LEGEND THE DESIGN FOR THIS RESIDENCE IS TO BE IN ACCORDANCE WITH THE BCA 1.1.1.2
SCHEDULE OF DRAWINGS DESIGN CRITERIA - WIND SPEED N3 (tbc) (REFER TO ENG.DWGS)
RPD: lot 54 on rp 81810 DEVELOPMENT APPROVAL ISSUE 24.05.2023 CODE ITEM CODE ITEM
553.58sqm DD.01 SITE PLAN & NOTES 1:200 PTY PANTRY 90mm INTERNAL STUD WALL AS SPEC. NOTES
Planning Area Zoning: Low Density Residential DD.02 LEVEL B - EXISTING & DEMOLITION FLOOR PLAN 1:100 REF REFRIGERATOR BLOCK WALL (THICK. AS NOM.)
DD.03 LEVEL G - EXISTING & DEMOLITION FLOOR PLAN 1:100 SHR SHOWER (D-DOUBLE) GENERAL
Local Authority: Noosa Shire Council GS
DD.04 LEVEL 1 - EXISTING & DEMOLITION FLOOR PLAN 1:100 TUB SINGLE LAUNDRY TUB GRATED SUMP
Do not scale plans, use written dimensions only. If any discrepancies are found, the following must
Locality: Sunshine Beach WM WASHINE MACHINE be notified.
DD.05 LEVEL 1 - EXISTING & DEMOLITION ROOF PLAN 1:100
Proposed Use: New alterations & additions MH CEILING MANHOLE GD GRATED DRAIN
DD.06 EXIST. & DEMOLITION WEST & NORTH ELEVATIONS 1:100 EARTHWORKS
DP 100mm PVC DOWNPIPE MB ELECTRICAL METER BOX & SWITCHBOARD
Overlays: DD.07 EXIST. & DEMOLITION EAST & SOUTH ELEVATIONS 1:100 UNO all earthworks in accordance with BCA 3.1.1, A.S.1684.2 & A.S.3798. Cut/ fill indicated on plans
SA SMOKE DETECTOR ALARM WIRED
Acid Sulphate Soils; DD.08 LEVEL B - FLOOR PLAN 1:100 GHW GAS HOT WATER UNIT may vary at construction stage, building to adjust as required. Any variation at construction stage is
MB CONSUMER MAINS POWER to comply with local building authority and BCA on earthworks / drainage. All cut and fill
Coastal protection & scenic amenity; DD.09 LEVEL G - FLOOR PLAN 1:100 BW BRICK WALL - FACE BRICK - (Pattern to Detail)
MRS METAL ROOF SHEETING embankments up to 1m in height are to be no greater thatn 1 in 4. Max. cut/fill to be 1.5m.
Landslide Hazard (High Hazard Area); DD.10 LEVEL 1 - FLOOR PLAN 1:100 BW(feature) BRICK WALL - FEATURE (Pattern to Detail)
MRC METAL ROOF CAPPING
Riparian Buffer DD.11 LEVEL 1 - ROOF PLAN 1:100 CB CONCRETE BLOCK -(r=render; e=exposed; p=paint)
PRWS POLYCARBONATE ROOF / WALL SHEETING RETAINING WALLS
DD.12 WEST & NORTH ELEVATIONS 1:100 RW RETAINING WALL
TS TIMBER SCREENING (hwd dressed) All retaining walls and embankments are to comply with local building authority requirements. Any
BAL(-) BALUSTRADE (Type to Detail)
DD.13 EAST & SOUTH ELEVATIONS 1:100 MS METAL SCREENING (to detail) retaining wall over 1m in height must be engineer designed. Position of retaining walls and
WC(v/h) WALL CLADDING - (vertical / horizontal)
DD.14 SECTION A-A, B-B 1:100 TP- TIMBER POSTS TO ENG'S REQ'TS (Type) embankments may vary to suit site works.
WC(fc) WALL CLADDING - FIBRE CEMENT
DD.15 SECTION C-C 1:100 SHS/RHS STEEL COLUMN TO ENG'S REQ'TS -
(e - exposed, aluminium cover plates to suit) WINDOWS & DOORS CONTOURS & LEVELS
exist. Floor Areas exist. Gross Floor Areas - Total - 402.3m² All levels marked on drawings to AHD. Floor slabs to finish a minimum of 300mm above prepared
SC / SB STEEL COLUMN / BEAM TO ENG'S REQ'TS O FIXED PANEL platform level, 225mm above finished ground level. Timber floor framing to finish to heights above as
internal: internal:
- level basement floor area: 112.7m²; - level basement floor area: 89.2m²; TS/D TIMBER STAIRS / DECK (hwd dressed) X OPENING PANEL shown on drawings. Max. 3.0m height to undercroft space. All surfaces adjacent to buildings for a
- level g: 206.6m²; - level g: 159.7m²; TRB(exp) TIMBER RAFTERS / BATTENS EXPOSED OBS OBSCURE GLASS minimum width of 1m, to be graded away from buildings to a minimum slope of 1 in 20. Level at
4
- level 1: 164.2m² (incl.void) / (external under roof - 15.7m²) - level 1: 153.4m². SH SUN HOOD (as detailed) alignments to be in accordance with local building authority requirements.
.6
FG FIXED GLASS
.76
19
19
MRD METAL ROLLER DOOR SG SAFETY GLASS
exist. site coverage: HC HOSE COCK H
DH DOUBLE HUNG
DRAINAGE
.51
19
- level g - 206.7m² (37.33%) CJ CONTROL JOINT All work to be accordance with the BCA and the Australian Standards adopted by reference. All
AWN AWNING
- level 1 - 195.0m² (35.22%) HR HAND RAIL sewage & wastewater to be discharged and approved to local building authority requirements.
GL GLASS LOUVRES
HW HOT WATER SYSTEM Licenced plumber & drainer or local building authority to prepare drainage plans. All rainwater to be
TL TIMBER LOUVRES dischared to the rainwater tanks or as directed by local building authority.
proposed Floor Areas proposed Gross Floor Areas - Total - 410.4m² FWMLLH18.91 FLOOR WASTE
SW STORM WATER DRAINAGE PIT W.01 WINDOW NUMBER
internal: internal: SETOUT
.29
LL BUILDING LEVEL
19
- level basement floor area: 112.7m² (no change); - level basement floor area: 86.7m²; EX.FAN EXHAUST FAN
All boundary clearances shown are to be verified by builder prior to set out & commencement of any
.06
RWH RAIN WATER HEAD D.01 DOOR NUMBER
19
- level g: 211.1m²; - level g: 159.3m²; construction. Builder to confirm position of all services prior to commencement of construction.
FA.G FASCIA GUTTER - HALF ROUND PROFILE LL BUILDING LEVEL
.74
- level 1: 172.1m² (incl.void) + (external under roof - 7.8m²) - level 1: 164.4m².
.97
18
18
.32
18
STRUCTURAL DESIGN
proposed site coverage: Refer to Sturctural Design Drawings & Specification for details of slabs, footings, beams,
.19
- level g - 211.1m² (38.13%) columns & framing etc.
.93
18
.71
17
43'
E
17
74°
RAC
- level 1 - 213.67m² (38.60%)
1.5m se
2.0m se
CONTROL JOINTS
.40
R 43m
17
E
rb
in Ke
WT
ail
BM: N .47 den 9.1 Provide control joints to masonry walls to Structural Design Drawings & Specification. Provide
.74
exist. deck (LG) to remain Gar
.61
5
RL: 1
AVIE
16
tback
17
expansion joints for Tiling to Manufacturers' req'ts and relevant codes.
tback
- no change with new open timber 16
SE
.92
.80
Deck
pergola structure over
16
18.01
EXTERNAL FITTINGS & FIXTURES
Ro
ck
.13
.38
R
et
new outdoor kitchen (fireplace,
17
Ensure all external fittings & fixtures are of corrosive resistant materials. Hot-dip galvanised structural
16
ain
.45
.22
.50
ing
.05
16
.24
sink, bbq, pizza oven)
16
16
W
16
15
steel u.n.o.
.92
16
all
.6 8
.14
15
exist. rendered block e
.78
.24
Nativ 7
18
.19
.75
.79
IO
.94
.93
.79
.60
.78
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of sections 2 to 6 (of 24)
Section 2
15
.37
15
16
16.3 LL15
16
16
16
15
15 .66
.93
Re
15
16
n
.83
16
m
16
.75
n
Garde walls to remain
.05
6.981
de
14
.43
Rendered Wall
TERMITE TREATMENT
15
red
16
.28
2
.94
16
Wa
.95
.93
'30"
ll SWP
16
.92
15
15
5
.01
15
3 IL14.44
5 810
.98
14
.88
85°3
14
.25
90Ø PVC
Termite treatment to be in accordance with AS3660.1, the Building Code of Australia and any
16
15
RP81
.92
.28
16
.92
.93
.91
.67
14
ex.dp
.49
16
15
14
14
16 15
.55
.33
.37
15
variations to the BCA. Annual inspections to be carried out by a licenced pest control operator.
15
.01 .1 Top 18.67
.67
6
exist.driveway Rendered Wall
new Level G Lounge
16
16
16
.49
15
2. 0
Balcony 18.39
.91
.53
15
15
.39
14
.37
.1
15
.15
Top21.54
extension
.36
15 2
Rendered Wall
5
m
15
.5
.52
BUSH FIRE ATTACK LEVEL
15
15
15
.15
15
.51
1. 5
.50
.62
se
15
15
.93 4.93
.52
.52
.93
15
15
exist.external entry
.58
.54
m tb IO .55 Top 18.71
15
15
14
15
15
1
se ac LL15
All works to be accordance with AS3959-2009 'Construction of building in bushfire prone areas' and
.53
15
tb k
.15
.37
15
14
.50
.63
ac BCA 3.7.4.
15
15
new open pergola structure to
15
Eave 18.11
20.851m
.16
k
G20.92
.94
WM
.94
.53
Top21.54 Top21.54
15
14
14
Level G
WM
2
15
.5
Bin
POOL FENCING
.37
.51
15
s
.53
15
15
15
.53
exist.bin area
.52
15
All fences & balustrades enclosing swimming pool an overflow to comply with BCA & AS 1926.1-1993
G20.85
15
Deck
.54
.50
Balcony 17.95
18.02
1184 2°02'
15
.45
& AS 1926.2 - 1995.
15
.91
EXIST. DOUBLE GARAGE
15
14
EXIST. balcony extension to Level 1
.53
.02 0
GTS
15
.6
ex. GARAGE - FFL15.540
.13
RESIDENCE .94
ENERGY EFFICIENCY
14
14
14
All construction to comply with BCA Part 3.12 - Req'ts for Climate Zone 2.
.94
.96
14
14
nus
Panda15.11
ex. LEVEL B - FFL12.480 exist. pandanus tree Provide roof ventilation to comply with BCA Part 3.12.1.1
4485
tback
G20.74
ex. LEVEL G - FFL15.000 Provide energy efficient fluorescent lighting in accordance with Performance Criteria 2 &
Balcony 18.01
se
ex.dp
exist. parapet
4.5m ex. LEVEL 1 - FFL18.060 exist. deck to remain - no change Acceptable Solution 2 of mandarory Part 4.1 of Queensland Development Code (QDC).
8
ex. rl 21.60
.9
14
.27
k
13
etbac balcony extension to Level 1
.95
14 4.95
6m s
14
WATER EFFICIENCY
14
ex.dp
1
Top21.50 .95
1
.5
.95
.95
15
14
.33
17 8.36
.14
G20.98
part new deck to infill garden Provide water saving to new shower roses and all new tapware (min. 3 star WELS rated) in
G20.76
15
7
15
.3
TW p1
Section 3
14
.95
.10
To
.95
(relocated hot water unit) 13
accordance with QDC. Provide water saving to new toilet cisterns (min. 4 star WELS rated) which
14
.14
.77
2170
exist. deck
.14
ex.dp
15
32 Pool Top 16.43
14
15
.82
14
Top20.68
have a dual flush function, in accordance with QDC.
5
.95
.95
4°
.1
11
(LG)
15
.61
14
Balcony 18.02
08
Roof 20.64
Balcony 18.02
11
' exist. pool & decks to
.74
Level G to remain
14
Top20.65 14
.95
.95
22
14
3500
.02
.93
3
5
.13
.1
4m
14
.9
8m
15
22.12
14
15
14 4.94
ex.dp
15
.05
1
5'
.13
new Level 1 Bed 2 extension 266°0
.22
St
ep
14
s
new open timber pergola
.94
14 3
SITE PLAN
.04
14
.2
01
14
structure to Level G
56
35
.
.
15
17
TW
TW
-
85
1:200@A3 / 1:100@A1 exist. deck (Level 1) & Bed 2 Extension with roof
.9
.71
ist
over (exist)
13
ex
0 1.0 2.0 5.0m 51810
.68
12
RP81 exist. rendered block walls
to remain - no change 05 DA Issue-Delete Roof Terrace/Balcony Extension 24.05.2023
4760
Issue Amendment Date
bsa lic.no.1071865
The design & drawings shown on these PROJECT DRAWING TITLE SCALE DWG No. ISSUE
plans are copyrighted and remain the
New Alterations & Extensions for Maree & John Woodley Proposed Site Plan
1:200@A3 / 1:100@A1
property of 'georgina price design'. No
unauthorised copies shall be made. 36 Seaview Terrace, Sunshine Beach Q
DATE
July 2022
DD.01 05
Section 4
site cover
gross floor area (GFA)
ACE ACE
RAC
E
WTERR WT ERR
TER AVIE AVIE
VIEW SE SE
SEA
ex.door
ex.win. ex.win.
ex.win.
ex
do ist.
or
LEVEL B - EXIST. GFA 02 LEVEL G - EXIST. SITE COVER & GFA 03 LEVEL 1 - EXIST. SITE COVER & GFA
01
- - exist. Gross Floor Areas - exist. Gross Floor Areas
- level g: 159.7m² - level 1: 153.4m²
exist. Gross Floor Area
- level basement floor area: 89.2m² exist. site coverage: exist. site coverage:
- level g - 206.7m² (37.33%) - level 1 - 195.0m² (35.22%)
CE CE CE
RRA TE RRA TE RRA
VI E W TE VIEW VIEW
SEA SEA SEA
04 LEVEL B - PROPOSED GFA 05 LEVEL G - PROPOSED SITE COVER & GFA 06 LEVEL 1 - PROPOSED SITE COVER & GFA
- proposed Gross Floor Areas - proposed Gross Floor Areas - proposed Gross Floor Areas
- level basement floor area: 86.7m² - level g: 159.3m² - level 1: 164.4m²
proposed site coverage:
proposed site coverage
- level g - 211.1m² (38.13%)
- level 1 - 213.67m² (38.60%)
05 DA Issue-Delete Roof Terrace/Balcony Extension 24.05.2023
Issue Amendment Date
bsa lic.no.1071865
The design & drawings shown on these PROJECT DRAWING TITLE SCALE DWG No. ISSUE
plans are copyrighted and remain the
New Alterations & Extensions for Maree & John Woodley Gross Floor Area & Site Cover - Plans
1:200@A3 / 1:100@A1
property of 'georgina price design'. No
unauthorised copies shall be made. 36 Seaview Terrace, Sunshine Beach Q
DATE
July 2022
DD.01.A 05
Section 5
'
1.5m se
°43
2.0m se
74 43
9.1
tback
tback
en
Gard
Deck
RACE 18.01
T ER
IE W 02
EAV
DD.06
S e
Nativ 7
16.3
"
3'30
85°3
8 1 RP
26.9
20.851
1900
'
182°02
exist. conc. slab to be modified to suit
new lift pit area (shown hatched) nom.
800
80mm depth required - to eng's req'ts
store shelves to
be removed ex.CELLAR
WM
2.0 exist. cellar equipment to be
WM
1.5 m ex. STORE
m se reused - to be confirmed
se tb ac door removed
tb ac k remove exist. door
k
3600
01 Deck
DD.06
18.02
ex.MEDIA remove exist. fixtures uno,
part wall removed for and floor / wall tiles
exist. doors
new door / glazing ex. WC / SHR
to remain
complete 14
.60
.13
.02
14
14
exist. win.
remove exist. tiles / remove external shower
1050
carpet to all Level B ex.ext. fittings / tiles complete
ex. LIVING 3 shower
anus
c k (STORAGE) ex.dp Pand 15.11
setba
4.5m ex.FFL12.460
22 ex.FFL12.480
32 .02 ex. timber 01
4° 4 DD.07
08
3130
bench seat
ck ' exist. doors ex.undercroft space under deck
6m setba ex.PLANT / STORE remove exist.
to remain
.27
ex.conc. ex.undercroft
13
windows for new
ex.entry ex.FFL12.430
exist.
13 6
.36
.12
.65
.6
12
12
12
.13
remove ex.paved paths,
900
13
.10
13 .66
.44
.45
tiles, linear drains up
.37
.12
13
12
12
12
12
.12
ex.dp's exist. timber structure to remain
7
4
1
.3
13
.82
OUTDOOR LIVING SPACE
.38
- remove balustrade / handrail /
.
.39
13
12
.44
.35
remove ex.paved paths /
11
3
12
.28
treads
12
.4
8
12
.61
13
.3
.17
12
paved areas
12
12
11
all
13
red W
.37
.35
ex. PLUNGE POOL 12 de
.32
.41 Ren
.13
12
3300
12
ilter
.27
nb: all external walls, fascias, soffits to be repaired / removed & replaced where required
.74
FFL F .50
4
.12
12
13
.3
.16
12
.32
GTS
14
12
12
13
d e r
Un
13
12
walls / fixtures to be demolished - make good where req'd
.25
4
.24
exist. gas bottles (to remain
.4
12
.43
12
12
existing wall/s to remain (make good as req'd) 1 in this location)
.42
remove2.85 12
12
3
.35
.35
.8
13 5
12
.01
14 .13
/ gate Steps
.1
.45
11
.85
balustrade
12
.36
13
.13
12 28
15
.05 4
12
11
22.1
.81
.86
12
.9
exist. garden
13
Rock
15
05'
12
.11 1
.48
266°
.13
13 13.1
.67
.99
12
Steps
.22
14
.01
12
12
3
.24
.15
.45
14
.1
13
13
.11
13
.56
13
13
exist. rendered block garden
.48
.94
13
12
LEVEL B - EXIST. & DEMOLITION FLOOR PLAN planters to remain (uno)
.55
01
13
14 3
.04
14
.2
13
14
.31 .51
6
-
5
.13
1:100@A3 / 1:[email protected]
5
.24
13
15
17
.2
13
TW
13
TW
12
all
dW exist. rock steps / artifical
dere
13
0 1.0 2.0 5.0m Ren 02
.78
turf to remain DD.07
13
.71
Section 6
13
513150
.68
2400 6420 2080 3760 2500 3575
810
12
RP81
06 DA Issue-Delete Roof Terrace/Balcony Extension 24.05.2023
Issue Amendment Date
bsa lic.no.1071865
The design & drawings shown on these PROJECT DRAWING TITLE SCALE DWG No. ISSUE
plans are copyrighted and remain the
New Alterations & Extensions for Maree & John Woodley Level B - Exist. & Demolition Floor Plan
1:100@A3 / 1:50@A1
property of 'georgina price design'. No
unauthorised copies shall be made. 36 Seaview Terrace, Sunshine Beach Q
DATE
July 2022
DD.02 06
The text continues on section 7.
Used in these records
Amended Plans.pdfRelated documentApplication case desk ↗
About this file
- File size
- 12.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.