Council archive · source document
OPW11/0023 Development Application part 2 of 2 Planning Report and Plans 178 Eumundi Noosa Road Noosaville
Plans and drawings: the text below has words only, no drawings.
Very large file (70.0 MB): may take a few minutes to open.
BUNNINGS WAREHOUSE. NOOSAVILLE
SURFACE WATER MANAGEMENT PLAN
Runoff Generation Parameters
I
Parameter Urban Commercial
Residential
Field Capacity (mm) 200 80
I Infiltration Capacity Coefficient a
Infiltration Capacity Exponent b
Rainfall Threshold (mm)
50
1
1
200
1
1
Soil Capacity (mm) 400 120
Initial Storage (%) 10 25
Daily Recharge Rate (%) 25 25
Daily Drainage Rate (%) 5 5
Initial Depth (mm) 50 50
Pj
-
Pollutant Export Relationships
Land Use
Source
Parameter Total Suspended
Solids (mg/L)
Total Ph osphorus
(m g/L)
Total Nitrogen
(mg/L)
Nodes
Base Storm Base Storm Base Storm
Flow Flow Flow Flow Flow Flow
Urban Mean 0.10 2.18 -0.97 -0.47 0.20 0.26
Residential
Std Dev. 0.34 0.39 0.31 0.31 0.20 0.23
Commercial I Mean 0.78 2.16 -0.60 -0.39 -0.32 1 0.37
Std Dev. 0.39 0.38 0.50 0.34 0.30 0.34
I
I
f
Bunnings Warehouse Version 1 15 December 2006
J\35o1-54\WRSWMPdoc Commercial in Confidence
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
OPW11/0023 Development Application part 2 of 2 Planning Report and Plans 178 Eumundi Noosa Road NoosavilleRelated documentApplication case desk ↗
About this file
- File size
- 70.0 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.