Skip to the record
Noosa's #1 Council Tracker.

Council archive · source document

OPW11/0023 Development Application part 2 of 2 Planning Report and Plans 178 Eumundi Noosa Road Noosaville

of 57

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (70.0 MB): may take a few minutes to open.

Log in to see the plans as drawn
     BUNNINGS WAREHOUSE, NOOSAVILLE
     SURFACE WATER MANAGEMENT PLAN                                                                ^^ Cardno

     LIST OF TABLES

     Table 1            Rainfall Parameters for Rockhampton ..................................................................... 2
     Table 2            RAFTS Model: Area and Slope ............................................................................... 2
     Table 3            Rational Method Calculations .................................................................................. 3
     Table 4            Rational Method vs RAFTS Results ........................................................................ 3
     Table 5            Detention Basins Stage Storage Curves ................................................................. 3
     Table 6            Detention Basin Sizing Results ................................................................................ 4
     Table 7            Detention Basin Sizing Results - including unattenuated car park area ................. 5
     Table 8            BCC Swale Design Guidelines ................................................................................ 6
     Table 9            Stormwater Management Practices ......................................................................... 8
     Table 10           Water Quality Objectives ....................................................................................... 10
     Table 11           Bioretention Device Parameters ............................................................................ 13
     Table 12           Total Annual Loads ................................................................................................ 13
     Table 13           Rainwater Tank Performance ................................................................................ 14
     Table 14           Detention Basin Parameters: Summary ................................................................. 18

     LIST OF FIGURES

     Figure 1           Schematic Treatment Train
     Figure 2           Locality Plan
     Figure 3           Existing Site
     Figure 4           Proposed Site and Conceptual Drainage Layout


     APPENDICES

     APPENDIX A                RAFTS Results
     APPENDIX B                MUSIC Parameters
     APPENDIX C                Statement of Landscape Intent




ri   Bunnings Warehouse
     J \3501-54\VVP\SWMP doc
                                                                   Version 1
                                                             Commercial in Confidence
                                                                                                                         15 December 2006
                                                                                                                                  Page iii

Used in these records

About this file

File size
70.0 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

OPW11_0023 Development Application part 2 of 2 Planning Report and Plans 178 Eumundi Noosa Road Noosaville.pdf · 70.0 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.