Information Response to DTMR · MCU12/0208
Response:
Further to the Department of Transport and Main Roads Request for Information please refer to
Attachment 2 which includes the amended Traffic Impact Assessment Report.
Additional information regarding the routes through the development site is included within Section
4.1 and Figure 2-2 of the amended Traffic Assessment Report contained within Attachment 2. Figure 2-
2 illustrates an indicative street network allowing potential future public transport developments to
serve the proposed development. Furthermore Sections 2.2 and 4.2 of the amended Traffic Impact
Assessment Report outline the existing and proposed Active Transport Facilities proposed.
The full extent of works necessary along Hollett Road and Tidswell Road to provide for the various
vehicle types and road users (pedestrians, cyclists etc) will be provided as part of the detailed design
process at a later date.
Areas to be set aside for bus stops (including shelters, bike racks etc), set down and turning areas will
be provided as part of the detailed design process required for future approvals.
Translink approval to utilise those sections of the routes that are located within proposed common
property areas will be obtained and subsequently provided to Council as part of the detailed design
process required for future approvals.
Comment on the delineation between private and public infrastructure in regard to public access and
ongoing maintenance responsibilities (roads, paths, car parking areas, parks etc) is provided in the
amended Civil Engineering Report in Attachment 3.
The private development streets within Noosa on Weyba will be designed to encourage low travel
speeds (<50km/h) for the purposes of community safety and environmental approach. The added
benefit of this approach is that internal streets can comfortably accommodate active transport modes.
A network of pedestrian and cycle routes are proposed within the development allowing access to key
activity nodes including the lake, retail precinct and external pedestrian/cycle infrastructure. The
intent of this high quality connectivity plan is to encourage the use of active transport modes for local
trips. At this preliminary stage of the design process, the level of detail provided with an access and
mobility plan is not considered to be appropriate. As such, this detail will be provided at the Detailed
Application stage. Notwithstanding this Section 4.1 of the amended Traffic Impact Assessment Report
outlines the potential public transport provision for the proposed development.
It is intended that a dedicated pedestrian and cycle route be provided along the eastern high road as
shown on Figure 2-2 of the amended Traffic Impact Assessment Report included in Attachment 2, thus
providing connection to the external cycle network along Walter Hay Drive and the western side of the
development. These active transport connections are only indicative of a potential network, and the
eventual detailed design may differ.
In addition these pedestrian/cycle linkages could also be utilised to provide connections north and
south of the development to the new areas of national park being created.
(c) An amended Traffic Impact Assessment report which demonstrates:
3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Information Response to DTMRRelated documentApplication case desk ↗
About this file
- File size
- 516 KB (small file)
- File type
No other editions are linked here.