Skip to the record
Trusted by locals. Built for Noosa.

Council archive · source document

OPW11/0023 Development Application part 2 of 2 Planning Report and Plans 178 Eumundi Noosa Road Noosaville

of 57

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (70.0 MB): may take a few minutes to open.

Log in to see the plans as drawn
      Rainfall Station and Data Set              Cooroy Composite site pluviograph

      Time Step                                  6 Min

      Modelling Period                           15L January 1973 to 315` December 1983.

      Mean Annual Rainfall (mm)                  1595

      Evapotranspiration (mm)                    1630

      Rainfall runoff parameters                 As per MMG 2010 for commercial use (Table 3.7)


I     Pollutant export parameters                As per MMG 2010 for commercial source node (Table 3.8)




                                   Table 3 - MUSIC Modelling Hydrologic Input Data




      3.2       Treatment Train & Methods

      All paved areas on the site will be conveyed to the legal point of discharge in Gateway Drive via a
      sediment basin and bioretention cell. In addition, most car park pavements will slope directly
      towards vegetated swales so that runoff is dispersed. Areas that can not be sloped towards a
      vegetated swale or other soft landscaping feature are drained via a trench grate or pit that
      discharges into the underground drainage system.             The underground drainage system then
      discharges into the sedimentation basin.

      Almost 20% of the site has been set aside for landscaping.
P-j
      3.3       Sub-Catchment Areas

      Sub-catchment areas, along with conceptual design of the treatment train, is shown on plans
      included in Appendix A.

      3.3.1     Vegetated Swales: During detailed design it was found that vegetated swales would be
      impractical due to the steepness of the site. They have been deleted from the treatment train.

I     3.3.2     Buffer Strips:


I     All of sub-catchment 13 drains into the main sedimentation basin via a buffer strip with the
      following parameters;

            •   Buffer Strip area: 23% of sub-catchment area
            •   Exfiltration Rate: Nil

                                                         8

Used in these records

About this file

File size
70.0 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

OPW11_0023 Development Application part 2 of 2 Planning Report and Plans 178 Eumundi Noosa Road Noosaville.pdf · 70.0 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.