Council archive · source document
20517 App J.pdf [As Published] · 132007.1259
Concept Stormwater Management Plan Essence of Peregian CONCEPT STORMWATER MANAGEMENT PLAN FOR ESSENCE OF PEREGIAN AT DAVID LOW WAY, PEREGIAN BEACH TABLE OF CONTENTS 1.0 INTRODUCTION 2.0 SITE CHARACTERISTICS... 2.1 Location....... 2.2 Topography ai : 3.0 FLOODING .........ccccssenseeeees a 4.0 STORMWATER QUALITY ......cssccuees we 4.1 Stormwater Quality Management Strategy..... 42. Pollutants of Concern / Water Quality Objectives. 4.2.1 Regional Water Quality Guidelines.............. 4.2.2 Water Quality Objectives Suitable to Site 4.3. MUSIC Modelling.......... 4.3.1 Meteorological Data 4.3.2 Source Nodes.... 4.3.3 Drainage Links... - 4.3.4 Treatment Nodes... 4.4 MUSIC Modelling Results 5.0 WATER BALANCE MODELLING 5.1. Demand Reduction... 5.2 _ Proposed Measures. 5.3 Water Balance Analysis 5.3.1 Rainfall Data 5.3.2 Roof Details and Irrigation Areas 5.3.3 Usage ........ 5.3.4 Resullts....... 6.0 WATER SENSITIVE DESIGN CODE RESPONSE 7.0 CONCLUSIONS AND RECOMMENDATIONS... 8.0 REFERENCE. ..........ccccscsssssssessrerseseneneeeses - 9.0 APPENDICES ...0....ceccecseseeeeeseeseeeeessesseeseeseeseaseaeaseseesveseaseneseesaessesseatoesneenieeevsesneusansontans 17 RAR i l B07047-01A.doc Page ii
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
20517 App J.pdf [As Published]Related documentApplication case desk ↗
About this file
- File size
- 5.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.