Original source · versioned page text
2016-11-08 S&O Agenda - Item 3, Attachment 1 - Local Economic Plan
The original of this document is very large (15.1 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Financial Statements 2016
QAO
Noosa Shire Council
Notes to the Financial Statements
for the year e nded 30 June 201 6
Note 1. Summary of Significant Accounting Policies (continued)
assets (which have a recognition threshold of $1), Non·current physical assets measured at fair value
are treated as an expense in the year of acquisition. are revalued. where required, so that the carrying
All other items of property, plant and equipment are amount of each class of asset does not materially
capitalised. differ from its fair value at the reporting date. This is
achi~ved by engaging independent, professionally
The classes of property, plant and equipment qualified valuers to determine the fair value for each
recognised by Council are reported in note 11 . class of property, plant and equipment assets at least
once every 3 years. Th is process involves the valuer
Acquisition of assets physically sighting a representative sample of Council
assets across all asset classes and making their own
Acquisitions of assets are initially recorded at cost. assessments of the condition of the assets at the date
Cost is determined as the fair value of the assets of inspection.
given as consideration plus costs incidental to the
acquisition, including freight in. architect's fees and Council uses internal engineers to assess the
engineering design fees and all other establishment condition and cost assumptions associated with all
costs. infrastructure assets , the results of which are
considered in combination with the relevant indices
Property, plant and equipment received in the form independently published for the Sunshine Coast
of contributions, are recognised as assets and Region. Together these are used to form the basis of
revenues at fair value by Council valuation where a management valuation for infrastructure asset
that value exceeds the recognition thresholds for the classes in each of the intervening years. With respect
respective asset class. Fair value is the price that to the valuation of the land and improvements, and
would be received to sell the asset in an orderly buildings classes in the intervening years,
transaction between market participants at the management engage independent. professionally
measurement date. qualified valuers to perform a "desktop" valuation. A
desktop valuation involves management providing
Capital and operating expenditure updated information to the valuer regarding additions,
deletions and changes in assumptions such as useful
Direct labour and materials and an appropriate life, residual value and condition rating. The valuer
proportion of overheads incurred in the acquisition or then determines suitable indices which are applied to
construction of assets are treated as capital each of these asset classes.
expenditure. Assets under construction are not
depreciated until they are completed and On revaluation, accumulated depreciation is restated
commissioned , at which time they are reclassified proportionately with the change in the carrying
from work in progress to the appropriate property, amount of the asset and any change in the estimate
plant and equipment class. of remaining useful life.
Routine operating maintenance. repair costs and Separately identified components of assets are
minor renewals to maintain the operational capacity measured on the same basis as the assets to which
and useful life of the non-current asset is expensed they relate.
as incurred, while expenditure that relates to
replacement of a major component of an asset to Capital work in progress
maintain its service potential is capitalised.
The cost of property, plant and equipment being
Valuation constructed by the Council includes the cost of
purchased services, materials, direct labour and an
Land and improvements, butldtngs, major plant and appropriate proportion of labour overheads.
all infrastructure assets are measured on the
revaluation basis, at fair value, in accordance with Depreciation
AASB 116 Property, Plant & Equipment and AASB
13 Fair Value requirements. Other plant and Land is not depreciated as it has an unlimited useful
equipment and work in progress are measured at life. Depreciation on other property, plant and
cost. equipment assets is calculated on a straight-line basis
so as to write-off the net cost or revalued amount of
page 9
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.