Council archive · source document
20517 App J.pdf [As Published] · 132007.1259
Concept Stormwater Management Plan
Essence of Peregian
("i |
Results also indicate that average annual runoff under the developed scenario with rainwater reuse is only 0.09 ML
(1.2%) lower than under the existing scenarios. Therefore, the developed site is closely replicating runoff volumes of
the existing site.
The water balance analysis undertaken shows that the proposed development with reuse measures produces
average annual runoff volumes lower than existing volumes. Therefore the Noosa Council requirement for
maintenance of existing site average annual runoff volumes by the proposed development is complied with.
BO07047-01A.doc Page 14
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
20517 App J.pdf [As Published]Related documentApplication case desk ↗
About this file
- File size
- 5.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.