Council archive · source document
20517 App J.pdf [As Published] · 132007.1259
SS Concept Stormwater Management Plan Essence of Peregian “Ee 2.5.1.2. The guidelines then refer the user to the default regional water quality guidelines for slightly to moderately So disturbed waters (Table 2.5.1.1). = = According to Figure 2.5.1b of the Queensland Water Quality Guidelines (2006), the site falls within the ‘lowland stream’ water type. Table 2.5.1.1 outlines the indicator values suitable for MUSIC Modelling (Refer to Section 4.3) and are reproduced in Table 4.1 below. Table 4.1: South-East Queensland Regional Water Quality Guideline Objectives* Pollutant | Total Suspended Solids (mg/L) | Total Phosphorous (mg/L) | Total Nitrogen (mg/L) Objective 6 : 0.050 0.500: *Concentrations given are median values. The following load reduction targets which satisfy water quality objectives (WQOs) of Maroochy Shire Council are listed in Table 4.2. The reason for inclusion of these targets is explained in Section 4.2.2. Table 4.2: Maroochy Shire Council Pollutant Load Reduction Targets* Pollutant Load Reduction Target (%) Total Suspended Solids 80 Total Phosphorous 60 Total Nitrogen 45 *MSC Planning Scheme Policy No. 5 (Section 7.2.4). The design objectives are reductions in mean annual load leaving developed areas, compared to traditional urban design where stormwater is not treated (Australian Government, 2006). 42.2 Water Quality Objectives Suitable to Site The site is currently in a partially developed state. Its use as a Caravan Park and camping ground comprises grassed areas, gravel access roads, demountable cabins, concrete pads for caravan parking, site amenity buildings, an office and a bitumen entrance road. The proportion of hard (impervious) surface fluctuates throughout the year due to the variable presence of vehicles and caravans. The presence of these surfaces and other equipment brought to the site by guests leads to the likelihood of higher pollutant loads in runoff than the site alone. Also, due to the fact that the site is not in a natural ‘undeveloped’ condition, it is considered that concentration targets as required by Queensland Water Quality Guidelines cannot appropriately be applied to this development. It is considered that load reduction targets are more appropriate to determine the impact of water quality treatment trains proposed for the development. The load reduction targets of Maroochy Shire Council have been adopted for the purposes of this Stormwater Quality Management Strategy. 4.3 MUSIC Modelling Water quality modelling of the proposed development has been undertaken using the Model for Urban Stormwater Improvement Conceptualisation (MUSIC) Version 3.01, developed by the Cooperative Research Centre for Catchment Hydrology (CRCCH). MUSIC enables the user to model the transfer of pollutants through a catchment and provides an aid in determining how effective the stormwater quality treatment train is at meeting WQOs. The critical pollutants to be modelled are Total Suspended Solids (TSS), Total Phosphorous (TP) and Total Nitrogen (TN). BO07047-01A.doc Page 5
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
20517 App J.pdf [As Published]Related documentApplication case desk ↗
About this file
- File size
- 5.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.