Council archive · source document
08/0299 - Response to Information Request [As Published] · 132008.299
-@_..Page-5. = Stage, it is important that they are considered Prior to obtaining a Maternal Change of Use approval, as they may impact on the proposal. Comment: The applicant Traffic engineer has responded as follows: A report outlining the compliance with the driveways and parking code is attached. In regard fo the existing services code, there are no extensions impacting on existing or proposed services. The existing stormwater pit located in the kerb on Ferguson Street adjacent to the existing driveway will remain. Further details regarding water reticulation and sewerage will be provided at detailed design with the Operational Works. In regard to the Transport, Roads & Drainage Code, the proposed development will not generate significant traffic on the external road network. As shown in the survey data obtained from the existing site, guests utilise the shuttle bus service, with very few guests arriving with a car. The hostel is well located for tourist activities and provides excellent options for alternative modes of transport to reduce car trips on the local road network. Item 13: Please demonstrate that sufficient rainwater tanks will be provided on site to service the toilets in the new building and the landscaping areas. To this end the overall tank(s) capacity should be based on 12 litres/rn2 of roof area or at least one 5000-litre tank, whichever is the greater. Comment: Amended plans are provided that demonstrate the location of rainwater tanks on site. These tanks are located at the rear of the site. Item 14: Provide drainage assessment prepared by a qualified registered engineer to estimate the depth of stormwater ponding on the site during the 1 in 100 Average Recurrence Interval (ARI) storm event and demonstrate what measures (such as raised floor levels, waterproof flooring etc) to be implemented on the development site to alleviate flooding of the premises during 1 in 100 year ARI. Comment: The applicant has submitted numerous complaints to Council over the years as to the problems associated with stormwater ponding in the street and flooding the subject site. The photographs below detail recent flooding of Ferguson Street and demonstrates that the existing stormwater systems are not able to cope with the flows of the surrounding area.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0299 - Response to Information Request [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.