Approved Plans MCU18/0120, RAL18/0013, OPW18/0197
Plans and drawings: the text below has words only, no drawings.
Very large file (16.0 MB): may take a few minutes to open.
Original PDF page 26, section 1. The text section number identifies this passage in the reader.
Proposed Industrial C
F.F.L. - 121.400m
PIT 1/1
DP DP DP DP DP DP DP DP DP DP DP DP DP DP DP DP DP DP DP
DP 150Ø PVC-U at 1%
co
300Ø PVC-U at 1% 225Ø PVC-U at 1%
i ls 1%
eta U at
k1
d PVC-
an 100Ø
T Proposed underground harvest
MH
5 fo r
C0 & reuse OSD tank by builder.
fer Total water storage = 48 kL
Re
STORMWATER TANK 1 PIT 6/1 PIT 5/1 PIT 4/1 PIT 3/1 PIT 2/1
450mm sq Pit
with D-Class Grate 300Ø PVC-U at 1% 225Ø PVC-U at 1% 225Ø PVC-U at 1% 225Ø PVC-U at 1%
300Ø PVC-U at 1%
S.L. - 120.72 2/225Ø PVC-U at 1%
Outlet Weir with orifice to
Manufacturer's specification. 15
PIT 7/1 0Ø
PV
C-
Ua
t1
%
225Ø PVC-U at 1%
co
MCU18/0120 RAL18/0013 OPW18/0197
PIT 1/2
DP DP DP DP DP DP DP DP DP DP
DP
Existing boulder retaining
APPROVED PLAN
NOOSA COUNCIL
wall to be retained.
225Ø PVC-U at 1%
21 NOV 2018
PIT 1/5
150Ø or 2/100 PVC-U
-
Rock scour protection. with vertical drop and
Typical to pits discharged into swale.
2/225Ø PV
DP
discharging into swale Typical.
& bio-retention basin.
DP
C
-U at 1%
Proposed Industrial B
F.F.L. - 120.950m
450mm sq Pit
with D-Class Grate
S.L. - 120.76
1%
at
U
C-
PV
Proposed landscaped
0Ø
diversion swale. Refer
10
C04 for detail.
DP DP DP DP DP DP DP DP DP DP DP
225Ø PVC-U at 1%
Divers
ion Sw
ale 3%
Proposed underground harvest
& reuse OSD tank by builder.
Total water storage = 73 kL STORMWATER DRAINAGE:
Fall
ls
tai
de
All Stormwater pipes shall 150Ø PVC-U with
2
nk
PIT 6/3 PIT 5/3 PIT 4/3 PIT 3/3 PIT 2/3
Ta
MH 300mm Min. cover and laid at 1:100mm Min.
or
6f
C0
PIT 8/1 225Ø PVC-U at 1% 225Ø PVC-U at 1% 225Ø PVC-U at 1% 225Ø PVC-U at 1% 100Ø PVC-U at 1% fall. U.N.O.
fer
225Ø PVC-U at 1% 2/225Ø PVC-U
Re
at 1%
DP DP 225Ø PVC-U at 1% DP STORMWATER TANK 2
DP DP DP DP DP DP - 150Ø downpipes to stormwater pipes/rainwater
tanks as illustrated. U.N.O.
PIT 2/5 Downpipe diameter based on eaves gutters
225Ø PVC-U at 1%
PIT 1/3 with a minimum of 24700mm² to a maximum
450mm sq Pit of 55000mm² effective cross-sectional area
with D-Class Grate Proposed underground harvest and a gradient of 1:500 or steeper.
& reuse OSD tank by builder.
S.L. - 120.30 DP
Total water storage = 46 kL
Stormwater pipes shall be connected to an
approved Legal Point of Discharge as specified
MH by N.C.C. and QUDM.
%
s
All stormwater drainage shall be in accordance
il
t1
eta
Ua
3d
with A.S. 3500
C-
ank
PV
T
0Ø
or
7f
30
All stormwater drainage shall be in accordance
C0
fer
with N.S.C. guidelines to minimise erosion
Re
Proposed Industrial A STORMWATER TANK 3 and scouring. Stormwater flow other than natural
F.F.L. - 120.500m overland flow shall not be discharged onto
neighbouring property.
DP
The stormwater drainage design shown herein may
SW
2/225Ø PV
only be altered with written approval by the design
225Ø PVC-U at 1%
Engineer.
C-U at 1%
SW
PIT 3/5
450mm sq Pit DP
with D-Class Grate DP DP DP DP DP DP BIORENTENTION BASIN NOTES:
SW
S.L. - 120.24 6. Inspection hold points for bioretention basin construction are as
%
at 1
1. Bioretention basing to be constructed with a minimum 300mm follows.
-U
225Ø PVC-U at 1%
VC
non-dispersive layer of soil to all banks.
ØP
7. Completion of bulk earthworks.
00
2/3
SW
2. Vegetation to comply with the requirements of appendix 'A' of
'Healthy Waterways Water Sensitive Urban Design' to loamy soils. 8. Completion of subsoil drainage system.
450mm sq Pit 450mm sq Pit 450mm sq Pit Refer to landscape architects plans for details.
9. Completion of coarse sand transition layer
with D-Class Grate with D-Class Grate with D-Class Grate
SW
3. FAWB (Facility for Advancing Water Biofiltration) accredited
S.L. - 119.86 S.L. - 119.86 S.L. - 119.86
certification for filtration media to be forwarded to the engineer 10. Completion of sandy loam filtration media layer
prior to placement.
450mm sq Pit Proposed stepped bio-retention basin to
11. Flush out points are to be See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.