Delegated Report - Code - Planning MCU20 0137 · MCU20/0137

of 1

Text shows just the words. Original shows the document exactly as it was published.

Author	Coordinator Engineering, Mark Lewis
Development Assessment

APPLICATION DETAILS
Application No.	MCU20/0137 & OPW20/0220
Applicant	Dakl Pty Ltd
Proposal	Material Change of Use - Landing – Residential & Operational Works - Prescribed Tidal Works (Removal of existing jetty. Installation of mooring pile, new jetty and Pontoon System)
Properly Made Date	18 November 2020
Information Request Date	Not Applicable
Information Response Date	Not Applicable
Decision Due Date	10 February 2021
Report Completed Date	14 January 2021
Report Reviewed By	Diogo Carrico

PROPERTY DETAILS
Property Address	59 Wyuna Dr Noosaville Qld 4566
RP Description	Lot 29 N 10575
Land Area	616.0000 m²
Existing Use of Land	Residential

STATUTORY DETAILS
SEQRP Designation	Urban Footprint
Zone	Low Density Residential
Precinct	Not Applicable
Local Plan Area	Not Applicable
Overlays	Acid Sulfate Soils, Flooding
Assessment Type	Code
PROPOSAL
The application seeks approval for a Material Change of Use - Landing – Residential & Operational Works - Prescribed Tidal Works (Removal of existing jetty. Installation of mooring pile, new jetty and Pontoon System).
The locality and proposal plan are included below.

Figure 1 – Locality

Figure 2 – Aerial Photo

Figure 3 – Proposal Plan

site details
Background
The proposal includes the removal of an existing jetty and the installation of a fixed jetty section, a pontoon and gangway system.
Site Description
The site is currently used for low density residential
Surrounding Land Uses
Low density residential
assessment
Instruments for Statutory Assessment
Under the Planning Act 2016 the application must be assessed against each of the following statutory planning instruments to the extent they are relevant to the development:
State Planning Policy;
South East Queensland Regional Plan;
Planning Regulation 2017; and
Noosa Plan 2020.
Noosa Plan 2020
The following codes from the Noosa Plan 2020 are applicable to this development:
Waterways Works Code
The application has been found to generally comply with all applicable statutory instruments.
cONSULTATION
Referral Agencies
The applicant was referred to the following Referral Agencies:
Queensland Government - State Assessment and Referral Agency (SARA)
Internal Council Referrals
The application was forwarded to the following internal Council officers for review and/or comment:
Planning Assessment
conclusion & reasons for decision
The proposed development generally complies with the requirements of the planning scheme and does not raise any significant issues that cannot be addressed by reasonable and relevant conditions. The application is therefore recommended for approval.
The report is provided in accordance with Section 63(5) of the Planning Act 2016.
RECOMMENDATION
With regard to Application No MCU20/0137 OPW20/0220 for a Material Change of Use - Landing – Residential & Operational Works - Prescribed Tidal Works (Removal of existing jetty. Installation of mooring pile, new jetty and Pontoon System) situated at 59 Wyuna Dr Noosaville Qld 4566 and described as Lot 29 N 10575, it is recommended the application be approved in accordance with the following details for the Decision Notice:
application details
Application No:	MCU20/0137
Street address:	59 Wyuna Dr Noosaville Qld 4566
Real property description:	Lot 29 N 10575
Planning Scheme:	Noosa Plan 2020 (25 September 2020)
Decision details
Council decided to issue the following type of approval:
Development Permit for Material Change of Use - Landing – Residential & Operational Works - Prescribed Tidal Works (Removal of existing jetty. Installation of mooring pile, new jetty and Pontoon System).
CURRENCY PERIOD of approval
The currency period for this development approval is stated in the conditions below.
assessment manager conditions
Approved Plans
Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions.
Plan No.	Rev.	Plan/Document Name	Date
SJ-33600	D	Site Plan, Layout Plan & Water Allocation prepared by Edge Consulting Engineers	24 August 2020
SJ-33601	D	Elevation & Abutment Details prepared by Edge Consulting Engineers	24 August 2020
JSP-GW-006	L	Standard Catwalk Construction prepared by Edge Consulting Engineers	9 September 2020
JSP-SD-045	E	Concrete Insitu Pile Construction 315 & 400 Diameter Reinforced prepared by Edge Consulting Engineers	9 September 2020
JSP-SD-142	F	Pile Bracket Construction to Suit 400 dia – 450 dia & 8 Roller Bracket prepared by Edge Consulting Engineers	9 September 2020
JSP-SD-212	D	FRP Reinforced Pontoon Construction Standard Flat Deck and Float A Boat Pontoons prepared by Edge Consulting Engineers	9 September 2020
Currency Period
The Currency Period for this development approval lapses if all conditions have not been complied with by 14 January 2023, unless an application to extend the currency period is approved by Council.
General Conditions
The maximum number of vessels that may be berthed, moored, attached or stored on the structure(s) must not exceed 2.
Vessels berthed/moored at the pontoon must be located a minimum of 1.0m from the prolongation of the property boundaries.
Vessels and boatlifting devices must be connected directly to the pontoon, and not located side by side or in tandem with another vessel.
The jetty or landing must not be roofed.
The use of the jetty/pontoon must not cause any adverse effects on the amenity of the surrounding area including changes to light, views, air quality and noise.
Structures must use materials, natural finishes and colours that blend with the surrounding natural landscape.
All structures must be designed and constructed such that they are free standing within the waterway and are not connected to or behind the revetment wall
All structures must have no detrimental effects on stormwater drains and/or easements.
A rigid handrail must be fitted on one side of the walkway.
No boatlifting devices are to be attached or moored at the structures for the purpose of elevating a vessel above the water without Council approval.
There must be no electrical reticulation system carrying electricity in excess of 24 volts beyond the revetment wall unless all switches and power outlets are positioned above the 1%AEP flood level.
Lighting associated with the use must be designed, installed, operated, and maintained in accordance with Section 3 of AS4282 Control of the Obtrusive Effects of Outdoor Lighting.
The jetty and pontoon are to be used for private purposes only with no commercial operations to be undertaken.
Boat repair activities are not permitted on site.
Wastewater and sullage must only be disposed of at approved pumpout facilities.
The mooring facility must not be utilised for live-aboard purposes.
Any construction and post construction activity is not to impact on the condition of the waterway, and is to be conducted so as not to breach the Environmental Protection Act EPA (1994) and the Environmental Protection (Water) Policy 2009.
Certification by a Registered Professional Engineer of Queensland that states that the jetty and pontoon are constructed/installed in accordance with best practice methods and are structurally sound must be submitted to Council. This certification must be submitted to Council within three (3) months of the completion of the works.  A final inspection and approval of the structure by Council’s Inspector is also required.  Please contact Council’s Development Assessment Branch on 5329 6500 to arrange the inspection.
This approval lapses where the construction of the jetty has not commenced within two (2) years of the date of issue of the approval, unless application is made and approved by Council for an extension.
After completion, the proposed works must be maintained in a sound state of repair in accordance with the approved plans
referral agencies
The referral agencies applicable to this application are:
Referral Status	Referral Agency and Address	Referral Trigger	Response

Concurrence	SARA at DILGP SARA at DILGP Via MyDAS2 at https://prod2.dev-assess.qld.gov.au/suite/ (for assistance, contact DILGP at 5352 9701 or email:[email protected]	Planning Regulation 2017 Schedule 10, Part 17 – Tidal Works or Works in a Coastal Management District	The agency provided its response on 15 December 2020  (Reference No. 2012-20091 SRA). A copy of the response is attached

Advisory notes
The following notes are included for guidance and information purposes only and do not form part of the assessment manager conditions:
General Advisory Notes
Council has undertaken an audit check of the Operational Works drawings in relations to the proposed works.  A detailed check of the calculations and drawings has not been undertaken, as they have been certified by a RPEQ.  The RPEQ bears full responsibility for all aspects of the engineering design.  Council reserves the right to require further amendments and/or additions at a later date should design errors become apparent.
The approval or conditions do not absolve the owner of the land from complying with all the conditions of this approval and/or relevant Council By-Laws and Policies and/or relevant statues and/or statutory regulations in the execution and/or performance of said works.
Council reserves the right to call up any performance bond held or levy charges against the property, should emergency works be required to be undertaken by Council to make the site safe due to inactivity on the development site for extended periods of time.
Should any changes or modifications to the approved plans be required as a result of construction constraints, a “Request to change an existing approval” under the Planning Act 2016 must be made. Amended plans clearly indicating the changes must be lodged with this application along with the appropriate fees.
Building and Construction Industry (Portable Long Service Leave) Levy
The QLeave levy must be paid prior to the issue of a development permit where it is required. Council will not be able to issue a Decision Notice without receipt of details that the Levy has been paid.
property notes
Not applicable.
VARIATION approval details
Not applicable.
further development permits required
Not applicable.
submissions
Not applicable.
RIGHTS OF APPEAL
You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the Planning Act 2016 is attached.
During the appeal period, you as the applicant may suspend your appeal period and make written representations to Council about the conditions contained within the development approval. If Council agrees or agrees in part with the representations, a negotiated decision notice will be issued. Only one negotiated decision notice may be given.
OTHER DETAILS
If you wish to obtain more information about the decision, electronic copies are available on line at www.noosa.qld.gov.au or at Council Offices.

[word/footer1.xml]
Page 8 of 8

[word/header1.xml]
3

[word/header2.xml]
DEVELOPMENT ASSESSMENT DELEGATED REPORT

[Attachment: image1.jpeg (image text)]
   

 

 

   
   
  

ie £ 51
na y (25N10575.
a _ 34
———— _ Sant0575,
42. | \
53
‘seNt0575 aN \— 20nt0s7s
40 S5N10575 .
smNt0s7s | 38
S6N10575
y : ve
My | 2IN10875
"8 Driv |
5 ST E
Wyuna Drive zenios7s
| i a
fe \ 20Nt0575,
33N10575, i 61

65 \
aanibsrs | ginfSere | 2ONtO5S

 

   

 

 


[Attachment: image2.jpeg (image text)]
ee

 


[Attachment: image3.jpeg (image text)]
 

 

 

 

LOT 29

28

WYUNA DRIVE

 

SITE PLAN &

WATER ALLOCATION
SCALE 1:500

NOTES:

Gisng structures shown in opproximate positon
BSRTHING:

Moxnum wel vessel length — 12.0m
Moxmum wet vessel beam = 44m

          
     
    

 

 

 

TO ALL SES

 

cast ALM
conours os No
alll dome Cons Sono OFS
r 15010
‘yi sa t 6856: |
— 400 130KNm RC mo T sa
| onl wage PLE 8
00 30m
\ \ | ies ;

Vi 1 Foibot pues ‘sco wren

we th t Aaa

vose Het i en

a IA pesme ser Aton,

\ - PE dato

Listo-4 |
i t
1500 WATER: Fi |
‘ALLOCATION g !
“AUTHORITY Ss i
Wt HH AL, ; i

      
    

SERVICES PEDESTAL WH

 

 

FITTED aT 4th UPRIGHT

Poo.-LaTcH

(OF GATE FOR CHED SAFETY

(ro reuce

‘OSED POSTION)

PUNO WAGE

TO 1600 WIDE LAND ANCHOR

LAYOUT PLAN
SCALE 1:100

WALL & STARS TO BE

 

 

 

 

 

 

FITED ON SOE
ACCESS WHLE WN

 

 

.

cconvecron |
I
|
i
|

 

‘A SECOND POOL-LATCH
FITTED TO ENABLE Lock
WRLE IN OPEN POSTION

ERISTING BOAT RAMP

 

 

 

 

 

 

 

ODED 6Y OTHERS
TO PROMDE ACCESS

E14
(2aas|

 

70 CATWALK

 

 

THIS DRAWING TS SUBECT TO COPFRIGHT AN CHOOT BE REPRODUCED WT PART OR FUL OR PRSSED ON TO A THRO PARTY WOOT THE WATE PERSSON OF THE GETTY 3

 

 

 

 

 

 

 

 

ax oo ms innate com

‘ie et Falig
elastase sige |TRONE,IS
Wan S@t ae) 80

 

 

sar “Em
FRBNY OM PRAEGER TE [278720

[a Sale tr PLN COE Twa 57800 Le
a] DESRPTON [OAT

 

 

 

 

 

 

 

aE
76/08/2020

 

 

 

THE MARINA SPECIALIST

‘AON O;0853178|

a coamout Pine
THE ett O10 4551 MUSTRALA
lomo

vw SPECIALIST

PHONON) 5402 S28

SURVEY DATA] F™" DAKL PTY LTD.

 

18 BO RENO aes

loan

 

LOT 29 (58) WYUNA DR
NOOSAVILE

 

 

‘a

 

 

ig
res
ee fo cea |

 

fees)

 

 

 

PROPOSED PONTOON & CATWALK

 

 

 

 

 

 

[™* SITE PLAN, LAYOUT PLAN

& WATER ALLOCATION
a TS RE ar

29/7/20 | wu | 1:100_1:500 | |A3
[vw $J~33600 D

 

 

 

Used in these records

About this file

File size
247 KB (small file)
File type
DOCX

No other editions are linked here.

Original file

Log in to download the original file

Delegated Report - Code - Planning MCU20 0137.docx · 247 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.