Council archive · source document
20517 App J.pdf [As Published] · 132007.1259
Essence of Peregian Appendix C Title: Catchment Area and Basin Calculations Job: Essence of Peregian Filename: H:\B07\001-049\B07047\MUSIC\[B07047 MUSIC & Tank Calcs.xls]SQID Calcs Date: 20/06/2007 By: KU Pee x Ground Area|Ground Combined Ground % MUSIC. MUSIC Catchment |Catchment Roof Area |Roof Ground |+ Roof Impervious |Ground/Roof |Effective Catchment Catchment Area Area Description Roof Area |RoofArea |(MUSIC) | Bypass Area Bypass Estimate [Impervious _|Impervious m ha m? ha ha ha ha % % ISUB-A, ROOF Ai B1 2479 0.248|Block A1 B1 1278| 0.128| 0.128 0.000} 0.103) 0.103 40% 40% 12% 175) 0.018} 0.018] - 0.000} ISUB-B ROOF A2 B2 2705 0.271|Block A2 B2 1338| 0.134} 0.134) 0,000) 0.437] 0.137) 55%) 55%) 17% [SUB-C. ROOF C1 B3 3342! 0.334] Block C1 B3 1478} 0.148) 0.148) 0.000) 0.186) 0.186 60% 60% 19% SUB-D. 850 0.085]/Entrance Tum, i 0.085 0.085, 75%|- 23% |SUB-E_ 1730) 0.173|Commercial 0.473, 0.173) 95%|- 48% ISUB-F ROOF F 3624 0.362|Cabins 1229) 0.123} 0.123} 0.000} 0.240) 0.240) 10% 10%. 3% ISUB-G 8393 0.839/Swamy 0.839) 0.839) O%|- 0% ISUB-H 5663 0.566]Hotel and Road 0.566) 0.566) 95% 48% Total Area 28786 0.550 0.000 2.329 2.879 % Roof area draining to tanks 100% BO7047
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
20517 App J.pdf [As Published]Related documentApplication case desk ↗
About this file
- File size
- 5.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.