Council archive · source document
OPW11/0023 Development Application part 2 of 2 Planning Report and Plans 178 Eumundi Noosa Road Noosaville
Plans and drawings: the text below has words only, no drawings.
Very large file (70.0 MB): may take a few minutes to open.
Place barcode here
ioim^uuiuiui
S0044522
THIS IS THE NEXT PART OF A
MULTIPLE PART RECORD
0 velor
2 5 JAN 2011
Maroocrly lore
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 56 pages
Page 2
1
1
BUNNINGS WAREHOUSE, NOOSAVILLE
SURFACE WATER MANAGEMENT PLAN
REF NO.: 4400-02-CE
AUTHOR: GLENN MANSELL, TGM GROUP PTY. LTD.
DATE: DECEMBER 2010
1
ENGINEERS, SURVEYORS & PLANNERS
1
Page 3
1
DOCUMENT STATUS AND HISTORY
t
t
I ISSUE
DRAFT
REV.
1
ISSUED TO
Sunshine Coast
QTY
1
DATE
16/11/10
REVIEWED
P Tadgell
Regional
Council
FINAL 2 Sunshine Coast 1 20/01/11
Regional
Council
1
2
1
Page 4
1
CONTENTS
TITLE PAGE
1.0 EXECUTIVE SUMMARY 4
s 2.0 WATER QUALITY
2.1 RAINFALL DATA
4
4
2.2 RUNOFF VOLUMES AND FLOWS 5
1 2.2.1 DETENTION BASIN 5
2.2.2 MODEL CORRELATION 6
3.0 RUNOFF QUALITY 7
3.1 MODELLING METHODOLOGY AND INPUT 7
3.2 TREATMENT TRAIN AND METHODS 8
3.3 SUB-CATCHMENT AREAS 8
1 3.3.2 VEGETATED SWALES 9
3.3.3 BIORETENTION CELL 9
I 3.3.4
3.4
RAINWATER TANKS
MUSIC MODELLING RESULTS
10
10
4.0 IMPACTS ON RECEIVING WATERWAYS 10
APPENDIX A - CONCEPTUAL SURFACE WATER MANAGEMENT LAYOUT
DESIGN
APPENDIX B - CARDNO SURFACE WATER MANAGEMENT PLAN
APPENDIX C - DRAINS MODEL DATA AND RESULTS
3
Page 5
1.0 EXECUTIVE SUMMARY
TGM Group were engaged by H Troon to prepare the surface water management plan for the
proposed Bunnings Warehouse development on the corner of Eumundi-Noosa Rd and Gateway Dve,
Noosaville. We are also required to prepare the runoff quality modelling and design of treatment
measures to meet the requirements of the MUSIC Modelling Guidelines.
This report will demonstrate that the minimum runoff quality objectives can be met and exceeded
by the proposed stormwater treatment and harvesting measures in summary as follows;
F1 • 105kL capacity rainwater tank used for irrigation and toilet flushing,
• Bioretention cell with an extended depth of 0.2m and mean area of 308m2,
• Buffer Strip equivalent to 23% of an adjacent car park area,
The following modelling results were achieved using MUSIC:
Source Residual Reduction % Reduction % Reduction
Parameter Load Load Target % (200mm/hr)* (5Omm/hr)*
Flow (ML/yr) 19.7 16.4 16.4 4.3
Total Suspended Solids (kg/yr) 4.10E+03 424 80 89.6 83.3
Total Phosphorus (kg/yr) 13.9 2.55 60 81.7 75.7
Total Nitrogen (kg/yr) 63 31.1 45 50.7 42.2
Gross Pollutants (kg/yr.) 456 0 90 100 100
* Relative results for hydraulic conductivity of 50mm/hour and 200mm/hr for the filter media in
bioretention cell.
2.0 WATER QUANTITY
2.1 Rainfall Data
The development has not changed location and as such no change to rainfall data is necessary.
However, for detention basin calculations rainfall hyetographs were used to simulate real rainfall
events in DRAINS.
4
Page 6
2.2 Runoff Volumes & Flows
I The site has changed size and layout. The total development site area is approximately 2.32 Ha. The
development site and amount of impervious area have significantly reduced in size, thus runoff
I volumes have significantly reduced compared to those calculated by Cardno in the original report.
The new areas are as follows;
Surface Type Original Areas Proposed Areas (TGM
(Cardno Report) Report)
(Ha) (Ha)
Roof 0,7884 0.667
Impervious Ground 1.325 1.20
Surface
Pervious Areas 0.352 0.456
F1
TGM note that the CARDNO report calculated runoff from the site layout prior to this development
using RAFTS and it then compared to the result calculated using the rational method. Results of the
comparison between the RAFTS and rational methodologies indicated that runoff flow rates were
close and therefore it is expected that a pro-rata adjustment of those flows for the new site areas
will also give acceptable results (i.e. existing discharge calculations adjusted by a factor of
2.327Ha/2.7543Ha).
DRAINS uses rainfall hyetographs from Australian Rainfall & Runoff to simulate actual rainfall events.
The hyetographs mimic the variation in rainfall during a rain storm, therefore for any given average
rainfall intensity DRAINS simulates the peaks and troughs during the storm, so that peak runoff flow
rates may be more than when calculated using the average intensity.
2.2.1 Detention Basin
It is anticipated that all paved areas can be collected and discharged via the detention basin and the
legal point of discharge in Gateway Drive. The construction stage sedimentation basin will be
cleaned at the end of the construction phase and converted into a detention basin and bioretention
cell.
t The outlet pipe from the basin shall be 600mm diameter. The invert of the outlet pipe will be set
300mm above the invert of the basin to allow for an extended detention period for the
sedimentation basin. It is assumed that the extended detention depth is full at the commencement
of the design storms for the purpose of sizing the detention basin.
5
Page 7
Results of hydrologic and hydraulic analysis is included in the table 1 below.
1 Storm Existing
Discharge
Developed Case Detention Basin
Event Discharge (no
(Capacity 1160m3)
detention)
(m3/s)
(m3/s)
Peak Basin Peak Basin Peak Outflow
Stage (m)** Volume (m3)
Tc (Mins) 30 15
100 0.663 1.23 2.1 1030 0.54
20 0.502 0.99 1.7 750 0.45
10 0.429 1.18 1.5 620 0.425
5 0.377 1.03 1.32 550 0.393
** Includes extended detention depth of 0.2m.
Table 1- Detention Basin Requirements
2.2.2 Model Correlation
r Hydrologic and hydraulic computations were performed using DRAINS. DRAINS calculates runoff by
modelling depression (initial) loss for pervious and impervious areas, along with modelling a
reducing loss through infiltration in pervious areas as these areas become wetter (known as the
Horton infiltration model). The following parameter values were used in the hydrologic model;
Paved Area Depression Storage: 1mm
Grassed Area Depression Storage: 3mm
Soil Type: 2 (Moderate infiltration rates)
Antecedent moisture content: 3 (Moderately wet)
6
Page 8
Results of the DRAINS hydrologic model were compared to the results using the rational method
and the comparison is presented in Table 2 below;
Model Existing 1 in 100 Existing 1 in I Proposed 1 in Proposed 1 in
Year Runoff Max. 100 Year Max. 100 Year Max. 100 Year Max.
Flow Volume Flow Volume
(m3/S) (m3) (m3/s) (m3)
(tc = 30 min) (tc = 30 min) (tc = 15 min) (tc = 15 min)
Rational Method 0.663 1193 1.23 1107
DRAINS (Horton 0.673 1245 1.23 1268
Infiltration)
Difference +1 4% 0% 15%
Table 2 - Correlation of DRAINS with Rational Method
DRAINS simulates the peaks and troughs in rainfall intensity during actual rainfall events , so
comparison of peak flows between DRAINS and the rational method can be misleading. Therefore, a
comparison of the volume of runoff is also necessary in order to calibrate the model to the rational
method.
The comparison above indicates that for the 1 in 100 Year rainfall events the DRAINS model
correlates reasonably well with the traditional rational method.
3.0 RUNOFF QUALITY
I 3.1 Modelling Methodology and Input
Source node pollution parameters were taken from the MUSIC Modelling Guidelines by "Water by
Design" (2010) (MMG 2010). MUSIC input parameters and data are summarised in table 3 below;
F1
7
Page 9
Rainfall Station and Data Set Cooroy Composite site pluviograph
Time Step 6 Min
Modelling Period 15L January 1973 to 315` December 1983.
Mean Annual Rainfall (mm) 1595
Evapotranspiration (mm) 1630
Rainfall runoff parameters As per MMG 2010 for commercial use (Table 3.7)
I Pollutant export parameters As per MMG 2010 for commercial source node (Table 3.8)
Table 3 - MUSIC Modelling Hydrologic Input Data
3.2 Treatment Train & Methods
All paved areas on the site will be conveyed to the legal point of discharge in Gateway Drive via a
sediment basin and bioretention cell. In addition, most car park pavements will slope directly
towards vegetated swales so that runoff is dispersed. Areas that can not be sloped towards a
vegetated swale or other soft landscaping feature are drained via a trench grate or pit that
discharges into the underground drainage system. The underground drainage system then
discharges into the sedimentation basin.
Almost 20% of the site has been set aside for landscaping.
P-j
3.3 Sub-Catchment Areas
Sub-catchment areas, along with conceptual design of the treatment train, is shown on plans
included in Appendix A.
3.3.1 Vegetated Swales: During detailed design it was found that vegetated swales would be
impractical due to the steepness of the site. They have been deleted from the treatment train.
I 3.3.2 Buffer Strips:
I All of sub-catchment 13 drains into the main sedimentation basin via a buffer strip with the
following parameters;
• Buffer Strip area: 23% of sub-catchment area
• Exfiltration Rate: Nil
8
Page 10
I 3.3.3 Bioretention Cell:
All areas within the site shall discharge into the bioretention cell located in the base of the detention
basin. The relevant MUSIC parameters were as follows;
• Mean Surface area (m2): 308 m2
• Extended detention depth: 0.2m
• Filter area: 210 m2
• Unlined filter media perimeter (m): N/A (not available in version 3),
• Saturated hydraulic conductivity: 50mm & 200mm per hour
• Filter depth: 400mm
• TN content of media (%): NIL. Ameliorated with dynamic lifter just prior to planting,
• Proportion of organic material in filter (%): NIL (as for TN),
• Orthophosphate content of filter media (mg/kg): NA,
• Base will not be lined,
• Bioretention cell will be planted out with plants effective at nutrient removal (refer
landscape details). Planting density shall be a minimum of
0 a mixture of at least 3 of the following species across 80% of the basin is required:
• Carex appressa
n Ficinia nodosa
n Juncus amabilis
n Juncus flavidus
0 the remaining 20% balance area of the basin should be planted out with species
from the following list;
n Isolepsis nodosa
n Lomandra longifolia
n Lomandra hystrix
n Ghania sieberiana
• Overflow weir width: NA (secondary 525mm diameter RCP provided at driveway entrance in
case the primary 450mm outlet blocks),
• Exfiltration Rate: NA
• Depth of submerged zone: NA (not included in Version 3 bioretention node),
9
Page 11
3.3.4 Rainwater Tanks
It is proposed to install 4 35kL underground rainwater tanks at the site to collect runoff from the
main retail area roof to be utilised for irrigation of plants in the nursery area and for flushing the
staff and public toilets. The relevant MUSIC parameters for the rainwater tanks are as follows;
• Volume below overflow pipe: 105kL
• Depth above overflow: 0.1m
• Surface area of tanks: 80m2
• Overflow pipe diameter:
• Stored Water for irrigation and other purposes: Up to 105kL,
• Indoor Connections: Staff and public toilets (4No.)
• Annual demand: 1105 kL
3.4 MUSIC Modelling Results
Results of the MUSIC model analysis are shown in Tables 5 & 6 below;
Source Residual Reduction % Reduction % Reduction
Parameter Load Load Target % (200mm/hr)* (50mm/hr)*
Flow (ML/yr) 19.7 16.4 16.4 4.3
Total Suspended Solids (kg/yr) 4.10E+03 424 80 89.6 83.3
Total Phosphorus (kg/yr) 13.9 2.55 60 81.7 75.7
Total Nitrogen (kg/yr) 63 31.1 45 50.7 42.2
Gross Pollutants (kg/yr) 456 0 90 100 100
* Relative results for hydraulic conductivity of 50mm/hour and 200mm/hr for the filter media in
bioretention cell.
Table 5 - MUSIC Modelling Results - Pollutant Reduction
I Flow (ML/yr) 16.4
I Total Suspended Solids (kg/yr)
Total Phosphorus (kg/yr)
Total Nitrogen (kg/yr)
4.24E+02
2.55
31.1
Gross Pollutants (kg/yr) 0
Table6 - MUSIC Modelling - Mean Annual Residual Loads
10
Page 12
REV:
OF
SHEET:
[TGM REF, No.
RECEIVING St +f
PAVEMENT AREA: 10693.768 m? | we eeorvine I
CANOPY
ROOF AREA: 6668.792 m? tt . | Warehouse Roof 0-667Ha £69 850 m2
pa s at
S| ere — Fo) ik
NURSERY AREA AREA: 1347.287 m? — oe Gage HRS ft 2. To toile ed
oo — ISRE 17 500 oo oe
28) eskL Ramwater <—————_maat _
. Tank «= ti«éC Plant PST
: ‘ 5 |
| LANDSCAPE AREA
2400 HIGH SECURITY FENCE
*PROPHSED DEWELOPMENTE = # og | \
BDY
= EXTG-LE
RL 14.0
BBY
o_o
SON INN
183.947 m* —
SNe
FA 1 Coa
ZLLI. 2 rae
Ze = || ee ee eee :
ss GATEWAY Rive : aw
EA I
a ee
eee ‘
VE CLeter
rl
ISSUE ISSUED FOR DATE | DRAWN | APPROVED |ISSUE ISSUED FOR DATE | RAWN | APPROVED | DESIGNED DATE: CLIENT: PROJECT
DRAWN: SCALE:
- | SURVEY: SHEET SIZE: TGM GROUP Pty Ltd BSI ar Te ee
Ballarat DRAWING TITLE
CHECKED: APPROVED: 1315 Sturt Street
Ballarat, VIC 3350
Ph: (03) 5330 8888 180 9001
DATE DATE Web: tgmgroup.com gue ASINZS 4801
i A.B.N. 11125 568 461 — ewtonnetASINZS 14001
() COPYRIGHT T.G.M GROUP PTY. LTD. TGM REF, No. SHEET:
Page 13
4.0 Impacts on Receiving Waterways
Stormwater harvesting demand from the site will represent around 1.2 ML per year, compared to
the original annual average runoff volume of approximately 7.5ML per year and a residual post-
developed annual average runoff volume of 16.4ML per year (refer Table 5)1. Therefore it can be
seen that stormwater harvesting will not reduce the total volume of water discharging into the
downstream catchment.
The proposed stormwater detention will maintain the peak runoff flow rates close to the original
(pre-developed) flow rates (see Table 1), so the sedimentation/detention basin will have no adverse
impact on downstream receiving waterways.
I
I
' The original runoff volume is calculated by multiplying the site area of 2.33 Ha by the annual rainfall runoff of 1.6m and a
typical runoff co-efficient of 0.2 (conservative).
11
Page 14
APPENDIX A - SURFACE WATER MANAGEMENT
CONCEPTUAL LAYOUT PLAN
1
12
[OCR of page images]
APPENDIX A — SURFACE WATER MANAGEMENT
CONCEPTUAL LAYOUT PLAN
12
Page 15
APPENDIX B - CARDNO SURFACE WATER MANAGEMENT PLAN
1
I
1
13
[OCR of page images]
APPENDIX B — CARDNO SURFACE WATER MANAGEMENT PLAN
13
Page 16
Cardno
Shaping the Future
RUNNINGS WAREHOUSE, NOOSAVILLE
Surface Water Management Plan
15 December 2006
Job No. 3501-54 Bunnings Warehouse
Page 17
BUNNINGS WAREHOUSE, NOOSAVILLE
SURFACE WATER MANAGEMENT PLAN
Cardno (QId) Pty Ltd
ABN 57 051 074 992
5 Gardner Close Milton Q 4064
PO Box 388 Toowong
Queensland 4066 Australia
Telephone: 07 3369 9822
Facsimile: 07 3369 9722
International: +61 7 3369 9822
card no@ca rd n o.com. au
www.cardno.com.au
Document Control
Author Reviewer
Vers i on D a te
Name Initials Name Initials
1 15 December 2006 Sid Duty Martin Giles
"© 2006 Cardno (QId) Pty Ltd All Rights Reserved. Copyright in the whole and every part of this
document belongs to Cardno (QId) Pty Ltd and may not be used, sold, transferred, copied or
reproduced in whole or in part in any manner or form or in or on any media to any person without the
prior written consent of Cardno (Qld) Pty Ltd."
Bunnings Warehouse Version 1 15 December 2006
J 1350154 \WP\SWMP doc Commercial in Confidence Page i
1
Page 18
1 BUNNINGS WAREHOUSE, NOOSAVILLE
SURFACE WATER MANAGEMENT PLAN
t BUNNINGS WAREHOUSE, NOOSAVILLE
SURFACE WATER MANAGEMENT PLAN
TABLE OF CONTENTS
1. INTRODUCTION .................................................................................................................1
1.1 Landscape Intent ........................................................................................................ 1
2. WATER QUANTITY ............................................................................................................ 2
2.1 Rainfall data ............................................................................................................... 2
2.2 RAFTS Model Setup .................................................................................................. 2
2.3 Model Calibration ....................................................................................................... 3
2.4 Detention Basin Sizing ............................................................................................... 3
1 2.5 RAFTS Model Results ................................................................................................4
2.5.1 Areas with impractical gradients .................................................................... 5
2.6 Outlet .......................................................................................................................... 5
3. SWALE SIZING .................................................................................................................. 6
1 4. STORMWATER QUALITY ................................................................................................. 7
4.1 Stormwater Management Practices ........................................................................... 7
4.2 Available Management Practices and Suitability ....................................................... 7
4.3 Outline Suitability Assessment ................................................................................... 9
4.4 Proposed Stormwater Management ........................................................................ 10
4.5 Site Specific Objectives ................................................................................
4.6 MUSIC Methodology ................................................................................................ 12
4.6.1 Adopted Land Uses ...................................................................................... 12
4.6.2 Nursery area ................................................................................................ 12
4.7 Device Sizing ........................................................................................................... 12
4.8 Modelling Results ..................................................................................................... 13
5. IRRIGATION TANK SIZING .............................................................................................14
6. MAINTENANCE REQUIREMENTS .................................................................................. 16
6.1 Construction Phase & Sediment Control .................................................................. 16
6.2 Ongoing Maintenance .............................................................................................. 16
7. CONCLUSION .................................................................................................................. 18
Bunnings Warehouse Version 1 15 December 2006
J \3501-54\WP\SWMP doc Commercial in Confidence Page ii
Page 19
BUNNINGS WAREHOUSE, NOOSAVILLE
SURFACE WATER MANAGEMENT PLAN ^^ Cardno
LIST OF TABLES
Table 1 Rainfall Parameters for Rockhampton ..................................................................... 2
Table 2 RAFTS Model: Area and Slope ............................................................................... 2
Table 3 Rational Method Calculations .................................................................................. 3
Table 4 Rational Method vs RAFTS Results ........................................................................ 3
Table 5 Detention Basins Stage Storage Curves ................................................................. 3
Table 6 Detention Basin Sizing Results ................................................................................ 4
Table 7 Detention Basin Sizing Results - including unattenuated car park area ................. 5
Table 8 BCC Swale Design Guidelines ................................................................................ 6
Table 9 Stormwater Management Practices ......................................................................... 8
Table 10 Water Quality Objectives ....................................................................................... 10
Table 11 Bioretention Device Parameters ............................................................................ 13
Table 12 Total Annual Loads ................................................................................................ 13
Table 13 Rainwater Tank Performance ................................................................................ 14
Table 14 Detention Basin Parameters: Summary ................................................................. 18
LIST OF FIGURES
Figure 1 Schematic Treatment Train
Figure 2 Locality Plan
Figure 3 Existing Site
Figure 4 Proposed Site and Conceptual Drainage Layout
APPENDICES
APPENDIX A RAFTS Results
APPENDIX B MUSIC Parameters
APPENDIX C Statement of Landscape Intent
ri Bunnings Warehouse
J \3501-54\VVP\SWMP doc
Version 1
Commercial in Confidence
15 December 2006
Page iii
Page 20
BUNNINGS WAREHOUSE. NOOSAVILLE
SURFACE WATER MANAGEMENT PLAN C04"") C"Fw"Cr
1. INTRODUCTION
A Bunnings Warehouse is proposed for a site on the corner of Eumundi-Noosa Road and
Gateway Drive in Noosaville. The site falls under the jurisdiction of Noosa Shire Council.
Development has the potential to increase the rate of runoff from the site, possibly leading
to flooding issues downstream. Human activity on the site will also bring with it the
potential to adversely affect the quality of runoff, through the transport of debris, litter,
petrols, oils and lubricants and so on from impervious areas. However, the existing site is
not undisturbed; it has been cleared and appears to be used as a stockpile area for
aggregates.
In accordance with the requirements to maintain post-development runoff quantity and
quality, this document details the preliminary sizing and modelling of the detention
requirements and stormwater quality treatment train for the development, using Water
Sensitive Urban Design techniques. The final type, capacity and dimensions of the devices
will be subject to detailed design at a later stage.
1.1 Landscape Intent
A Statement of Landscape Intent (11 December 2006) has been prepared by Arterra
Landscape Architects, and is included as Appendix C. It describes the general landscaping
across the site, and includes a summary of the Water Related Design Principles described
and modelled within this report.
F1
Bunnings Warehouse Version 1 15 December 2006
J \3501-54\WPSWMP doc Commercial in Confidence Page 1
Page 21
BUNNINGS WAREHOUSE, NOOSAVILLE
SURFACE WATER MANAGEMENT PLAN
(40:^ Cardna
2. WATER QUANTITY
2.1 Rainfall data
Historical rainfall intensities were calculated with AUS-IFD software, employing methods
detailed in the Institute of Engineers Australia's 1987 Australian Rainfall & Runoff (ARR).
1 The parameters used in the software are listed in Table 1 below.
Table 1 Rainfall Parameters for Rockhampton
wy uw,nuau nUwnaIuca,,nnnnn,
2 year 1 hour 50.0 50 year 1 hour 93.64
2 year 12 hour 10.69 50 year 12 hour 23.84
2 year 72 hour 3.38 50 year 72 hour 9.26
Geographical Factors
Skewness G 0 F2 4.23 F50 17.85
The AUS-IFD software produces a table of rainfall intensities for a range of storm durations,
and this information was entered as a series of design storms to the RAFTS database.
Zone 3 temporal patterns were applied to the data according to the ARR standard.
2.2 RAFTS Model Setup
The site was divided into several subcatchments according to lot position, slope and
direction of fall. These are shown schematically on Figure 1 and in plan on Figure 4. In
order to mitigate against the potential increase in stormwater runoff following development,
the existing situation was also modelled in order to establish a baseline.
Slopes in the existing situation were derived from information provided on the surveyor's
drawings, and from contours, and slopes for the proposed situation were estimated. These
were later adapted to achieve calibration, as described in the following section.
Pervious and impervious areas were calculated assuming that the site is completely
pervious in its existing state, and completely impervious following development (except for
the bioretention strips and landscaping, which are assumed to be completely pervious).
The model parameters are listed in Table 2 below.
Table 2 RAFTS Model: Area and Slope
Existing Proposed Existing Proposed
Node Area (ha)
Slope (%) Slope (%) Mannings Mannings
Car park 1.1190 4 2 0.07 0.025
Bioretention 0.1507 4 2 0.07 0.07
Roofs 0.7884 4 30 0.07 0.025
Hardstand 0.2064 4 2 0.07 0.025
Landscape 0.2011 4 2 0.07 0.05
Each node in RAFTS is also assigned rainfall losses: for pervious areas, initial loss is zero,
and continuing loss is 2.5mm. For impervious areas both losses were set to zero.
Bunnings Warehouse Version 1 15 December 2006
j \3501-54\lAP\SWMP doc Commercial in Confidence Page 2
Page 22
BUNNINGS WAREHOUSE, NOOSAVILLE
SURFACE WATER MANAGEMENT PLAN
^^ Carlla/no
2.3 Model Calibration
The Rational Method calculation parameters are summarised in Table 3 below.
Table 3 Rational Method Calculations
Parameter Existing Conditions I Developed Conditions
Area 2.7543 ha
10 year 1 hour rainfall intensity 59 mm/hr
Fraction Impervious (fi) 0.10 0.775
Coefficient of runoff (C10) 0.55 0.83
Coefficient of runoff (C1oo) 0.660 0.996
Time of concentration (tc) 30 mins 10 mins
Rainfall Intensity (100 year) 152 mm/hr 249 mm/hr
Peak Runoff (100 year ARI) 0.77 m3/s 1.90 m3/s
% Difference Approx + 250 %
The model was calibrated by comparing the flows produced by RAFTS with those
calculated by the rational method above for the 100 year event. The results are shown
below.
Table 4 Rational Method vs RAFTS Results
Node Existing Q100 (m3/s) Proposed Q100 (m3/s)
Rational 0.77 1.90
RAFTS Results 0.78 1.82
Difference +1.3% -4.7%
As can be seen from the table, the results produced from the Rational calculation for the
100-year average recurrence interval compare very favourably in the proposed case with
the runoff predicted by the RAFTS model. The results were achieved using a Storage
Coefficient Multiplication Factor, B, of 2.
2.4 Detention Basin Sizing
In order to mitigate the increase in peak discharge under developed conditions the RAFTS
model was used to size the detention basin required for the site. The basin will be located
in a landscaped area at the south-east corner of the site.
The stage storage curves adopted for the basin are presented in Table 5.
Table 5 Detention Basins Stage Storage Curves
1 Stage (m)
Storage (m)
0
0
0.1
250
0.4
500
0.6
750 1
0.8 1.0
1000 1 1250 1 1500
1.2
Bunnings Warehouse Version 1 15 December 2006
J \3501- 54\WP\SWMP doc Commercial in Confidence Page 3
Page 23
RUNNINGS WAREHOUSE, NOOSAVILLE
SURFACE WATER MANAGEMENT PLAN (L:^ Carldna
In order to provide a further improvement in water quality in low flow events (of up to the
three month return period) the initial 300mm of storage depth available in the basin will be
used for stilling of flows. The main stormwater outlet will be set at 300mm above the basin
invert level, whereas a smaller pipe set at a lower level will allow the controlled release of
low flows over a longer period.
An emergency spillway is also provided in the basin to allow flows from extreme events
(including and in excess of the 100-year event) to pass over the rim of the basin, bypassing
r1i
the outlet. This weir would be 20 metres wide and at a level of 1.15 metres above the
basin invert.
2.5 RAFTS Model Results
A range of storm durations were modelled for a series of ARI design events. Peak flows
were determined for the 1 year through to the 100 year event and durations ranged from
10 minutes through to the 24 hour event.
The results of the modelling are shown in the table below.
Table 6 Detention Basin Sizing Results
Existing Case Developed Case Detention Basin
Storm
Discharge (without basin) Peak Basin Peak Basin Peak Outflow
Event
(m'/s) Discharge (m'/s) Stage (m) Volume (m3) (m'/s)
100 0.785 1.816 1.16 1455 0.609
50 0.698 1.653 1.06 1321 0.513
I 20
10
0.594
0,508
1.523
1.338
0.91
0.80
1144
1002
0.451
0.396
5 0.446 1.199 0.72 901 0.351
1 I 0.224 0.759 0.46 574 0.198
The table shows that in all cases peak outflows are reduced to below the existing case
discharges. The maximum utilised volume of the detention basin is approximately 1455 m3,
giving a peak stage of 1.16 metres in the 100 year ARI event. It can be noted that the
design is relatively conservative as the depth of ponding is relatively low. Therefore it
should be possible to optimise the design and reduce the footprint of the basin even further
in detailed design.
QUDM indicates in Table 6.2 that the maximum allowable stage during the 20 year ARI
event is 1.20 metres. The peak basin stage of 0.91 metres displayed for the basin is well
below this figure and, of course, the basin is only a maximum of 1.2 metres deep in any
case. Further, only the deepest central area of the basin would experience such depths,
and the long shallow fall at the edges of the device (set at a gradient of 1 in 6) would
preclude any public safety risk due to sharp inclines.
To allow for a freeboard and include an additional factor of safety, it is suggested that the
top of the bund should be at a level of 300 mm above the maximum 100-year level - in this
case equating to 1.46m above the basin invert.
Bunnings Warehouse Version 1 15 December 2006
J 1.3501-54vM' S`NMP aoc Commercial in Confidence Page 4
Page 24
BUNNINGS WAREHOUSE, NOOSAVILLE
SURFACE WATER MANAGEMENT PLAN 111(4^ calw"Cr
2.5.1 Areas with impractical gradients
It may be noted that levels across the site may be such that it will be difficult or impractical
to route runoff from certain areas to the detention basin. To ensure adequate falls across
the car park, for example, a cut and fill operation is envisaged which will require the use of
a retaining wall along the western boundary. It has been suggested that in this area,
I surface water is released direct to the outlet swale without passing through the detention
basin (although three-month flows will still pass through bio-retention devices). To ensure
that surface water runoff rates following development are equal to or less than those
existing, even with an unattenuated area of almost 2500m , the RAFTS model was
amended and revised results calculated. The results are shown in Table 7 below.
Table 7 Detention Basin Sizing Results - including unattenuated car park area
Event Existing (m'ls) Stage (m) Volume (m') Site Outflow (m3/s)
100 0.785 1.06 1325 0.575
50 0,698 0.95 1193 0.522
20 0.594 0.84 1046 0.471
10 0.508 0.73 909 0.403
5 0.446 0.66 822 0.350
1 0.224 0.41 518 0.209
It can be seen that for each storm event, the outflows from the site as a whole (the outflow
refers to the site 'end' node and not the basin) remain less than the existing rates.
I Paradoxically, allowing certain areas of the site to drain direct to the Swale does not
increase the overall peak runoff rate in this case. This is likely to be because the times of
concentration (the time taken for the runoff to arrive at the discharge point) for each area do
not coincide, and this creates two smaller peaks in the hydrograph over a longer period of
time.
2.6 Outlet
A single 525mm pipe was adopted for the basin outlet and, as described above, set with an
invert level 300mm above the bottom of the basin. This outlet pipe will drain through the
bund, is 10 metres long and set at a grade of 0.5 per cent. The overflow spillway level was
set at 1.15 metres above the invert of the basin (at the downstream end) and is 20 metres
wide.
The overflow weir becomes operational only in events approaching the 100-year return
period, when it would experience a flow depth of approximately 10mm.
r As stated, the outlet pipe has been placed with its invert set at 300mm above the 'floor
level' of the basin. This provides storage for the containment and stilling of runoff from
events of up to the three-month average recurrence interval. These flows will not exit from
the basin via the stormwater pipe, but instead through a lower and smaller pipe through a
longer period of time. Using this approach, the option also exists to install a sandy loam
bioretention filter placed in the floor of the basin to further improve the treatment train.
Flows from the detention basin will be released via the outlet to a vegetated Swale, running
in a northerly direction along the western boundary of the site. An outline sizing of this
Swale is provided in the following section.
Bunnings Warehouse Version 1 15 December 2006
J \3501- 54\VVP\SWMP doc Commercial in Confidence Page 5
Page 25
BUNNINGS WAREHOUSE, NOOSAVILLE
SURFACE WATER MANAGEMENT PLAN
^^ Cardno
3. SWALE SIZING
Discharges from the detention basin will travel along a grassed swale in a northerly
direction along the western boundary. A HECRAS flow model was constructed to analyse
the performance of a such a Swale.
From Table 6 it can be seen that the peak outflow in the 100-year event equates to 0.609
m3/s. Mannings equation was used to arrive at an outline size for the Swale. The swale
was a total of 5m wide, 0.3m deep, and sides sloping at 1 in 6, meeting at a base of 1.4m
width. The swale would be approximately 150 metres long, and set at a gradient of around
1.5%. At this outline design stage, bends and constrictions were not modelled (driveway
crossings would need to be elevated in order to avoid wide and shallow cross sections).
Cross sections were input to HEC-RAS, a value of Manning's n of 0.06 was selected, and
the above derived flow of 0.609 m3/s was applied to the head of the run.
As swales are generally accessible by the public, design guidelines are available that
ensure that safety considerations are met in terms of bank slope, flow velocity and depth.
Brisbane City Council's Draft WSUD Engineering Guidelines (August 2005), for example,
lists typical design parameters which have been reproduced in Table 8 below. The results
s of the HECRAS analysis are also included in the table.
Table 8 BCC Swale Design Guidelines
Design Parameter Typical Value Actual Value
Swale longitudinal slope 1 to 4% 1.5%
Swale side slope (for areas not requiring access, eg. Parks, 1:3 to 1:10 1:6
easements, median strips)
Swale side slope for trafficability (for footpaths with 'at- Max 1:9 n/a
grade' crossings)
Swale side slope (elevated driveway crossings) 1:3 to 1:10 1:6
Manning's n (with flow depth less than vegetation height) 0.15 to 0.4 n/a
Manning's n (with flow depth greater than vegetation height) 0.02 to 0.05 0.05
Maximum velocity for scour in minor event (eg. Q2) 0.5 m/s 0.5 m/s
Maximum velocity for Q50 2.0 m/s 0.6 m/s
Depth x velocity for high risk locations <0.4 m2/s
0 . 2 m 2 /s
Depth x velocity for low risk locations <0.6 m2/s
Maximum depth of flow, Q50 0.3m 0.28 m
As can be seen from the table, the swale is adequate to convey the anticipated flows while
meeting minimum safety criteria. However, the design levels at the basin outlet, at
approximately 15m AHD, fall to approximately 11 m AHD at the northern end of the site - a
fall of around 2.6%. The difference between the Swale slope used above and the actual
s slope on site can be reduced through the use of simple rock dams placed at predetermined
drops in the channel level, creating attractive weirs or waterfalls along the length of the
swale.
Further modelling will be required at the detailed design stage to accurately model all
bends and constrictions in the swale's route through the site and the addition of local
surface water discharges to the flow. However, the analysis demonstrates that it will be
I possible to provide a Swale to convey flow.
I Bunnings Warehouse
J 13501-54\WP\SWMP doc
Version 1
Commercial in Confidence
15 December 2006
Page 6
Page 26
BUNNINGS WAREHOUSE. NOOSAVILLE
SURFACE WATER MANAGEMENT PLAN (*M^ Calw"Cill,
I 4. STORMWATER QUALITY
4.1 Stormwater Management Practices
The formulation and implementation of the stormwater management plan for the
development is based on the following key principles.
• Adoption of Water Sensitive Urban Design (WSUD) principles throughout the site.
t This includes consideration of features such as preventing the concentration of flow
in downstream areas and the use of wetland systems to manage runoff water
quality.
• Management and control of water quality both during and after construction. A
detailed Erosion and Sedimentation Control Plan will need to be developed in
accordance with recognised standards during the detailed design phase and
implemented on site during the subdivision construction process.
A Stormwater Quality Management Plan (SQMP) has been prepared for the site that uses
s these principles to describe how stormwater runoff from the site is to be treated to comply
with the water quality objectives specified for the receiving water bodies (refer Section 3.1).
This SQMP describes the stormwater management measures proposed for the site, and
includes the following broad steps:
I • Identify environmental values and water quality objectives for discharge from site
(refer Section 4.5);
• Consider types of stormwater management practices appropriate for use within
development (refer Section 4.2);
• Demonstrate that water quality objectives can be met with available stormwater
management practices (refer Section 4.8).
4.2 Available Management Practices and Suitability
A wide range of stormwater management practices are available to achieve the principles
of Water Sensitive Urban Design. All have been shown to be successful when correctly
designed, but selection of the most appropriate practices for a particular development is
highly dependent on site conditions.
The Table overleaf lists the most common stormwater management practices currently
used, along with opportunities and constraints for their use. This table forms the starting
point for stormwater management for the site. Considering the site's constraints, not all of
the measures outlined in the table are suitable. Each treatment option is therefore
discussed in more detail and comment made on the suitability of each in the context of the
development.
Bunnings Warehouse Version 1 15 December 2006
J 13501-54\wp\SWMP Doc Commercial in Confidence Page 7
Page 27
a BUNNINGS WAREHOUSE, NOOSAVILLE
SURFACE WATER MANAGEMENT PLAN ^^ Cara/no
1 Table 9 Stormwater Management Practices
Practice Opportunities Constraints
Pollutants removed Scale Other
Pre-treatment for Require frequent
Litter baskets/racks Litter and debris - M Local
other practices maintenance
Coarse sediment - H
Sediment traps Regional Aesthetic and safety issues
Suspended solids - L
Litter and debris - M
Gross pollutant Pre-treatment for
Coarse sediment - H Regional Require regular maintenance
traps (GPTs) other practices
Suspended solids - L
Litter and debris - M
I Filter strips/ buffer
strips
Coarse sediment - H
Suspended solids - H
Nutrients - M
Lot/Local
Peak flow
management
Require flat terrain
Litter and debris - M
Coarse sediment - H Peak flow
Grass swales Local Require flat terrain
Suspended solids - H management
Nutrients - M
Litter and debris - M
Coarse sediment - H Peak flow
Vegetated swales Local Require flat terrain
Suspended solids - H management
Nutrients - H
Coarse sediment - M
Extended detention Peak flow Requires pre-treatment
Suspended solids - M Regional
basins management Large land area required
Nutrients - L
Suspended solids - H
Peak flow
Infiltration trenches Nutrients - M Local Requires pre-treatment
management
Bio-retention Coarse sediment - H
Peak flow
systems Suspended solids - H Local Requires pre-treatment
management
(rain garden) Nutrients - H
Suspended solids - H
Peak flow Not appropriate for steep
I Porous pavements Total phosphorus - M
Total nitrogen - L
Coarse sediment - H
Local
management sites
Requires pre-treatment
Constructed Suspended solids - H Peak flow Not appropriate for steep
Regional
wetlands Total phosphorus - M management sites
Total nitrogen - L Requires large area of land
Peak flow Requires community
Rainwater tanks N/A Lot
management involvement
Other benefits
Community Litter and debris - L include weed
Regional Community participation
education Nutrients - L control, reduced
water use
Note: Data taken from NSW EPA Managing Urban Stormwater - Treatment Techniques, 1997
L - 10 - 50% removal
1 M - 50 - 75% removal
H - 75 - 100% removal
Scales Lot less than 1 ha
Local 1 - 10 ha
Regional greater than 10 ha
Bunnings Warehouse Version 1 15 December 2006
J13501-S4 WP\SWMPdoc Commercial in Confidence Page 8
s
Page 28
BUNNINGS WAREHOUSE. NOOSAVILLE
SURFACE WATER MANAGEMENT PLAN
(.^ C"rwncp
4.3 Outline Suitability Assessment
Each of the techniques described in the previous table is further assessed below, with
regard to the site's specific opportunities and constraints.
Litter Baskets/racks
The primary purpose for litter baskets is to remove medium sized litter and debris from the
site. Significant litter loads are not expected and other measures will be more appropriate
for managing the removal of litter from the site.
Sediment Traps
Sediment traps will be required during the construction phase to limit the transport of
sediment off site. Following construction, sediment levels will return to a low level, and
traps are therefore not considered necessary as a long-term water quality measure.
Gross Pollutant Traps
Gross pollutant traps (GPTs) are predominantly used for the removal of litter and debris -
t although they have been shown to effectively remove coarse sediment and suspended
solids (Brisbane City Council, 1999). Modelling shows that a GPT will be not be required.
Filter Strips/Buffer Strips
Buffer strips are areas of land left in their natural state that act to reduce peak runoff flows
and improve the quality of stormwater runoff. This treatment improves the aesthetic and
biodiversity value of the development and provides significant quality and quantity
improvements.
Grass Swales
Grass swales are considered a highly effective and aesthetic water quality (and to a lesser
extent, water quantity) control measure, when placed in flat areas. In this case, vegetated
swales, described below, are more appropriate.
Vegetated Swales
Vegetated swales require similar conditions as those outlined for grass swales above, and
wherever slopes are sufficiently low they would provide effective stormwater treatment for
the site. They will be employed in the car park areas, but feature a filter media for
treatment: see Bio-retention Systems.
Extended Detention Basin
Extended detention basins are designed to generally store runoff for 1-2 days. Their main
purpose is the reduction of the peak discharge from the site during a storm event, and the
retention of particulate matter. A detention basin is included on site in the southeast
r. corner.
Infiltration Trenches
Infiltration trenches allow pre-treated stormwater runoff to infiltrate into surrounding soils
and groundwater, and as such are not a treatment device in themselves. Where space is
limited, bio-retention systems are preferred.
Bunnings Warehouse Version 1 15 December 2006
J 13501-541WP\SWMP4oc Commercial in Confidence Page 9
f
Page 29
BUNNINGS WAREHOUSE. NOOSAVILLE
SURFACE WATER MANAGEMENT PLAN
(.^ Carlldno
Bio-retention Systems
Bio-retention systems effectively combine a grass or vegetated Swale with an infiltration
trench. They are considered to be extremely effective in removing sediment and nutrients.
Long bio-retention basins will be employed on site in the landscape divides of the car-park
area, in order to treat stormwater to an appropriate standard prior to release.
Porous Pavements
Porous pavements are not appropriate for high traffic areas due to increased maintenance
requirements. They are also less effective in steep areas. However, for relatively flat, low
traffic roads they could be suitable for this development, although their perceived expense
often leads to the preference of other measures in reaching quantity and quality objectives.
Constructed Ponds and Wetlands
Wetlands require reasonably large flat areas of land. Given the constraints of this
development, and the ability to use bio-retention systems, the use of ponds or wetlands is
not recommended.
Rainwater Tanks
The ability exists to install rainwater tanks throughout the development to reduce overall
water consumption. Tanks will be employed on site to collect roof runoff and provide a
source of irrigation for the nursery.
4.4 Proposed Stormwater Management
In summary, the stormwater management practices considered appropriate for use in this
development are:
• Rainwater tanks to collect roof runoff, to supply nursery irrigation needs;
• bio-retention swales, located in the car park landscape divides;
• a detention basin for stormwater attenuation, located in the southeast corner.
To ensure that the Water Quality Objectives (described in the following section) can be
met, devices will be sized such that all stormwater up to the three-month design flow will
have passed through the nominated measures for treatment.
4.5 Site Specific Objectives
Water Quality Objectives (WQO) for the study site have been derived with reference to the
Queensland Environment Protection Agency Queensland Water Quality Guidelines (March
2006). The site is inland, and discharges would flow for approximately one kilometre along
what would be categorised in the guidelines as a 'lowland stream'. It is located within in the
South-east Region. The WQOs so derived are shown in the table below.
Table 10 Water Quality Objectives
Parameter Queensland EPA Value
Suspended Sediments 6 mg/L
Total Phosphorus 50 pg /L
Total Nitrogen 500 pg/L
Bunnings Warehouse Version 1 15 December 2006
J \3501 -54\WP\S WM P dOC Commercial in Confidence Page 10
Page 30
BUNNINGS WAREHOUSE, NOOSAVILLE
SURFACE WATER MANAGEMENT PLAN (4^ Cardno
As the development is commercial in character, the water quality parameters of relevance
to the site are suspended solids, nutrients (nitrogen and phosphorus), litter, faecal coliforms
and hydrocarbons. Of these parameters, the detailed modelling of litter, faecal coliforms
and hydrocarbons is not possible at present using the industry standard analysis package
(MUSIC) due to the lack of information regarding export rates. The modelling of defined
water quality objectives has therefore necessarily focused on suspended solids and
nutrients (nitrogen and phosphorus).
Previous versions of the MUSIC modelling software were able to achieve State and
international objectives through the use of a suitably sized treatment train. However,
following a software update in 2005 to correct an error in the modelling of bio-retention
basins, the new 'background' concentrations used in version 3.01 of the software are
higher than the published water quality objectives. No matter how efficient the treatment
train employed to serve the development, or the number of devices employed, it will not be
possible to achieve the concentrations listed in Table 2.
Further, it should be noted that the values presented in the Guidelines represent desirable
water quality in the watercourse, rather than the quality of the discharge to it. While
specifying such values would guarantee that acceptable aquatic concentrations are
obtained, such an approach is highly conservative and unrealistic if it is not possible to
demonstrate that the objectives can be achieved, even with the latest modelling software
and treatment technology.
The EPA Guidelines (in Section 4.3 on Page 51) state that 'a very important point to note is
that although guidelines provide technical input to the development of WQOs or targets,
they are not necessarily the same values as the finally adopted WQOs. The final
WQOs take into account social, economic and current condition factors. These may dictate
that achieving the actual guideline value is economically or technically unacceptable and
that therefore the WQO should be set at some less stringent value. Hence the WQOs
ultimately adopted might be the same as, or different from, the technical guideline values,
depending on community and economic considerations.'
Alternative water quality objectives are clearly necessary. In recognition of the above,
many Local Authorities have adopted load-based objectives. These require the
development to achieve:
• an 80 % reduction in suspended solids;
• a 60 % reduction in total phosphorus;
• a 45 % reduction in total nitrogen; and,
• a 90 % reduction in gross pollutants
when compared to unmitigated urban development.
This approach has recently been ratified in Healthy Waterways' Water Sensitive Urban
Design Technical Design Guidelines for South East Queensland (June 2006). These load
based reduction objectives were therefore employed for this report.
Bunnings Warehouse Version 1 15 December 2006
J X501-54\WRSWMP tloc Commercial in Confidence Page 11
Page 31
1 BUNNINGS WAREHOUSE, NOOSAVILLE
SURFACE WATER MANAGEMENT PLAN (,,^ Cardno
4.6 MUSIC Methodology
In order to determine the effectiveness of the proposed treatment train in meeting the water
quality objectives, a stormwater quality analysis was performed using the Model for Urban
Stormwater Improvement Conceptualisation (MUSIC) Version 3.01.
The model requires the user to specify meteorological data (rainfall and evaporation), soil
properties and pollutant loads for each area of the site, and suitable parameters for the
MUSIC model were adopted in accordance with the recommendations of the Brisbane City
Council publication Draft Guidelines for Pollutant Export Modelling in Brisbane- Version 7
t (2003). The values adopted for the analysis are listed in Appendix A.
Rainfall and evaporation data for the site was input to the model using ten years of data
from 1988 to 1997 for Nambour, and employing a six minute time step.
4.6.1 Adopted Land Uses
The modelling guidelines define a range of source nodes reflecting various land use types.
Based on the descriptions, the land use for the proposed site was modelled as
'commercial'. The existing situation was also modelled for comparison and, due to the
disturbed nature of the site in its current state, an 'urban residential' node is appropriate.
The areas of buildings, car parks, bio-retention reserves and landscaped borders were
derived from site survey and design plans. Roof areas, car parks, roads and associated
hardstands were assumed to be completely impervious, and the bio-retention reserves and
landscaped areas assumed to be completely pervious.
4.6.2 Nursery area
The nursery area has been assumed to be completely impervious, and is included in the
model as a 'building'. Rainfall on this area will be intercepted either by the concrete
hardstand or the shade sails. Although a proportion of incident rainfall will permeate
through the sails and possibly be intercepted by the plants and their containers, this effect
has been discounted to enable a conservative quantity assessment.
Information received from Arterra Landscape Architects and from staff at existing Bunnings
Warehouses suggests that growing plants would be irrigated at a rate of 20 to 25
millimetres per week. From the proposals, the growing area has been assumed to be
equivalent to the area under the shade sails; some 970 m .
Separate from the main treatment train, the growing area was modelled as a completely
pervious agricultural node, using a specially prepared rainfall file which simulated the above
irrigation rate. It was assumed that plants would require irrigation every day for eight
months, but only every other day for four summer months - a daily rainfall total of 3.6
millimetres being applied accordingly. Daily pollutant fluxes were exported from this model
and saved, and applied to the main treatment train model using an 'Imported Data' node.
The model is shown schematically in Figure 1.
4.7 Device Sizing
The vegetated reserves located between the car parking bays will be used to contain the
main treatment device for the development - a series of long bio-retention devices. The
car park areas will be graded such that the vast majority of the flow resulting from rainfall
events of up to the three-month return period will be directed toward the devices. After
passing through a 500 mm depth of sandy loam filter material, slotted drainage pipes will
collect the runoff and direct it to the detention basin.
Bunnings Warehouse Version 1 15 December 2006
J\3501-54\WP\SWMPdoc Commercial in Confidence Page 12
Page 32
C
BUNNINGS WAREHOUSE, NOOSAVILLE
SURFACE WATER MANAGEMENT PLAN (4:^ Car-dna
F1 For the purposes of the modelling, sensible device parameters based on outline quantity
calculations were input to the model, as described in the table below. If the layout of the
site changes in future these can be amended to suit, providing that the overall effectiveness
is maintained. The bio-retention device is modelled as a single large device, for example,
where in fact several smaller devices of equal total capacity would be employed in the car
park landscaping divides around the site.
Table 11 Bioretention Device Parameters
Parameter Value
Surface Area (m) 860
Extended Detention Depth (m) 0.1
Filter Area (m) 860
Filter Depth (m) 0.5
Mean Particle Diameter (mm) 0.36
Saturated Hydraulic Conductivity (mm/hr) 180
Overflow Weir Width (m) 2
Rainwater tanks provide some reduction in nitrogen loads, thought to be via biofilm activity
within the tank. The reduction in overall runoff through storage and reuse will also minimise
loads at the site outlet. To enable a conservative quality assessment, only a nominal
rainwater tank size was used, having a volume of 18kL and a surface area of 8m2. A
realistic re-use demand of 1250kL per year was applied. This size is conservative given
the likely rainwater tank size to be adopted (refer Section 5).
4.8 Modelling Results
The results of the MUSIC modelling, shown as total annual loads, are presented in the
table overleaf. It can be seen from the tables that the treatment train would reduce all of
the total loads released from the developed site to such an extent that the target reductions
are achieved for all pollutants.
Table 12 Total Annual Loads
Total Suspended Total Total Total Gross
Situation
Solids Phosphorus Nitrogen Pollutants
Existing Site
t (Rural Res)
Development
Potential
3,000 kg/yr
6,880 kg/yr
6.27 kg/yr
18.5 kg/yr
34.1 kg/yr
106 kg/yr
196 kg/yr
683 kg/yr
Development with
1240 kg/yr 5.20 kg/yr 54.8 kg/yr 0 kg/yr
treatment train
Realised Reduction 82 % 72 % 48 % 100 %
Target Reduction 80 % 60 % 45 % 90 %
Note that the proposed development, owing to its water sensitive urban design
measures, produces lower annual pollutant loads than the existing rural residential
case, for most of the modelled pollutants.
I
' Bunnings Warehouse Version 1 15 December 2006
J \3501 541WP15WMP doc Commercial in Confidence Page 13
Page 33
1
lJ
BUNNINGS WAREHOUSE, NOOSAVILLE
SURFACE WATER MANAGEMENT PLAN J) Cara/no
5. IRRIGATION TANK SIZING
I Historical rainfall data was obtained for Noosa for the period between 1950 and 2002. A
yield analysis was conducted, applying the rainfall to the building roof area (accounting for
a first flush loss of 0.2mm and an initial loss of 1 mm) to estimate the daily inflow to the tank.
The roof area was assumed to be 4600 m2, derived from initial design drawings. In many
instances, the fall of the roof and surrounding ground levels dictate that not all of the
rainwater can be practicably harvested - for this reason a 'half-sized' roof of 2300m2 was
also modelled.
Demands of 2500, 3000 and 3500 litres per day were used. Over a nursery area of
approximately 1000 m2, this equates to an irrigation rate of about 2.5, 3.0 and 3.5 mm per
day.
The model provides an estimate of the demand supplied, expressed as a percentage of the
total volume required. Note that it is not a percentage of total time the demand is supplied
- although this figure will be similar. The results are shown in Table 13 below.
Table 13 Rainwater Tank Performance
Demand supplied (%) for each tank size (kL)
D eman d : roo f area
10 20 30 40 50 60 70 80 90 100 150 200
2500 Lpd:4600m2 64 79 87 91 94 95 96 97 98 99 100 100
74
r
3000 Lpd : 4600m2 59 83 88 91 93 94 96 96 97 99 100
3500 Lpd 4600m2 56 70 79 84 88 91 92 94 95 96 98 99
2500 Lpd:2300m2 60 75 83 87 90 92 94 95 96 97 99 100
3000 Lpd:2300m2 55 70 78 83 86 89 91 92 93 94 97 99
i7 3500 Lpd2300m2 52 65 73 78 82 85 87 89 90 91 95 97
The results are better presented as a graph, as follows:
Rainwater Tank Performance
2500 Lpd, full roof
3000 Lpd, full roof
3500 Lpd, full roof
2500 Lpd, half roof
3000 Lpd. half roof
3500 Lpd, half roof
55
50
0 50 100 150 200
Tank Size (kL)
Bunnings Warehouse Version 1 15 December 2006
J\3501-54\WP\S'WMPdoc Commercial in Confidence Page 14
Page 34
I BUNNINGS WAREHOUSE, NOOSAVILLE
SURFACE WATER MANAGEMENT PLAN 4(*M^ Cardno
t The final size and design of the tank will depend upon site conditions, and will be confirmed
at the detailed design stage. At this stage, some obvious conclusions may be drawn from
the data above; increasing the irrigation rate decreases reliability, but larger tanks served
by larger roof areas increase reliability.
However, these effects cannot necessarily be extrapolated to reach a guaranteed 100%
performance target. The vagaries of rainfall mean that in reality, with a sensibly sized tank
serving a realistic roof area, some dry periods will be experienced. The commercial cost of
this shortfall must be compared with the capital costs inherent in the tank.
To conclude, a 100 kL tank could supply a demand of 3500 litres per day with 95%
reliability (utilising all of the available roof area). If only 50% reliability is required, then a 10
kL tank would suffice (supplied by only half of the roof area). At this point a tank size of
1OOkL is recommended to provide 95% reliability.
The model tends towards a conservative assessment in that a daily supply has been
modelled. As described in previous sections, in periods of natural rainfall the artificial
irrigation demand of the nursery would decrease (watering being required perhaps every
other day). This effect would lead to a modest improvement on the above figures.
P-j
Bunnings Warehouse Version 1 15 December 2006
J.\3501-54\ P\SWMPdoc Commercial in Confidence Page 15
Page 35
BUNNINGS WAREHOUSE, NOOSAVILLE
SURFACE WATER MANAGEMENT PLAN (40:^ cafwncp
I 6. MAINTENANCE REQUIREMENTS
6.1 Construction Phase & Sediment Control
During the construction phase, the potential exists for significant increases in the
I amount of pollutants, particularly sediment, exported from the site. During this period,
an Erosion and Sediment Control Plan is required as part of the overall Environmental
Management Plan prepared for the construction phase. The erosion and sediment
control plan for the site would be completed in accordance with Soil Erosion and
Sediment Control, Engineering Guidelines for Queensland Construction Sites
(Institution of Engineers Australia, 1996).
The completion of construction activities in accordance with an Erosion and Sediment
Control Plan developed using the above guidelines will minimise the nature of any
adverse impacts during the construction phase. It is considered that the appropriate
time for the preparation of the Erosion and Sediment Control Plan is at the Operational
works stage. Further, it is expected that the requirement to prepare a plan will be a
condition of any development approval issued with respect to the site.
Performance indicators for the construction phase will be set as part of the overall EMP for
the construction phase and in agreement with Council. Should non-compliance with the
performance indicators occur, the following corrective actions are to be implemented:
• Identification of the cause of the non-compliance;
• Implementation of appropriate mitigation measures as determined by the
Contractor in consultation with the Consultant; and
• Relevant validation monitoring to confirm that the nominated corrective
actions have been effective.
It is envisaged that the detention basin will first be constructed as a sediment basin to treat
runoff during the construction phase, and the same would apply to the car park landscape
divides to a lesser extent. At the end of construction, the basin and swales would have any
accumulated sediment removed and the vegetation installed (and the filter, in the case of
the bio-retention devices). As there is likely to be a significant pollutant load generated as
the Warehouse is first opened to the public, it may be necessary to replace the filter media
at intervals until the vegetation is fully established.
6.2 Ongoing Maintenance
The proposed maintenance for the bio-retention systems is drawn from the Melbourne
Water publication WSUD Engineering Procedures: Stormwater (June 2004, Chapter 6):
The most intensive period of maintenance is during the plant establishment
period (first two years) when weed removal and replanting may be required It
is also the time when large loads of sediments could impact on plant growth
particularly in developing catchments with poor building controls.
Bunnings Warehouse Version 1 15 December 2006
J \3501-541WP\SWMPdoc Commercial in Confidence Page 16
Page 36
BUNNINGS WAREHOUSE, NOOSAVILLE
SURFACE WATER MANAGEMENT PLAN 11^4^ Cardno
Maintenance is primarily concerned with:
• Maintenance of flow to and through the bio-retention basin
• Maintaining vegetation
• Preventing undesired overgrowth vegetation from taking over the bio-
retention basin
Ej: • Removal of accumulated sediments
• Litter and debris removal
Vegetation maintenance will include:
• Fertilising plants
• Removal of noxious plants or weeds
• Re-establishment of plants that die.
Sediment accumulation at the inlets needs to be monitored. Depending on the
catchment activities (eg building phase) the deposition of sediment can tend to
smother plants and reduce the ponding volume available. Should excessive
sediment build up it will impact on plant health and require removal before it
reduces the infiltration rate of the filter media.
Similar to other types of practices, debris removal is an ongoing maintenance
function. Debris, if not remove, can block inlets or outlets, and can be unsightly
if located in a visible location. Inspection and removal of debris should be done
regularly, but debris should be removed whenever observed on the site."
Given the above, a three monthly inspection frequency is proposed until the catchment has
r. become stabilised (i.e. until the development is largely complete). After this time, the
frequency of inspections can be reduced to every six months or as determined by the
operational performance of the devices.
I
I
r
I
Bunnings Warehouse Version 1 15 December 2006
J \3501-541WPnSWMP.doc Commercial in Confidence Page 17
Page 37
I BUNNINGS WAREHOUSE, NOOSAVILLE
SURFACE WATER MANAGEMENT PLAN (J) Ca.wno
I 7. CONCLUSION
Bunnings Warehouse plan to develop a new retail outlet in Noosaville, on the corner of the
Noosa-Eumundi Road and Gateway Drive.
The development of the site for its commercial use will lead to an increase in impervious
area across the site (although it should be noted that there is a far greater landscaped area
across the site than is normally the case for such development types). An increased
amount of runoff will occur during a storm, which will flow at an increased rate. To alleviate
flooding problems on site or downstream of it, a detention basin has been provided which
will detain flows and release them in a controlled manner over time for all flows up to and
including the 100-year event.
The key data for the detention basin is summarised below:
Table 14 Detention Basin Parameters: Summary
Parameter Value
Volume 1500m
Depth 1200mm
Freeboard 300mm
Outlet diameter 525mm
Outlet invert +300mm
Overflow weir width 20m
Overflow weir invert +1150mm
In order to protect the environmental value of the receiving water body, appropriate
stormwater treatment measures have been adopted for the site. Modelling of the
performance of these measures has indicated that the water quality objectives applicable to
the site and its watercourse will be met. The proposed treatment measures will reduce the
total annual load of pollutants entering the creek to meet or exceed standard performance
1 targets.
Discharges from the site will eventually pass to the Noosa River, and so it is important that
runoff quality be maintained following development. As the human activity expected for the
site could lead to pollution (particularly from litter and vehicles), bio-retention devices will be
employed across the car-parking areas of the site to capture nutrients, hydrocarbons and
gross pollutants. All runoff originating from storms of up to the three month return period
will undergo treatment by passing through a sandy-loam filter before passing to the
detention basin.
This report sizes the detention basin for the site, and suggests water sensitive urban design
measures to ensure quality is maintained. Quantity modelling of the performance of the
detention basin indicates that the proposed runoff rate will match the existing in all events
of up to the 100-year return period. Quality modelling of the treatment train has indicated
that the water quality objectives applicable to the site will be met in all cases.
I Bunnings Warehouse
J\3501-5d\WP\SWMPdoc
Version 1
Commercial in Confidence
15 December 2006
Page 18
Page 38
BUNNINGS WAREHOUSE, NOOSAVILLE
SURFACE WATER MANAGEMENT PLAN (M^ C"Iwncr
FIGURES
' Figure 1 Schematic Treatment Train
' Figure 2 Locality Plan
Figure 3 Existing Site
Figure 4 Proposed Site and Conceptual Drainage Layout
I
t
Bunnings Warehouse Version 1 15 December 2006
J' o1- 541WPGWMP doc Commercial in Confidence
Page 39
BUNNINGS WAREHOUSE, NOOSAVILLE
SURFACE WATER MANAGEMENT PLAN c0*10 Cardno
I Figure One: Schematic Treatment Trains
I MUSIC
Building Roof Car park Roads & Landscape
I 0.7884 ha 1.1190 ha Hardstands
0.2064 Ha 02011 Ha
Rainwater Tank
Nursery
T
Bio-retention reserves
1510 m2 surface, 860 m2 filter
1 Detention basin
1500 m3 volume, 1.2 m deep
Legal point of discharge
1 RAFTS
Building Roof Car park Bioretention Hardstands Landscape
1 0.7884 ha
Impervious
1.1190 ha
Impervious
0.1507 ha
Pervious
0.2064 Ha
Impervious
0.2011 Ha
Pervious
Detention
Basin
1fi0O m3
Bunnings Warehouse Version 1 15 December 2006
J 13501.541WP\SWMP doc Commercial in Confidence
Page 40
BUNNINGS WAREHOUSE, NOOSAVILLE
SURFACE WATER MANAGEMENT PLAN
r
1
r
w 200 0
..
200 1.00 500 800 1000m
1120,000
© r-1, J1- Olal P'y Ltd AP Rlgns a 9dv] 2OT
Scale 1:20,000 (A4)
0-rig" In be M.* srd :xy par. W nu drerlry bnlwya W C-M* (Oil Py LA w+1
Kv Uc rrcat. .Jbb !raoxlwrpd, wxrlod w r Wr:+?utN h wlwb w h pwi n a,ry marvly w
.0110 p o0. arry rr<pb, 'v an0 oara-n omcr mar w aprromm: *Mr CwdwPry LM
FIGURE 2
LOCALITY PLAN
i t rbp.rro^r li CYabSSC by C^rdno IQldl Py LV itIdy 1d Vc 4[00!1 H a+d us by
< cNm^ h ¢rnMa^a W "ne'erm. of rye retn+v. i^.Ern (I*A PY Lld don nM
Ma mm^u.rrnn ar:y.vrgxwrOIy rr YabLly 04100.000:0 NV MYd navy 0.0419 M rr
mY v..a yr relarea uY'nuv Par^/ nn'Fe ¢n.mN ihh vaaa^oi
Rev: Orig. Date: 15 December 2006 Project No.: 3501,54
Bunnings Warehouse
.AL ,,_l-_i :1^4;[email protected]_Ai]1iWMP A(.y.;'/-Lp:ainr plat/.9
x911
Page 41
BUNNINGS WAREHOUSE NOOSAVILLE
SURFACE WATER MANAGEMENT PLAN
a
t
:r.rq... s..+r nu...y.r a.+.^f.^.vvyiw pn vyuwl
Scale 1: 1000 (A31
FIGURE 3
w w,.r r.ti
EXISTING SITE
Rev: O+Ig. Date: T 5 DecemDer 2006 Project No.: 3501 54
Runnings Warehouse
U ^. ^nr wu U.i• Mrl-[WyLNM
Page 42
iUNNINGS WAREHOUSE. NOOSAVILLE
iURFACEE WATER MANAGEMENT PLAN
BIORETENTION DEVICES
IN LANDSCAPED
CARPARK DIVIDES
io0-0 0 ---- -!0 20 30 :0 ,Gm Scale 1:1000 (A3)
n^-- 11000
FIGURE 4
PROPOSED SITE AND
CONCEPTUAL DRAINAGE LAYOUT
Rev. 0119. Die:15 Decembe12(S6 Project No: 350154
BumYlgs WB,Ohp se
Page 43
BUNNINGS WAREHOUSE, NOOSAVILLE
SURFACE WATER MANAGEMENT PLAN (4^ Car-dna
APPENDIX A
RAFTS Results
t
Bunnings Warehouse Version 1 15 December 2006
J \3501-541WP1SWMP doc Commercial in Confidence
Page 44
I BUNNINGS WAREHOUSE, NOOSAVILLE
SURFACE WATER MANAGEMENT PLAN Lr) Cardno
100 YEAR 10 YEAR
existing proposed basins existing proposed basins
bios 0.347 0.9375 0.9375 bios 0.2222 0.6919 0.6919
' grn cnr 0.7848 1.816 0.6087 grn cnr 0.5084 1.338 0.3959
carpark 0.3011 0.9242 0.9242 carpark 0.1907 0.6854 0.6854
roof 0.2264 0.6863 0.6863 roof 0.1468 0.5215 0.5215
hrdstand 0.0719 0.1721 0.1721 hrdstand 0.0436 0.1281 0.1281
landscape 0.0703 0.0656 0.0656 landscape 0.0426 0.0405 0.0405
END 0.7848 1.816 0.6087 END 0.5084 1,338 0.3959
BASIN BASIN
Max Stg m 1.164 Max Stg m 0.802
Max Vol m3 1454.6 Max Vol m3 1002.3
50 YEAR 5 YEAR
existing proposed basins existing proposed basins
bios 0.3071 0.8528 0.8528 bios 0.1958 0.6222 0.6222
grn cnr 0.6976 1.653 0.5126 grn cnr 0.4459 1.199 0.3507
carpark 0.2654 0.8409 0.8409 carpark 0.1678 0.6168 0.6168
roof 0.2021 0.6285 0.6285 roof 0.1273 0.4655 0.4655
hrdstand 0.0618 0.157 0.157 hrdstand 0.0383 0.116 0.116
landscape 0.0603 0.0574 0.0574 landscape 0.0374 0.0355 0.0355
END 0.6976 1.653 0.5126 END 0.4459 1.199 0.3507
BASIN BASIN
Max Stg m 1.057 Max Stg m 0.721
Max Vol m3 1321.1 Max Vol m3 900.93
20 YEAR 1 YEAR
existing proposed basins existing proposed basins
bios 0.2595 0.7897 0.7897 bios 0.097 0.3929 0.3929
grn cnr 0.5943 1.523 0.4513 grn cnr 0.2244 0.7593 0.1978
carpark 0.2244 0.7812 0.7812 carpark 0.0806 0.3895 0.3895
roof 0.1724 0.5914 0.5914 roof 0.0587 0.2866 0.2866
hrdstand 0.0513 0.1436 0.1436 hrdstand 0.0222 0.0725 0.0725
landscape 0.0504 0.0478 0.0478 landscape 0.0217 0.0205 0.0205
END 0.5943 1.523 0.4513 END 0.2244 0.7593 0.1978
t BASIN
Max Stg m 0.915
Max Vol m3 1143.5
BASIN
Max Stg m 0.459
Max Vol m3 574.32
Bunnings Warehouse Version 1 15 December 2006
J \3501-54\WP\SWMP doc Commercial in Confidence
Page 45
1
L I BUNNINGS WAREHOUSE, NOOSAVILLE
SURFACE WATER MANAGEMENT PLAN
4(46^ Car-dno
APPENDIX B
MUSIC Parameters
1
Bunnings Warehouse Version 1 15 December 2006
J \3501-54\WP\SWMP doc Commercial in Confidence
Page 46
BUNNINGS WAREHOUSE. NOOSAVILLE
SURFACE WATER MANAGEMENT PLAN
Runoff Generation Parameters
I
Parameter Urban Commercial
Residential
Field Capacity (mm) 200 80
I Infiltration Capacity Coefficient a
Infiltration Capacity Exponent b
Rainfall Threshold (mm)
50
1
1
200
1
1
Soil Capacity (mm) 400 120
Initial Storage (%) 10 25
Daily Recharge Rate (%) 25 25
Daily Drainage Rate (%) 5 5
Initial Depth (mm) 50 50
Pj
-
Pollutant Export Relationships
Land Use
Source
Parameter Total Suspended
Solids (mg/L)
Total Ph osphorus
(m g/L)
Total Nitrogen
(mg/L)
Nodes
Base Storm Base Storm Base Storm
Flow Flow Flow Flow Flow Flow
Urban Mean 0.10 2.18 -0.97 -0.47 0.20 0.26
Residential
Std Dev. 0.34 0.39 0.31 0.31 0.20 0.23
Commercial I Mean 0.78 2.16 -0.60 -0.39 -0.32 1 0.37
Std Dev. 0.39 0.38 0.50 0.34 0.30 0.34
I
I
f
Bunnings Warehouse Version 1 15 December 2006
J\35o1-54\WRSWMPdoc Commercial in Confidence
Page 47
BUNNINGS WAREHOUSE, NOOSAVILLE
SURFACE WATER MANAGEMENT PLAN C07) Cardno
r
APPENDIX C
Statement of Landscape Intent
Li
Bunnings Warehouse Version 1 15 December 2006
J\3501-54\WP\,SWMPdoc Commercial in Confidence
Page 48
statement of C1i-- ^. r= r-- C1
landscape intent
BUNNINGS NOOSAVILLE
Cnr Eumundi- Noosa Drive and Gateway Drive, Noosaville, QLD
11 December, 2006
The design of the Bunnings at Noosaville incorporates water related initiatives and
water sensitive urban design principles that are reflected and implemented in the
landscape design. The simple yet "graphic" landscape design embraces the "Noosa
Style" in terms of its species selection. The area devoted to soft landscaping is
substantially greater than in other comparable developments. Screening and visibility
of the store have been carefully considered to achieve a suitably balanced outcome.
It should be noted that the site levels and soil profiles have been substantially altered
for almost the entire site and thus bear no resemblance to the natural circumstance
ideally suited to supporting indigenous vegetation.
Low maintenance plants not requiring pruning will be used. The majority of the plants
proposed will be native.
The landscape design of the various components of the site is described as follows
I Water Related Design Principles
The following solutions address the increasingly important issue of water on the site.
Water will be collected from the large roof area and stored in large tanks. It will be
used for nursery irrigation, external washing down and at times for landscape
irrigation. It is intended that no mains water will be used for these purposes.
Except for black water (ie toilets and kitchens), all water leaving the site will be bio-
filtered through the landscape. All nutrient rich nursery irrigation runoff will be reused
for landscape irrigation thus reducing the need for tank or mains water use and
minimising the need for added fertiliser application.
Subsoil drains will collect any excess irrigation groundwater. it will be passed through
a bio-retention system located in a highly publicly visible location at the corner of
Eumundi-Noosa Road and Gateway Drive. This area will also be used for stormwater
detention on the site.
Carpark surface water runoff wil_I not be collected in surface pits for immediate
discharge to Council's stormwater network. It will all first be passed through planting
areas and biofiltered. The carpark is graded to fall towards the wide planted islands
surrounded by "hit and miss" kerbs. This will ensure gross pollutants are collected on
the edge of the planting areas where they are visible and will be collected and
disposed off. Potentially hydrocarbon contaminated water will be passed through
specially formulated planting soil for pre-treatment. Plants will be watered and
irrigation needs reduced. In the majority of storm events the water holding capacity of
the soil will result in significant buffering of stormwater discharge from the site due to
the holding of water in the substantial air space within the soil structure. Excessive
storm volumes, beyond the water holding capacity of the soil, will be collected in a
subsoil system and held in the large detention area in the south west corner of the site.
Plants used will generally have low water requirements. They will be substantially
native species. Gravel will be used instead of turf to reduce water and ongoing
maintenance needs. No turf is proposed on the site or in the verge.
ARTERRA DESIGN PTY LTD ABN 40 069 552 610
SUITE 2 22 CONSTANCE ST. FORTITUDE VALLEY QLD 4006
P 07 3100 8839 F 07 3257 4320 W ARTERRA.COM.AU
Page 49
I
I
Eumundi-Noosa Road Frontage
The existing streetscape is of poor quality. There is currently no footpath. A concrete
footpath will be installed along the length of this frontage.
Many existing native trees along the boundary will be retained and protected. The
proposed footpath will be kept clear of the trees and existing levels around them kept
unchanged to minimise any potential damage to the trees. In particular, the large
Eucalypts in the south-east corner of the site will be retained with the proposed
delivery dock access road angled to maximise their root zone. This protected root zone
will also provide space for substantial new screen planting.
Tear drop shaped planted mounds in differing coloured bands of gravel provide a
visual separation between the roundabout and the proposed nursery in the very
generous setback provided. Alternate mounds will be planted with one of Noosa's
signature plants, the Pandanus and potentially other visually striking feature plants.
The nursery has been set down approx. 1.5m below the verge level to further reduce
its visual presence on the street.
The main vehicle entry to the site from the roundabout will be flanked by large canopy
trees and pedestrian access paths. Sight lines at the vehicle entry / exit points will be
maintained for safety. Car parking is set a significant distance back from the boundary
behind the corner bio-retention system and soft landscaping.
More tear drop shaped planted mounds punctuate the large landscape setback area on
the corner of Eumundi-Noosa Road and Gateway Drive. This area will include bands of
planting and ornamental gravels and will act as both a bio-retention and stormwater
detention area. An existing stand of native trees on Council's verge in this corner
(currently in reasonably poor condition) will be retained.
Gateway Drive Frontage
I Once again the existing streetscape is of poor quality. This will be improved with the
inclusion of a simple curvaceous edge between a low maintenance and no water use
gravel verge and bands of planting and ornamental gravel leading into the site. A
swale runs along the boundary at the bottom of the slope from the car park above.
This swale conveys any stormwater water leaving the site and entering Council's
stormwater network. The slope is planted with native shrub and groundcover species
screening a varying height retaining wall near the top of the slope. Native canopy trees
(eg Tuckeroos) line this frontage providing shade and screening parked cars.
Sight lines at the vehicle entry / exit points will be maintained for safety.
Car park
The car park's key landscape design feature is the wide central planting strips between
cars. These strips provide very substantial consolidated soil areas (far greater than 5m2
as required by Council) allowing shade trees to reach their maximum potential size.
Shade trees (ie Tuckeroos) have been provided at every fourth parking space as
required by Council. The trees are located to avoid damage from cars. These trees will
reduce the visual impact of the building and the car park. Car park shading will reduce
the potential heat island effect generated.
The car park generally falls at 1:40 from the store entry in the east down towards the
west. This allows disabled and trolley access to all areas of the car park. "Hit and
miss" kerbs along the high side of each planting strip allow surface runoff to enter the
planted areas containing a mix of native and exotic shrub and groundcover species. A
drainage swale through this area will collect and temporarily store excess runoff before
conveying it to the detention basin via subsurface pipes. Trees, shrubs and
groundcovers will receive supplementary water from car park runoff.
The ends of the central planted islands are planted with feature trees (ie Pandanus)
with limited canopies to minimise potential damage from larger vehicles using these
main access routes.
Arterra
Bunnings Noosaville
Statement of landscape Intent
Revision P1, Issued for DA, 11 December 2006 Page 2
Page 50
0
Pedestrian access through the carpark is via clearly delineated ramps (allowing
disabled access) and main paths. Minor access routes through the wide planting strips
are accommodated with steppers between the trees.
Northern Boundary
Native tree species will line the western end of this boundary and the entry / exit lane
forming a consistent vertical screento the neighbouring site to the north. These trees
will be planted in a wide sloping garden visually buffering the northern edge of the car
park.
Irrigation
Mains water will not be used for landscape irrigation on the site. Planting within the
site will be able to be irrigated with an automatic sub-surface irrigation system using
water reused from the nursery runoff (or collected from the building roof where
absolutely necessary). This sub-surface system will ensure the reused water is not in
contact with customers and eliminates the loss of water into the atmosphere typical of
above ground spray heads. All nursery runoff will be collected and dissipated into the
landscape via the irrigation system on a daily basis.
Conclusion
The landscape design provides substantial areas for mainly native tree and shrub
planting ensuring the proposed building and car park are partially screened from view
and their scale reduced while maintaining some visibility of the development for
commercial reasons.
Regards
Paul Hardyman
Director, Registered Landscape Architect, Consulting Arborist
[email protected]
I
s
Arterra
Bunnings Noosaville
Statement of Landscape Intent
Revision Pt, Issued for DA, 11 December 2006 Page 3
Page 51
APPENDIX C- DRAINS DATA & RESULTS
I
I
I
I
I
14
[OCR of page images]
APPENDIX C — DRAINS DATA & RESULTS
Page 52
DRAINS INPUT DATA
PIT/ NODE DETAILS Version 9
Name Type Family Size Ponding Pressure Surface Max Pond Base Blocking x y Bolt-down id
Volume Change Elev (m) Depth (m) Inflow Factor lid
(cu.m) Coeff. Ku (cu.m/s)
N6 Node 13 0 116.383 110.751 15
N3 Node 10 0 64.474 -2.506 8
DETENTION BASIN DETAILS
Name Elev Surf. Area Init Vol. (cu.m) Outlet Type K Dia(mm) Centre RL Pit Family Pit Type x y HED Crest RL
Basing 8.5 295 62 Culvert 0.5 88.94 14.148 No
8.7 320
9.5 475
10.5 700
10.8 1168
10.9 10000
SUB-CATCH MENT DETAILS
Name Pit or Total Paved Grass Supp Paved Grass Supp Paved Grass Supp Paved Grass
Node Area Area Area Area Time Time Time Length Length Length Slope(%) Slope
(ha) % % % (min) (min) (min) (m) (m) (m) % %_
Catl N6 2.327 80.4 19.6 0 15 30 0
PIPE DETAI LS
Name From To Length U/S IL D/S IL Slope Type Dia I.D. Rough Pipe Is No. Pipes Chg From
(m) (m) (m) (%) (mm) (mm)
Pipe3 N6 Basin2 10 10.55 10.5 0.5 Concrete, not under roads 750 750 0.3 NewFixed 1 N6
Pipel Basin2 N3 10 8.7 7.9 8 Concrete, not under roads 450 450 0.3 NewFixed 1 Basin2
20/01/2011 K:\AA - Great Plains Jobs\4400 (Bunnings Noosa)\02 (Civil)\Admin\WSUD\Admin\4400-02(DRAINS Modelling Results)
Page 53
DRAINS ANALYSIS RESULTS
MINOR STORMS
DRAINS results prepared 20 January, 2011 from Version 2010.10
PIT / NODE DETAILS Version 8
Name Max HGL Max Pond Max Surface Max Pond Min Overflow Constraint
HGL Flow Arriving Volume Freeboard (cu.m/s)
(cu.m/s) (cu.m) (m)
N6 11.12 0.85
N3 8.11 0
SUB-CATCHMENT DETAILS
Name Max Paved Grassed Paved Grassed SUP P. Due to Storm
Flow Q - Max Q Max Q Tc Tc Tc
(cu.m/s) (cu.m/s) (cu.m/s) (min) (min) (min)
Catl 0.85 0.804 0.047 15 30 0 AR&R 10 year, 20 minutes storm, average 128 mm/h, Zone .3
Outflow Volumes for Total Catchment (1.87 impervious + 0.46 pervious = 2.33 total ha)
Storm Total Rainfall Total Runoff Impervious Runoff Pervious Runoff
cu.m cu,m (Runoff %) cu.m (Runoff %) cu.m (Runoff %)
AR&R 5 year, 5 minutes storm, average 202 mm/h, Zone 3 391.71 301.50 (77.0%) 296.23 (94.1%) 5.27 (6.9%)
AR&R 5 year, 10 minutes storm, average 156 mm/h, Zone 3 605.02 482.98 (79.8%) 467.73 (96.2%) 15.25 (12.9%)
AR&R 5 year, 20 minutes storm, average 115 mm/h, Zone 3 892.02 734.48 (82.3%) 698.47 (97.4%) 36.01 (20.6%)
AR&R 5 year, 30 minutes storm, average 94.2 mm/h, Zone 3 1096.02 914.99 (83.5%) 862.49 (97.9%) 52.50 (24.4%)
AR&R 5 year, 1 hour storm, average 64.7 mm/h, Zone 3 1505.57 1271.35 (84.4%) 1191.77 (98.5%) 79.59 (27.0%)
AR&R 5 year, 2 hours storm, average 42.8 mm/h, Zone 3 1991.91 1654.79 (83.1%) 1582.79 (98.8%) 72.00 (18.4%)
AR&R 10 year, 5 minutes storm, average 223 mm/h, Zone 3 432.43 336.72 (77.9%) 328.97 (94.6%) 7.76(9.2%)
AR&R 10 year, 10 minutes storm, average 173 mm/h, Zone 3 670.95 543.40 (81.0%) 520.74 (96.5%) 22.67 (17.2%)
AR&R 10 year, 20 minutes storm, average 128 mm/h, Zone 3 992.85 833.22 (83.9%) 779.54 (97.7%) 53.68 (27.6%)
AR&R 10 year, 30 minutes storm, average 105 mm/h, Zone 3 1221.67 1037.98 (85.0%) 963.52 (98.1% 74.47 (31.1%)
AR&R 10 year, 1 hour storm, average 72.3 mm/h, Zone 3 1682.42 1441.94 (85.7%) 1333.96 (98.6%) 107.99 (32.7%)
AR&R 10 year, 2 hours storm, average 48.4 mm/h, Zone 3 2252.54 1901.79 (84.4%) 1792.33 (99.0%) 109.46 (24.8%)
PIPE DETAILS
Name Max Q Max V Max U/S Max D/S Due to Storm
(cu.m/s) (m/s) HGL (m) HGL (m)
Pipe3 0.85 2.4 11.116 11.066 AR&R 10 year, 20 minutes storm, average 128 mm/h, Zone 3
Pipel 0.425 6 8.905 8.105 AR&R 10 year, 1 hour storm, avers e 72.3 mm h, Zone 3
CHANNEL DETAILS
Name Max Q Max V Chainage Max Due to Storm
cu.m/s) (m/s) (m) HGL (m)
DETENTION BASIN DETAILS
Name Max WL MaxVol Max Q Max Q Max Q
Total Low Level High Level
Basin2 9.98 628.9 0.425 0.425 0
CONTINUITY CHECK for AR&R 10 year, 20 minutes storm, average 128 mm/h, Zone 3
Node Inflow Outflow Storage Change Difference
(cu.m) (cu.m) (cu.m) %
N6 833.22 833.22 0 0
Basin2 833.22 827.51 -11.2 2
N3 726.62 726.62 0 01 1
20/01/2011 K:\AA - Great Plains Jobs\4400 (Bunnings Noosa)\02 (Civil)\Admin\WSUD\Admin\4400-02(DRAINS Modelling Results)
Page 54
DRAINS ANALYSIS
MAJOR STORMS
DRAINS results prepared 20 January, 2011 from Version 2010.10
PIT / NODE DETAILS Version 8
Name Max HGL Max Pond Max Surface Max Pond Min Overflow Constraint
HGL Flow Arriving Volume Freeboard (cu.m/s)
(cu.m/s) (cu.m) (m)
N6 11.29 1.231
N3 8.14 0
SUB-CATCHMENT DETAILS
Name Max Paved Grassed Paved Grassed Supp. Due to Storm
Flow Q Max Q Max Q Tc Tc Tc
(cu.m/s) (cu.m/s) (cu.m/s) (min) (min) (min)
Catl 1.231 1.143 0.091 15 30 0 AR&R 100 y ear, 20 minutes storm average 185 mm/h, Zone 3
Outflow Volumes for Total Catchment (1.87 impervious + 0.46 pervious = 2.33 total ha)
Storm Total Rainfall Total Runoff Impervious Runoff Pervious Runoff
cu.m cu.m (Runoff %) cu.m (Runoff %) cu.m (Runoff %)
AR&R 20 year, 5 minutes storm, average 253 mm/h, Zone 3 490.61 387.84 (79.1%) 375.74 (95.3%) 12.10 (12.6%)
AR&R 20 year, 10 minutes storm, average 196 mm/h, Zone 3 760.15 627.45 (82.5%) 592.45 (96.9%) 35.00 (23.5%)
AR&R 20 year, 20 minutes storm, average 145 mm/h, Zone 3 1124.72 962.88 (85.6%) 885.56 (97.9%) 77.32 (35.1%)
AR&R 20 year, 30 minutes storm, average 119 mm/h, Zone 3 1384.56 1197.91 (86.5%) 1094.48 (98.3%) 103.43 (38.1%)
AR&R 20 year, 1 hour storm, average 82.7 mm/h, Zone 3 1924.43 1676.76 (87.1%) 1528.53 (98.8%) 148.23 (39.3%)
AR&R 100 year, 5 minutes storm, average 321 mm/h, Zone 3 622.47 507.35 (81.5%) 481.76 (96.3%) 25.59 (21.0%)
AR&R 100 year, 10 minutes storm, average 250 mm/h, Zone 3 969.58 831.30 (85.7%) 760.84 (97.6%) 70.47 (37.1%)
AR&R 100 year, 20 minutes storm, average 185 mm/h, Zone 3 1434.98 1267.90 (88.4%) 1135.02 (98.4%) 132.88 (47,2%)
AR&R 100 year, 30 minutes storm, average 152 mm/h, Zone 3 1768.52 1571.86 (88.9%) 1403.18 (98.7%) 168.68 (48.7%)
AR&R 100 year, 1 hour storm, average 107 mm/h, Zone 3 2489.89 2227.18 (89.4%) 1983.16 (99.1%) 244.02 (50.0%)
AR&R 100 year, 2 hours storm, average 73.5 mm/h, Zone 3 3420.69 3037.21 (88.6%) 2731.53 (99.3%) 305.69 (45.6%)
PIPE DETAILS
Name Max Q Max V Max U/S Max D/S Due to Storm
(cu.m/s) (m/s) HGL (m) HGL (m)
Pipe3 1.231 3 11.295 11.156 AR&R 100 year, 20 minutes storm, average 185 mm/h, Zone 3
Pipet 0.542 6.5 8.935 8.135 AR&R 100 year, 1 hour storm, average 107 mm/h, one 3
CHANNEL DETAILS
Name Max Q Max V Chainage Max Due to Storm
(cu.m/s) (m/s) (m) HGL (m)
DETENTION BASIN DETAILS
Name Max WL MaxVol Max Q Max Q Max Q
Total Low Level High Level
Basing 10.58 1026.2 0.542 0.542 0
CONTINUITY CHECK for AR&R 100 year, 20 minutes storm, average 185 mm/h, Zone 3
Node Inflow Outflow Storage Change Difference
(cu.m) (cu.m) (cu.m) %
N6 1267.9 1267.9 0 01 1
Basing 1267.9 1248 1.25 1.5 1 1
N3 1147.11 1147.11 0 0
20/01/2011 K:\AA - Great Plains Jobs\4400 (Bunnings Noosa)\02 (Civil)\Admin\WSU D\Adm i n\4400-02 (DRAINS Modelling Results)
Page 55
01
REV:
oF
SHEET:
C2
TGM REF. No.
4400-02-CE
DATE: DATE:
©) COPYRIGHT T.G.M GROUP PTY. LTD.
Web: tgmgroup.com
A.B.N. 11 125 568 461
onas AS/NZS 4801
Environment AS/NZS 14004
Fax: (03) 5338 1310
Email: [email protected]
NOOSAVILLE, QUEENSLAND
cur INTERNAL DIMENSIONS INLET OUTLET
PITNo. |TYPE} LENGTH WIDTH FROM PIT DIA. (9) INVERT RL DIA. (9) | INVERT RL F.S.L. PIT DEPTH | REMARKS
P01 EW - - P02 4506 RCP 8.59 DETENTION BASIN - = EW TO SUIT 450¢ PIPE
P02 SEP 900 750 PO3 300% RCP RRJ ‘1. 40 450% RCP 13.24 15.35 2.11 MEDIUM DUTY CONCRETE COVER
P03 SEP 900 600 Pod 300% RCP RRJ 14.63 300% RCP RRJ 14.63 16.04 138 MEDIUM DUTY CONCRETE COVER
P05 300% RCP RRJ 14.85
P04 SEP 900 600 Pt 300 ROP RRI Tas 300¢ RCP RRJ 14.85 16.51 1,66 MEDIUM DUTY CONCRETE COVER
| P05 GP 900 600 P06 300% RCP RRJ 15.00 300 RCP RRJ 15.00 16.95 1.95 HEAVY DUTY GRATED COVER
<p 3008 RCP RRJe Aan f P06 GP 900 600 PO7 300% RCP RRJ 15.43 300% RCP RRJ 15.43 16.60 117 HEAVY DUTY GRATED COVER
fo* f P07 GP 900 600 P08 300 RCP RRJ 15.67 300 RCP RRJ 15.67 16.85 1.18 HEAVY DUTY GRATED COVER
KURY / ‘ / |_— 3000 RCP RRJ P08 GP 900 600 P09 300 RCP RRJ 15.96 300 RCP RRJ 15.96 17.25 1.29 HEAVY DUTY GRATED COVER
& BIO RETENTION CELL / 4 fo a P09 GP 900 600 P10 300% RCP RRJ 16.30 300% RCP RRJ 16.30 17.30 1.00 HEAVY DUTY GRATED COVER
“\REFER DETAILS P10 GP 900 600 - - - 300% RCP RRJ 16.51 11.30 0.79 HEAVY DUTY GRATED COVER
y Pil SEP 900 600 - - - 300¢ RCP RRJ 15.90 17.01 111 MEDIUM DUTY CONCRETE COVER
P12 EW - - PB 300% RCP 8.59 DETENTION BASIN - - EW TO SUIT 300¢ PIPE
< P13 SEP 900 750 Pt 300% RCP RRJ 14.19 300% RCP B.03 15.14 2.11 MEDIUM DUTY CONCRETE COVER
D PI4 GP 900 600 PAS 300 RCP RRJ 14.37 300% RCP RRJ 14.37 15.19 0.81 HEAVY DUTY GRATED COVER
it) | P15 SEP 900 600 P16 300 RCP RRJ 44.73 300@ RCP RRJ 14.73 16.05 1,32 MEDIUM DUTY CONCRETE COVER
BREAK INTO SIDE OF EXISTIN P16 SEP 900 600 P17 300 RCP RRJ 15,23 300@ RCP RRJ 15.23 16.29 1.06 MEDIUM DUTY CONCRETE COVER
SIDE ENTRY PIT. aN P17 SEP 900 600 - - - 300 RCP RRJ 15.84 11.19 135 MEDIUM DUTY CONCRETE COVER
HVE} fA \ P18 EW - - P19 525 RCP 8.57 DETENTION BASIN - - EW TO SUIT 5259 PIPE
lo | \ P19 GP 900 750 P20 525% RCP RRJ 9.84 525% RCP 9.84. 11.84 2.00 HEAVY DUTY GRATED COVER
MU I P21 525@ RCP 12.17
(> P20 ap 900 750 525@ RCP RRJ 1h 13.91 2.47 HEAVY DUTY GRATED COVER
= 3009 REP:RRI P27 300 RCP RRJ 12.17
\ OFF % S P21 GP 300 750 P22 525 RCP RRJ 13.24 525 RCP 13.24 14.11 0.87 HEAVY DUTY GRATED COVER
} | YY AVY)
a > » P22 SEP 900 750 P23 525 RCP RRJ 13.78 525% RCP RRJ 13.78 16.11 2.33 MEDIUM DUTY CONCRETE COVER
=~ 4 P23 GP 900 750 P24 4506 RCP RRJ 15.06 525@ RCP RRJ 13.94 16.15 2.21 HEAVY DUTY GRATED COVER
(ZX | i P2k SEP 900 600 P25 300 RCP RRJ 15.44 450@ RCP RRJ 15.44 16.62 1.21 MEDIUM DUTY CONCRETE COVER
' Z | P26 300% RCP RRJ 15.98
P 6 300¢ , ‘ ; T
= | L iS P25 G 900 00 P78 3008 REP RR a RCP RRJ 15.98 16.98 1.00 HEAVY DUTY GRATED COVER
ib, /\ » 3 \ os P26 GP 900 600 - - - 300 RCP RRJ 16.55 17.50 0.95 HEAVY DUTY GRATED COVER
L/ < a } j P27 SEP 900 750 - - - 300% RCP RRJ 13.78 16.01 2.23 MEDIUM DUTY CONCRETE COVER
© | iz PROPOSED BUNNINGS S ie P28 SEP 900 600 - - - 300% RCP 16,09 17.02 0.93 MEDIUM DUTY CONCRETE COVER
Va } FF L 17 50 oo HAS KS P29 EW - - P30 525¢ RCP 8.57 DETENTION BASIN - - EW TO SUIT 525¢ PIPE
ia! _— EBay y P30 JP 900 750 ~ - - 525 RCP 9.01 11.04 2.00 HEAVY DUTY CONCRETE COVER
a SE WW r 3000 RCP RRJ P31 EX SEP EXISTING PIT P32 4506 RCP 8.41 EXISTING PIPE 8.41 11.01 2.60 EXISTING PIT
if P32 EW - - - - - 450 RCP 8.70 - - EW TO SUIT 4509 PIPE
-< ya’ EW - DENOTES ENDWALL
Y P10 SEP - DENOTES SIDE ENTRY PIT
JP - DENOTES JUNCTION PIT
ae GP - DENOTES GRATED PIT
f. Lo Y : —
ry OVERFLOW DISCHARGE LOCATION FROM
TORMWATER HARVESTING TANKS
/ J a rae
Ak LEGEND
___ EXISTING SURFACE CONTOURS
PROPOSED TITLE BOUNDARY
PROPOSED STORMWATER DRAINAGE PIPE
| PROPOSED GRATED PIT
DESIGN PAVEMENT LEVEL
x
HEAVY DUTY ASPHALT PAVEMENT
HEAVY DUTY CONCRETE PAVEMENT
LIGHT DUTY ASPHALT PAVEMENT
PROPOSED ROAD RELOCATIO
REFER EXTERNAL WORKS
DOCUMENTS
REFER EXTERNAL
_ WORKS DOCUMENTS
oom scour smatt
ISSUE ISSUED FOR DATE | DRAWN | APPROVED }ISSUE ISSUED FOR DATE | DRAWN | APPROVED | OFSIGNED: G@ MANSELL DATE: 19/01/11 CLIENT: PROJECT: aa
DRAWN SCALE: CIVIL DRAWING
01 | ISSUED FOR INFORMATION 19/01/11} SM, S. MANTERFIELD 1:500
SURVEY: SHEET SIZE a4 TGM GROUP Pty Ltd BSla H. TROON PTY. LTD. PROPOSED BUNNINGS
Ballarat ALUMINIUM AND STEEL FABRICATORS DRAWING TITLE:
CHECKED: APPROVED:
1315 Sturt Street BUILDERS - COMMERCIAL AND INDUSTRIAL WAREHOUSE
ee Ge vos see PROPOSED INTERNAL DRAINAGE &
Ph: (03) 5330 8888 uns ISO 9004 Tel: (03) 5339 2208 - (03) 5339 3622 EUMUNDI-NOOSA ROAD
PAVEMENT LAYOUT PLAN & PIT SCHEDULE
TGM REF. No.:
4400-02-CE
SHEET:
c2 "3
REV: 0 4
Page 56
Callaghan & Toth
Civil, Environmental &
Hydraulic Engineers
6/41 Sunshine Beach Rood
{ NOOSA JUNCTION 4566
Ph: 54749081 Fax: 54749041
www.callaghanandtoth.com.au
—
ASSOCIATED CONSULTANT
Phone
designed | X datum AHD
drawn Xx
. PM 48314
checked |X | Origin (B.M.) RL 106.896
approved . }
roject :
CONCEPT DESIGN OF A
YANDINA-COOLUM RD LANDFILL
PROPOSED LEACHATE
RISING MAIN
a
aia.
Client
SUNSHINE COAST
REGIONAL COUNCIL
i
foment
title
LEACHATE TRANSPORT PUMPING
SYSTEM FROM COOLUM
LANDFILL TO GRAVITY SEWER J
real property description
YANDINA-COOLUM RD
Parish of NOOSA
County of MARCH
SUNSHINE COAST COUNCIL
LOCALITY: NOOSAVILLE
——_ _____S
eoorreree'’’-’-'-—-——
SCALE
0 255.0 7.5 10 125 Meters 25
a
ScOle SCALE SHOWN IS ORIGINAL DRAWING SCALE
1:500(A2) _ D0_NOT SCALE FROM THIS DRAWING
USE ONLY DIMENSIONS PROVIDED
REVISIONS
revision
~T?
FILES
COMPUTER DIRECTORY.
(C:\vobs\CT\ 1034.dwq
DRAFT DESIGN
Sheet of —_ sheets
drawing number
1034-14
\ ae JAN 2014 ]
Page 57
01
REV:
C3 OF
SHEET:
4400-02-CE
TGM REF. No.
SL92 TOP SAW CUT
\ 800mm
= ros OS
s1@ —RKNLSSANYYS
: 100mm THICK CRUSHED ROCK BASE TO BE
EXISTING SIDE PROVIDED IN FILL & SUB-GRADE AREAS.
ENTRY PIT
APPROVED SUB-GRADE
NOTE: MIN 50mm COVER.
GRAVEL MULCH SAW CUTS @ 6m SPACING MAXIMUM IN EITHER DIRECTION.
50mm THICK SAW CUTS TO 70mm IN DEPTH.
450mm@ RCP SL62 TO BE PROVIDED CENTRALLY IN BOTTOM
800mm LONG CENTRALLY UNDER SAW CUT.
ENDWALL
UNDER DRAIN JUNCTION PIT (BOLT DOWN
SEALED LID 50mm PROUD OF BASIN INVERT
mm TYPICAL CONCRETE PAVEMENT DETAIL
une SCALE N.T.S
ee ake
HoLe2ss5 s
30Orimetin.200 100mm® SLOTTED Loan BEDDING LAYER 35mm MIN. CONSOLIDATED THICKNESS OF TYPE N
PVC GRADE 1 in 200 L 400 SLOTTED PVE ASHPALT 10 mm NOMINAL SIZE AGGREGATE. SIZE
NON-WOVEN GEO-TEXTILE LINER L DRAINAGE LAYER: 5mm ONE SIZE AGGREGATE ON A PREPARED AND PRIMED SURFACE.
(BIDIM A19 OR APPROVED EQUIVALENT) (50mm THICKNESS)
L TRANSITION LAYER: CLEAN SAND 2mm NOMINAL a ee Fe ANC SHcieS bones.
SIZE AGGREGATE (tm THICKNESS) MAXIMUM. MODIFIED DRY DENSITY COMPACTION.
“FILTER MEDIA: CLEAN SAND 0.25mm NOMINAL SIZE AGGREGATE. v IMI (G07 CONSGL I ATeUSTRICNESSOE GLASS
2
AMER WN 30g LIME AND 100g DYNAMIC LIFTER PER m2, MIX 3, 40 mm FINE CRUSHED ROCK 979% MAXIMUM,
mm OF FILTER MEDIA, MINIMUM HYDRAULIC HODIEIED DRY DENSITY COMPACTION
CONDUCTIVITY 190mm/hr, MAXIMUM HYDRAULIC CONDUCTIVITY
BIORETENTION SECTION 240mm/hr. TO BE VERIFIED BY GEOTECHNICAL TESTING PRIOR TO PREPARED AND APPROVED
= ee SUPPLY TO SITE.
SCALE N.T.S. Phdce THEMES) SUBGRADE MATERIAL
TYPICAL LIGHT DUTY ASPHALT PAVEMENT
SCALE N.T.S
50mm MIN, CONSOLIDATED THICKNESS OF TYPE H
ASHPALT 10 mm NOMINAL SIZE AGGREGATE. SIZE
ON A PREPARED AND PRIMED SURFACE.
: 100mm MIN. CONSOLIDATED THICKNESS OF
5 ee CLASS 2, 20mm FINE CRUSHED ROCK 98
MAXIMUM, MODIFIED DRY DENSITY COMPACTION.
EROSION PROTECTION
ee 200mm CONSOLIDATED THICKNESS OF CLASS
SCALE N.T.S. 3, 40 mm FINE CRUSHED ROCK 97
25 m MODIFIED DRY DENSITY COMPACTION
PREPARED AND APPROVED
SUBGRADE MATERIAL
UNDERDRAIN 100mm SLOTTED
100° 200 min NORINAL SIZE ROCK TYPICAL HEAVY DUTY ASPHALT PAVEMENT
PVC @ 1000mm C-C T
in | ee A39 GEOFABRICS GEOTEXTILES on ane PROFILE TO BE REVIEWED FOLLOWING COMPLETION OF FILLING &
« FINISHED SURFACE OF BASIN OR EQUIVALENT, ANCHORED AT PREPARATION OF SUBGRADE FORMATION & COMPACTION TESTING
Sa] TOP AND BOTTOMOF BATTER
to
LL/ 300mm UNDERDRAIN TO JP
JP (BOLT DOWN LID) 1 FROM BIORETENTION CELL 300 300
tt
10, {40 No , {40
JP TO JOIN 450mm AND 150mm | |
UNDERDRAIN FROM BIORETENTION CELL S 1 so
3 ENDWALL BEACHING 4 oe Z
i SCALE N.T.S. Ss ae aS
Tt {
J e . a : ae r
a.- se Le a = 3 oS
300mm ROCK SPALLS 2 Sai tae 2 2
| KA } Fa “A
BIORETENTION CELL PLAN yo S -
SCALE NTS. 300 mm APPROX.
300 mm APPROX. B2 B3
— A39 GEOFABRIC LAID BARRIER KERB B RI
}+----——_-] UNDERNEATH ROCK SPALLS SSalaece eae BARRIER KERB
SCALE N.T.S SCALE N.T.S
500 mm. 2000 mm. (300-450) OUTLETS
2500 mm. (525%) OUTLETS
ISSUE ISSUED FOR DATE | DRAWN | APPROVED |ISSUE ISSUED FOR DATE | DRAWN | APPROVED| DESIGNED: G MANSELL DATE: 19/01/11 CLIENT: PROJECT: TL rere ae ee eee sa
01 | ISSUED FOR INFORMATION ssvovn| SM. DRAWN: Ss. MANTERFIELD SCALES 4500 CIVIL DRAWING CS
SURVEY: SHEET SIZE: 4 TGM GROUP Pty Ltd BSla H. TROON PTY. LTD. PROPOSED BU NNINGS ee ee a ee
Tea TPAD —,, A eee © Hit cmmorwercrms | WAREHOUSE Maas
. Ballarat, VIC 3350 P.O. BOX 84, WENDOUREE, 3355 CIVIL DETAILS SHEET
Ph: (03) 5330 8888 cuaity [SO 9004 Tel: (03) 5339 2208 - (03) 5339 3622 EUMUNDI-NOOSA ROAD
DATE: DATE: Web: tgmgroup.com onas ASINZS 4804 Fax: (03) 5338 1310
A.B.N. 11125 568 461 — tnvionnenASINZS 14001 Email: [email protected] NOOSAVILLE, QUEENSLAND
COPYRIGHT T.G.M GROUP PTY. LTD. TGM REF. No.: SHEET: OF REV:
©) 4400-02-CE c3 “3 |"'01
Used in these records
About this file
- File size
- 70.0 MB (very large file)
- File type
No other editions are linked here.
Original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.