 Duke Street, Sunshine Beach

For

P & L Staley

May 2008

  

Traffic Engineering Consultant
PO Box 303, Coolum Beach Qld, 4573 © 0403 B89 039 » [email protected]

 

 

Page 9

DM Hayes
~ Traffic Engineering Consuliant

1. INTRODUCTION

D M Hayes Consulting has been commissioned by P and L Staley to provide traffic
engineering advice for the proposed access arrangements for a Material Change of
Use Application for Visitor Accommodation (Hostel) at 14-18 Duke Street, Sunshine
Beach. The objective of this study is to provide adequate information to Noosa
Council for a Development Application for Visitor Accommodation Type 4
Conventional - Hostel.

2. PROPOSED DEVELOPMENT

The proposed development includes the extension of dorms and associated facilities
to the existing Dolphins Beach House hostel at Duke Street, Sunshine Beach. The
development currently accommodates an estimated 36 guests and will ultimately
provide accommodation for up to 84 guests. The site is located with good access to
local shops, restaurants and café, the beach and Noosa National Park. The 12 seat
shuttle bus provides regular trips to the transit centre (currently located at Hastings
Street), reducing vehicular trips on the road network. A copy of the proposed plans
has been provided by Kidd + Co Designers and is attached in Appendix A.

3. ACCESS ARRANGEMENTS

3.1 Existing Access
There are two existing access locations for the development. One access is
provided from Ferguson Street directly to the guest car parking spaces. There
is also an access from Duke Street to the Managers residence, providing two
garaged parking spaces.

   

Photograph 1 — View of existing driveway access
onto Ferguson Street

Access Assessment — Duke Street, Sunshine Beach
For P & L Staley

Page 10

DM Hayes

 

"7 “=~ Trafic Engineering Consultant

parking are outlined in Figure 2.2 of AS2890.1. Minimum requirements for
90 degree angle parking bays include a width of 2.4m, length of 5.4m.
Consideration must also be given to the location of columns, walls and
obstructions as shown in Figure 5.2.

5. ACCESS & CAR PARKING COMPLIANCE

Access driveways will be located from Ferguson Street and also from Duke Street.
Guest parking has been provided within the site from the access driveway located off
Ferguson Street. Manager, staff and bus parking has been provided from the existing
access driveway off Duke Street. Provision for 7 guest parking spaces, 2 parking
spaces for the management and staff, and one shuttle bus has been included. Refer to
Appendix A for layout of proposed parking arrangements.

5.1 Compliance with The Noosa Plan Requirements

The development proposal includes provision for 84 beds and therefore 84
guests. The proposed development has made provision for 7 guest parking
spaces, 2 secure staff/manager parking spaces, and one shuttle bus. The
minimum number of spaces required by The Noosa Plan for this development
is 7 guest parking spaces, parking for each staff member and parking for a
courtesy shuttle bus. Staff parking will be accommodated in the adjacent site,
as the hostel is a family run business with staff residing in the family home.
On-site staff parking is accommodated in the existing double garage.
Therefore the proposed development complies with the requirements of The
Noosa Plan.

5.2 Compliance with Australian Standards AS2890

An assessment of the existing access driveway at Ferguson Street has been
undertaken. The location meets the requirements of Figure 3.1 of AS2890.1
and is located 6m from the tangent point of the intersection of Ferguson Street
and Duke Street. The location of this access is governed by the existing
buildings and existing guest parking spaces.

An assessment of the access off Duke Street has not been undertaken as it
exists for its current use; however an assessment of bus manoeuvrability at
this location has been undertaken and is adequate as outlined in Section 4.3
below. ‘

Car parking for guests has been assessed. The car parking bay dimensions
comply with the requirements of AS2890.1 providing a minimum of 2.4m
width and a length of 5.4m. There is adequate area within the site for vehicles
to manoeuvre and also to arrive and depart in a forward direction from
Ferguson Street. :

53 Manoeuvrability

Access to the shuttle bus parking space has been assessed. The shuttle bus
can manoeuvre in a forward direction into the parking area, reverse and exit
the site in a forward direction as shown in the turning template provided in
Appendix B. This is the preferred location for the bus parking area as there is_

Access Assessment ~ Duke Street, Sunshine Beach
For P & L Staley

 

Page 11

DM Hayes

 

-+—— —~ ~ “Traffic Engineering Cansiltant

 

Appendix A

Proposed Development
Provided by Kidd + Co Designers

Access Asséssment — Duke Street, Sunshine Beach
For P & L Staley

Page 12

|
|

@)qL0z'0S
wn ‘eNeumeX)
flo 1m
a gona
20 dv UROYS SE
iy =

i Nd
YOOTd ONNOYD
barre)

ou!
ATWIE 12d
=
HOV29 SNIHSNAS:
| is 34nd sb
wom

ANBAHSISUNSTY
suaNovd Nova
pag

'&
| =
ohn aAQWaH cree
\ ONLNYId NBN ¥

OMLNYId ONSIXA OC &

|

  

  

wBorrswss Arora,
Sua NOVaMOWE NVId YOOI GNNOYD\_|_/

 

‘is pind

 

 

 

 

   

“Ls NOSNDY3I

 

      

 
 

ZONNOT AMIN

AVMANY1 G3WYOANN

           

    

     

ve 7

OO

    
 

     

 
    

 

Hive

HIVE

 

    

opaaeys 3H wo ERO
{woot woop Fo BRA rE

  

ESaAnAAN

Aw HLr ti EE

   

aN
~—

Page 13

3m

 

asa
{1SEAT AH METERS
wom is
TRAGK Pi
LocKTOLOCKTWE =: BRD
STEERING ANGLE 2 ast

 

x
WK SS
>
SS

IN ASSOCIATION WITH

De. Engineering Consultant

PO Bax 303, Coatum Beech QM. 4573 » o4u3 Ey O39 » dnhayestiatficGoptunneLcom.su:

 

 

 

 

 

    

 

 

 

 

 

 

 

 

 

aE . CONTOUR || pRoposen RenovaTION Se SS es TURNING PATH

if “BA consulting Engineers 3] AT 1G DUKE ST, SUNSHINE BEACH ome Sq | 12 SEAT MINI BUS / VAN

? 5 } eral FOR DM HAYES Swe ea-on- pou NOT FOR CONSTRUCTION
7 NS Sersiranateee sa mone O2SS-DUKE-TO! nonin A oem tort

 

 

 

 

 

 

 

  

 

3

 

Page 14

Gd L00'S
“ON Buwexy

‘ON ans]

el d10 © HOV39 SNIHSNNS

20, Yd UMOUS SB
ara apg

 

SAAILDSdyAd
“ NOILVAONSY LS ANNA QI
AIWIS 9d
HOV SNIHSNNS
1S and at
INAWHSISYN434
a5710H neque Ly 2v © 001:b3TvOS (ors
BoE SS SAILOAdYAd LSSM HLYON\ ¢_/

oes

i pres

 

 

‘i

 

l

 

 

|

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

BERS zv © 001-3 1vOS ony
soype au hota AN LOAddAd LSSM HLNOS\_} 7

 

 

 

 

 

 

NB'WOd'COPPIAGPopLH

SERS Lr¥S 20 ‘eyuursoe 4
SE9S LrvS 20 auoydaray,

29S¢ CTO Spesy esooy
292 X08 Od

295% C10 Wea au;ysuNg
Was aNd 0%

ssouBisap

 

Page 15

)

"ON anes
e120
-0N Gop

20, ddV
aq

LOL'as
‘ON Gueig

app
Agueeig

uMoys Se
aR

NV1d ALIS SNILSIXA

amy. Buyweig
AAWLS 18d
vay

HOV3 SNIHSNNS

4S 3yNd 8h
09200)

AINSWHSIaens3ay
SSNOHMEDIOVADIO¥H

é g a

© & *

 

Se

 

Lt
‘BE

.
2

LE

hes

 

BTBE

O
©

 

FY;

 

£o7e
eole
a
s

a
brie" OFZE™

6yLE* OS ZE™

       

Osndy34

NC

 

‘Be
E
BE
"BE
BE

 

&
Bi
ere

 

 

 

 

MS
SINTER

fe

CS BE~
€9°8E«

 

 

‘woyne aig Avadaxd
ag uewal Sues

‘g ubisap soy pyfiukddon,
‘fuses ij posn

29 0) jou awe shuweup
sayy, Spam fue
ueWE0UEWIUOD Oy Oud ays
uo SUORSUGUUNp FB ALE,

pepuswe:

88°9 S76) Mera Bog
AIEPURS 2 $9909 VOR
Rvs RNR EY
‘Ahuuno oy uogensu0%)
‘Sodey

‘9 sfuweig spouting
ya uonpuniuoo 1s peau
29 0) & Buywesp sau

 

 

 

TM

 

 

LSE

 

LS LE

 

 

 

 

 

 

 

9s'Ze
tele
T
—
&
Om
oO

 

Q Cole
aNVT AYMHL¥d

 

 

 

   

Lee
Leze

et

 

6BLE

 

 

 

STLE
SIZE

NE" WOO" COPY AA

™
LAAYLS

1 “zp,
SBE
6s6e St

or
ne woo'coppHy@oys st

 

 

@
ZE-8S. O8'6E«
¥

SERS Lvs 20 eqwisoe 4

const
£09G Zr¥G £0 euoydoyay i

C-)
Q
2
et ae

 

 

 

 

 

 

S1'ae.
gree:
LEBER
a
a
%,
&
of
o.
&
%
Cs
aay
&
%,
e
*S'6E
Slee
ree

Z9S¥ G1 SpeaH ES0ON (O10)
z92 0g Od

 

 

29S¥ 10 yoeag eunssung (862)
wang ang Oz >

ssouBisep

 

Page 16

id ZOL'GS
“ON Cupra

‘oN anssy
£120 4pp
‘ON Gor fquven

20. ddV UmMOYs Se

eq apg

NV1d

ALIS G3SOd0ud

muy Buyncag

AAIWLS 13 d

way

HOVad SNIHSNNS

1S SiNd 81

uogeno]

LNSWHSISYNASY
3asno

wala

ONLINVId G3AOWNSY ‘Oi AH!

ONLNYTd ONUSIXA @ [SS

ON39371 ONIINV Id

 

 

“woune ata yo Ayadoud
ap ewan sSumenp
‘9 usp soy py8uldor
‘hugeas Joy psn

80) )0u axe sae
Seay “spam Aue jo
{UBUIBOUBLLUDO 0} JOud ays:
uo suorsuauUp Ie Aaj,
Papuewue

829-976) mera Bog
AUEPUES 9 59009 WOR
BYVS UeNoEL Fe
‘Agno 04 vogonuysuio

Body

"9 sfuyraig smeusuy
{pa uogouniiuco ia peau
990) Guwen sy
Ne"WOo'COppD AM,
Ne'WOo ‘COppHopy

S885 Les 20 ‘oqtwsoe 4
SE9S Lvs 20 auoydeyay

29% C10 Speay soon
292 X09 Od

295% OW Weag ouysung
ans 010Q 02

sieuBisep

 

 

 

 

 

 

 

 

 

 

 

 
 

pe
ee

CYA O A ihe PS Ree, |
HY 7 Loe — ny K x . RA) ROY
YY eS RSL — a Roz oator gna INE,
Si yon ine \_S AWE ONIISIRS yp AEE
, — — ARR Oe Re

 

 

 

 

 

 

 

&

 

 

 

0.22
vOLZE

 

      

Vauy
NOWWOO
M3N

| —

   

 

 

 

 

 

 

 

 

 

ly

v1

Vaev 100d ONUSKI

 

 

 

 

 

SW
ONIL

 

 

 

 

zw ® 002:} F1v9s /eov'as\
NV1d SLIS\ 1 /

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

NIVINZd OL INSWHOLVO 4004 ONY S13A37 YOO14 LING ONLLSIXS “SLON

qed
CO,
OE ATT Oe,
pe
ss
\.
\,
N.
ONMYVEYY DS |
Od \
SIXa \
>
!
a
SWHOd
ONILSIXA
V
ws

cn ae Ce

Oo ==

 

 

 

K SWUYOGSONSAISTY y Ko

SYAOVDIOVa

 

 

me
™

s.,

_

aN

‘LS NOSNDYS

Page 17

32.187

 

  
  
 
   

 

< existing access 5
kidd
+CO

   

 

   

233°0

approximate
location of poo!

designers

  
  

7.544

 

 

 

20 Duke Street
Sunshine Beach QLD 4567

S PO Box 262
Noosa Heads QLD 4567

 

Q
8
L

Telephone 07 5447 5633
Facsimite 07 5447 5833

[email protected]

 

 

www. kiddco.com.au

This drawing s to be
fead in conjunction with
Engineers Drawings &
Reports.

‘Construction to comply
with all relevant SAA 8
BCA Codes & standard
Bldg By-aw 1975 & as
amended

 

 

 

k—pool fence shown dotted /

( *
|

\ e

 

    

‘Verify al dimensions on
Ske prior to commencement
of any works, These
drawings are not to be
used for scaling,
Copyright for design &
drawings remain the
Property of the authors,

CONSULTANTS
‘Stucure Enginoers.

Ces SITE AREA: 842.48m?

SITE COVER: —299.71m? or 35.6%

DOUGLAS ST.

  
 

communial

KITCHEN

  

 

sta UNFORMED LANEWAY

2.0m Setback

   

©O:

 

  
 

   
 

  

 

 
 

   

 
 
  

| Up LEGEND
if sO [J rew lightweight wal
| existing. |. PATH GE existing wal
| GARAGE (LLL ZA Wem masonty wall
y youd CCITT ening tobe removed
@2
eee athe oo. OW
ew O O
2S L]
ON
_ EXISTING DRIVEWAYI™ as
-BUS LOADING ZONE 25 =

   

 

 

Project

HOUSE

REFURBISHMENT

Location

18 DUKE ST

SUNSHINE BEACH

Giert

P &L STALEY

Drawing Tile

GROUND FLOOR

PLAN

Scale Date

as shown APR ‘07

Drawn By Job No:

ddt 0713

Drawing No. tssue No,
/_1 \GROUND FLOOR RESIDENCE/DORMS SD.201a 12)

    

‘ \90.2019/
‘ a

SCALE 1:100 @A2

Page 18

  
    

 

:
Y
E
Fj
i

 

4<— existing access

kidd
+CO

designers

 

 

approximate
location of pool

  

FOR EXACT POSITIONING
OF BUILDING ON SITE REFER
TO SURVEYORS PLANS.

     
  
 
 

 

20 Duke Street
Sunshine Beach QLD 4567

 

PO Box 262
Noosa Heads QLD 4567

Fi P) Telephone 07 5447 5633
ss Facsimile 07 5447 5833

4

 

 

 

 

[email protected]

|
!
i
!
|
|
I
|
|
!
(
I
t
|
www.kiddeo.com.au
!

 

k—pool fence shown dotted
(

 

    

 

UNFORMED LANEWAY
DOUGLAS ST.

  
  
   

ISTING BUILDING TO REMAI

 

 

Ce SITEAREA: 842.48?

SITE COVER: —-299.71m? or 35.6%

 
   
 
  
  
 
 

2.0m Setback

    

LEGEND

[___] newlightweight wall
PY existing wall

new masonty wall

wen eceeeenen ene .
f '

i

. t ;
©... | 4
_ existing f

“GARAGE

 

 

beeen ee 1 existing to be removed

      

PLANTING LEGEND

 

Ge @ EXISTING PLANTING

& © NEW PLANTING

(GS) \6) REMOVED PLANTING

 
 

   

    

-...., EXISTING DRIVEWAY”
~ BUS LOADING ZONE. -

‘BIN ENCLOSURE
\ ]WASH ZONE

   

    
   

 

Project

HOUSE

REFURBISHMENT

Location

18 DUKE ST

SUNSHINE BEACH

Client

P&L STALEY

Drawing Tile

GROUND FLOOR

PLAN

Scale Date

as shown APR '07

Drawn By Job No:

ddt 0713

Drawing No. Issue No.
/ / 1 \GROUND FLOOR RESIDENCE/DORMS SD.201a 61)

6 a/ SCALE 1:100 @A2

Page 19

@e202 OS w® ool; 3wos £2070
6420 app SWHOd/SONSCISSY YOOTS LSHIs\_ 4b /

“ON Gor Aquwaig

20,ud¥ =—-_- UMOYS SE
#0 aRIS

NV1d yOO14 iSdl4

aL Gayneng

AAWLS 13d
wag

HOW3d SNIHSNNS _—a—o
4S 3nd 81

uoR007]
INAWHSIaansay

ASNOH
pokd

©

vnowaseqo)Bugsxe +

em Auosew mau [LZ]
rem Sugsxo

em yyBiemjy6y mou [|
anges)

%9'SE 40 2W2'66Z = -YAAOD ALIS
2ugh 28 ‘Wad SUS

Ta eS
SINWTENDD
‘gouge aig jo Ayadad a0VeYsL
ag urewen SBuMep pesodad
"9 ubsap 19) uBio “SELLE
“Gumpos any psn :
2q 0) ou ae sfuenp
sayy, ‘Sypom fue jo
UBWROUBLLLIND 04 J0Ud Ss
Uo SUOSUGLUD FB AA

 

 

 

 

AYMANW1 GSWYOANN

Pepuowe
$29 c/61 werk Bog
PIRPUBB 9 59009 YOR
2 VVS TENOR Fe La
‘Adon cy uogorgsuc;,

‘LS SVIONOG

“soday

‘2 sBuyreng siooubug
ygrs uogpuniuco ul peal
aqa.s Guwep su,

Te" WOo"COppDy MAM
ne'woo'coppryBo}ly

COS Lb¥S LO aqunsoe 4
££9S Lr¥G 20 auoydayay

£9S¥ CWO Spes} BS0ON
29% X08 Od

296% C10 yeag auiysUNS
wags SN 02

ssauBisep

 

Page 20

 

i mht

r a | +CO
|

 

 

+ 1585 + 1500 # 15520 + 10083 t
- 1.5m SETBACK Existing New Scheme 1 designers

line of roof over shown dotted = | 20 Duke Street

____existingstair ; ______—_sexistingstair
double glazing fo all dorm room ' \ \ Sunshine Beach QLD 4567

eT ----Up -- a4 windows on NE elevation

     
 
   
    
 

PO Box 262
Noosa Heads QLD 4567

 

 

 

 

 

 

 

 

 

 

{plicit LLL

LI

 

 

 

 

 

 

Serr

Telephone 07 54475633
Facsimile 07 5447 5833

 
 

 

   

 

[email protected]

 

 

 

 

 

\ www. kiddco.com.au

 

Er)

 

LOUNGE

 

 

 

 

 

 

 

 

|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|

 

 

 

 

fine of roof over shown dotted

 

SITE AREA: 996.25m?
SITECOVER: — 385.25m? or 38.7%

_O-
i
ut
UNFORMED LANEWAY

LEGEND

2 Es [_________] newlightweight wall
—— EE existing wall
t new masonty wall

prscecccn eee eend
' '

 

 

 

 

 

be-----------.--

Upper Balcony

existing to be removed

 

 

 

 

 

 

 

 

 

 

2.0m SETBACK

 

|
|
|
i
|
|
|
{
|
|
|
|
|
(
|
|
|
|
|
|
|
4
I
I!
|
|

| Project
; BACKPACKERS
| REFURBISHMENT

; _ Location
. . new star oe eae 18 DUKE ST
N ee Lees ob SUNSHINE BEACH

_ Client
Deer P&L STALEY
- ee as Drawing The

FIRST FLOOR PLAN

DUKE ST. 2S APR 07

as shown

orm FIRST FLOOR PLAN BACKPACKERS Sant te
D.202hy : Drawing No. Issue No,
~— SD.202b 12)

Page 21

@deL0S'aS
‘ON anes ‘ON Guwmexy

£420 wp
ON gor fqueeag

20, dd¥ UMOUS SE
aed aS

SNOILVAS13

mu, Buyer

AFWLS 18d
wan

HOV28 SNIHSNNS

4S DING 8b
wogeo0]

LNAWHSISeNdy

asno
olay

Ne'weo'ooppny aa
NB" WOT'OOp PEDO}

SERS Lies 20 SqUsoe
8E96 Leys 20 auoydajay

29Gb GW Spee} eSOON
292 X09 Od

295% C10 Weeg aulysung
yeags ang 02

suauBisap

 

zw ® ool:1FIvos /BL0S'as

SWaOd/SONAGISSY NOLLWAS 1a AS. 27

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

i90y TH4 - WOOT GNTOHS

 

 

 

 

 

 

 

 

 

 

 

 

SS TT BOOT ISTE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

S/N 9) suaped sequin yam
Bugseys yueredsuen

        

2v@ o0l:b3 IOS evga)
SWYOd/SONSGISSY NOLLVAS TS MN. 4 /

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   

” 00e'Gr “Fd * HOOT Isat

So,

O0C er T44 - YOOTS ISHId

 

 

S/N) SuaHeg soquy RS
Bunseys wuaedsuen

 

Page 22

Gd) ®Z0G'GS
‘ON anssj “ON Guna

€+20 \pp
‘ON Gop Aqueeq

40.ud¥ —_ uMoys se
aq org

SNOILWA313

muy Buyneig
AAWLS 13d
AK

HOV SNIHSNNS

4S 5nd 81
uoge2007

LNAWHSIGYN3SY

ASNOH
wefouy

SIMITENCO

“suoygne aug jo Ayedad
Op urea, SBuyeup

‘9 bisa 404 9yBukdo
“Bhuyeos 104 pasn
2q.0))0u ae sianep
sal, pom Aue jo
U2LIGOUBULUCD 04 s0ud ays
Uo SUO;SUOLLED je Aug,
pepuswe:

8295261 metlg Bog
PIEPURS 9 $900 YOR
VS eNaAL Ie yA
‘Aduro 04 uogongsuog

 

 

ne wos ooppygojut

 

8898S Lees 20 Sywuysoe 4
£€9S LPS 20 suoydaya,

 

29S% G10 speay esoon
29 X08 Od

 

295% CTO yoeag eurysung
wags a4ng 02

suauBisop

OME
eae

 

 

  

SWYOd/SONACIS3SY NOLWAS 1S We)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

3Pep pue Buyye mau

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Wer Td - 8001s iSuid

 

 

2v © 00b:1TWOS

SWYOO/SONACISSY NOLLWAI 1a MS

 

 

   

 

 

 

SWOT TWNOILIGGY a3S

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1489} Buping “ey We

 

2H Gupang “ew we

Page 23

2v O 001} 31WOS Arozad.
SYaWOVdNOVE NVId YHOOT1S GNNOYD\ 4 /

    

Gd) 02'S
“ON anssy “ON Guyreig

€420 \pp

‘ON Gor Aquveig
20, ddV UMOYS Se OI EEN anaes cn ne OS
aeq apg
NW1d

YOO 1d GNNOYD
nu Buyreiq

AAWLS 13d
wa

HOVad SNIHSNNS

1S SN 81
092207]

INSWHSISYNsSY
SYaNOVdNOVa
pabug

 

 

 

 

corccnt a
1

HilWd TWNYALXA s

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ONLNWTd G3AOWSY ag:

 

 

ZI 391440
Janoa ; ONILSIX3

L_]
a I cons ang vz|;o™ png vz| ™
WYOd wxod

 

 

   

 

CR
ONILNVId ONUSIXS €F &S

QN3937 ONILNV Id

 

 

 

    

 

 

 

wavdxa G

 

 

 

   
 

[ed Aue ops
Mavdyvo X3

i ae
yRivd xa RIV Xa weld Xa
€ zZ b
) vm b be
Sire 7 wre 7 ORT 7

iS wes Bugsexe anowe: —3

 

 

 

panoway aq o} Bugsxe |
panowias aq o} Bugsy [Td
em Auosew mau (777777777
ren Suisxo SE
em yyBiomyy6y mou [|
ONdDS1

 

 

“Payop uMoys J8A0 Auogjeg Jo aui

:

is

+t
DOE

() Hive AYLNA
»
JSNNO1

 

 

 

 

 

 

 

 

 

 

HL BE 30 WGeS8E = -HSAOD ALIS
2UiSZ'966 ‘Wad SIS

SaaS
SINTTENO

“syne auy jo Ayadad
ap yews sSuweNp

19 ubsap 09 y46ustdor)
“Guys 10} pasn

89.0) )0U ae sfuweip
Seay SpoN Aue jo
WOLWOUBLLLUICO 04 Joud eas
Uo SuORUBUAp Fe Au),

papuawe
829 S61 Werke Opa
AUEPURRS 9 $9000 YOR
PWS WEASEL FE an
‘Adiuico aj uoyongsuo;)

 

 

 

 

_Panop umoys sono Aucoyeq Jo au ise!

 

 

 

SJONNOT

() HIV AMLNA
PLDT - = 9 Sa] am fF

72
WHO | an

 

 

 

 

 

 

 

 

 

 

 

 

 

\ ve
| wyod

 

“SWI SYOABANS O1 | 4
434 S18 NO ONIGTING 30 |.
QNINOTLUSOd LO¥X3 YOd

 

 

 

 

 

 

 

 

 

 

 

JONNOT AMLNA AYLNA =39NNO1

ih

 

 

Ls
@
3
z
&
Hid WNYALXS
|
O

a “LS NOSNDY3

AVMANV1 GSWeOANN

ey

 

v2 vz|
WHOG) = fp] == WHOd == fd Hive
= eee fe

[ * LL —
lililil

YONNVT

(2) 2/2/58]

CC8S LyvS 20 BpuuISORY CxO
£096 Lr¥S 20 auoydoray
29S¥ G10 Spesy e500
292 XG Od

 

 

 

 

 

(313)
5 3
[iia

 

 

 

 

 

 

Hii TTL Th

299% QO yoeag Sujysung
yans ONG 0%

 

 

 

 

 

 

 

: UOHEAS}a SN UO SMOPUIM
Torereeaeccerce cance . “—"" WkOOy WUOP Ye 0} Buizey6 ajqnop

 

 

 
 

 

  

 

 

oe
|

FLL

 

 

  

siouBisep

 

 

 

 
 

Page 24

Ga) q10S'GS
“oN anes “ON Buyneiy

€120 4pP
-ON Gop Aquwenq

ZO.udv = UMOYs Se
aa 2g

SNOILVAS14

any Buyweig

AAWLS 13d
wa

HOVAd SNIHSNNS

1S SyNNd 81
09200)

INAWHSI88ns3aY
SYsxOVdNOVE
ppaloug

DROS
SINITENDS

“sour 04) 0 Ayedoud
ap upuiay SEuyeIp

19 ubrsap 1oy 48 uAdor)
‘fume0s 24 pon

9q 0) jou aww suru
‘as=K{,, SyOM Aue jo
UAUIBOUBUILINO 04 J0ud args
uo SUOSUGLURD pe Aju,
Papua
8296/6) wer Bog
PREPURS 9 S8R00 VOR
BS MANOR Fe UA
‘Aduuco oy uogoniysu0c)

spodey,

‘9 sfuweng sisoubug
{gpa uogpunluco uy pear
24.04 Gumenp st
T2"WW09"09 Pty" AAA,
ne'woa‘ooppy@ajuy

€C8S ZrvS 20 ayuysoe4
£09S Lr¥S 20 auoydelay,

29S CTO Spee} ESooN
29% X0g Od

L9S% CO Weag aulysUNS
WANs dN 02

si9uBisap

 

Zv ® 001-14 Tv9S /Q10S'GS

SYaMOVdMOWE NOLLWASTS MN\ ¢_/

      

pOUps Jajau SyeM IAS
man Oy sepua payed

  

 

quBioH Buipang ‘xeW We ~ oa eee ~o Le

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

gies ok : fe! SUROPUUA WuTUILUN}e MOU
ONICTING ONILSIXA ZA
° Lory Da
Se : . . : ” Se ee
Ge ~ oe Ff = Ff —— WOH Bupa “eH WE
—_ ~ oT Payps sya Sessny
nbex Bang xenne —) “1 Cc JoE;QUAA joo! Bugsnce 0) poos pays ByooRIe} Mau JOYE RURA JOO!

Page 25

@d)qZ0S°AS
‘ON ans] “ON Bue)

7) 4pp

ON Gor Aqueeq
20, ddV UMOYs Se
ara agg

SNOLLVAS1A Zv © 001: WS /4Z05°OS

oa fone SYsOWdNOVE NOLLWASTS MNCS

AAWLS 18d
van

 

HOV38 SNIHSNAS

1S SxNG 81
09207

INAWHSIadNnsaY
SYayNoVdNOVa
olay

       

ESE | en ES 2  ONITING DNUSIG =,

aR
SINITENOO

‘soyne aa p Aodad

yy upusal sues

‘g ublesap acy pyfuutcdory
‘Bugzoe 104 pasn

99.0) ;0u a shure
‘seu, ‘Spom Aue jo
{UBLUBOUBLLLUOO 04 J0ud Sigs
{uo suoRsuaUUp fe ANA,

pepuawe
529 S61 werd Bog
PAEPUBES 9 $9009 YOR
DWWS MEADE
‘Aduuno 04 uogonigsuoz)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

‘sotey

1g sfuweig enousuy
ge uogounico Uy peau
9q 0) Gupweup sip.

 

 

 

 

 

 

 

 

 

 

 

poyps s0yeu SEM eWEYKe

 

 

 

 

 

 

 

 

 

 

 

 

Ne"UOo'COp PH AAA
TB"WOD COPPONEPO}LY

€E8S 2e9S 40 ‘aquysoe
£095 Leys 20 euoydajal,

 

 

L9Sy CWO SpEdH BSOON
292 X09 Od

 

 

2959 O70 yesg auysuNS
PANS SHG 02

 

 

sieuBisep

 

Page 26

“ ‘\
8M Max. Building Height

   
   
 
  
   

 

8M Max. Bulding Height

FIRST FLOOR - FFI. 43.500 <<<

 

 

 

 

 

 

 

 

 

new handrail
& deck _-Y-
|
FIRST FLOOR - FFL. 41,100

 

 

roof ventilator new terraccta tied roof to existing roof ventilator rot vette

—— SM Max BuldingHeigtt Toot russes refer sched
af sa $ erg wl

 

FIRST FLOOR - FFL. 43.500

 

 

 

 

 

 

 

 

2500 2,400

>

kidd
ae

designers

 

20 Duke Street
Sunshine Beach QLD 4567

PO Box 262
Noosa Heads QLD 4567

Telephone 07 5447 5633
Facsimfe 07 5447 5833

[email protected]

www. kiddco.com.au

Project
BACKPACKERS
REFURBISHMENT
Locaion

18 DUKE ST
SUNSHINE BEACH

Client
P&L STALEY
Drawing THe

ELEVATIONS

Scale Date

as shown APR ‘07
Drawn By Job No:
ddt 0713

Drawing No. Iesue No.
SD.502b 12)

Used in these records

About this file

File size
3.3 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_0299 - Response to Information Request [As Published].pdf · 3.3 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.