Concept Stormwater Management Plan Essence of Peregian 7.0 CONCLUSIONS AND. RECOMMENDATIONS This report has been prepared generally in accordance with Noosa Council's ‘The Noosa Plan’ Planning Scheme Policy. Information has been provided on the relevancy of flooding to the site, a stormwater quality management strategy and a water balance analysis. “es = = = Noosa Council provided documentation that the site has no nominated flood levels associated with it and is not within an area subject to minimum floor heights. A flood study was not part of the scope of this report. A Water Quality treatment train has been devised for the proposed subdivision consisting of e An external bio-filtration basin to treat runoff from the proposed commercial site and external areas being David Low Way and Peregian Beach Hotel; e Abio-filtration basin to treat runoff from the internal loop driveway; e Above ground 3 kL rainwater tanks with internal reuse for toilets and laundry, for each of the 30 beach shacks; e Three rainwater tanks that collect roof runoff from the accommodation buildings for irrigation of landscaped areas in the vicinity of the tank; e Three Ephemeral Wetlands treating overflows from accommodation building rainwater tanks and ground level areas surrounding the accommodation buildings; e Vegetated swales that convey surface runoff to ephemeral wetlands and overflows to discharge points. The treatment train was modelled using the software program MUSIC and has been demonstrated to achieve significant pollutant load reductions from treatment of both the developed site and external site catchments. Load reductions have been compared to water quality objectives as required by neighbouring Maroochy Shire Council. Load based objectives were applied to this report as concentration targets in the Queensland Water Quality Guidelines were argued as not appropriate for this development. The developed scenario (with rainwater reuse measures) water balance model produced average annual runoff volumes lower than the existing site runoff volumes. It is recommended that the Concept Stormwater Management Plan be approved and incorporated into the Operational Works design. Detailed construction drawings for proposed water quality treatment devices will be submitted with the Operational Works application. B07047-01A.doc Page 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
20517 App J.pdf [As Published]Related documentApplication case desk ↗
About this file
- File size
- 5.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.