Council archive · source document
Attachment 4 - Geotech Report · MCU23/0030
50 NOOSA PARADE, NOOSA HEADS PROPOSED RESIDENCE Table of Contents 1.0 INTRODUCTION ........................................................................................................................................................ 1 2.0 PROPOSED DEVELOPMENT ................................................................................................................................... 1 3.0 SITE DESCRIPTION .................................................................................................................................................. 2 4.0 METHOD OF INVESTIGATION ................................................................................................................................. 4 4.1 Fieldwork ...................................................................................................................................................... 4 4.2 Geotechnical Laboratory Testing .................................................................................................................. 4 4.3 Environmental Laboratory Testing ................................................................................................................ 4 5.0 INVESTIGATION FINDINGS ..................................................................................................................................... 5 5.1 Regional Geology ......................................................................................................................................... 5 5.2 Subsurface Conditions.................................................................................................................................. 5 5.3 Groundwater ................................................................................................................................................. 6 5.4 Geotechnical Laboratory Testing .................................................................................................................. 7 6.0 ENGINEERING ASSESSMENT ................................................................................................................................ 7 6.1 Earthworks .................................................................................................................................................... 7 6.1.1 Site Preparation ...................................................................................................................................... 7 6.1.2 Excavations ............................................................................................................................................. 7 6.1.3 Material Re-Use ...................................................................................................................................... 8 6.1.4 Trafficability ............................................................................................................................................. 8 6.1.5 Filling....................................................................................................................................................... 8 6.2 Temporary and Permanent Retention........................................................................................................... 9 6.3 Building Foundations .................................................................................................................................. 10 6.3.1 Footing Options ..................................................................................................................................... 10 6.3.2 Raft Footing Design .............................................................................................................................. 10 6.3.3 Piled Footing Design ............................................................................................................................. 11 6.3.4 Earthquake Design Considerations ....................................................................................................... 12 6.3.5 Site Classification .................................................................................................................................. 12 6.4 Permanent Drainage................................................................................................................................... 12 6.5 Additional Investigation ............................................................................................................................... 12 7.0 ACID SULFATE SOIL ASSESSMENT .................................................................................................................... 13 7.1 General ....................................................................................................................................................... 13 7.2 DERM ASS Mapping .................................................................................................................................. 13 2 February 2023 Report No. 22500-001-Rev0 ii
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 4 - Geotech Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 6.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.