N13078 - 2014.10.17 - 1 Of 2

Attached to the e-mail OPW14/0197 - Amended Plans for Approval (Email 1 of 5)..

of 19

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

 

DRAWING INDEX

ROADWORKS AND DRAINAGE

SEWERAGE RETICULATION

LAKE DOONELLA NOOSA

STAGES C1-C6

BECKMANS ROAD, NOOSAVILLE
FOR QM PROPERTIES

N13078-100 | DRAWING INDEX, LAYOUT AND LOCALITY PLAN

N13078-101 SURVEY SETOUT PLAN SHEET 1 OF 3

N13078-102 | SURVEY SETOUT PLAN SHEET 2 OF 3

N13078-103. --SURVEY- SETOUT-PLAN-SHEET -3..0F 3 D
N13078-104 SEDIMENT AND EROSION CONTROL EARTHWORKS PHASE PLAN SHEET 1 OF 3

N13078-105 | SEDIMENT AND EROSION CONTROL EARTHWORKS PHASE PLAN SHEET 2 OF 3

N13078-106 | SEDIMENT AND EROSION CONTROL EARTHWORKS PHASE PLAN SHEET 3 OF 3

N13078=107 BULK EARTHWORKS LAYOUT PLAN SHEET 1 OF 3

N13078-108 | BULK EARTHWORKS LAYOUT PLAN SHEET 2 OF 3

N13078-109 | BULK EARTHWORKS LAYOUT PLAN SHEET 3 OF 3

N13078-110 ROADWORKS AND DRAINAGE LAYOUT PLAN SHEET 1 OF 3

N13078-111 ROADWORKS AND DRAINAGE LAYOUT PLAN SHEET 2 OF 3

N13078-112 ROADWORKS AND DRAINAGE LAYOUT PLAN SHEET 3 OF 3

N13078-113 AGATHIS PLACE LONGITUDINAL SECTION

N13078-114. AGATHIS PLACE CROSS SECTIONS

N13078-115 CARISSA PLACE LONGITUDINAL SECTION

N13078-116 CARISSA PLACE CROSS SECTIONS

N13078-117 DODONAEA CLOSE LONGITUDINAL SECTION AND CROSS SECTIONS

N13078-118 MORINDA CIRCUIT LONGITUDINAL SECTION AND CROSS SECTIONS

N13078-119 MULBERRY CLOSE LONGITUDINAL SECTION AND CROSS SECTIONS

N13078-120 SHIRE DRIVE LONGITUDINAL SECTION

N13078-121 SHIRE DRIVE CROSS SECTIONS SHEET 1 OF 2

N13078-122 | SHIRE DRIVE CROSS SECTIONS SHEET 2 OF 2

N13078-123 TWIGRUSH COURT LONGITUDINAL SECTION AND CROSS SECTIONS

N13078-124 INTERSECTION DETAILS AND SIGNS AND LINEMARKING PLAN SHEET 1 OF 3

N13078-125 INTERSECTION DETAILS AND SIGNS AND LINEMARKING PLAN SHEET 2 OF 3 N
N13078-126 INTERSECTION DETAILS AND SIGNS AND LINEMARKING PLAN SHEET 3 OF 3 |
N13078-127 STORMWATER DRAINAGE CATCHMENT PLAN

N13078-128 | STORMWATER DRAINAGE BIO DETENTION BASIN A LAYOUT PLAN AND SECTIONS
N13078-129 | STORMWATER DRAINAGE BIO DETENTION BASIN B LAYOUT PLAN AND SECTIONS
N13078-130 = STORMWATER DRAINAGE BIO DETENTION BASIN C LAYOUT PLAN AND SECTIONS
N13078-131 STORMWATER DRAINAGE BIO DETENTION NOTES AND DETAILS

N13078-132 | STORMWATER DRAINAGE LONGITUDINAL SECTIONS SHEET 1 OF 4

N13078-133 STORMWATER DRAINAGE LONGITUDINAL SECTIONS SHEET 2 OF &

N13078-134 | STORMWATER DRAINAGE LONGITUDINAL SECTIONS SHEET 3 OF &

N13078-135 9 STORMWATER DRAINAGE LONGITUDINAL SECTIONS SHEET 4 OF 4

N13078-136 STORMWATER DRAINAGE CALCULATIONS TABLE SHEET 1 OF 4&

N13078-137 STORMWATER DRAINAGE CALCULATIONS TABLE SHEET 2 OF 4&

N13078-138 | STORMWATER DRAINAGE CALCULATIONS TABLE SHEET 3 OF 4

N13078-139 STORMWATER DRAINAGE CALCULATIONS TABLE SHEET 4 OF 4&

N13078-140 | STORMWATER DRAINAGE STRUCTURE DETAILS

N13078-141 BLOCKWORK RETAINING WALL DETAILS

N13078-142 | SEDIMENT AND EROSION CONTROL ROADWORKS AND DRAINAGE PHASE PLAN SHEET 1 OF 3
N13078-143 SEDIMENT AND EROSION CONTROL ROADWORKS AND DRAINAGE PHASE PLAN SHEET 2 OF 3
N13078-144 | SEDIMENT AND EROSION CONTROL ROADWORKS AND DRAINAGE PHASE PLAN SHEET 3 OF 3
N13078-145 SEDIMENT AND EROSION CONTROL PRACTICAL COMPLETION PHASE SHEET 1 OF 3
N13078-146 SEDIMENT AND EROSION CONTROL PRACTICAL COMPLETION PHASE SHEET 2 OF 3
N13078-147 SEDIMENT AND EROSION CONTROL PRACTICAL COMPLETION PHASE SHEET 3 OF 3
N13078-148 | SEDIMENT AND EROSION CONTROL BASIN SECTIONS

N13078-149 STORMWATER DRAINAGE NORTHERN BIO-RETENTION SWALE LAYOUT PLAN AND SECTIONS
N13078-150 = STORMWATER DRAINAGE SOUTHERN BIO-RETENTION SWALE LAYOUT PLAN AND SECTIONS

   
   

STAGE C1

 

LJ EXISTING |

SAS i]
+ “(oe

     
    
   

SHIRE DRIVE

 

  

3
8

 

 

3
3

 

eT
=

 

 

DODONAEA CL
3
a

w7 /

 

 

 

an = =. -

 

mT
-
5:

fatag

{ite 178

 

 

180)

 

 

 

 

 

 

LOCALITY PLAN
N.T.S.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

N13078-200 | SEWERAGE RETICULATION LAYOUT PLAN SHEET 1 OF 3 U.B.D. REF: AUSTRALIAN CITY STREETS VERSION: 6.0.0
N13078-201 SEWERAGE RETICULATION LAYOUT PLAN SHEET 2 OF 3 (SUNSHINE COAST) MAP: 18 | GRID: A1
N13078-202 | SEWERAGE RETICULATION LAYOUT PLAN SHEET 3 OF 3
N13078-203 SEWERAGE RETICULATION LONGITUDINAL SECTIONS SHEET 1 OF & SITE PLAN
N13078-204 SEWERAGE RETICULATION LONGITUDINAL SECTIONS SHEET 2 OF 4 SCALE 12000
N13078-205 SEWERAGE RETICULATION LONGITUDINAL SECTIONS SHEET 3 OF 4 CONSTRUCTION HOLD POINT R.P. DESCRIPTION NOTE:
N13078-206 SEWERAGE RETICULATION LONGITUDINAL SECTIONS SHEET 4 OF 4 PRIOR TO CONSTRUCTION THE CONTRACTOR LOT 7 ON RP8OW12 IT IS THE RESPONSIBILITY OF THE
WATER RETICULATION SHALL VERIFY LEVELS OF ALL EXISTING AND PART. OF CONTRACTOR TO CONTACT ALL RELEVANT
COSSIGS 140 COMEETON FONTS worn on spss | |EIU MMORTES Te ve
N13078-300 WATER RETICULATION LAYOUT PLAN SHEET 1 OF 3 PARISH OF TEWANTIN PRIOR TO START OF CONSTRUCTION.
N13078-301 WATER RETICULATION LAYOUT PLAN SHEET 2 OF 3 COUNTY OF MARCH
N13078-302 WATER RETICULATION LAYOUT PLAN SHEET 3 OF 3 _
CONSTRUCTION HOLD POINT were Ne OF aT ~ 66
ONCE THE BASE OF MANHOLES, INSPECTION PITS, GULLIES AND STAGE C2 - 11
FIELD INLETS FOR STORMWATER DRAINAGE AND SEWER STAGE G3 _ 11
RETICULATION HAVE BEEN POURED, FURTHER CONSTRUCTION STAGE Ch - 16
SHALL NOT PROCEED UNTIL THE SUPERINTENDENT AND OR STAGE (5 9
ENGINEER HAVE INSPECTED THE WORKS FOR FINISHED LEVELS STAGE Cé - 10
AND APPROVED CONSTRUCTION TO CONTINUE, AREA OF SITE - 9.05 Ha
FILE: N13078-100.dwq DATE; 17-10-2014 TIME: 14:54
Xref's: X-N13078-TIT X-N13078-BASE USR: Curtis Boorman
Saat [once [om aT cusin omon SORE METREST TIGROFIEN Wo. or DRAWNG TIE
[AMENDMENT DETAILS SURVEYOR: RPS er
ee RH 7 INNOVATION PARKWAY, BIRTINYA QM PROPERTIES \ CONSULT AUSTRALA DRAWING INDEX, LAYOUT
5 Ph (07) 5436 7888 Fax (07) 5493 6630 AND LOCALITY PLAN
E BI] nT [NT | 30.06.16 | DRAWING INDEX AMENDED TO ADD DRAWINGS 142-147. 12000 2010 020 40 60 80 100 ay PROJECT
pic] AT NT | 05.08.14 J DRAWINGS ABDED TO INDEX DRAWN CHECK] 14000 AR PROJECT No. APPROVED SHAUN PILCHER RPEQ 14593 Brown Consultiny {QLD} Pty Lid ‘ual
MOL @ | @ | toto [oRAWNG UST AMEND LAKE DOONELLA NOOSA : ng (LD) Py |
‘ B :AWING LIST AMEN N13078 J fee BeATHEY HLL PEO ITs STAGE C1. C6 Smart Consulting Eee ten ane aH Say | ORAS REN 1078-100 >
Sir FOR & ON BEHALF GF BROWN CONSULTING (QLD) PTY LTD Drishann Conbar Mekhouns Spieey Gingepere Gumsbine Comt = Lic 4004 -

 

 

 

 
Log in to download the original file

N13078 - 2014.10.17 - 1 OF 2.pdf · 9.1 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.