Attachment 4 - Geotech Report · MCU23/0030
50 NOOSA PARADE, NOOSA HEADS PROPOSED RESIDENCE 4.0, then an ASS specialist should be engaged to determine whether there has been any significant environmental impact, why the pH has dropped and how the works may progress without undue environmental risk. Once basement excavation has achieved the final design level a reinforced concrete structural slab and perimeter walls will be constructed to seal the basement and achieve a ‘tanked structure’, whereby no permanent dewatering will be required (during operation). 8.4 Water Quality Management Erosion and sediment control measures are expected to be applied in accordance with current industry practice to contain and control site runoff waters during construction. Runoff generated from the ASS treatment area(s), including excavation activities, will be contained, tested and treated (if necessary) prior to discharge or re-use onsite. Uncontrolled discharge of water from excavation areas, ASS treatment areas or exposed works areas will not be allowed to occur. If discharge from the site is required, performance criteria detailed in Table 5 must be met prior to release. The Contractor shall be responsible for ensuring relevant water quality criteria are met prior to discharge. Table 5: Water Quality Release Criteria Indicator Release Limit pH 6.5 - 8.5 Total Suspended Solids < 50 mg/L Aluminium < 0.2 mg/L Iron < 0.3 mg/L No visible litter sheen or odour washed from the site Litter/Gross Pollutants or deposited in waters downstream of any discharge Groundwater extracted internally would be expected to require quality adjustment prior to off-site release to stormwater. At a minimum, this is expected to involve buffering (increasing) of the pH to within the range 6.5 to 8.5 by the addition of a suitable agent, followed by the addition of a flocculant to reduce turbidity and subsequent metal loads. Effective treatment of groundwater to achieve suitable release criteria requires reasonable spatial and temporal consideration. Where required, a suitable dewatering sub-contractor should be consulted to ensure appropriate outcomes can be achieved. For basement excavations in similar conditions, groundwater treatment is normally carried out using a staged process. The first stage involves adjustment of the pH, typically by mixing caustic soda solution within an enclosed tank. As dissolved metals (mostly iron) typically ‘come out’ of solution as the pH is raised, thereby increasing turbidity, a second stage of treatment is normally required. This involves reduction of the turbidity by the addition of a flocculant. 9.0 LIMITATIONS Your attention is drawn to the document Limitations, which is included in Appendix D of this report. The statements presented in this document are intended to advise you of what your realistic expectations of this report should be, and to present you with recommendations on how to minimise the risks associated with the services provided by Tectonic for this project. 2 February 2023 Report No. 22500-001-Rev0 18
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 4 - Geotech Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 6.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.