OPW11/0023 Development Application part 2 of 2 Planning Report and Plans 178 Eumundi Noosa Road Noosaville

of 57

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (70.0 MB): may take a few minutes to open.

Log in to see the plans as drawn
                     Place barcode here
                                          ioim^uuiuiui
                                            S0044522



           THIS IS THE NEXT PART OF A
          MULTIPLE PART RECORD




0 velor
      2 5 JAN 2011

   Maroocrly lore
Full text of the other 56 pages

Page 2

1
1

               BUNNINGS WAREHOUSE, NOOSAVILLE

               SURFACE WATER MANAGEMENT PLAN




    REF NO.:        4400-02-CE

    AUTHOR:         GLENN MANSELL, TGM GROUP PTY. LTD.

    DATE:           DECEMBER 2010




1



     ENGINEERS, SURVEYORS & PLANNERS


1

Page 3

1
            DOCUMENT STATUS AND HISTORY
t
t

I   ISSUE

    DRAFT
            REV.

             1
                   ISSUED TO

                   Sunshine Coast
                                    QTY

                                        1
                                             DATE

                                            16/11/10
                                                         REVIEWED

                                                       P Tadgell
                      Regional
                      Council

    FINAL    2     Sunshine Coast       1   20/01/11
                      Regional
                      Council




1



                                    2



1

Page 4

1
                                CONTENTS


    TITLE                                             PAGE

    1.0     EXECUTIVE SUMMARY                                4


s   2.0     WATER QUALITY

            2.1     RAINFALL DATA
                                                             4

                                                             4


            2.2     RUNOFF VOLUMES AND FLOWS                 5


1           2.2.1   DETENTION BASIN                          5

            2.2.2   MODEL CORRELATION                        6

    3.0     RUNOFF QUALITY                                   7

            3.1     MODELLING METHODOLOGY AND INPUT          7

            3.2     TREATMENT TRAIN AND METHODS              8

            3.3     SUB-CATCHMENT AREAS                      8
1           3.3.2   VEGETATED SWALES                         9

            3.3.3   BIORETENTION CELL                        9


I           3.3.4

            3.4
                    RAINWATER TANKS

                    MUSIC MODELLING RESULTS
                                                             10

                                                             10

    4.0     IMPACTS ON RECEIVING WATERWAYS                   10

    APPENDIX A - CONCEPTUAL SURFACE WATER MANAGEMENT LAYOUT

                      DESIGN

    APPENDIX B - CARDNO SURFACE WATER MANAGEMENT PLAN

    APPENDIX C - DRAINS MODEL DATA AND RESULTS




                                        3

Page 5

     1.0       EXECUTIVE SUMMARY


     TGM Group were engaged by H Troon to prepare the surface water management plan for the
     proposed Bunnings Warehouse development on the corner of Eumundi-Noosa Rd and Gateway Dve,
     Noosaville. We are also required to prepare the runoff quality modelling and design of treatment
     measures to meet the requirements of the MUSIC Modelling Guidelines.

     This report will demonstrate that the minimum runoff quality objectives can be met and exceeded
     by the proposed stormwater treatment and harvesting measures in summary as follows;
F1         •   105kL capacity rainwater tank used for irrigation and toilet flushing,
           •   Bioretention cell with an extended depth of 0.2m and mean area of 308m2,
           •   Buffer Strip equivalent to 23% of an adjacent car park area,

     The following modelling results were achieved using MUSIC:

                                           Source      Residual     Reduction       % Reduction   % Reduction
      Parameter                             Load        Load        Target %       (200mm/hr)*    (5Omm/hr)*
      Flow (ML/yr)                             19.7          16.4                          16.4            4.3
      Total Suspended Solids (kg/yr)      4.10E+03           424              80           89.6           83.3
      Total Phosphorus (kg/yr)                 13.9          2.55             60           81.7           75.7
      Total Nitrogen (kg/yr)                     63          31.1          45  50.7            42.2
      Gross Pollutants (kg/yr.)            456           0          90          100             100
     * Relative results for hydraulic conductivity of 50mm/hour and 200mm/hr for the filter media in
     bioretention cell.




     2.0       WATER QUANTITY


     2.1       Rainfall Data

     The development has not changed location and as such no change to rainfall data is necessary.
     However, for detention basin calculations rainfall hyetographs were used to simulate real rainfall
     events in DRAINS.




                                                         4

Page 6

     2.2      Runoff Volumes & Flows


I    The site has changed size and layout. The total development site area is approximately 2.32 Ha. The
     development site and amount of impervious area have significantly reduced in size, thus runoff

I    volumes have significantly reduced compared to those calculated by Cardno in the original report.
     The new areas are as follows;




           Surface Type           Original Areas           Proposed Areas (TGM
                                 (Cardno Report)                  Report)

                                         (Ha)                         (Ha)



     Roof                              0,7884                        0.667

     Impervious Ground                  1.325                         1.20
     Surface

     Pervious Areas                     0.352                        0.456

F1
     TGM note that the CARDNO report calculated runoff from the site layout prior to this development
     using RAFTS and it then compared to the result calculated using the rational method. Results of the
     comparison between the RAFTS and rational methodologies indicated that runoff flow rates were
     close and therefore it is expected that a pro-rata adjustment of those flows for the new site areas
     will also give acceptable results (i.e. existing discharge calculations adjusted by a factor of
     2.327Ha/2.7543Ha).




     DRAINS uses rainfall hyetographs from Australian Rainfall & Runoff to simulate actual rainfall events.
     The hyetographs mimic the variation in rainfall during a rain storm, therefore for any given average
     rainfall intensity DRAINS simulates the peaks and troughs during the storm, so that peak runoff flow
     rates may be more than when calculated using the average intensity.

     2.2.1    Detention Basin

     It is anticipated that all paved areas can be collected and discharged via the detention basin and the
     legal point of discharge in Gateway Drive. The construction stage sedimentation basin will be
     cleaned at the end of the construction phase and converted into a detention basin and bioretention
     cell.

t    The outlet pipe from the basin shall be 600mm diameter. The invert of the outlet pipe will be set
     300mm above the invert of the basin to allow for an extended detention period for the
     sedimentation basin. It is assumed that the extended detention depth is full at the commencement
     of the design storms for the purpose of sizing the detention basin.

                                                       5

Page 7

    Results of hydrologic and hydraulic analysis is included in the table 1 below.




1    Storm          Existing
                   Discharge
                                   Developed Case                         Detention Basin
      Event                         Discharge (no
                                                                         (Capacity 1160m3)
                                      detention)
                     (m3/s)
                                        (m3/s)

                                                           Peak Basin       Peak Basin      Peak Outflow
                                                           Stage (m)**     Volume (m3)

    Tc (Mins)          30                  15

       100            0.663               1.23                 2.1             1030             0.54

        20            0.502               0.99                 1.7             750              0.45

        10            0.429               1.18                 1.5             620             0.425

        5             0.377               1.03                1.32             550             0.393




        ** Includes extended detention depth of 0.2m.

                                   Table 1- Detention Basin Requirements


    2.2.2     Model Correlation


r   Hydrologic and hydraulic computations were performed using DRAINS. DRAINS calculates runoff by
    modelling depression (initial) loss for pervious and impervious areas, along with modelling a
    reducing loss through infiltration in pervious areas as these areas become wetter (known as the
    Horton infiltration model). The following parameter values were used in the hydrologic model;

    Paved Area Depression Storage: 1mm

    Grassed Area Depression Storage: 3mm

    Soil Type: 2 (Moderate infiltration rates)

    Antecedent moisture content: 3 (Moderately wet)




                                                       6

Page 8

     Results of the DRAINS hydrologic model were compared to the results using the rational method
     and the comparison is presented in Table 2 below;




             Model            Existing 1 in 100     Existing 1 in I Proposed 1 in        Proposed 1 in
                             Year Runoff Max.      100 Year Max.        100 Year Max.    100 Year Max.
                                      Flow             Volume                  Flow        Volume

                                     (m3/S)                (m3)                (m3/s)           (m3)

                                  (tc = 30 min)     (tc = 30 min)        (tc = 15 min)   (tc = 15 min)




     Rational Method         0.663                 1193             1.23                 1107

     DRAINS (Horton          0.673                 1245                 1.23             1268
     Infiltration)

     Difference              +1                   4%                0%                   15%




                            Table 2 - Correlation of DRAINS with Rational Method


     DRAINS simulates the peaks and troughs in rainfall intensity during actual rainfall events , so
     comparison of peak flows between DRAINS and the rational method can be misleading. Therefore, a
     comparison of the volume of runoff is also necessary in order to calibrate the model to the rational
     method.

     The comparison above indicates that for the 1 in 100 Year rainfall events the DRAINS model
     correlates reasonably well with the traditional rational method.




     3.0      RUNOFF QUALITY


I    3.1      Modelling Methodology and Input

     Source node pollution parameters were taken from the MUSIC Modelling Guidelines by "Water by
     Design" (2010) (MMG 2010). MUSIC input parameters and data are summarised in table 3 below;




F1
                                                       7

Page 9

      Rainfall Station and Data Set              Cooroy Composite site pluviograph

      Time Step                                  6 Min

      Modelling Period                           15L January 1973 to 315` December 1983.

      Mean Annual Rainfall (mm)                  1595

      Evapotranspiration (mm)                    1630

      Rainfall runoff parameters                 As per MMG 2010 for commercial use (Table 3.7)


I     Pollutant export parameters                As per MMG 2010 for commercial source node (Table 3.8)




                                   Table 3 - MUSIC Modelling Hydrologic Input Data




      3.2       Treatment Train & Methods

      All paved areas on the site will be conveyed to the legal point of discharge in Gateway Drive via a
      sediment basin and bioretention cell. In addition, most car park pavements will slope directly
      towards vegetated swales so that runoff is dispersed. Areas that can not be sloped towards a
      vegetated swale or other soft landscaping feature are drained via a trench grate or pit that
      discharges into the underground drainage system.             The underground drainage system then
      discharges into the sedimentation basin.

      Almost 20% of the site has been set aside for landscaping.
P-j
      3.3       Sub-Catchment Areas

      Sub-catchment areas, along with conceptual design of the treatment train, is shown on plans
      included in Appendix A.

      3.3.1     Vegetated Swales: During detailed design it was found that vegetated swales would be
      impractical due to the steepness of the site. They have been deleted from the treatment train.

I     3.3.2     Buffer Strips:


I     All of sub-catchment 13 drains into the main sedimentation basin via a buffer strip with the
      following parameters;

            •   Buffer Strip area: 23% of sub-catchment area
            •   Exfiltration Rate: Nil

                                                         8

Page 10

I   3.3.3   Bioretention Cell:

    All areas within the site shall discharge into the bioretention cell located in the base of the detention
    basin. The relevant MUSIC parameters were as follows;




        •   Mean Surface area (m2): 308 m2
        •   Extended detention depth: 0.2m
        •   Filter area: 210 m2
        •   Unlined filter media perimeter (m): N/A (not available in version 3),
        •   Saturated hydraulic conductivity: 50mm & 200mm per hour
        •   Filter depth: 400mm
        •   TN content of media (%): NIL. Ameliorated with dynamic lifter just prior to planting,
        •   Proportion of organic material in filter (%): NIL (as for TN),
        •   Orthophosphate content of filter media (mg/kg): NA,
        •   Base will not be lined,
        •   Bioretention cell will be planted out with plants effective at nutrient removal (refer
            landscape details). Planting density shall be a minimum of
                0 a mixture of at least 3 of the following species across 80% of the basin is required:


                         •   Carex appressa
                         n   Ficinia nodosa
                         n   Juncus amabilis
                         n   Juncus flavidus
                0 the remaining 20% balance area of the basin should be planted out with species
                    from the following list;


                         n   Isolepsis nodosa
                         n   Lomandra longifolia
                         n   Lomandra hystrix
                         n   Ghania sieberiana


        •   Overflow weir width: NA (secondary 525mm diameter RCP provided at driveway entrance in
            case the primary 450mm outlet blocks),
        •   Exfiltration Rate: NA
        •   Depth of submerged zone: NA (not included in Version 3 bioretention node),




                                                        9

Page 11

    3.3.4   Rainwater Tanks

    It is proposed to install 4 35kL underground rainwater tanks at the site to collect runoff from the
    main retail area roof to be utilised for irrigation of plants in the nursery area and for flushing the
    staff and public toilets. The relevant MUSIC parameters for the rainwater tanks are as follows;
         • Volume below overflow pipe: 105kL
         • Depth above overflow: 0.1m
         • Surface area of tanks: 80m2
         • Overflow pipe diameter:
         • Stored Water for irrigation and other purposes: Up to 105kL,
         • Indoor Connections: Staff and public toilets (4No.)
         • Annual demand: 1105 kL



    3.4     MUSIC Modelling Results

    Results of the MUSIC model analysis are shown in Tables 5 & 6 below;




                                          Source      Residual      Reduction     % Reduction % Reduction
     Parameter                             Load        Load         Target %      (200mm/hr)* (50mm/hr)*
     Flow (ML/yr)                             19.7           16.4                         16.4                4.3

     Total Suspended Solids (kg/yr)      4.10E+03            424           80             89.6               83.3
     Total Phosphorus (kg/yr)                 13.9           2.55          60             81.7               75.7
     Total Nitrogen (kg/yr)                     63           31.1          45             50.7               42.2
     Gross Pollutants (kg/yr)             456           0          90           100            100
    * Relative results for hydraulic conductivity of 50mm/hour and 200mm/hr for the filter media in
    bioretention cell.

                          Table 5 - MUSIC Modelling Results - Pollutant Reduction




I                                     Flow (ML/yr)                              16.4


I                                     Total Suspended Solids (kg/yr)
                                      Total Phosphorus (kg/yr)
                                      Total Nitrogen (kg/yr)
                                                                         4.24E+02
                                                                                2.55
                                                                                31.1
                                      Gross Pollutants (kg/yr)                    0


                          Table6 - MUSIC Modelling - Mean Annual Residual Loads




                                                        10

Page 12

 

REV:

 

OF

SHEET:

 

 

[TGM REF, No.

 

 

     

 

 

RECEIVING St +f

PAVEMENT AREA: 10693.768 m? | we eeorvine I

 

 

 

   

     

      
    
  
 

CANOPY

 

 

ROOF AREA: 6668.792 m? tt . | Warehouse Roof 0-667Ha £69 850 m2

pa s at

S| ere — Fo) ik
NURSERY AREA AREA: 1347.287 m? — oe Gage HRS ft 2. To toile ed
oo —  ISRE 17 500 oo oe
28) eskL Ramwater <—————_maat _
. Tank «= ti«éC Plant PST
: ‘ 5 |

 

 

 

 

  
 

| LANDSCAPE AREA

 

2400 HIGH SECURITY FENCE

 

 

*PROPHSED DEWELOPMENTE = # og | \

 

 

 

 

 

 

 

 

 

 

 

 

 

BDY

 

= EXTG-LE
RL 14.0

 

 

 

BBY

 

o_o

 

SON INN

183.947 m* —

 

 

 

 

SNe

 

 

 

 

FA 1 Coa

 

ZLLI. 2 rae

Ze = || ee ee eee :
ss GATEWAY Rive : aw

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

EA I
a ee
eee ‘
VE CLeter
rl
ISSUE ISSUED FOR DATE | DRAWN | APPROVED |ISSUE ISSUED FOR DATE | RAWN | APPROVED | DESIGNED DATE: CLIENT: PROJECT
DRAWN: SCALE:
- | SURVEY: SHEET SIZE: TGM GROUP Pty Ltd BSI ar Te ee
Ballarat DRAWING TITLE
CHECKED: APPROVED: 1315 Sturt Street
Ballarat, VIC 3350
Ph: (03) 5330 8888 180 9001
DATE DATE Web: tgmgroup.com gue ASINZS 4801
i A.B.N. 11125 568 461 — ewtonnetASINZS 14001
() COPYRIGHT T.G.M GROUP PTY. LTD. TGM REF, No. SHEET:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 13

    4.0       Impacts on Receiving Waterways


    Stormwater harvesting demand from the site will represent around 1.2 ML per year, compared to
    the original annual average runoff volume of approximately 7.5ML per year and a residual post-
    developed annual average runoff volume of 16.4ML per year (refer Table 5)1. Therefore it can be
    seen that stormwater harvesting will not reduce the total volume of water discharging into the
    downstream catchment.

    The proposed stormwater detention will maintain the peak runoff flow rates close to the original
    (pre-developed) flow rates (see Table 1), so the sedimentation/detention basin will have no adverse
    impact on downstream receiving waterways.




I




I
    ' The original runoff volume is calculated by multiplying the site area of 2.33 Ha by the annual rainfall runoff of 1.6m and a
    typical runoff co-efficient of 0.2 (conservative).

                                                                   11

Page 14

    APPENDIX A - SURFACE WATER MANAGEMENT

           CONCEPTUAL LAYOUT PLAN




1




                     12


[OCR of page images]
APPENDIX A — SURFACE WATER MANAGEMENT

CONCEPTUAL LAYOUT PLAN

12

 

 

 

Page 15

    APPENDIX B - CARDNO SURFACE WATER MANAGEMENT PLAN




1
I




1



                            13


[OCR of page images]
APPENDIX B — CARDNO SURFACE WATER MANAGEMENT PLAN

13

 

 

 

Page 16

                   Cardno
                   Shaping the Future




                          RUNNINGS WAREHOUSE, NOOSAVILLE



                                        Surface Water Management Plan




15 December 2006
Job No. 3501-54                                     Bunnings Warehouse

Page 17

    BUNNINGS WAREHOUSE, NOOSAVILLE
    SURFACE WATER MANAGEMENT PLAN




                                                                                                 Cardno (QId) Pty Ltd
                                                                                                       ABN 57 051 074 992
                                                                                             5 Gardner Close Milton Q 4064
                                                                                                      PO Box 388 Toowong
                                                                                                Queensland 4066 Australia
                                                                                                 Telephone: 07 3369 9822

                                                                                                   Facsimile: 07 3369 9722
                                                                                             International: +61 7 3369 9822
                                                                                                    card no@ca rd n o.com. au
                                                                                                           www.cardno.com.au




      Document Control

                                                           Author                                 Reviewer
          Vers i on                D a te
                                                       Name                Initials           Name                   Initials
              1              15 December 2006         Sid Duty                              Martin Giles



            "© 2006 Cardno (QId) Pty Ltd All Rights Reserved. Copyright in the whole and every part of this
            document belongs to Cardno (QId) Pty Ltd and may not be used, sold, transferred, copied or
            reproduced in whole or in part in any manner or form or in or on any media to any person without the
            prior written consent of Cardno (Qld) Pty Ltd."




    Bunnings Warehouse                                      Version 1                                       15 December 2006
    J 1350154 \WP\SWMP doc                           Commercial in Confidence                                          Page i




1

Page 18

1   BUNNINGS WAREHOUSE, NOOSAVILLE
    SURFACE WATER MANAGEMENT PLAN




t                                 BUNNINGS WAREHOUSE, NOOSAVILLE
                                 SURFACE WATER MANAGEMENT PLAN

                                                    TABLE OF CONTENTS

    1.      INTRODUCTION .................................................................................................................1

            1.1      Landscape Intent ........................................................................................................ 1

    2.      WATER QUANTITY ............................................................................................................ 2

            2.1      Rainfall data ............................................................................................................... 2
            2.2      RAFTS Model Setup .................................................................................................. 2
            2.3     Model Calibration ....................................................................................................... 3
            2.4     Detention Basin Sizing ............................................................................................... 3
1           2.5     RAFTS Model Results ................................................................................................4
                    2.5.1 Areas with impractical gradients .................................................................... 5
            2.6     Outlet .......................................................................................................................... 5

    3.      SWALE SIZING .................................................................................................................. 6

1   4.      STORMWATER QUALITY ................................................................................................. 7

            4.1     Stormwater Management Practices ........................................................................... 7
            4.2     Available Management Practices and Suitability ....................................................... 7
            4.3     Outline Suitability Assessment ................................................................................... 9
            4.4     Proposed Stormwater Management ........................................................................ 10
            4.5     Site Specific Objectives ................................................................................
            4.6     MUSIC Methodology ................................................................................................ 12
                    4.6.1 Adopted Land Uses ...................................................................................... 12
                    4.6.2 Nursery area ................................................................................................ 12
            4.7     Device Sizing ........................................................................................................... 12
            4.8     Modelling Results ..................................................................................................... 13

    5.      IRRIGATION TANK SIZING .............................................................................................14

    6.      MAINTENANCE REQUIREMENTS .................................................................................. 16

            6.1     Construction Phase & Sediment Control .................................................................. 16
            6.2     Ongoing Maintenance .............................................................................................. 16

    7.      CONCLUSION .................................................................................................................. 18




    Bunnings Warehouse                                                   Version 1                                               15 December 2006
    J \3501-54\WP\SWMP doc                                     Commercial in Confidence                                                    Page ii

Page 19

     BUNNINGS WAREHOUSE, NOOSAVILLE
     SURFACE WATER MANAGEMENT PLAN                                                                ^^ Cardno

     LIST OF TABLES

     Table 1            Rainfall Parameters for Rockhampton ..................................................................... 2
     Table 2            RAFTS Model: Area and Slope ............................................................................... 2
     Table 3            Rational Method Calculations .................................................................................. 3
     Table 4            Rational Method vs RAFTS Results ........................................................................ 3
     Table 5            Detention Basins Stage Storage Curves ................................................................. 3
     Table 6            Detention Basin Sizing Results ................................................................................ 4
     Table 7            Detention Basin Sizing Results - including unattenuated car park area ................. 5
     Table 8            BCC Swale Design Guidelines ................................................................................ 6
     Table 9            Stormwater Management Practices ......................................................................... 8
     Table 10           Water Quality Objectives ....................................................................................... 10
     Table 11           Bioretention Device Parameters ............................................................................ 13
     Table 12           Total Annual Loads ................................................................................................ 13
     Table 13           Rainwater Tank Performance ................................................................................ 14
     Table 14           Detention Basin Parameters: Summary ................................................................. 18

     LIST OF FIGURES

     Figure 1           Schematic Treatment Train
     Figure 2           Locality Plan
     Figure 3           Existing Site
     Figure 4           Proposed Site and Conceptual Drainage Layout


     APPENDICES

     APPENDIX A                RAFTS Results
     APPENDIX B                MUSIC Parameters
     APPENDIX C                Statement of Landscape Intent




ri   Bunnings Warehouse
     J \3501-54\VVP\SWMP doc
                                                                   Version 1
                                                             Commercial in Confidence
                                                                                                                         15 December 2006
                                                                                                                                  Page iii

Page 20

     BUNNINGS WAREHOUSE. NOOSAVILLE
     SURFACE WATER MANAGEMENT PLAN                                           C04"") C"Fw"Cr
     1.           INTRODUCTION

                 A Bunnings Warehouse is proposed for a site on the corner of Eumundi-Noosa Road and
                 Gateway Drive in Noosaville. The site falls under the jurisdiction of Noosa Shire Council.

                 Development has the potential to increase the rate of runoff from the site, possibly leading
                 to flooding issues downstream. Human activity on the site will also bring with it the
                 potential to adversely affect the quality of runoff, through the transport of debris, litter,
                 petrols, oils and lubricants and so on from impervious areas. However, the existing site is
                 not undisturbed; it has been cleared and appears to be used as a stockpile area for
                 aggregates.

                 In accordance with the requirements to maintain post-development runoff quantity and
                 quality, this document details the preliminary sizing and modelling of the detention
                 requirements and stormwater quality treatment train for the development, using Water
                 Sensitive Urban Design techniques. The final type, capacity and dimensions of the devices
                 will be subject to detailed design at a later stage.

                  1.1        Landscape Intent
                 A Statement of Landscape Intent (11 December 2006) has been prepared by Arterra
                 Landscape Architects, and is included as Appendix C. It describes the general landscaping
                 across the site, and includes a summary of the Water Related Design Principles described
                 and modelled within this report.




F1




     Bunnings Warehouse                                Version 1                               15 December 2006
     J \3501-54\WPSWMP doc                       Commercial in Confidence                                Page 1

Page 21

    BUNNINGS WAREHOUSE, NOOSAVILLE
    SURFACE WATER MANAGEMENT PLAN
                                                                                           (40:^ Cardna

    2.           WATER QUANTITY

                  2.1            Rainfall data
                 Historical rainfall intensities were calculated with AUS-IFD software, employing methods
                 detailed in the Institute of Engineers Australia's 1987 Australian Rainfall & Runoff (ARR).
1                The parameters used in the software are listed in Table 1 below.

                 Table 1          Rainfall Parameters for Rockhampton

                   wy uw,nuau nUwnaIuca,,nnnnn,



                               2 year 1 hour   50.0                                   50 year 1 hour   93.64

                              2 year 12 hour   10.69                              50 year 12 hour      23.84

                              2 year 72 hour   3.38                               50 year 72 hour      9.26

                   Geographical Factors

                     Skewness G       0                           F2    4.23                              F50   17.85


                  The AUS-IFD software produces a table of rainfall intensities for a range of storm durations,
                  and this information was entered as a series of design storms to the RAFTS database.
                  Zone 3 temporal patterns were applied to the data according to the ARR standard.

                  2.2            RAFTS Model Setup

                  The site was divided into several subcatchments according to lot position, slope and
                  direction of fall. These are shown schematically on Figure 1 and in plan on Figure 4. In
                  order to mitigate against the potential increase in stormwater runoff following development,
                  the existing situation was also modelled in order to establish a baseline.

                 Slopes in the existing situation were derived from information provided on the surveyor's
                 drawings, and from contours, and slopes for the proposed situation were estimated. These
                 were later adapted to achieve calibration, as described in the following section.

                 Pervious and impervious areas were calculated assuming that the site is completely
                 pervious in its existing state, and completely impervious following development (except for
                 the bioretention strips and landscaping, which are assumed to be completely pervious).
                 The model parameters are listed in Table 2 below.

                 Table 2          RAFTS Model: Area and Slope


                                                        Existing          Proposed              Existing          Proposed
                         Node             Area (ha)
                                                       Slope (%)          Slope (%)             Mannings          Mannings


                      Car park             1.1190           4                     2                0.07             0.025

                   Bioretention            0.1507           4                     2                0.07              0.07

                        Roofs              0.7884           4                  30                  0.07             0.025

                     Hardstand             0.2064           4                     2                0.07             0.025

                     Landscape             0.2011           4                     2               0.07               0.05


                 Each node in RAFTS is also assigned rainfall losses: for pervious areas, initial loss is zero,
                 and continuing loss is 2.5mm. For impervious areas both losses were set to zero.


    Bunnings Warehouse                                       Version 1                                          15 December 2006
    j \3501-54\lAP\SWMP doc                            Commercial in Confidence                                             Page 2

Page 22

    BUNNINGS WAREHOUSE, NOOSAVILLE
    SURFACE WATER MANAGEMENT PLAN
                                                                                              ^^ Carlla/no

                  2.3            Model Calibration
                 The Rational Method calculation parameters are summarised in Table 3 below.


                 Table 3             Rational Method Calculations

                   Parameter                                   Existing Conditions I Developed Conditions

                   Area                                                                2.7543 ha

                    10 year 1 hour rainfall intensity                                  59 mm/hr

                   Fraction Impervious (fi)                              0.10                              0.775
                   Coefficient of runoff (C10)                           0.55                              0.83

                   Coefficient of runoff (C1oo)                         0.660                              0.996

                   Time of concentration (tc)                          30 mins                            10 mins

                   Rainfall Intensity (100 year)                     152 mm/hr                           249 mm/hr

                    Peak Runoff (100 year ARI)                        0.77 m3/s                          1.90 m3/s

                   % Difference                                                                    Approx + 250 %


                  The model was calibrated by comparing the flows produced by RAFTS with those
                  calculated by the rational method above for the 100 year event. The results are shown
                  below.

                  Table 4            Rational Method vs RAFTS Results

                              Node          Existing Q100 (m3/s)          Proposed Q100 (m3/s)

                         Rational                   0.77                               1.90

                    RAFTS Results                   0.78                               1.82

                        Difference                 +1.3%                              -4.7%


                  As can be seen from the table, the results produced from the Rational calculation for the
                  100-year average recurrence interval compare very favourably in the proposed case with
                  the runoff predicted by the RAFTS model. The results were achieved using a Storage
                  Coefficient Multiplication Factor, B, of 2.

                  2.4            Detention Basin Sizing
                  In order to mitigate the increase in peak discharge under developed conditions the RAFTS
                  model was used to size the detention basin required for the site. The basin will be located
                  in a landscaped area at the south-east corner of the site.

                 The stage storage curves adopted for the basin are presented in Table 5.

                 Table 5             Detention Basins Stage Storage Curves



1                  Stage (m)

                   Storage (m)
                                               0

                                               0
                                                        0.1

                                                        250
                                                                       0.4
                                                                       500
                                                                                      0.6
                                                                                      750     1
                                                                                                   0.8            1.0

                                                                                                  1000 1 1250 1 1500
                                                                                                                             1.2




    Bunnings Warehouse                                           Version 1                                           15 December 2006
    J \3501- 54\WP\SWMP doc                                Commercial in Confidence                                            Page 3

Page 23

      RUNNINGS WAREHOUSE, NOOSAVILLE
      SURFACE WATER MANAGEMENT PLAN                                                     (L:^ Carldna

                    In order to provide a further improvement in water quality in low flow events (of up to the
                    three month return period) the initial 300mm of storage depth available in the basin will be
                    used for stilling of flows. The main stormwater outlet will be set at 300mm above the basin
                    invert level, whereas a smaller pipe set at a lower level will allow the controlled release of
                    low flows over a longer period.

                    An emergency spillway is also provided in the basin to allow flows from extreme events
                    (including and in excess of the 100-year event) to pass over the rim of the basin, bypassing
r1i
                    the outlet. This weir would be 20 metres wide and at a level of 1.15 metres above the
                    basin invert.

                    2.5              RAFTS Model Results
                    A range of storm durations were modelled for a series of ARI design events. Peak flows
                    were determined for the 1 year through to the 100 year event and durations ranged from
                    10 minutes through to the 24 hour event.

                    The results of the modelling are shown in the table below.

                    Table 6           Detention Basin Sizing Results

                                     Existing Case   Developed Case                     Detention Basin
                       Storm
                                      Discharge      (without basin)       Peak Basin    Peak Basin       Peak Outflow
                       Event
                                         (m'/s)      Discharge (m'/s)       Stage (m)    Volume (m3)         (m'/s)

                         100             0.785            1.816                1.16         1455              0.609

                          50             0.698            1.653                1.06         1321              0.513


I                         20

                          10
                                         0.594
                                         0,508
                                                          1.523

                                                          1.338
                                                                               0.91

                                                                               0.80
                                                                                            1144

                                                                                            1002
                                                                                                              0.451

                                                                                                              0.396

                           5             0.446            1.199                0.72          901              0.351

                           1     I       0.224            0.759                0.46          574              0.198


                    The table shows that in all cases peak outflows are reduced to below the existing case
                    discharges. The maximum utilised volume of the detention basin is approximately 1455 m3,
                    giving a peak stage of 1.16 metres in the 100 year ARI event. It can be noted that the
                    design is relatively conservative as the depth of ponding is relatively low. Therefore it
                    should be possible to optimise the design and reduce the footprint of the basin even further
                    in detailed design.

                    QUDM indicates in Table 6.2 that the maximum allowable stage during the 20 year ARI
                    event is 1.20 metres. The peak basin stage of 0.91 metres displayed for the basin is well
                    below this figure and, of course, the basin is only a maximum of 1.2 metres deep in any
                    case. Further, only the deepest central area of the basin would experience such depths,
                    and the long shallow fall at the edges of the device (set at a gradient of 1 in 6) would
                    preclude any public safety risk due to sharp inclines.

                    To allow for a freeboard and include an additional factor of safety, it is suggested that the
                    top of the bund should be at a level of 300 mm above the maximum 100-year level - in this
                    case equating to 1.46m above the basin invert.




      Bunnings Warehouse                                       Version 1                                  15 December 2006
      J 1.3501-54vM' S`NMP aoc                           Commercial in Confidence                                     Page 4

Page 24

    BUNNINGS WAREHOUSE, NOOSAVILLE
    SURFACE WATER MANAGEMENT PLAN                                                  111(4^ calw"Cr
                  2.5.1        Areas with impractical gradients

                  It may be noted that levels across the site may be such that it will be difficult or impractical
                  to route runoff from certain areas to the detention basin. To ensure adequate falls across
                  the car park, for example, a cut and fill operation is envisaged which will require the use of
                  a retaining wall along the western boundary. It has been suggested that in this area,

I                 surface water is released direct to the outlet swale without passing through the detention
                  basin (although three-month flows will still pass through bio-retention devices). To ensure
                  that surface water runoff rates following development are equal to or less than those
                  existing, even with an unattenuated area of almost 2500m , the RAFTS model was
                  amended and revised results calculated. The results are shown in Table 7 below.

                  Table 7       Detention Basin Sizing Results - including unattenuated car park area

                     Event     Existing (m'ls)         Stage (m)               Volume (m')    Site Outflow (m3/s)

                       100          0.785                 1.06                    1325              0.575

                        50          0,698                 0.95                    1193              0.522

                        20          0.594                 0.84                    1046              0.471

                        10          0.508                 0.73                    909               0.403

                        5           0.446                 0.66                    822               0.350

                         1          0.224                 0.41                    518               0.209


                  It can be seen that for each storm event, the outflows from the site as a whole (the outflow
                  refers to the site 'end' node and not the basin) remain less than the existing rates.

I                 Paradoxically, allowing certain areas of the site to drain direct to the Swale does not
                  increase the overall peak runoff rate in this case. This is likely to be because the times of
                  concentration (the time taken for the runoff to arrive at the discharge point) for each area do
                  not coincide, and this creates two smaller peaks in the hydrograph over a longer period of
                  time.

                  2.6          Outlet
                  A single 525mm pipe was adopted for the basin outlet and, as described above, set with an
                  invert level 300mm above the bottom of the basin. This outlet pipe will drain through the
                  bund, is 10 metres long and set at a grade of 0.5 per cent. The overflow spillway level was
                  set at 1.15 metres above the invert of the basin (at the downstream end) and is 20 metres
                  wide.

                  The overflow weir becomes operational only in events approaching the 100-year return
                  period, when it would experience a flow depth of approximately 10mm.



r                 As stated, the outlet pipe has been placed with its invert set at 300mm above the 'floor
                  level' of the basin. This provides storage for the containment and stilling of runoff from
                  events of up to the three-month average recurrence interval. These flows will not exit from
                  the basin via the stormwater pipe, but instead through a lower and smaller pipe through a
                  longer period of time. Using this approach, the option also exists to install a sandy loam
                  bioretention filter placed in the floor of the basin to further improve the treatment train.

                  Flows from the detention basin will be released via the outlet to a vegetated Swale, running
                  in a northerly direction along the western boundary of the site. An outline sizing of this
                  Swale is provided in the following section.




    Bunnings Warehouse                                     Version 1                              15 December 2006
    J \3501- 54\VVP\SWMP doc                        Commercial in Confidence                                Page 5

Page 25

    BUNNINGS WAREHOUSE, NOOSAVILLE
    SURFACE WATER MANAGEMENT PLAN
                                                                                 ^^ Cardno

    3.          SWALE SIZING

                Discharges from the detention basin will travel along a grassed swale in a northerly
                direction along the western boundary. A HECRAS flow model was constructed to analyse
                the performance of a such a Swale.

                From Table 6 it can be seen that the peak outflow in the 100-year event equates to 0.609
                m3/s. Mannings equation was used to arrive at an outline size for the Swale. The swale
                was a total of 5m wide, 0.3m deep, and sides sloping at 1 in 6, meeting at a base of 1.4m
                width. The swale would be approximately 150 metres long, and set at a gradient of around
                1.5%. At this outline design stage, bends and constrictions were not modelled (driveway
                crossings would need to be elevated in order to avoid wide and shallow cross sections).
                Cross sections were input to HEC-RAS, a value of Manning's n of 0.06 was selected, and
                the above derived flow of 0.609 m3/s was applied to the head of the run.

                As swales are generally accessible by the public, design guidelines are available that
                ensure that safety considerations are met in terms of bank slope, flow velocity and depth.
                Brisbane City Council's Draft WSUD Engineering Guidelines (August 2005), for example,
                lists typical design parameters which have been reproduced in Table 8 below. The results


s               of the HECRAS analysis are also included in the table.

                Table 8       BCC Swale Design Guidelines

                  Design Parameter                                               Typical Value    Actual Value

                  Swale longitudinal slope                                          1 to 4%            1.5%

                  Swale side slope (for areas not requiring access, eg. Parks,    1:3 to 1:10            1:6
                  easements, median strips)

                  Swale side slope for trafficability (for footpaths with 'at-      Max 1:9              n/a
                  grade' crossings)

                  Swale side slope (elevated driveway crossings)                  1:3 to 1:10            1:6

                  Manning's n (with flow depth less than vegetation height)       0.15 to 0.4            n/a

                  Manning's n (with flow depth greater than vegetation height)    0.02 to 0.05          0.05

                  Maximum velocity for scour in minor event (eg. Q2)                0.5 m/s          0.5 m/s

                  Maximum velocity for Q50                                          2.0 m/s          0.6 m/s

                  Depth x velocity for high risk locations                         <0.4 m2/s
                                                                                                     0 . 2 m 2 /s
                  Depth x velocity for low risk locations                          <0.6 m2/s

                  Maximum depth of flow, Q50                                         0.3m             0.28 m


                As can be seen from the table, the swale is adequate to convey the anticipated flows while
                meeting minimum safety criteria. However, the design levels at the basin outlet, at
                approximately 15m AHD, fall to approximately 11 m AHD at the northern end of the site - a
                fall of around 2.6%. The difference between the Swale slope used above and the actual

s               slope on site can be reduced through the use of simple rock dams placed at predetermined
                drops in the channel level, creating attractive weirs or waterfalls along the length of the
                swale.

                Further modelling will be required at the detailed design stage to accurately model all
                bends and constrictions in the swale's route through the site and the addition of local
                surface water discharges to the flow. However, the analysis demonstrates that it will be

I               possible to provide a Swale to convey flow.




I   Bunnings Warehouse
    J 13501-54\WP\SWMP doc
                                                           Version 1
                                                     Commercial in Confidence
                                                                                                 15 December 2006
                                                                                                           Page 6

Page 26

    BUNNINGS WAREHOUSE. NOOSAVILLE
    SURFACE WATER MANAGEMENT PLAN                                               (*M^ Calw"Cill,

I   4.          STORMWATER QUALITY

                4.1             Stormwater Management Practices
                The formulation and implementation of the stormwater management plan for the
                development is based on the following key principles.

                      •      Adoption of Water Sensitive Urban Design (WSUD) principles throughout the site.

t                            This includes consideration of features such as preventing the concentration of flow
                             in downstream areas and the use of wetland systems to manage runoff water
                             quality.

                      •      Management and control of water quality both during and after construction. A
                             detailed Erosion and Sedimentation Control Plan will need to be developed in
                             accordance with recognised standards during the detailed design phase and
                             implemented on site during the subdivision construction process.

                A Stormwater Quality Management Plan (SQMP) has been prepared for the site that uses

s               these principles to describe how stormwater runoff from the site is to be treated to comply
                with the water quality objectives specified for the receiving water bodies (refer Section 3.1).
                This SQMP describes the stormwater management measures proposed for the site, and
                includes the following broad steps:

I                     •      Identify environmental values and water quality objectives for discharge from site
                             (refer Section 4.5);

                      •      Consider types of stormwater management practices appropriate for use within
                             development (refer Section 4.2);

                      •      Demonstrate that water quality objectives can be met with available stormwater
                             management practices (refer Section 4.8).

                4.2             Available Management Practices and Suitability
                A wide range of stormwater management practices are available to achieve the principles
                of Water Sensitive Urban Design. All have been shown to be successful when correctly
                designed, but selection of the most appropriate practices for a particular development is
                highly dependent on site conditions.

                The Table overleaf lists the most common stormwater management practices currently
                used, along with opportunities and constraints for their use. This table forms the starting
                point for stormwater management for the site. Considering the site's constraints, not all of
                the measures outlined in the table are suitable. Each treatment option is therefore
                discussed in more detail and comment made on the suitability of each in the context of the
                development.




    Bunnings Warehouse                                     Version 1                              15 December 2006
    J 13501-54\wp\SWMP Doc                           Commercial in Confidence                               Page 7

Page 27

a   BUNNINGS WAREHOUSE, NOOSAVILLE
    SURFACE WATER MANAGEMENT PLAN                                                         ^^ Cara/no

1                Table 9       Stormwater Management Practices

     Practice                                           Opportunities                           Constraints

                               Pollutants removed          Scale            Other
                                                                            Pre-treatment for         Require frequent
      Litter baskets/racks      Litter and debris - M         Local
                                                                             other practices           maintenance
                               Coarse sediment - H
        Sediment traps                                      Regional                            Aesthetic and safety issues
                               Suspended solids - L
                               Litter and debris - M
        Gross pollutant                                                     Pre-treatment for
                               Coarse sediment - H          Regional                            Require regular maintenance
         traps (GPTs)                                                        other practices
                               Suspended solids - L

                                Litter and debris - M


I      Filter strips/ buffer
               strips
                               Coarse sediment - H
                               Suspended solids - H
                                    Nutrients - M
                                                            Lot/Local
                                                                               Peak flow
                                                                              management
                                                                                                     Require flat terrain


                               Litter and debris - M
                               Coarse sediment - H                             Peak flow
         Grass swales                                         Local                                  Require flat terrain
                               Suspended solids - H                           management
                                   Nutrients - M
                                Litter and debris - M
                               Coarse sediment - H                             Peak flow
       Vegetated swales                                       Local                                  Require flat terrain
                               Suspended solids - H                           management
                                    Nutrients - H
                               Coarse sediment - M
      Extended detention                                                       Peak flow          Requires pre-treatment
                               Suspended solids - M         Regional
            basins                                                            management          Large land area required
                                   Nutrients - L

                               Suspended solids - H
                                                                               Peak flow
      Infiltration trenches        Nutrients - M              Local                               Requires pre-treatment
                                                                              management

            Bio-retention      Coarse sediment - H
                                                                               Peak flow
               systems         Suspended solids - H           Local                               Requires pre-treatment
                                                                              management
            (rain garden)          Nutrients - H
                               Suspended solids - H
                                                                               Peak flow          Not appropriate for steep

I     Porous pavements         Total phosphorus - M
                                 Total nitrogen - L

                               Coarse sediment - H
                                                              Local
                                                                              management                   sites

                                                                                                  Requires pre-treatment
            Constructed        Suspended solids - H                            Peak flow         Not appropriate for steep
                                                            Regional
             wetlands          Total phosphorus - M                           management                   sites
                                 Total nitrogen - L                                             Requires large area of land

                                                                               Peak flow            Requires community
        Rainwater tanks                 N/A                    Lot
                                                                              management               involvement

                                                                              Other benefits
            Community           Litter and debris - L                         include weed
                                                            Regional                              Community participation
             education              Nutrients - L                            control, reduced
                                                                                water use

    Note:        Data taken from NSW EPA Managing Urban Stormwater - Treatment Techniques, 1997
                 L - 10 - 50% removal

1                M - 50 - 75% removal
                 H - 75 - 100% removal
                 Scales    Lot      less than 1 ha
                           Local     1 - 10 ha
                           Regional greater than 10 ha




    Bunnings Warehouse                                          Version 1                                     15 December 2006
    J13501-S4 WP\SWMPdoc                                 Commercial in Confidence                                       Page 8




s

Page 28

     BUNNINGS WAREHOUSE. NOOSAVILLE
     SURFACE WATER MANAGEMENT PLAN
                                                                               (.^ C"rwncp
                 4.3         Outline Suitability Assessment
                 Each of the techniques described in the previous table is further assessed below, with
                 regard to the site's specific opportunities and constraints.

                 Litter Baskets/racks

                 The primary purpose for litter baskets is to remove medium sized litter and debris from the
                 site. Significant litter loads are not expected and other measures will be more appropriate
                 for managing the removal of litter from the site.

                 Sediment Traps

                 Sediment traps will be required during the construction phase to limit the transport of
                 sediment off site. Following construction, sediment levels will return to a low level, and
                 traps are therefore not considered necessary as a long-term water quality measure.

                 Gross Pollutant Traps

                 Gross pollutant traps (GPTs) are predominantly used for the removal of litter and debris -

t                although they have been shown to effectively remove coarse sediment and suspended
                 solids (Brisbane City Council, 1999). Modelling shows that a GPT will be not be required.

                 Filter Strips/Buffer Strips

                 Buffer strips are areas of land left in their natural state that act to reduce peak runoff flows
                 and improve the quality of stormwater runoff. This treatment improves the aesthetic and
                 biodiversity value of the development and provides significant quality and quantity
                 improvements.

                 Grass Swales

                 Grass swales are considered a highly effective and aesthetic water quality (and to a lesser
                 extent, water quantity) control measure, when placed in flat areas. In this case, vegetated
                 swales, described below, are more appropriate.

                 Vegetated Swales

                 Vegetated swales require similar conditions as those outlined for grass swales above, and
                 wherever slopes are sufficiently low they would provide effective stormwater treatment for
                 the site. They will be employed in the car park areas, but feature a filter media for
                 treatment: see Bio-retention Systems.

                 Extended Detention Basin

                Extended detention basins are designed to generally store runoff for 1-2 days. Their main
                purpose is the reduction of the peak discharge from the site during a storm event, and the
                retention of particulate matter. A detention basin is included on site in the southeast


r.              corner.

                 Infiltration Trenches

                Infiltration trenches allow pre-treated stormwater runoff to infiltrate into surrounding soils
                and groundwater, and as such are not a treatment device in themselves. Where space is
                limited, bio-retention systems are preferred.




     Bunnings Warehouse                                   Version 1                              15 December 2006
     J 13501-541WP\SWMP4oc                         Commercial in Confidence                                Page 9




f

Page 29

BUNNINGS WAREHOUSE. NOOSAVILLE
SURFACE WATER MANAGEMENT PLAN
                                                                                  (.^ Carlldno

               Bio-retention Systems

               Bio-retention systems effectively combine a grass or vegetated Swale with an infiltration
               trench. They are considered to be extremely effective in removing sediment and nutrients.
               Long bio-retention basins will be employed on site in the landscape divides of the car-park
               area, in order to treat stormwater to an appropriate standard prior to release.

               Porous Pavements

               Porous pavements are not appropriate for high traffic areas due to increased maintenance
               requirements. They are also less effective in steep areas. However, for relatively flat, low
               traffic roads they could be suitable for this development, although their perceived expense
               often leads to the preference of other measures in reaching quantity and quality objectives.

               Constructed Ponds and Wetlands

               Wetlands require reasonably large flat areas of land. Given the constraints of this
               development, and the ability to use bio-retention systems, the use of ponds or wetlands is
               not recommended.

               Rainwater Tanks

               The ability exists to install rainwater tanks throughout the development to reduce overall
               water consumption. Tanks will be employed on site to collect roof runoff and provide a
               source of irrigation for the nursery.

               4.4             Proposed Stormwater Management
               In summary, the stormwater management practices considered appropriate for use in this
               development are:

                     •      Rainwater tanks to collect roof runoff, to supply nursery irrigation needs;

                     •      bio-retention swales, located in the car park landscape divides;

                     •      a detention basin for stormwater attenuation, located in the southeast corner.

               To ensure that the Water Quality Objectives (described in the following section) can be
               met, devices will be sized such that all stormwater up to the three-month design flow will
               have passed through the nominated measures for treatment.

               4.5             Site Specific Objectives
               Water Quality Objectives (WQO) for the study site have been derived with reference to the
               Queensland Environment Protection Agency Queensland Water Quality Guidelines (March
               2006). The site is inland, and discharges would flow for approximately one kilometre along
               what would be categorised in the guidelines as a 'lowland stream'. It is located within in the
               South-east Region. The WQOs so derived are shown in the table below.

               Table 10         Water Quality Objectives

                                      Parameter                                 Queensland EPA Value

                               Suspended Sediments                                      6 mg/L
                                 Total Phosphorus                                      50 pg /L
                                   Total Nitrogen                                      500 pg/L




Bunnings Warehouse                                         Version 1                                15 December 2006
J \3501 -54\WP\S WM P dOC                            Commercial in Confidence                                Page 10

Page 30

BUNNINGS WAREHOUSE, NOOSAVILLE
SURFACE WATER MANAGEMENT PLAN                                               (4^ Cardno

            As the development is commercial in character, the water quality parameters of relevance
            to the site are suspended solids, nutrients (nitrogen and phosphorus), litter, faecal coliforms
            and hydrocarbons. Of these parameters, the detailed modelling of litter, faecal coliforms
            and hydrocarbons is not possible at present using the industry standard analysis package
            (MUSIC) due to the lack of information regarding export rates. The modelling of defined
            water quality objectives has therefore necessarily focused on suspended solids and
            nutrients (nitrogen and phosphorus).

            Previous versions of the MUSIC modelling software were able to achieve State and
            international objectives through the use of a suitably sized treatment train. However,
            following a software update in 2005 to correct an error in the modelling of bio-retention
            basins, the new 'background' concentrations used in version 3.01 of the software are
            higher than the published water quality objectives. No matter how efficient the treatment
            train employed to serve the development, or the number of devices employed, it will not be
            possible to achieve the concentrations listed in Table 2.

            Further, it should be noted that the values presented in the Guidelines represent desirable
            water quality in the watercourse, rather than the quality of the discharge to it. While
            specifying such values would guarantee that acceptable aquatic concentrations are
            obtained, such an approach is highly conservative and unrealistic if it is not possible to
            demonstrate that the objectives can be achieved, even with the latest modelling software
            and treatment technology.

            The EPA Guidelines (in Section 4.3 on Page 51) state that 'a very important point to note is
            that although guidelines provide technical input to the development of WQOs or targets,
            they are not necessarily the same values as the finally adopted WQOs. The final
            WQOs take into account social, economic and current condition factors. These may dictate
            that achieving the actual guideline value is economically or technically unacceptable and
            that therefore the WQO should be set at some less stringent value. Hence the WQOs
            ultimately adopted might be the same as, or different from, the technical guideline values,
            depending on community and economic considerations.'

            Alternative water quality objectives are clearly necessary. In recognition of the above,
            many Local Authorities have adopted load-based objectives.           These require the
            development to achieve:

                 •      an 80 % reduction in suspended solids;
                 •      a 60 % reduction in total phosphorus;
                 •      a 45 % reduction in total nitrogen; and,
                 •      a 90 % reduction in gross pollutants

           when compared to unmitigated urban development.

           This approach has recently been ratified in Healthy Waterways' Water Sensitive Urban
           Design Technical Design Guidelines for South East Queensland (June 2006). These load
           based reduction objectives were therefore employed for this report.




Bunnings Warehouse                                     Version 1                            15 December 2006
J X501-54\WRSWMP tloc                            Commercial in Confidence                            Page 11

Page 31

1   BUNNINGS WAREHOUSE, NOOSAVILLE
    SURFACE WATER MANAGEMENT PLAN                                          (,,^ Cardno

               4.6         MUSIC Methodology
               In order to determine the effectiveness of the proposed treatment train in meeting the water
               quality objectives, a stormwater quality analysis was performed using the Model for Urban
               Stormwater Improvement Conceptualisation (MUSIC) Version 3.01.

               The model requires the user to specify meteorological data (rainfall and evaporation), soil
               properties and pollutant loads for each area of the site, and suitable parameters for the
               MUSIC model were adopted in accordance with the recommendations of the Brisbane City
               Council publication Draft Guidelines for Pollutant Export Modelling in Brisbane- Version 7

t              (2003). The values adopted for the analysis are listed in Appendix A.

               Rainfall and evaporation data for the site was input to the model using ten years of data
               from 1988 to 1997 for Nambour, and employing a six minute time step.

               4.6.1       Adopted Land Uses

               The modelling guidelines define a range of source nodes reflecting various land use types.
               Based on the descriptions, the land use for the proposed site was modelled as
               'commercial'. The existing situation was also modelled for comparison and, due to the
               disturbed nature of the site in its current state, an 'urban residential' node is appropriate.

               The areas of buildings, car parks, bio-retention reserves and landscaped borders were
               derived from site survey and design plans. Roof areas, car parks, roads and associated
               hardstands were assumed to be completely impervious, and the bio-retention reserves and
               landscaped areas assumed to be completely pervious.

               4.6.2       Nursery area

               The nursery area has been assumed to be completely impervious, and is included in the
               model as a 'building'. Rainfall on this area will be intercepted either by the concrete
               hardstand or the shade sails. Although a proportion of incident rainfall will permeate
               through the sails and possibly be intercepted by the plants and their containers, this effect
               has been discounted to enable a conservative quantity assessment.

               Information received from Arterra Landscape Architects and from staff at existing Bunnings
               Warehouses suggests that growing plants would be irrigated at a rate of 20 to 25
               millimetres per week. From the proposals, the growing area has been assumed to be
               equivalent to the area under the shade sails; some 970 m .

               Separate from the main treatment train, the growing area was modelled as a completely
               pervious agricultural node, using a specially prepared rainfall file which simulated the above
               irrigation rate. It was assumed that plants would require irrigation every day for eight
               months, but only every other day for four summer months - a daily rainfall total of 3.6
               millimetres being applied accordingly. Daily pollutant fluxes were exported from this model
               and saved, and applied to the main treatment train model using an 'Imported Data' node.
               The model is shown schematically in Figure 1.

               4.7         Device Sizing
               The vegetated reserves located between the car parking bays will be used to contain the
               main treatment device for the development - a series of long bio-retention devices. The
               car park areas will be graded such that the vast majority of the flow resulting from rainfall
               events of up to the three-month return period will be directed toward the devices. After
               passing through a 500 mm depth of sandy loam filter material, slotted drainage pipes will
               collect the runoff and direct it to the detention basin.



    Bunnings Warehouse                                Version 1                               15 December 2006
    J\3501-54\WP\SWMPdoc                        Commercial in Confidence                              Page 12

Page 32

C
     BUNNINGS WAREHOUSE, NOOSAVILLE
     SURFACE WATER MANAGEMENT PLAN                                                        (4:^ Car-dna

F1                For the purposes of the modelling, sensible device parameters based on outline quantity
                  calculations were input to the model, as described in the table below. If the layout of the
                  site changes in future these can be amended to suit, providing that the overall effectiveness
                  is maintained. The bio-retention device is modelled as a single large device, for example,
                  where in fact several smaller devices of equal total capacity would be employed in the car
                  park landscaping divides around the site.

                  Table 11        Bioretention Device Parameters

                    Parameter                                                     Value

                    Surface Area (m)                                               860
                    Extended Detention Depth (m)                                   0.1

                    Filter Area (m)                                                860

                    Filter Depth (m)                                               0.5

                    Mean Particle Diameter (mm)                                    0.36

                    Saturated Hydraulic Conductivity (mm/hr)                       180
                    Overflow Weir Width (m)                                         2


                  Rainwater tanks provide some reduction in nitrogen loads, thought to be via biofilm activity
                  within the tank. The reduction in overall runoff through storage and reuse will also minimise
                  loads at the site outlet. To enable a conservative quality assessment, only a nominal
                  rainwater tank size was used, having a volume of 18kL and a surface area of 8m2. A
                  realistic re-use demand of 1250kL per year was applied. This size is conservative given
                  the likely rainwater tank size to be adopted (refer Section 5).

                  4.8            Modelling Results
                  The results of the MUSIC modelling, shown as total annual loads, are presented in the
                  table overleaf. It can be seen from the tables that the treatment train would reduce all of
                  the total loads released from the developed site to such an extent that the target reductions
                  are achieved for all pollutants.

                  Table 12        Total Annual Loads

                                              Total Suspended             Total             Total       Total Gross
                              Situation
                                                   Solids              Phosphorus          Nitrogen      Pollutants

                          Existing Site

t                         (Rural Res)

                          Development
                           Potential
                                                 3,000 kg/yr


                                                 6,880 kg/yr
                                                                          6.27 kg/yr


                                                                          18.5 kg/yr
                                                                                           34.1 kg/yr


                                                                                           106 kg/yr
                                                                                                          196 kg/yr


                                                                                                          683 kg/yr

                      Development with
                                                 1240 kg/yr               5.20 kg/yr       54.8 kg/yr      0 kg/yr
                       treatment train

                     Realised Reduction             82 %                    72 %             48 %          100 %

                     Target      Reduction          80 %                    60 %             45 %           90 %

                  Note that the proposed development, owing to its water sensitive urban design
                  measures, produces lower annual pollutant loads than the existing rural residential
                  case, for most of the modelled pollutants.


I
'    Bunnings Warehouse                                       Version 1                                 15 December 2006
     J \3501 541WP15WMP doc                            Commercial in Confidence                                 Page 13

Page 33

1
lJ
     BUNNINGS WAREHOUSE, NOOSAVILLE
     SURFACE WATER MANAGEMENT PLAN                                                          J) Cara/no

     5.          IRRIGATION TANK SIZING


I                Historical rainfall data was obtained for Noosa for the period between 1950 and 2002. A
                 yield analysis was conducted, applying the rainfall to the building roof area (accounting for
                 a first flush loss of 0.2mm and an initial loss of 1 mm) to estimate the daily inflow to the tank.

                 The roof area was assumed to be 4600 m2, derived from initial design drawings. In many
                 instances, the fall of the roof and surrounding ground levels dictate that not all of the
                 rainwater can be practicably harvested - for this reason a 'half-sized' roof of 2300m2 was
                 also modelled.

                 Demands of 2500, 3000 and 3500 litres per day were used. Over a nursery area of
                 approximately 1000 m2, this equates to an irrigation rate of about 2.5, 3.0 and 3.5 mm per
                 day.

                 The model provides an estimate of the demand supplied, expressed as a percentage of the
                 total volume required. Note that it is not a percentage of total time the demand is supplied
                 - although this figure will be similar. The results are shown in Table 13 below.

                 Table 13        Rainwater Tank Performance

                                                        Demand supplied (%) for each tank size (kL)
                   D eman d : roo f area
                                            10   20      30         40     50   60     70   80   90    100      150     200

                    2500 Lpd:4600m2         64   79      87         91     94   95     96   97   98    99       100     100

                                                 74


r
                    3000 Lpd : 4600m2       59           83         88     91   93     94   96   96    97       99      100

                    3500 Lpd 4600m2         56   70      79         84     88   91     92   94   95    96       98       99
                    2500 Lpd:2300m2         60   75      83         87     90   92     94   95   96    97       99      100

                    3000 Lpd:2300m2         55   70      78         83     86   89     91   92   93    94       97       99
i7                  3500 Lpd2300m2          52   65      73         78     82   85     87   89   90    91       95       97


                 The results are better presented as a graph, as follows:


                                                 Rainwater Tank Performance




                                                                                                        2500 Lpd, full roof
                                                                                                        3000 Lpd, full roof
                                                                                                        3500 Lpd, full roof
                                                                                                        2500 Lpd, half roof
                                                                                                        3000 Lpd. half roof
                                                                                                        3500 Lpd, half roof




                        55

                        50
                             0             50                 100                150             200

                                                       Tank Size (kL)




     Bunnings Warehouse                                        Version 1                                     15 December 2006
     J\3501-54\WP\S'WMPdoc                            Commercial in Confidence                                        Page 14

Page 34

I     BUNNINGS WAREHOUSE, NOOSAVILLE
      SURFACE WATER MANAGEMENT PLAN                                                 4(*M^ Cardno

t                 The final size and design of the tank will depend upon site conditions, and will be confirmed
                  at the detailed design stage. At this stage, some obvious conclusions may be drawn from
                  the data above; increasing the irrigation rate decreases reliability, but larger tanks served
                  by larger roof areas increase reliability.

                  However, these effects cannot necessarily be extrapolated to reach a guaranteed 100%
                  performance target. The vagaries of rainfall mean that in reality, with a sensibly sized tank
                  serving a realistic roof area, some dry periods will be experienced. The commercial cost of
                  this shortfall must be compared with the capital costs inherent in the tank.

                  To conclude, a 100 kL tank could supply a demand of 3500 litres per day with 95%
                  reliability (utilising all of the available roof area). If only 50% reliability is required, then a 10
                  kL tank would suffice (supplied by only half of the roof area). At this point a tank size of
                  1OOkL is recommended to provide 95% reliability.

                  The model tends towards a conservative assessment in that a daily supply has been
                  modelled. As described in previous sections, in periods of natural rainfall the artificial
                  irrigation demand of the nursery would decrease (watering being required perhaps every
                  other day). This effect would lead to a modest improvement on the above figures.



P-j




      Bunnings Warehouse                                    Version 1                                   15 December 2006
      J.\3501-54\ P\SWMPdoc                           Commercial in Confidence                                   Page 15

Page 35

    BUNNINGS WAREHOUSE, NOOSAVILLE
    SURFACE WATER MANAGEMENT PLAN                                            (40:^ cafwncp
I   6.          MAINTENANCE REQUIREMENTS

                6.1         Construction Phase & Sediment Control
                During the construction phase, the potential exists for significant increases in the

I               amount of pollutants, particularly sediment, exported from the site. During this period,
                an Erosion and Sediment Control Plan is required as part of the overall Environmental
                Management Plan prepared for the construction phase. The erosion and sediment
                control plan for the site would be completed in accordance with Soil Erosion and
                Sediment Control, Engineering Guidelines for Queensland Construction Sites
                (Institution of Engineers Australia, 1996).

                The completion of construction activities in accordance with an Erosion and Sediment
                Control Plan developed using the above guidelines will minimise the nature of any
                adverse impacts during the construction phase. It is considered that the appropriate
                time for the preparation of the Erosion and Sediment Control Plan is at the Operational
                works stage. Further, it is expected that the requirement to prepare a plan will be a
                condition of any development approval issued with respect to the site.

                Performance indicators for the construction phase will be set as part of the overall EMP for
                the construction phase and in agreement with Council. Should non-compliance with the
                performance indicators occur, the following corrective actions are to be implemented:

                        •   Identification of the cause of the non-compliance;
                        •   Implementation of appropriate mitigation measures as determined by the
                            Contractor in consultation with the Consultant; and
                        •   Relevant validation monitoring to confirm that the nominated corrective
                            actions have been effective.

                It is envisaged that the detention basin will first be constructed as a sediment basin to treat
                runoff during the construction phase, and the same would apply to the car park landscape
                divides to a lesser extent. At the end of construction, the basin and swales would have any
                accumulated sediment removed and the vegetation installed (and the filter, in the case of
                the bio-retention devices). As there is likely to be a significant pollutant load generated as
                the Warehouse is first opened to the public, it may be necessary to replace the filter media
                at intervals until the vegetation is fully established.

                6.2         Ongoing Maintenance

                The proposed maintenance for the bio-retention systems is drawn from the Melbourne
                Water publication WSUD Engineering Procedures: Stormwater (June 2004, Chapter 6):

                        The most intensive period of maintenance is during the plant establishment
                       period (first two years) when weed removal and replanting may be required It
                       is also the time when large loads of sediments could impact on plant growth
                       particularly in developing catchments with poor building controls.




    Bunnings Warehouse                                 Version 1                               15 December 2006
    J \3501-541WP\SWMPdoc                        Commercial in Confidence                              Page 16

Page 36

      BUNNINGS WAREHOUSE, NOOSAVILLE
      SURFACE WATER MANAGEMENT PLAN                                                    11^4^ Cardno

                           Maintenance is primarily concerned with:

                               •       Maintenance of flow to and through the bio-retention basin
                               •       Maintaining vegetation
                               •       Preventing undesired overgrowth vegetation from taking over the bio-
                                       retention basin
Ej:                            •       Removal of accumulated sediments
                               •       Litter and debris removal

                           Vegetation maintenance will include:

                                •      Fertilising plants
                                   •   Removal of noxious plants or weeds
                                •      Re-establishment of plants that die.

                           Sediment accumulation at the inlets needs to be monitored. Depending on the
                           catchment activities (eg building phase) the deposition of sediment can tend to
                           smother plants and reduce the ponding volume available. Should excessive
                           sediment build up it will impact on plant health and require removal before it
                           reduces the infiltration rate of the filter media.

                           Similar to other types of practices, debris removal is an ongoing maintenance
                           function. Debris, if not remove, can block inlets or outlets, and can be unsightly
                           if located in a visible location. Inspection and removal of debris should be done
                           regularly, but debris should be removed whenever observed on the site."

                  Given the above, a three monthly inspection frequency is proposed until the catchment has


r.                become stabilised (i.e. until the development is largely complete). After this time, the
                  frequency of inspections can be reduced to every six months or as determined by the
                  operational performance of the devices.




I
I
r
I
      Bunnings Warehouse                                          Version 1                         15 December 2006
      J \3501-541WPnSWMP.doc                                Commercial in Confidence                        Page 17

Page 37

I   BUNNINGS WAREHOUSE, NOOSAVILLE
    SURFACE WATER MANAGEMENT PLAN                                               (J) Ca.wno
I   7.          CONCLUSION

                Bunnings Warehouse plan to develop a new retail outlet in Noosaville, on the corner of the
                Noosa-Eumundi Road and Gateway Drive.

                The development of the site for its commercial use will lead to an increase in impervious
                area across the site (although it should be noted that there is a far greater landscaped area
                across the site than is normally the case for such development types). An increased
                amount of runoff will occur during a storm, which will flow at an increased rate. To alleviate
                flooding problems on site or downstream of it, a detention basin has been provided which
                will detain flows and release them in a controlled manner over time for all flows up to and
                including the 100-year event.

                The key data for the detention basin is summarised below:
                Table 14     Detention Basin Parameters: Summary
                         Parameter                     Value
                           Volume                     1500m
                            Depth                     1200mm
                         Freeboard                    300mm
                      Outlet diameter                 525mm
                        Outlet invert                 +300mm
                     Overflow weir width                20m
                     Overflow weir invert            +1150mm

                In order to protect the environmental value of the receiving water body, appropriate
                stormwater treatment measures have been adopted for the site.             Modelling of the
                performance of these measures has indicated that the water quality objectives applicable to
                the site and its watercourse will be met. The proposed treatment measures will reduce the
                total annual load of pollutants entering the creek to meet or exceed standard performance

1               targets.

                Discharges from the site will eventually pass to the Noosa River, and so it is important that
                runoff quality be maintained following development. As the human activity expected for the
                site could lead to pollution (particularly from litter and vehicles), bio-retention devices will be
                employed across the car-parking areas of the site to capture nutrients, hydrocarbons and
                gross pollutants. All runoff originating from storms of up to the three month return period
                will undergo treatment by passing through a sandy-loam filter before passing to the
                detention basin.

                This report sizes the detention basin for the site, and suggests water sensitive urban design
                measures to ensure quality is maintained. Quantity modelling of the performance of the
                detention basin indicates that the proposed runoff rate will match the existing in all events
                of up to the 100-year return period. Quality modelling of the treatment train has indicated
                that the water quality objectives applicable to the site will be met in all cases.




I   Bunnings Warehouse
    J\3501-5d\WP\SWMPdoc
                                                          Version 1
                                                   Commercial in Confidence
                                                                                                   15 December 2006
                                                                                                            Page 18

Page 38

    BUNNINGS WAREHOUSE, NOOSAVILLE
    SURFACE WATER MANAGEMENT PLAN                                         (M^ C"Iwncr
                                                                               FIGURES
'                 Figure 1   Schematic Treatment Train

'                 Figure 2   Locality Plan

                  Figure 3   Existing Site

                  Figure 4   Proposed Site and Conceptual Drainage Layout




I


t
    Bunnings Warehouse                               Version 1                 15 December 2006
    J'   o1- 541WPGWMP doc                     Commercial in Confidence

Page 39

    BUNNINGS WAREHOUSE, NOOSAVILLE
    SURFACE WATER MANAGEMENT PLAN                                                          c0*10 Cardno

I                Figure One: Schematic Treatment Trains



I                MUSIC


                             Building Roof            Car park                 Roads &           Landscape
I                             0.7884 ha               1.1190 ha               Hardstands
                                                                              0.2064 Ha          02011 Ha




                             Rainwater Tank



                                      Nursery

                                                          T
                                       Bio-retention reserves
                                    1510 m2 surface, 860 m2 filter


1                                                  Detention basin
                                              1500 m3 volume, 1.2 m deep



                                                      Legal point of discharge




1                RAFTS

                      Building Roof              Car park             Bioretention         Hardstands        Landscape

1                      0.7884 ha
                       Impervious
                                                 1.1190 ha
                                                Impervious
                                                                       0.1507 ha
                                                                        Pervious
                                                                                           0.2064 Ha
                                                                                           Impervious
                                                                                                             0.2011 Ha
                                                                                                              Pervious




                                                                        Detention
                                                                         Basin

                                                                        1fi0O m3




    Bunnings Warehouse                                             Version 1                                 15 December 2006
    J 13501.541WP\SWMP doc                                   Commercial in Confidence

Page 40

    BUNNINGS WAREHOUSE, NOOSAVILLE
    SURFACE WATER MANAGEMENT PLAN




r
1




r



w                                                                                          200    0
                                                                                                 ..
                                                                                                      200   1.00   500       800     1000m
                                                                                                                                         1120,000

    © r-1, J1- Olal P'y Ltd AP Rlgns a        9dv] 2OT
                                                                                                                         Scale 1:20,000 (A4)
    0-rig" In be M.* srd :xy par. W nu drerlry bnlwya W C-M* (Oil Py LA w+1
        Kv Uc rrcat. .Jbb !raoxlwrpd, wxrlod w r Wr:+?utN h wlwb w h pwi n a,ry marvly w

    .0110 p o0. arry rr<pb, 'v an0 oara-n omcr mar w aprromm: *Mr CwdwPry LM
                                                                                                                            FIGURE 2
                                                                                                             LOCALITY PLAN
    i t rbp.rro^r li CYabSSC by C^rdno IQldl Py LV itIdy 1d Vc 4[00!1 H a+d us by

     < cNm^ h ¢rnMa^a W "ne'erm. of rye retn+v. i^.Ern (I*A PY Lld don nM

       Ma mm^u.rrnn ar:y.vrgxwrOIy rr YabLly 04100.000:0 NV MYd navy 0.0419 M rr

    mY v..a yr relarea uY'nuv Par^/ nn'Fe ¢n.mN ihh vaaa^oi




    Rev: Orig.          Date: 15 December 2006                                                                            Project No.:     3501,54
    Bunnings Warehouse
    .AL ,,_l-_i :1^4;[email protected]_Ai]1iWMP A(.y.;'/-Lp:ainr plat/.9
    x911

Page 41

    BUNNINGS WAREHOUSE NOOSAVILLE
    SURFACE WATER MANAGEMENT PLAN




a




t


    :r.rq... s..+r nu...y.r a.+.^f.^.vvyiw pn vyuwl
                                                               Scale 1: 1000 (A31
                                                              FIGURE 3
                                           w w,.r r.ti
                                                         EXISTING SITE
    Rev: O+Ig.   Date: T 5 DecemDer 2006                 Project No.:   3501 54
    Runnings Warehouse
    U ^. ^nr wu U.i•       Mrl-[WyLNM

Page 42

 iUNNINGS WAREHOUSE. NOOSAVILLE
iURFACEE WATER MANAGEMENT PLAN




                                                 BIORETENTION DEVICES
                                                     IN LANDSCAPED
                                                    CARPARK DIVIDES




                                   io0-0   0 ---- -!0  20 30 :0 ,Gm                              Scale 1:1000 (A3)
                                                    n^--            11000
                                                                                                  FIGURE 4
                                                                                     PROPOSED SITE AND
                                                                            CONCEPTUAL DRAINAGE LAYOUT
Rev. 0119.   Die:15 Decembe12(S6                                                           Project No:   350154
BumYlgs WB,Ohp se

Page 43

    BUNNINGS WAREHOUSE, NOOSAVILLE
    SURFACE WATER MANAGEMENT PLAN                               (4^ Car-dna

                                                                   APPENDIX A




                                                                  RAFTS Results



t




    Bunnings Warehouse                     Version 1                   15 December 2006
    J \3501-541WP1SWMP doc           Commercial in Confidence

Page 44

I    BUNNINGS WAREHOUSE, NOOSAVILLE
     SURFACE WATER MANAGEMENT PLAN                                                  Lr) Cardno



                             100 YEAR                                                    10 YEAR
                       existing     proposed     basins                             existing       proposed    basins
             bios         0.347         0.9375   0.9375                  bios        0.2222           0.6919   0.6919
'         grn cnr        0.7848          1.816   0.6087               grn cnr        0.5084            1.338   0.3959
         carpark         0.3011         0.9242   0.9242               carpark        0.1907           0.6854   0.6854
             roof        0.2264         0.6863   0.6863                  roof        0.1468           0.5215   0.5215
        hrdstand         0.0719         0.1721   0.1721             hrdstand         0.0436           0.1281   0.1281
      landscape          0.0703         0.0656   0.0656            landscape         0.0426           0.0405   0.0405
           END           0.7848          1.816   0.6087                      END     0.5084            1,338   0.3959

                                        BASIN                                                     BASIN
                                  Max Stg m   1.164                                            Max Stg m   0.802
                                  Max Vol m3 1454.6                                            Max Vol m3 1002.3



                             50 YEAR                                                      5 YEAR
                       existing     proposed     basins                             existing       proposed    basins
            bios         0.3071        0.8528    0.8528                  bios        0.1958           0.6222   0.6222
         grn cnr         0.6976          1.653   0.5126               grn cnr        0.4459            1.199   0.3507
         carpark         0.2654         0.8409   0.8409               carpark        0.1678           0.6168   0.6168
             roof        0.2021         0.6285   0.6285                   roof       0.1273           0.4655   0.4655
        hrdstand         0.0618          0.157    0.157              hrdstand        0.0383            0.116    0.116
      landscape          0.0603         0.0574   0.0574            landscape         0.0374           0.0355   0.0355
           END           0.6976          1.653   0.5126                      END     0.4459            1.199   0.3507

                                     BASIN                                                            BASIN
                                  Max Stg m    1.057                                           Max Stg m   0.721
                                  Max Vol m3 1321.1                                            Max Vol m3 900.93



                             20 YEAR                                                      1 YEAR
                       existing    proposed      basins                             existing       proposed    basins
            bios        0.2595        0.7897     0.7897                 bios          0.097           0.3929   0.3929
         grn cnr        0.5943         1.523     0.4513              grn cnr         0.2244           0.7593   0.1978
         carpark        0.2244        0.7812     0.7812              carpark         0.0806           0.3895   0.3895
             roof        0.1724         0.5914   0.5914                      roof    0.0587          0.2866    0.2866
        hrdstand         0.0513         0.1436   0.1436             hrdstand         0.0222          0.0725    0.0725
      landscape          0.0504         0.0478   0.0478           landscape          0.0217          0.0205    0.0205
              END        0.5943          1.523   0.4513                END           0.2244          0.7593    0.1978



t                                       BASIN
                                  Max Stg m   0.915
                                  Max Vol m3 1143.5
                                                                                                     BASIN
                                                                                               Max Stg m   0.459
                                                                                               Max Vol m3 574.32




    Bunnings Warehouse                                  Version 1                                     15 December 2006
    J \3501-54\WP\SWMP doc                        Commercial in Confidence

Page 45

1
L   I   BUNNINGS WAREHOUSE, NOOSAVILLE
        SURFACE WATER MANAGEMENT PLAN
                                                                    4(46^ Car-dno


                                                                         APPENDIX B




                                                                    MUSIC Parameters


1




        Bunnings Warehouse                      Version 1                   15 December 2006
        J \3501-54\WP\SWMP doc           Commercial in Confidence

Page 46

     BUNNINGS WAREHOUSE. NOOSAVILLE
     SURFACE WATER MANAGEMENT PLAN




                Runoff Generation Parameters




I
                 Parameter                                      Urban               Commercial
                                                              Residential

                 Field Capacity (mm)                                 200                  80


I                Infiltration Capacity Coefficient a
                 Infiltration Capacity Exponent b

                 Rainfall Threshold (mm)
                                                                     50
                                                                      1

                                                                      1
                                                                                         200
                                                                                           1

                                                                                           1

                 Soil Capacity (mm)                                  400                 120
                 Initial Storage (%)                                 10                   25
                 Daily Recharge Rate (%)                             25                   25

                 Daily Drainage Rate (%)                              5                   5

                 Initial Depth (mm)                                  50                   50




Pj
-
                Pollutant Export Relationships

                 Land Use
                 Source
                               Parameter        Total Suspended
                                                 Solids (mg/L)
                                                                           Total Ph osphorus
                                                                                 (m g/L)
                                                                                                  Total Nitrogen
                                                                                                         (mg/L)
                 Nodes
                                               Base          Storm         Base        Storm     Base             Storm
                                               Flow           Flow         Flow        Flow      Flow             Flow

                 Urban         Mean            0.10           2.18         -0.97       -0.47     0.20             0.26
                 Residential
                               Std Dev.        0.34           0.39         0.31        0.31      0.20             0.23

                 Commercial I Mean             0.78           2.16         -0.60       -0.39     -0.32      1     0.37

                               Std Dev.        0.39           0.38         0.50        0.34      0.30             0.34




I


I

f
     Bunnings Warehouse                                       Version 1                                   15 December 2006
     J\35o1-54\WRSWMPdoc                               Commercial in Confidence

Page 47

     BUNNINGS WAREHOUSE, NOOSAVILLE
     SURFACE WATER MANAGEMENT PLAN                               C07) Cardno

r
                                                                    APPENDIX C




                                                Statement of Landscape Intent




Li




     Bunnings Warehouse                     Version 1                  15 December 2006
     J\3501-54\WP\,SWMPdoc            Commercial in Confidence

Page 48

    statement of                                                                                 C1i-- ^. r=                         r-- C1

    landscape intent

    BUNNINGS NOOSAVILLE
    Cnr Eumundi- Noosa Drive and Gateway Drive, Noosaville, QLD
    11 December, 2006


    The design of the Bunnings at Noosaville incorporates water related initiatives and
    water sensitive urban design principles that are reflected and implemented in the
    landscape design. The simple yet "graphic" landscape design embraces the "Noosa
    Style" in terms of its species selection. The area devoted to soft landscaping is
    substantially greater than in other comparable developments. Screening and visibility
    of the store have been carefully considered to achieve a suitably balanced outcome.

    It should be noted that the site levels and soil profiles have been substantially altered
    for almost the entire site and thus bear no resemblance to the natural circumstance
    ideally suited to supporting indigenous vegetation.

    Low maintenance plants not requiring pruning will be used. The majority of the plants
    proposed will be native.

    The landscape design of the various components of the site is described as follows



I   Water Related Design Principles
    The following solutions address the increasingly important issue of water on the site.

    Water will be collected from the large roof area and stored in large tanks. It will be
    used for nursery irrigation, external washing down and at times for landscape
    irrigation. It is intended that no mains water will be used for these purposes.

    Except for black water (ie toilets and kitchens), all water leaving the site will be bio-
    filtered through the landscape. All nutrient rich nursery irrigation runoff will be reused
    for landscape irrigation thus reducing the need for tank or mains water use and
    minimising the need for added fertiliser application.

    Subsoil drains will collect any excess irrigation groundwater. it will be passed through
    a bio-retention system located in a highly publicly visible location at the corner of
    Eumundi-Noosa Road and Gateway Drive. This area will also be used for stormwater
    detention on the site.

    Carpark surface water runoff wil_I not be collected in surface pits for immediate
    discharge to Council's stormwater network. It will all first be passed through planting
    areas and biofiltered. The carpark is graded to fall towards the wide planted islands
    surrounded by "hit and miss" kerbs. This will ensure gross pollutants are collected on
    the edge of the planting areas where they are visible and will be collected and
    disposed off. Potentially hydrocarbon contaminated water will be passed through
    specially formulated planting soil for pre-treatment. Plants will be watered and
    irrigation needs reduced. In the majority of storm events the water holding capacity of
    the soil will result in significant buffering of stormwater discharge from the site due to
    the holding of water in the substantial air space within the soil structure. Excessive
    storm volumes, beyond the water holding capacity of the soil, will be collected in a
    subsoil system and held in the large detention area in the south west corner of the site.

    Plants used will generally have low water requirements. They will be substantially
    native species. Gravel will be used instead of turf to reduce water and ongoing
    maintenance needs. No turf is proposed on the site or in the verge.



                                                                                                 ARTERRA DESIGN PTY LTD ABN 40 069 552 610
                                                                                                 SUITE 2 22 CONSTANCE ST. FORTITUDE VALLEY QLD 4006
                                                                                                 P 07 3100 8839 F 07 3257 4320 W ARTERRA.COM.AU

Page 49

I
I
    Eumundi-Noosa Road Frontage
    The existing streetscape is of poor quality. There is currently no footpath. A concrete
    footpath will be installed along the length of this frontage.

    Many existing native trees along the boundary will be retained and protected. The
    proposed footpath will be kept clear of the trees and existing levels around them kept
    unchanged to minimise any potential damage to the trees. In particular, the large
    Eucalypts in the south-east corner of the site will be retained with the proposed
    delivery dock access road angled to maximise their root zone. This protected root zone
    will also provide space for substantial new screen planting.

    Tear drop shaped planted mounds in differing coloured bands of gravel provide a
    visual separation between the roundabout and the proposed nursery in the very
    generous setback provided. Alternate mounds will be planted with one of Noosa's
    signature plants, the Pandanus and potentially other visually striking feature plants.
    The nursery has been set down approx. 1.5m below the verge level to further reduce
    its visual presence on the street.

    The main vehicle entry to the site from the roundabout will be flanked by large canopy
    trees and pedestrian access paths. Sight lines at the vehicle entry / exit points will be
    maintained for safety. Car parking is set a significant distance back from the boundary
    behind the corner bio-retention system and soft landscaping.

    More tear drop shaped planted mounds punctuate the large landscape setback area on
    the corner of Eumundi-Noosa Road and Gateway Drive. This area will include bands of
    planting and ornamental gravels and will act as both a bio-retention and stormwater
    detention area. An existing stand of native trees on Council's verge in this corner
    (currently in reasonably poor condition) will be retained.

    Gateway Drive Frontage


I   Once again the existing streetscape is of poor quality. This will be improved with the
    inclusion of a simple curvaceous edge between a low maintenance and no water use
    gravel verge and bands of planting and ornamental gravel leading into the site. A
    swale runs along the boundary at the bottom of the slope from the car park above.
    This swale conveys any stormwater water leaving the site and entering Council's
    stormwater network. The slope is planted with native shrub and groundcover species
    screening a varying height retaining wall near the top of the slope. Native canopy trees
    (eg Tuckeroos) line this frontage providing shade and screening parked cars.

    Sight lines at the vehicle entry / exit points will be maintained for safety.

    Car park
    The car park's key landscape design feature is the wide central planting strips between
    cars. These strips provide very substantial consolidated soil areas (far greater than 5m2
    as required by Council) allowing shade trees to reach their maximum potential size.
    Shade trees (ie Tuckeroos) have been provided at every fourth parking space as
    required by Council. The trees are located to avoid damage from cars. These trees will
    reduce the visual impact of the building and the car park. Car park shading will reduce
    the potential heat island effect generated.

    The car park generally falls at 1:40 from the store entry in the east down towards the
    west. This allows disabled and trolley access to all areas of the car park. "Hit and
    miss" kerbs along the high side of each planting strip allow surface runoff to enter the
    planted areas containing a mix of native and exotic shrub and groundcover species. A
    drainage swale through this area will collect and temporarily store excess runoff before
    conveying it to the detention basin via subsurface pipes. Trees, shrubs and
    groundcovers will receive supplementary water from car park runoff.

    The ends of the central planted islands are planted with feature trees (ie Pandanus)
    with limited canopies to minimise potential damage from larger vehicles using these
    main access routes.




                                                                                                                     Arterra
                                                                                                         Bunnings Noosaville
                                                                                                Statement of landscape Intent
    Revision P1, Issued for DA, 11 December 2006                                                                     Page 2

Page 50

0
    Pedestrian access through the carpark is via clearly delineated ramps (allowing
    disabled access) and main paths. Minor access routes through the wide planting strips
    are accommodated with steppers between the trees.

    Northern Boundary
    Native tree species will line the western end of this boundary and the entry / exit lane
    forming a consistent vertical screento the neighbouring site to the north. These trees
    will be planted in a wide sloping garden visually buffering the northern edge of the car
    park.

    Irrigation
    Mains water will not be used for landscape irrigation on the site. Planting within the
    site will be able to be irrigated with an automatic sub-surface irrigation system using
    water reused from the nursery runoff (or collected from the building roof where
    absolutely necessary). This sub-surface system will ensure the reused water is not in
    contact with customers and eliminates the loss of water into the atmosphere typical of
    above ground spray heads. All nursery runoff will be collected and dissipated into the
    landscape via the irrigation system on a daily basis.

    Conclusion
    The landscape design provides substantial areas for mainly native tree and shrub
    planting ensuring the proposed building and car park are partially screened from view
    and their scale reduced while maintaining some visibility of the development for
    commercial reasons.


    Regards




    Paul Hardyman
    Director, Registered Landscape Architect, Consulting Arborist
    [email protected]




I

s


                                                                                                                     Arterra
                                                                                                         Bunnings Noosaville
                                                                                               Statement of Landscape Intent
    Revision Pt, Issued for DA, 11 December 2006                                                                    Page 3

Page 51

    APPENDIX C- DRAINS DATA & RESULTS




I

I

I

I

I




                   14


[OCR of page images]
APPENDIX C — DRAINS DATA & RESULTS

 

 

 

Page 52

                                                                                                         DRAINS INPUT DATA

PIT/ NODE DETAILS                            Version 9
Name       Type              Family          Size                      Ponding           Pressure        Surface         Max Pond                       Base           Blocking       x              y              Bolt-down id
                                                                       Volume            Change          Elev (m)        Depth (m)                      Inflow         Factor                                       lid
                                                                       (cu.m)            Coeff. Ku                                                      (cu.m/s)
N6           Node                                                                                                   13                                             0                      116.383        110.751                            15
N3           Node                                                                                                   10                                             0                        64.474         -2.506                            8


DETENTION BASIN DETAILS
Name         Elev            Surf. Area      Init Vol. (cu.m)          Outlet Type        K              Dia(mm)         Centre RL                      Pit Family     Pit Type       x              y              HED          Crest RL
Basing                 8.5             295                       62 Culvert                        0.5                                                                                       88.94         14.148 No
                       8.7             320
                       9.5             475
                      10.5             700
                      10.8            1168
                      10.9           10000


SUB-CATCH MENT DETAILS
Name         Pit or          Total           Paved                     Grass             Supp            Paved           Grass                          Supp           Paved          Grass          Supp           Paved        Grass
             Node            Area            Area                      Area              Area            Time            Time                           Time           Length         Length         Length         Slope(%)     Slope
                             (ha)            %                         %                 %               (min)           (min)                          (min)          (m)            (m)            (m)            %            %_
Catl         N6                      2.327                      80.4              19.6               0              15                             30              0


PIPE DETAI LS
Name         From            To              Length                    U/S IL            D/S IL          Slope           Type                           Dia            I.D.           Rough          Pipe Is        No. Pipes    Chg From
                                             (m)                       (m)               (m)             (%)                                            (mm)           (mm)
Pipe3        N6              Basin2                              10              10.55            10.5             0.5 Concrete, not under roads                 750            750            0.3 NewFixed                     1 N6
Pipel        Basin2          N3                                  10                8.7             7.9               8 Concrete, not under roads                 450            450            0.3 NewFixed                     1 Basin2




20/01/2011                                                                                        K:\AA - Great Plains Jobs\4400 (Bunnings Noosa)\02 (Civil)\Admin\WSUD\Admin\4400-02(DRAINS Modelling Results)

Page 53

                                                                                                                      DRAINS ANALYSIS RESULTS
                                                                                                                                  MINOR STORMS


             DRAINS results prepared 20 January, 2011 from Version 2010.10


             PIT / NODE DETAILS                                                                                                                     Version 8
             Name                                                              Max HGL             Max Pond               Max Surface               Max Pond                Min                  Overflow     Constraint
                                                                                                   HGL                    Flow Arriving             Volume                  Freeboard            (cu.m/s)
                                                                                                                          (cu.m/s)                  (cu.m)                  (m)
             N6                                                                           11.12                                             0.85
             N3                                                                            8.11                                                 0

             SUB-CATCHMENT DETAILS
             Name                                                              Max                 Paved                  Grassed                   Paved                   Grassed              SUP P.       Due to Storm
                                                                               Flow Q   - Max Q                           Max Q                     Tc                      Tc                   Tc
                                                                               (cu.m/s)   (cu.m/s)                        (cu.m/s)                  (min)                   (min)                (min)
             Catl                                                                          0.85                   0.804                    0.047                      15              30                    0 AR&R 10 year, 20 minutes storm, average 128 mm/h, Zone .3



             Outflow Volumes for Total Catchment (1.87 impervious + 0.46 pervious = 2.33 total ha)
             Storm                                                             Total Rainfall      Total Runoff           Impervious Runoff         Pervious Runoff
                                                                               cu.m                cu,m (Runoff %)        cu.m (Runoff %)           cu.m (Runoff %)
             AR&R 5 year, 5 minutes storm, average 202 mm/h, Zone 3                      391.71 301.50 (77.0%)            296.23 (94.1%)            5.27 (6.9%)
             AR&R 5 year, 10 minutes storm, average 156 mm/h, Zone 3                     605.02 482.98 (79.8%)            467.73 (96.2%)            15.25 (12.9%)
             AR&R 5 year, 20 minutes storm, average 115 mm/h, Zone 3                     892.02 734.48 (82.3%)            698.47 (97.4%)            36.01 (20.6%)
             AR&R 5 year, 30 minutes storm, average 94.2 mm/h, Zone 3                   1096.02 914.99 (83.5%)            862.49 (97.9%)            52.50 (24.4%)
             AR&R 5 year, 1 hour storm, average 64.7 mm/h, Zone 3                       1505.57 1271.35 (84.4%)           1191.77 (98.5%)           79.59 (27.0%)
             AR&R 5 year, 2 hours storm, average 42.8 mm/h, Zone 3                      1991.91 1654.79 (83.1%)           1582.79 (98.8%)           72.00 (18.4%)
             AR&R 10 year, 5 minutes storm, average 223 mm/h, Zone 3                     432.43 336.72 (77.9%)            328.97 (94.6%)            7.76(9.2%)
             AR&R 10 year, 10 minutes storm, average 173 mm/h, Zone 3                    670.95 543.40 (81.0%)            520.74 (96.5%)            22.67 (17.2%)
             AR&R 10 year, 20 minutes storm, average 128 mm/h, Zone 3                    992.85 833.22 (83.9%)            779.54 (97.7%)            53.68 (27.6%)
             AR&R 10 year, 30 minutes storm, average 105 mm/h, Zone 3                   1221.67 1037.98 (85.0%)           963.52 (98.1%             74.47 (31.1%)
             AR&R 10 year, 1 hour storm, average 72.3 mm/h, Zone 3                      1682.42 1441.94 (85.7%)           1333.96 (98.6%)           107.99 (32.7%)
             AR&R 10 year, 2 hours storm, average 48.4 mm/h, Zone 3                     2252.54 1901.79 (84.4%)           1792.33 (99.0%)           109.46 (24.8%)

             PIPE DETAILS
             Name                                                              Max Q               Max V                  Max U/S                   Max D/S                 Due to Storm
                                                                               (cu.m/s)            (m/s)                  HGL (m)                   HGL (m)
             Pipe3                                                                          0.85                    2.4                    11.116                 11.066 AR&R 10 year, 20 minutes storm, average 128 mm/h, Zone 3
             Pipel                                                                        0.425                       6                     8.905                  8.105 AR&R 10 year, 1 hour storm, avers e 72.3 mm h, Zone 3

             CHANNEL DETAILS
             Name                                                              Max Q               Max V                  Chainage                  Max                     Due to Storm
                                                                                cu.m/s)            (m/s)                  (m)                       HGL (m)

             DETENTION BASIN DETAILS
             Name                                                              Max WL              MaxVol                 Max Q                     Max Q                   Max Q
                                                                                                                          Total                     Low Level               High Level
             Basin2                                                                         9.98                  628.9                     0.425                 0.425                  0


             CONTINUITY CHECK for AR&R 10 year, 20 minutes storm, average 128 mm/h, Zone 3
             Node                                                              Inflow              Outflow                Storage Change            Difference
                                                                               (cu.m)              (cu.m)                 (cu.m)                    %
             N6                                                                          833.22               833.22                            0                      0
             Basin2                                                                      833.22               827.51                        -11.2                      2
             N3                                                                           726.62              726.62                            0                      01                    1




20/01/2011                                                                                                                                                   K:\AA - Great Plains Jobs\4400 (Bunnings Noosa)\02 (Civil)\Admin\WSUD\Admin\4400-02(DRAINS Modelling Results)

Page 54

                                                                                                                            DRAINS ANALYSIS
                                                                                                                             MAJOR STORMS

      DRAINS results prepared 20 January, 2011 from Version 2010.10


      PIT / NODE DETAILS                                                                                                                      Version 8
      Name                                                               Max HGL             Max Pond               Max Surface               Max Pond                 Min                     Overflow     Constraint
                                                                                             HGL                    Flow Arriving             Volume                   Freeboard               (cu.m/s)
                                                                                                                    (cu.m/s)                  (cu.m)                   (m)
      N6                                                                            11.29                                             1.231
      N3                                                                             8.14                                                 0

      SUB-CATCHMENT DETAILS
      Name                                                               Max                 Paved                  Grassed                   Paved                    Grassed                 Supp.        Due to Storm
                                                                         Flow Q              Max Q                  Max Q                     Tc                       Tc                      Tc
                                                                         (cu.m/s)            (cu.m/s)               (cu.m/s)                  (min)                    (min)                   (min)
      Catl                                                                          1.231                   1.143                    0.091                      15                    30                  0 AR&R 100 y ear, 20 minutes storm average 185 mm/h, Zone 3



      Outflow Volumes for Total Catchment (1.87 impervious + 0.46 pervious = 2.33 total ha)
      Storm                                                              Total Rainfall      Total Runoff           Impervious Runoff         Pervious Runoff
                                                                         cu.m                cu.m (Runoff %)        cu.m (Runoff %)           cu.m (Runoff %)
      AR&R 20 year, 5 minutes storm, average 253 mm/h, Zone 3                      490.61 387.84 (79.1%)            375.74 (95.3%)            12.10 (12.6%)
      AR&R 20 year, 10 minutes storm, average 196 mm/h, Zone 3                     760.15 627.45 (82.5%)            592.45 (96.9%)            35.00 (23.5%)
      AR&R 20 year, 20 minutes storm, average 145 mm/h, Zone 3                    1124.72 962.88 (85.6%)            885.56 (97.9%)            77.32 (35.1%)
      AR&R 20 year, 30 minutes storm, average 119 mm/h, Zone 3                    1384.56 1197.91 (86.5%)           1094.48 (98.3%)           103.43 (38.1%)
      AR&R 20 year, 1 hour storm, average 82.7 mm/h, Zone 3                       1924.43 1676.76 (87.1%)           1528.53 (98.8%)           148.23 (39.3%)
      AR&R 100 year, 5 minutes storm, average 321 mm/h, Zone 3                     622.47 507.35 (81.5%)            481.76 (96.3%)            25.59 (21.0%)
      AR&R 100 year, 10 minutes storm, average 250 mm/h, Zone 3                    969.58 831.30 (85.7%)            760.84 (97.6%)            70.47 (37.1%)
      AR&R 100 year, 20 minutes storm, average 185 mm/h, Zone 3                   1434.98 1267.90 (88.4%)           1135.02 (98.4%)           132.88 (47,2%)
      AR&R 100 year, 30 minutes storm, average 152 mm/h, Zone 3                   1768.52 1571.86 (88.9%)           1403.18 (98.7%)           168.68 (48.7%)
      AR&R 100 year, 1 hour storm, average 107 mm/h, Zone 3                       2489.89 2227.18 (89.4%)           1983.16 (99.1%)           244.02 (50.0%)
      AR&R 100 year, 2 hours storm, average 73.5 mm/h, Zone 3                     3420.69 3037.21 (88.6%)           2731.53 (99.3%)           305.69 (45.6%)


      PIPE DETAILS
      Name                                                               Max Q               Max V                  Max U/S                   Max D/S                  Due to Storm
                                                                         (cu.m/s)            (m/s)                  HGL (m)                   HGL (m)
      Pipe3                                                                          1.231                      3                   11.295                 11.156 AR&R 100 year, 20 minutes storm, average 185 mm/h, Zone 3
      Pipet                                                                         0.542                     6.5                     8.935                  8.135 AR&R 100 year, 1 hour storm, average 107 mm/h, one 3

      CHANNEL DETAILS
      Name                                                               Max Q               Max V                  Chainage                  Max                      Due to Storm
                                                                         (cu.m/s)            (m/s)                  (m)                       HGL (m)

      DETENTION BASIN DETAILS
      Name                                                               Max WL              MaxVol                 Max Q                     Max Q                    Max Q
                                                                                                                    Total                     Low Level                High Level
      Basing                                                                         10.58               1026.2                       0.542                  0.542                     0


      CONTINUITY CHECK for AR&R 100 year, 20 minutes storm, average 185 mm/h, Zone 3
      Node                                                               Inflow              Outflow                Storage Change            Difference
                                                                         (cu.m)              (cu.m)                 (cu.m)                    %
      N6                                                                            1267.9               1267.9                           0                      01                        1
      Basing                                                                        1267.9                  1248                       1.25                    1.5 1                       1
      N3                                                                          1147.11               1147.11                           0                      0




20/01/2011                                                                                                                                             K:\AA - Great Plains Jobs\4400 (Bunnings Noosa)\02 (Civil)\Admin\WSU D\Adm i n\4400-02 (DRAINS Modelling Results)

Page 55

 

01

REV:

 

oF

SHEET:

C2

 

 

TGM REF. No.

4400-02-CE

 

     

   

   

 

 

   
  

 

 

  

 

 

   

 

   
        

 

 

  

 

 

 

 

 

 

 

 

               
   
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

    

 

 

 

 

 

 

 

 

 

 
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

     
      
  

  
 

   

 

 

 

 

 

 
  
  
 
 
 

  

        
       
    
       

          
  
    
    
      

 

     

 

           
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  
    
  
      
   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

DATE: DATE:

 

 

 

 

 

 

 

©) COPYRIGHT T.G.M GROUP PTY. LTD.

 

 

 

 

 

 

 

 

 

Web: tgmgroup.com
A.B.N. 11 125 568 461

onas AS/NZS 4801
Environment AS/NZS 14004

 

Fax: (03) 5338 1310
Email: [email protected]

 

NOOSAVILLE, QUEENSLAND

 

 

 

cur INTERNAL DIMENSIONS INLET OUTLET
PITNo. |TYPE} LENGTH WIDTH FROM PIT DIA. (9) INVERT RL DIA. (9) | INVERT RL F.S.L. PIT DEPTH | REMARKS
P01 EW - - P02 4506 RCP 8.59 DETENTION BASIN - = EW TO SUIT 450¢ PIPE
P02 SEP 900 750 PO3 300% RCP RRJ ‘1. 40 450% RCP 13.24 15.35 2.11 MEDIUM DUTY CONCRETE COVER
P03 SEP 900 600 Pod 300% RCP RRJ 14.63 300% RCP RRJ 14.63 16.04 138 MEDIUM DUTY CONCRETE COVER
P05 300% RCP RRJ 14.85
P04 SEP 900 600 Pt 300 ROP RRI Tas 300¢ RCP RRJ 14.85 16.51 1,66 MEDIUM DUTY CONCRETE COVER
| P05 GP 900 600 P06 300% RCP RRJ 15.00 300 RCP RRJ 15.00 16.95 1.95 HEAVY DUTY GRATED COVER
<p 3008 RCP RRJe Aan f P06 GP 900 600 PO7 300% RCP RRJ 15.43 300% RCP RRJ 15.43 16.60 117 HEAVY DUTY GRATED COVER
fo* f P07 GP 900 600 P08 300 RCP RRJ 15.67 300 RCP RRJ 15.67 16.85 1.18 HEAVY DUTY GRATED COVER
KURY / ‘ / |_— 3000 RCP RRJ P08 GP 900 600 P09 300 RCP RRJ 15.96 300 RCP RRJ 15.96 17.25 1.29 HEAVY DUTY GRATED COVER
& BIO RETENTION CELL / 4 fo a P09 GP 900 600 P10 300% RCP RRJ 16.30 300% RCP RRJ 16.30 17.30 1.00 HEAVY DUTY GRATED COVER
“\REFER DETAILS P10 GP 900 600 - - - 300% RCP RRJ 16.51 11.30 0.79 HEAVY DUTY GRATED COVER
y Pil SEP 900 600 - - - 300¢ RCP RRJ 15.90 17.01 111 MEDIUM DUTY CONCRETE COVER
P12 EW - - PB 300% RCP 8.59 DETENTION BASIN - - EW TO SUIT 300¢ PIPE
< P13 SEP 900 750 Pt 300% RCP RRJ 14.19 300% RCP B.03 15.14 2.11 MEDIUM DUTY CONCRETE COVER
D PI4 GP 900 600 PAS 300 RCP RRJ 14.37 300% RCP RRJ 14.37 15.19 0.81 HEAVY DUTY GRATED COVER
it) | P15 SEP 900 600 P16 300 RCP RRJ 44.73 300@ RCP RRJ 14.73 16.05 1,32 MEDIUM DUTY CONCRETE COVER
BREAK INTO SIDE OF EXISTIN P16 SEP 900 600 P17 300 RCP RRJ 15,23 300@ RCP RRJ 15.23 16.29 1.06 MEDIUM DUTY CONCRETE COVER
SIDE ENTRY PIT. aN P17 SEP 900 600 - - - 300 RCP RRJ 15.84 11.19 135 MEDIUM DUTY CONCRETE COVER
HVE} fA \ P18 EW - - P19 525 RCP 8.57 DETENTION BASIN - - EW TO SUIT 5259 PIPE
lo | \ P19 GP 900 750 P20 525% RCP RRJ 9.84 525% RCP 9.84. 11.84 2.00 HEAVY DUTY GRATED COVER
MU I P21 525@ RCP 12.17
(> P20 ap 900 750 525@ RCP RRJ 1h 13.91 2.47 HEAVY DUTY GRATED COVER
= 3009 REP:RRI P27 300 RCP RRJ 12.17
\ OFF % S P21 GP 300 750 P22 525 RCP RRJ 13.24 525 RCP 13.24 14.11 0.87 HEAVY DUTY GRATED COVER
} | YY AVY)
a > » P22 SEP 900 750 P23 525 RCP RRJ 13.78 525% RCP RRJ 13.78 16.11 2.33 MEDIUM DUTY CONCRETE COVER
=~ 4 P23 GP 900 750 P24 4506 RCP RRJ 15.06 525@ RCP RRJ 13.94 16.15 2.21 HEAVY DUTY GRATED COVER
(ZX | i P2k SEP 900 600 P25 300 RCP RRJ 15.44 450@ RCP RRJ 15.44 16.62 1.21 MEDIUM DUTY CONCRETE COVER
' Z | P26 300% RCP RRJ 15.98
P 6 300¢ , ‘ ; T
= | L iS P25 G 900 00 P78 3008 REP RR a RCP RRJ 15.98 16.98 1.00 HEAVY DUTY GRATED COVER
ib, /\ » 3 \ os P26 GP 900 600 - - - 300 RCP RRJ 16.55 17.50 0.95 HEAVY DUTY GRATED COVER
L/ < a } j P27 SEP 900 750 - - - 300% RCP RRJ 13.78 16.01 2.23 MEDIUM DUTY CONCRETE COVER
© | iz PROPOSED BUNNINGS S ie P28 SEP 900 600 - - - 300% RCP 16,09 17.02 0.93 MEDIUM DUTY CONCRETE COVER
Va } FF L 17 50 oo HAS KS P29 EW - - P30 525¢ RCP 8.57 DETENTION BASIN - - EW TO SUIT 525¢ PIPE
ia! _— EBay y P30 JP 900 750 ~ - - 525 RCP 9.01 11.04 2.00 HEAVY DUTY CONCRETE COVER
a SE WW r 3000 RCP RRJ P31 EX SEP EXISTING PIT P32 4506 RCP 8.41 EXISTING PIPE 8.41 11.01 2.60 EXISTING PIT
if P32 EW - - - - - 450 RCP 8.70 - - EW TO SUIT 4509 PIPE
-< ya’ EW - DENOTES ENDWALL
Y P10 SEP - DENOTES SIDE ENTRY PIT
JP - DENOTES JUNCTION PIT
ae GP - DENOTES GRATED PIT
f. Lo Y : —
ry OVERFLOW DISCHARGE LOCATION FROM
TORMWATER HARVESTING TANKS
/ J a rae
Ak LEGEND
___ EXISTING SURFACE CONTOURS
PROPOSED TITLE BOUNDARY
PROPOSED STORMWATER DRAINAGE PIPE
| PROPOSED GRATED PIT
DESIGN PAVEMENT LEVEL
x
HEAVY DUTY ASPHALT PAVEMENT
HEAVY DUTY CONCRETE PAVEMENT
LIGHT DUTY ASPHALT PAVEMENT
PROPOSED ROAD RELOCATIO
REFER EXTERNAL WORKS
DOCUMENTS
REFER EXTERNAL
_ WORKS DOCUMENTS
oom scour smatt
ISSUE ISSUED FOR DATE | DRAWN | APPROVED }ISSUE ISSUED FOR DATE | DRAWN | APPROVED | OFSIGNED: G@ MANSELL DATE: 19/01/11 CLIENT: PROJECT: aa
DRAWN SCALE: CIVIL DRAWING
01 | ISSUED FOR INFORMATION 19/01/11} SM, S. MANTERFIELD 1:500
SURVEY: SHEET SIZE a4 TGM GROUP Pty Ltd BSla H. TROON PTY. LTD. PROPOSED BUNNINGS
Ballarat ALUMINIUM AND STEEL FABRICATORS DRAWING TITLE:
CHECKED: APPROVED:
1315 Sturt Street BUILDERS - COMMERCIAL AND INDUSTRIAL WAREHOUSE
ee Ge vos see PROPOSED INTERNAL DRAINAGE &
Ph: (03) 5330 8888 uns ISO 9004 Tel: (03) 5339 2208 - (03) 5339 3622 EUMUNDI-NOOSA ROAD

PAVEMENT LAYOUT PLAN & PIT SCHEDULE

 

 

TGM REF. No.:

4400-02-CE

SHEET:

 

c2 "3

REV: 0 4

 

 

 

Page 56

 

 

 

Callaghan & Toth

Civil, Environmental &
Hydraulic Engineers
6/41 Sunshine Beach Rood
{ NOOSA JUNCTION 4566

Ph: 54749081 Fax: 54749041
www.callaghanandtoth.com.au

 

—

 

ASSOCIATED CONSULTANT

 

 

Phone
designed | X datum AHD
drawn Xx

 

 

. PM 48314
checked |X | Origin (B.M.) RL 106.896

 

   

 

 

 

 

 

approved . }
roject :

CONCEPT DESIGN OF A

YANDINA-COOLUM RD LANDFILL
PROPOSED LEACHATE

RISING MAIN
a

aia.

Client

SUNSHINE COAST

REGIONAL COUNCIL
i

foment

title

LEACHATE TRANSPORT PUMPING
SYSTEM FROM COOLUM

LANDFILL TO GRAVITY SEWER J
real property description

YANDINA-COOLUM RD

Parish of NOOSA

County of MARCH

SUNSHINE COAST COUNCIL
LOCALITY: NOOSAVILLE

——_ _____S

eoorreree'’’-’-'-—-——
SCALE

0 255.0 7.5 10 125 Meters 25
a

 

ScOle SCALE SHOWN IS ORIGINAL DRAWING SCALE
1:500(A2) _ D0_NOT SCALE FROM THIS DRAWING
USE ONLY DIMENSIONS PROVIDED

 

 

REVISIONS

revision
~T?

 

 

FILES

COMPUTER DIRECTORY.
(C:\vobs\CT\ 1034.dwq

DRAFT DESIGN

Sheet of —_ sheets
drawing number

1034-14
\ ae JAN 2014 ]

 

 

 

 

 

 

 

 

 

 

 

 

  

Page 57

 

01

REV:

 

C3 OF

SHEET:

 

4400-02-CE

 

TGM REF. No.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

    
   
  
 
 
   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SL92 TOP SAW CUT
\ 800mm
= ros OS
s1@ —RKNLSSANYYS
: 100mm THICK CRUSHED ROCK BASE TO BE
EXISTING SIDE PROVIDED IN FILL & SUB-GRADE AREAS.
ENTRY PIT
APPROVED SUB-GRADE
NOTE: MIN 50mm COVER.
GRAVEL MULCH SAW CUTS @ 6m SPACING MAXIMUM IN EITHER DIRECTION.
50mm THICK SAW CUTS TO 70mm IN DEPTH.
450mm@ RCP SL62 TO BE PROVIDED CENTRALLY IN BOTTOM
800mm LONG CENTRALLY UNDER SAW CUT.
ENDWALL
UNDER DRAIN JUNCTION PIT (BOLT DOWN
SEALED LID 50mm PROUD OF BASIN INVERT
mm TYPICAL CONCRETE PAVEMENT DETAIL
une SCALE N.T.S
ee ake
HoLe2ss5 s
30Orimetin.200 100mm® SLOTTED Loan BEDDING LAYER 35mm MIN. CONSOLIDATED THICKNESS OF TYPE N
PVC GRADE 1 in 200 L 400 SLOTTED PVE ASHPALT 10 mm NOMINAL SIZE AGGREGATE. SIZE
NON-WOVEN GEO-TEXTILE LINER L DRAINAGE LAYER: 5mm ONE SIZE AGGREGATE ON A PREPARED AND PRIMED SURFACE.
(BIDIM A19 OR APPROVED EQUIVALENT) (50mm THICKNESS)
L TRANSITION LAYER: CLEAN SAND 2mm NOMINAL a ee Fe ANC SHcieS bones.
SIZE AGGREGATE (tm THICKNESS) MAXIMUM. MODIFIED DRY DENSITY COMPACTION.
“FILTER MEDIA: CLEAN SAND 0.25mm NOMINAL SIZE AGGREGATE. v IMI (G07 CONSGL I ATeUSTRICNESSOE GLASS
2
AMER WN 30g LIME AND 100g DYNAMIC LIFTER PER m2, MIX 3, 40 mm FINE CRUSHED ROCK 979% MAXIMUM,
mm OF FILTER MEDIA, MINIMUM HYDRAULIC HODIEIED DRY DENSITY COMPACTION
CONDUCTIVITY 190mm/hr, MAXIMUM HYDRAULIC CONDUCTIVITY
BIORETENTION SECTION 240mm/hr. TO BE VERIFIED BY GEOTECHNICAL TESTING PRIOR TO PREPARED AND APPROVED
= ee SUPPLY TO SITE.
SCALE N.T.S. Phdce THEMES) SUBGRADE MATERIAL
TYPICAL LIGHT DUTY ASPHALT PAVEMENT
SCALE N.T.S
50mm MIN, CONSOLIDATED THICKNESS OF TYPE H
ASHPALT 10 mm NOMINAL SIZE AGGREGATE. SIZE
ON A PREPARED AND PRIMED SURFACE.
: 100mm MIN. CONSOLIDATED THICKNESS OF
5 ee CLASS 2, 20mm FINE CRUSHED ROCK 98
MAXIMUM, MODIFIED DRY DENSITY COMPACTION.
EROSION PROTECTION
ee 200mm CONSOLIDATED THICKNESS OF CLASS
SCALE N.T.S. 3, 40 mm FINE CRUSHED ROCK 97
25 m MODIFIED DRY DENSITY COMPACTION
PREPARED AND APPROVED
SUBGRADE MATERIAL
UNDERDRAIN 100mm SLOTTED
100° 200 min NORINAL SIZE ROCK TYPICAL HEAVY DUTY ASPHALT PAVEMENT
PVC @ 1000mm C-C T
in | ee A39 GEOFABRICS GEOTEXTILES on ane PROFILE TO BE REVIEWED FOLLOWING COMPLETION OF FILLING &
« FINISHED SURFACE OF BASIN OR EQUIVALENT, ANCHORED AT PREPARATION OF SUBGRADE FORMATION & COMPACTION TESTING
Sa] TOP AND BOTTOMOF BATTER
to
LL/ 300mm UNDERDRAIN TO JP
JP (BOLT DOWN LID) 1 FROM BIORETENTION CELL 300 300
tt
10, {40 No , {40
JP TO JOIN 450mm AND 150mm | |
UNDERDRAIN FROM BIORETENTION CELL S 1 so
3 ENDWALL BEACHING 4 oe Z
i SCALE N.T.S. Ss ae aS
Tt {
J e . a : ae r
a.- se Le a = 3 oS
300mm ROCK SPALLS 2 Sai tae 2 2
| KA } Fa “A
BIORETENTION CELL PLAN yo S -
SCALE NTS. 300 mm APPROX.
300 mm APPROX. B2 B3
— A39 GEOFABRIC LAID BARRIER KERB B RI
}+----——_-] UNDERNEATH ROCK SPALLS SSalaece eae BARRIER KERB
SCALE N.T.S SCALE N.T.S
500 mm. 2000 mm. (300-450) OUTLETS
2500 mm. (525%) OUTLETS
ISSUE ISSUED FOR DATE | DRAWN | APPROVED |ISSUE ISSUED FOR DATE | DRAWN | APPROVED| DESIGNED: G MANSELL DATE: 19/01/11 CLIENT: PROJECT: TL rere ae ee eee sa
01 | ISSUED FOR INFORMATION ssvovn| SM. DRAWN: Ss. MANTERFIELD SCALES 4500 CIVIL DRAWING CS
SURVEY: SHEET SIZE: 4 TGM GROUP Pty Ltd BSla H. TROON PTY. LTD. PROPOSED BU NNINGS ee ee a ee
Tea TPAD —,, A eee © Hit cmmorwercrms | WAREHOUSE Maas
. Ballarat, VIC 3350 P.O. BOX 84, WENDOUREE, 3355 CIVIL DETAILS SHEET
Ph: (03) 5330 8888 cuaity [SO 9004 Tel: (03) 5339 2208 - (03) 5339 3622 EUMUNDI-NOOSA ROAD
DATE: DATE: Web: tgmgroup.com onas ASINZS 4804 Fax: (03) 5338 1310
A.B.N. 11125 568 461 — tnvionnenASINZS 14001 Email: [email protected] NOOSAVILLE, QUEENSLAND
COPYRIGHT T.G.M GROUP PTY. LTD. TGM REF. No.: SHEET: OF REV:
©) 4400-02-CE c3 “3 |"'01

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Used in these records

About this file

File size
70.0 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

OPW11_0023 Development Application part 2 of 2 Planning Report and Plans 178 Eumundi Noosa Road Noosaville.pdf · 70.0 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.