                                                                                                                                                                                                                                                                                                               EARTHWORKS NOTES
                                                                                                                                                                                                                                                                                                               1.    FOR GENERAL NOTES REFER DWG C01, WHICH IS TO BE REQUESTED AND VIEWED PRIOR TO COMMENCEMENT OF CONSTRUCTION IF NOT
                                                                                                                                                                                                                                                                                                                     SUPPLIED.
                                                                                                                                                                                                                                                                                                               2.    FOR DETAILED GEOTECHNICAL INFORMATION, IT IS RECOMMENDED THAT A GEOTECHNICAL CONSULTANT BE CONTACTED TO CONFIRM THE
                                                                                                                                                                                                                                                                                                                     SOIL CONDITIONS PRIOR TO EARTHWORKS COMMENCING.
                                                                                                                                                                                                                                                                                                               3.    GRASS AND TOPSOIL SHALL BE STRIPPED TO A MINIMUM DEPTH OF 100MM OVER THE EXTENT OF THE WORKS UNLESS DIRECTED OTHERWISE
                                                                                                                                                                                                                                                                                                                     AND STOCKPILED WHERE REQUIRED FOR FILL OF LANDSCAPING AREAS. TOPSOIL MATERIALS MUST NOT BE USED IN STRUCTURAL FILL.
                                                                                                                                                                                                                                                                                                               4.    UNSUITABLE NATURAL MATERIALS SUCH AS SATURATED, LOOSE OR SOFT MATERIALS ENCOUNTERED SHOULD BE REMOVED DURING
                                                                                                                                                                                                                                                                                                                     SUBGRADE PREPARATION FOR BULK EARTHWORKS. ALL UNSUITABLE MATERIAL TO BE REMOVED FROM SITE AT CONTRACTORS EXPENSE.
                                                                                                                                                                                                                                                                                                               5.    COMPACTION OF THE EXPOSED SAND SUBGRADE REQUIRES SUBSTANTIAL VOLUMES OF WATER COMBINED WITH VIBRATORY COMPACTION
                                                                                                                                                                                                                                                                                                                     EQUIPMENT(E.G VIBRATING PLATE OR MINIMUM 4 TONNE VIBRATING SMOOTH DRUM ROLLER). CARE MUST BE TAKEN TO ENSURE THERE ARE
                                                                                                                                                      135                                                                                                                                                            NO IMPACTS ON SURROUNDING STRUCTURES. MATERIAL TO BE COMPACTED IN ACCORDANCE WITH GEOTECHNICAL REPORT AND AS1289.
                                                                                                                                                                                                                                                                                                               6.    TEMPORARY SWALE DRAINS TO BE PROVIDED ALONG CREST AND TOE OF ANY CUTS AND ABOVE FILL BATTERS GRADING DISCHARGE TO A
                                                                                                                                                  RP160425                                                                                                                                                           CONTROL POINT FOR DISCHARGE TO EXISTING STORMWATER INFRASTRUCTURE IN ROAD RESERVE.
                                                                                                                                                                                                                                                                                                               7.    A MINIMUM 150MM THICK GRANULAR WORKING PLATFORM MAY BE REQUIRED ON SOIL SUBGRADES ALONG HAUL ROADS AND LAYDOWN AREAS
                                                                                                                                                                                                                                                                                                                     TO IMPROVE TRAFFICABILITY. SPECIFIC PLATFORM DESIGN WOULD BE REQUIRED PRIOR TO MOBILISATION AND TRAFFICKING OF ANY HEAVY
                                                                                                                                                                                                                                                                                                                     MOBILE PLANT ON THE SITE.
                                                                                                                                                                                                                                                                                                               8.    IMPORTED GENERAL FILL MATERIAL SHALL BE SUPPLIED AND COMPACTED WHERE UNSUITABLE NATURAL MATERIALS ARE LOCATED AND AS
                                                                                                                                                                                                                                                                                                                     OTHERWISE NECESSARY TO OBTAIN SUBGRADE/PLATFORM LEVEL. IMPORTED GENERAL FILL MATERIAL SHALL BE CLEAN GRADED MATERIAL
                                                                                                                                                                                                                                                                                                                     FREE OF ORGANIC MATTER AND STONES, WITH MAXIMUM PARTICLE SIZE OF 100mm AND CAPABLE OF BEING COMPACTED INTO COHERENT
                                                                                                                                                   B                                                                                                                                                                 FILLING TO THE SPECIFIED STANDARD. THE MATERIAL SHALL HAVE A MAXIMUM PLASTICITY INDEX OF 15%, A SHRINK-SWELL INDEX OF LESS
                                                                                                                                                                                                                                                                                                                     THAN OR EQUAL TO 1% AND A MINIMUM C.B.R. OF 10%.

                                                                           -0.007m                                                                C31                                                                                                                                                          9.
                                                                                                                                                                                                                                                                                                               10.
                                                                                                                                                                                                                                                                                                                     ALL EARTHWORKS TO BE CARRIED OUT AT +/- 2% OPTIMUM MOISTURE CONTENT FOR STANDARD COMPACTION.
                                                                                                                                                                                                                                                                                                                     ANY PROPOSED RETAINING WALL WORKS MUST BE WHOLLY WITHIN THE PROPERTY BOUNDARY OF THE SUBJECT SITE, INCLUDING REAR OF
                                                                                                                                      26.48
                                                                                                                                              9m                                                                                                                                                                     RETAINING WALL DRAINAGE INFRASTRUCTURE FOR RETAINING WALLS IN CUT. RETAINING WALLS ARE TO BE PREPARED IN ACCORDANCE WITH
                                                                                                            -0.216m                                                                                                                                                                                                  STRUCTURAL ENGINEERS SPECIFICATIONS, AND IN CONFORMANCE WITH CONSTRUCTION REQUIREMENTS OF GEOTECHNICAL REPORT.
                                                                                                                                                                                                                                                                                                               11.   REFER ARCHITECT/LANDSCAPE ARCHITECT DRAWINGS FOR CONFIRMATION OF RETAINING WALL COLOUR AND FINISH.
                                                                                                                                    25.00                                                                                                                                                                      12.   ALL EARTHWORKS OPERATIONS SHALL BE CARRIED OUT WITH 'LEVEL 1' SOIL ENGINEERING SUPERVISION IN ACCORDANCE WITH APPENDIX B
                                                                                                                                         0m




                                                                                                                                                                                                                                                                       7
                                                                                                                                                                                                                                                                    .9
                                                                                                                                                   -0.108m                                                                                                                                                           OF AS 3798. THE NOMINATED GEOTECHNICAL TESTING AUTHORITY SHALL PROVIDE CERTIFICATION THAT ALL GENERAL EARTHWORKS




                                                                                                                                                                                                                                                                 30
                                                                                                                                                                                                                                                                                                                     OPERATIONS HAVE BEEN CARRIED OUT IN ACCORDANCE WITH THE DRAWINGS AND SPECIFICATIONS AND THE CONTROLLED FILL IS SUITABLE
                                                                                                                                                                                                                                                                                                                     FOR PURPOSE TO THE REQUIRED BEARING CAPACITY UNDER THE PLATFORM/STRUCTURES AS SPECIFIED BY THE GEOTECHNICAL REPORT.




                                                                                                                                                                                                                                                                      1
                                                                                                                                                                                                                                                                     .8
                                                                                                                                                                                                                                                                    30
                                                                                                                                                                                                                                                                                                               13.   ALL EARTHWORKS FILL AND EXCAVATED AREAS SHALL BE COMPACTED TO 98% STANDARD MAXIMUM DRY DENSITY OR A DRY DENSITY INDEX




                                                                                                                                                                                                                                                                                        8
                                                                                                                                                                                                                                                                                     .9
                                                                                                                                                                                                                                                                                                                     OF AT LEAST 75% IN ACCORDANCE WITH THE GEOTECHNICAL REPORT IN LAYERS OF 250MM LOOSE THICKNESS (PRIOR TO COMPACTION).




                                                                                                                                                                                                                                                                                     30
                                                                                                                                                                                                                                                       30.83                                                   14.   COMPACTION TESTING TO BE CARRIED OUT AT A MINIMUM OF TWO TESTS PER VERTICAL LIFT WHERE STRUCTURAL FILL HEIGHTS EXCEED
                                                                                                                                                                                                                                                                                                                     300MM IN ACCORDANCE WITH AS3798. CONTRACTOR TO UNDERTAKE ALL EARTHWORKS TESTING IN ACCORDANCE WITH GEOTECHNICAL
                                                                    0.111m                                                                                                                                                                        30.79
                                                                                                                                                                                                                                                                                                                     ENGINEER AND LOCAL AUTHORITY REQUIREMENTS.
                                                                                                                                                                                                                                                                                                               15.   FINISHED SURFACES TO ALL DISTURBED AREAS ARE TO BE TREATED IN ACCORDANCE WITH LANDSCAPE DRAWINGS.
                                                                                                     0.125m
                                                                                                                                                                                                                                                                                                               16.   ALL NEW WORKS TO MATCH NEATLY INTO EXISTING LEVELS.
                                                                                                                           20.00                                                                                                                                                                               17.   ALL WORKS TO BE CONSTRUCTED IN ACCORDANCE WITH APPROVED MANAGEMENT PLANS.
                                                                                                                                 0m




                                                                                                                                                                                                                                                             2
                                                                                                                                             0.129m                                                                                                                                                            18.   CONTRACTOR TO ENSURE SUITABLE EROSION CONTROL MEASURES ARE INSTALLED INCLUDING BUT NOT LIMITED TO SHAKE DOWNS, SILT




                                                                                                                                                                                                                                                          .6
                                                                                                                                                                                                                                                          30
                                                                                                                                                                                                                                                                                                                     FENCE ETC IN ACCORDANCE WITH EROSION AND SEDIMENT CONTROL PLAN.
                                                                                                                                                                              -0.017m                                                                                                                          19.   ADEQUATE SAFETY FENCING/BARRIERS TO BE APPLIED TO ALL BATTERS OR RETAINING WALLS (TEMPORARY OR PERMANENT) AS PER




                                                                                                                                                                                                                                              7
                                                                                                                                                                                                                                           .6
                      137                                                                                                                                                                      0.023m                                                                                                                RELEVANT AUSTRALIAN STANDARDS AND LEGISLATION.




                                                                                                                                                                                                                                      30
                                                                                                                                                                                                                                                                                                               20.   DUST CONTROL MEASURES ARE TO INCLUDE SPRAYING WATER ON UNPAVED ROADS, ACCESS TRACKS AND STOCKPILES AT A SUFFICIENT
                   RP160425                                                                                                                                                                                                                                                                                          LEVEL TO SUPPRESS DUST GENERATION. ADDITIONALLY CONTRACTORS ARE TO COVER OR ENCLOSE STOCKPILES WHERE REASONABLY
                                                                                                                                                                                                                                                                                                                     PRACTICAL TO RESTRICT DUST MOVEMENT.
                                                                                                                                                                                                                                                                                                               21.   PRIOR TO THE CONTRACTOR COMMENCING ANY WORKS DETAILED ON THIS DRAWING, THE CONTRACTOR IS TO NOTIFY RECOR AND RECEIVE
                                        A                     0.081m
                                                                                                                                                                                                                                                                                                                     WRITTEN CONFIRMATION THAT WORKS CAN COMMENCE.




                                                                                                                                                                                                                                                                                 5
                                       C31                                                     0.197m                                                                                                                                                                                                          22.   ALL EXCAVATIONS ARE TO BE CONDUCTED IN ACCORDANCE WITH THE REQUIREMENTS OF THE GEOTECHNICAL ENGINEER AS OUTLINED IN THE



                                                                                                        136




                                                                                                                                                                                                                                                                              .6
                                                                                                                                                                                                                                                                             30
                                                                                                                                                                                                                                                                                                                     GEOTECHNICAL INVESTIGATION REPORT BY TECTONIC. TEMPORARY UNSURCHARGED CUTS IN LOOSE TO VERY LOOSE SAND TO BE FORMED




                                                                                                                                                                                                                                    0
                                             20.00 0m
                                                  0m




                                                                                                                                                                                                                                 .5
                                                                                                                   15.00                                                                                                                                                                                             AT 1V:2H, AND IN MEDIUM DENSE SAND AT 1V:1H FOR BATTERS UP TO 3M IN HEIGHT. DEEPER CUTS ARE TO BE ASSESSED BY THE




                                                                                                                                                                                                                                                  1
                                                                                                                                                                                                                             30
                                                                                                                        0m




                                                                                                                                                                                                                                                .4
                                             20.33




                                                                                                                                    0.110m




                                                                                                                                                                                                                                             30
                                                                                                                                                                                                                                                                                                                     GEOTECHNICAL ENGINEER. PERMANENT CUT AND FILL BATTERS TO BE A MAXIMUM 1V:2.5H.
                                                                                          0m




                                                                                                                                                                                                                                                                                                               23.   EARTHWORKS FILL BATTERS TO BE MAXIMUM OF 1M IN HEIGHT, OR OTHERWISE RETAINED.
                                                                                                                                                                          0.014m                                                                                                                               24.   WHERE THE ABOVE TEMPORARY BATTER SLOPES CAN NOT BE ACHIEVED, TEMPORARY SHORING WILL BE REQUIRED UNDER THE ADVICE OF A
                                                                                     15.00




                                                                                                                                                                                                                                                                                                                     SPECIALIST SHORING CONTRACTOR.

                                                                                                                             0m




                                                                                                                                                                                                                          .4 43
                                                                                                                                                                                                                                                                                                               25.   EXCAVATIONS IN PROXIMITY TO EXISTING STRUCTURES WILL REQUIRE SPECIFIC DESIGN TO PREVENT UNDERMINING WHICH SHOULD BE




                                                                                                                                                                                                                        30 30.
                                                                                                                            10.00
                                                                                                                                                                                                                                                                                                                     CARRIED OUT BY A SUITABLY QUALIFIED AND EXPERIENCED RPEQ STRUCTURAL ENGINEER.




                                                                                                                                                                                                                            7




                                                                                                                                                                                                                                                               REET
                                                                                                                                                                                                                                                                                                               26.   CONTRACTOR'S RPEQ GEOTECHNICAL ENGINEER IS TO CONFIRM THAT ANY CONSTRUCTED CUT/FILL BATTERS AND RETAINING STRUCTURES




                                                                                                                                                                   m
                                                          0.184m
                                                                                                                                                                                                        A 30.4




                                                                                                                                                                  5.000
                                                                                                                                                                                                                                                                                                                     ON THE SITE HAVE ACHIEVED ADEQUATE STABILITY WITH A LONG-TERM FACTOR OF SAFETY AGAINST GEOTECHNICAL FAILURES TO THEIR




                                                                                                                                                                                                                                           30
                                                                                                                                                                                                               1                                                                                                     SATISFACTION.




                                                                                                                                                                                                                                        .
                                                                                                                                                                                                       C31




                                                                                                                                                                                                                                     30
                                                                                 0.126m




                                                                                                                                                                                               m
                                                                                                                                                                                                                                                                                                               27.   LEVELS AND VOLUMES SHOWN ARE TO FINISHED SURFACE INCLUSIVE OF TOPSOIL LAYER - EARTHWORKS FINISHED LEVEL NOMINALLY 200mm




                                                                                                                                                                                              0.000
                                                                                                                                                                                                                                                                                                                     BELOW. CONTRACTOR TO CONFIRM EARTHWORKS SURFACE LEVLS BASED ON STRUCTURAL ENGINEERING DRAWINGS FOR BUILDING SLAB




                                                                                                                                                                                                                                   en
                                                                                                           10.00
                                                                                                                0m                                                                                                                                                                                                   THICKNESSES AND HYDRAULIC DRAWINGS FOR SUB-FLOOR DRAINAGE TO CONFIRM FINAL EARTHWORKS SURFACE.




                                                                                                                                                                                                                             b
                                                                                                                            0.060m




                                                                                                                                                                                                                                 f Bitum
                                                                                                                                                                                                                      of Ker
                                                                                                                                                                                                                                                                                                               28.   ANY PRELOADING REQUIRED IS TO OCCUR IN ACCORDANCE WITH THE GEOTECHNICAL ENGINEERS REQUIREMENTS. CONTRACTOR TO ALLOW
                                                                                                                                                                 -0.008m                                                                                                                                             FOR THE IMPORT AND REMOVAL OF ALL NECESSARY MATERIAL TO UNDERTAKE THE PRELOADING OPERATIONS.
                                                                                                                                                                                                                                                                                                               29.   REFER ARCHITECTURAL DRAWINGS FOR BUILDING SETOUT.




                                                                                                                                                                                                                                                          ME ST
                                                                                                                                                                                                                            Edge o
                                                                                                                                                                                                                 Back
                                                   0.135m                                                                                                                                                          9
                                                                                                                                                                                                               30.2




                                                                                                                                                                                                                                                          4
                                                                                                                                                                                                                                                        .3
                                                                                                                                                                                                                                                      30
                                                                            0.09m
                                                                                                   5.000
                                                                                                        m




                                                                                                                                                                                                                          30
                                               0.034m




                                                                                                                                                                                                                            .14
                                                                                                                                                                                                                                                                                                                                     DEPTH LEGEND




                                                                                                                                                                                                           1
                                                                                                                                                                                                         .2




                                                                                                                                                                                                                                                     DELOR
                                                                                                                                                                                                       30
                                                                                                                                                                                                                                                                                                                                            -1.0 to -0.8

                                                                                                                                                                                                       30.13
                                                                                                                                                                                                                                                                                                                                            -0.8 to -0.6
                                                                                                                                                                                                                                                                                                                                            -0.6 to -0.4                                  EARTHWORK CUT/FILL VOLUMES:
                                                                                                            B                                                                                                     2
                                                                                                                                                                                                                .0
                                                                                                                                                                                                               30
                                                                                           0.000                                                                                                                                                                                                                                            -0.4 to -0.2
                                                                                                 m
                                                                                                           C31                                                                                                                                                                                                                              -0.2 to -0.0                                  TOTAL CUT:                         26.57m³
                                                                                                                                                                                             01




                    27.23
                                                                                                                                                                                            30.




                                                                                                                                                                                                      89                                                                                                                                    0.0 to 0.2                                    TOTAL FILL:                        33.14m³
                              Back o                                                                                                                                                              29 .
                                    f
                              Edge o Kerb
                   09




                                                                                                                                                                                                                                                                                                                                            0.2 to 0.4
                     .
                  27




                                     f Bitum                                                                                                                                                                                                                                                                                                                                              BALANCE:                      6.55m³ FILL
                                             en                     28.3
                                                                        8                                                                                                  29.83
                                                                                                                                                                                                                                                                                                                                            0.4 to 0.6
                                                                                                                                                                                   29.72                                                                                                                                                    0.6 to 0.8
                                                              6




                                                                                                                                                              6
                                                             .2




                                                                                                                                                            .5
                                                            28




                                                                                                                                                          29




                                                                                                                                                                                                                                                  8
                     9




                                                                                                                                                                                                                                                  .2
                   .2




                                                                                                                                    29.24
                                                                                                                                                                                                                                                                                                                                            0.8 to 1.0
                                                                                                                                                                                                                                              30
                 27




                                                                                                                                                      29.46
                                                                                                                             2
                                                                                                                            .1
                                                                                                                           29
                                                                   7
                                                               .4
                                                             28




                                                                       SAFAR
                                                                                                              I STRE
                                                                                                                                       29.
                                                                                                                                             50




                                                                                                                                                          ET
                                                                                                                                                                                                                                                                                                                                             NOTE:
                                                                                                                                                                                                                                                                                                                                             LEVELS SHOWN ARE TO FINISHED SURFACE. CONTRACTOR TO DETERMINE
                                                                                                                                                                                                                                 3
                                                                                                                                                                                                                            .4




                                                                                                                                                                                                                                                                                                                                             REQUIRED EARTHWORKS LEVEL BASED ON STRUCTURAL SLAB DESIGN AND
                                                                                                                                                                                                                          30




                                                                                                                                                                                                                                                                                                                                             HYDRAULIC SUB FLOOR DRAINAGE REQUIREMENTS.
                                                                                                                                                                                                                                                                            86.
                                                                                                                                                                                                                                                                           30




                                                                                                                                                      SCALE:                                                                                              CLIENT:                               APPROVED BY:                            PROJECT NAME:

                                                                                                                                                                                                                                                                                                                                        RESIDENTIAL DUPLEX AT 22 DELORME ST
                                                                                                                                                                                           1:100                                                                                                                                         TITLE:                                                 STATUS:

                                                                                                                                                                                                                                                                                                                                        BULK EARTHWORKS PLAN ISSUED FOR APPROVAL
 © ABN 89 647 469 707              C    21/10/22        REISSUED FOR APPROVAL                                  MVP           BRP             NW                                                                                                                             SANTIAGO NOMINEES         NATHAN WAGSTAFF
                                   B    12/06/22        REVISED ARCH LAYOUT                                    BRP           BRP             NW
    37 MARY ST                                                                                                                                                                                                                                                                                           RPEQ: 26443
                                   A    19/05/22        MCU ISSUE                                              BRP           BRP             NW
NOOSAVILLE, QLD 4566                                                                                                                                                                                                                                                                                     CPEng NER                      DRAWING NUMBER:                                         PROJECT NUMBER:                                      REV:
   +61 7 5211 1003               REV    DATE                       DESCRIPTION                                DWN           CHK              APP                                                                                                                                                                                                                                                                                            SHEET
                                                                                                                                                                                                                                                                                                        DATE: 21/10/22                                                                                                                       SIZE:
RECORCONSULTING.COM                                                 REVISIONS                                                                                                                                                                                                                                                            C30                                                    20220130                                     A1 C
Log in to download the original file

20220130-CV Set.pdf · 3.1 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.