4.0 Impacts on Receiving Waterways
Stormwater harvesting demand from the site will represent around 1.2 ML per year, compared to
the original annual average runoff volume of approximately 7.5ML per year and a residual post-
developed annual average runoff volume of 16.4ML per year (refer Table 5)1. Therefore it can be
seen that stormwater harvesting will not reduce the total volume of water discharging into the
downstream catchment.
The proposed stormwater detention will maintain the peak runoff flow rates close to the original
(pre-developed) flow rates (see Table 1), so the sedimentation/detention basin will have no adverse
impact on downstream receiving waterways.
I
I
' The original runoff volume is calculated by multiplying the site area of 2.33 Ha by the annual rainfall runoff of 1.6m and a
typical runoff co-efficient of 0.2 (conservative).
11
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
OPW11/0023 Development Application part 2 of 2 Planning Report and Plans 178 Eumundi Noosa Road NoosavilleRelated documentApplication case desk ↗
About this file
- File size
- 70.0 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.