Council archive · source document
07/2333 - Prescribed Tidal Works - Transport Type 5 - Domestic Marine (Private Jetty) [As Published] · 142007.2333
NOOSA Checklist - Applications Involving Land
Development & Land Use Sections
IDAS APPLICATION
This checklist should be used for any IDAS application. Please check each of the following items before accepting an
application at the counter.
1.
3.
_ APPLICATION FORMS 7 ~ “ ‘sen oo fe
41.1 Form 1 Part A
1.1.1. Ensure that the form is fully compteted. S|
4.4.2 In the case of an MCU or Op Works below the high-water mark, owners consent is required.
1.1.2.1 If there are multiple owners, the consent of each owner is required.
4.1.2.2 If the owner of the land is a company, either ACN No. or Company Seal required.
4.2 Form1 Part B-O Supporting Information : o Che AAS. weaned?
tmrhe [DAs rank reg
1.1.2 Ensure that for each box checked on Form A, the relevant additional Forms B-O are attached.
1.1.2.1. Ensure that each of Forms B-O which are attached are fully completed. [|
REFERRALINFORMATION ~ 2 7 oe, ge ig,
2.1. Ensure that items 1-23 have been checked and/or completed with regard to referrals. Cc]
” ENVIRONMENTALLY RELEVANT ACTIVITIES” “ oe
3.1 Ensure that Part G is completed if EPA referral is required.
3.2 Where EPA is delegated to Council (see * in ERA checklist), ensure that the correct application
fee is pald and recorded on the application.
-* PORM 22 REQUEST TO.CHANGE APPROVAL’. wk ,
4.1 Ensure that items 1-28 have been checked and/or completed including information regarding
applicant details and owners consent. LV]
PLANS. © oe a Soa ees ste
5.1 Ensure that at least 6 sets of the Plan of Development (5 for Reconfiguration and Operational
Works) accompanies the application. In addition ensure that each set is complete. f
5.2 Ensure that 1 of the copies of the Plan of Development is in an A3 or A4 format and is (A
unbound.
SUPPORTING INFORMATION. 7o))0 we ve ane
6.1. Ensure that at least 6 copies of any report accompanies the application (5 for Reconfiguration _
and Operational Works). If the application is accompanied by a covering letter, ensure that it is
capable of reproduction. [=]
6.2 In the case of reports, ensure that 1 of the copies is in an A3 or A4 format and is unbound.
Feet wc mt a
7.1 Ensure that the application fee, as determined from the Council's adopted scale of fees, UV
accompanies the application or has been paid. ,
7.2 Ensure that the fee which has been paid is recorded on the application form. Y
Receiving Officer PS. NTR
Having completed this form and accepted th
trays:-
Please DO NOT leave the application at the counter and DO NOT deliver the application to Records.
pplication, please deliver both to the following IDAS Application Receiving
If the application is for a Material Change of Use exclusively -AOP1's desk in the Land Use Section.
{f the application is for an Material Change of Use & Reconfiguration - AOP1’s desk in the Land Use Section.
If the application is for Operational Works (for parking, access, sewerage or drainage) exclusively - AOD2 in the
Land Development Section.
In all other circumstances — AOP1's desk in the Land Use Section.
SEP} g:\ant\forms\application checklist.doc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 15 pages
Page 2
Trish Sweeney, 5449 52939 Email: [email protected] Application Ref: 2007/2333 14 November 2007 Noosa Jetty Builders PO Box 299 NOOSAVILLE QLD 4566 Dear Sir, Re: Application for a Development Approval for Prescribed Tidal Works - Jetty situated at 35 Wyuna Drive Noosaville described as Lot 17 N 10576 | refer to your application and advise that it is not a properly made application, as defined by Section 3.2.1(6) of the integrated Planning Act. Specifically, ° Part P of Form 1 and the IDAS Assessment Checklist have not been provided ° Resource Entitlement from the Environmental Protection Agency has not yet been received, although in your description of attachments on the application form you refer to EPA. Please arrange for the submission of the outstanding items such that processing of the application may commence. Yours faithfully, ad Trish Sweeney ADMINISTRATION OFFICER - LAND USE Award Winner - Australian Clean Beach Challenge 2004 Litter Prevention
Page 3
NiCcs & Coumcicn INTEGRATED PLANNING ACT 1997 Part A, Version 3.0, 3 September 2007 identification of the premises the subject of the application 1. Can any part of the premises be identified by a street address or lot on plan description? (1) No - Answer Q1(a) 1(a) Does the application only involve a mobile and temporary environmentally relevant activity (ERA)? [1 No-Gowa2 [1 Yes - Complete Table A stating each local government area in which the mobile and temporary ERA is proposed to operate. Then go 10 Q9 Table A Name of each local government lt. of ves — Complete Table B and answer Q1(b) and Q1(c) Table B Lot on plan description Unit | Street Official suburb Post | (pisce each description in a separate row) number | number Street name focality name code [1 pn Local government area type number | (eg. RP, SP) Plan rumber [1 32> [WNuNAPR Se INoeAvieLe uch td | N /1051-6] eo snige} 4(b) a address be further described by shop/tenancy number or storey/level? No OO Yes- Complete Table C Table C Shop/tenancy number Storeyfevel [1. 1(c) Is apy part of the premises strategic port land under the Transport infrastructure Act 1994? No (Yes - Complete Table D Table D Lot on plan description Port authority for the lot [1.
Page 4
INTEGRATED PLANNING ACT 1997 Part A, Version 3.0, 3 September 2007
2. rye premises best be identified by coordinates (e.g. for development proposed in waters or on a site within a large nural loi?
N
lo
C1 Yes - Complete Table £
Table E
Coordinates Zone Ref
(place each set of coordinates in a separate row) ne 4D Sum Local government area
Easting Northing Latitude | Longitude and Datum
1. Zone Reference:
CD GDA94 (preferrea)
0 wese4
DD Other - Specity
3. Are the premises within or adjacent to a water body or watercourse?
Oo
Yes - Complete Table F and answer Q3{a)
Table F
Name of water body or watercourse
fT \WeNbA Clee
3(a) Is any part of the development proposed in tidal waters (ie. below high water mark/?
Xo
Y
es
If yes, is the land in either or both of the following —
eA tidal area for a local government ON Wes ~ Complete Table G, Column 1
© Atidal area for strategic port land To LD Yes - Complete Table G, Column 2
Table G
COLUMN 1 COLUMN 2
Name of local goverment (if applicable) Name of port authority (ifapplicable)
(. | Wowd SHWE CONE
4. What is the total area of land that makes up the premises (ie. the area covered by the application)?
Area of land above hjgh water mark/outside watercourse Area in a water body or watercourse
lo [ 4% [ame (1 hectares (Tick applicable unit) lo m [_] hectares (Tick applicable unit)
Existing use of the premises
5. Are the premises currently used for any purpose?
(I /No
RY ves - Ensure details of any existing use of the premises are provided in plans and documentation submitted with this application, e.g.
Jocation and nature of existing uses, buildings, structures and services
Page 5
INTEGRATED PLANNING ACT 1997 Part A, Version 3.0, 3 September 2007 6. eye any existing easements on the premises (e.g. for vehicular access, electricity, overtand flow)? No C1 Yes - Complete Table H and ensure the location and dimensions of each easement are included in plans, submitted with the application Table H Purpose of each easement Entity favoured by the easement [i. Proposal details 7. Are new uses proposed on the premises? 0 Ao Yes - Complete Table | Table | Each proposed new use f. [New viméek Terty Plivere 8. Are new buildings or structures proposed to be erected on the premises? te Yes — Ensure the nature, location and dimensions of the proposed new buildings, structures or services are included in plans, submitted with the application Applicant details 9. Who is the applicant for the application? comer Tie ir Phy Ed aft Nowa Joly Builders . Individual/ contact person details — Title | M ZS [First name EmMmn-éA- Last name | ZESD. Postal adress PO Box 894 NOOR AVILLE QW S66 Contact telephone number b1) Su I cf 3 ub KO Mobile phone number Cu OQ 1 S78 Ab Facsimile number (7 )Surqu Zur % O , . eval adress Ah ej yond b& aig pang nts -as Owner's consent and resource entitlement or ny other regulation? No C1 Yes - Complete a new Table J for each State-owned resource and submit, with the application evidence of resource allocation or entittement 10. xh the application involve a State-owned resource prescribed by schedule 10 of the /nlegrated Planning Regulation 1998 (\P Reg)
Page 6
INTEGRATED PLANNING ACT 1997 Part A, Version 3.0, 3 September 2007
Table J
Nature of State-owned resource
Nature of evidence required
Allocation/entitlement
reference number
State Goverment Date of | Date of
Name of authorising officer | Position of authorising officer Department issue | expiry
[ GENERATE ANOTHER TABLE |
11. Does the application involve land other than State-owned land (ie. privately owned land) and require owner's consent?
{(/ No
Yes - Complete Table K and submit, with the application, written documentation of all owner's consent
Table K
Owner name/s Street address or lot on plan description Date written consent was obtained
[_TEAANCO DE PRSGUALE | 25 SWINRO NOKAVIE | 24 /9fo7 .
QOLSEG ,
Mandatory attachments and supporting information
12. What are the other parts of [DAS Application Form 1 submitted with this application, and the other mandatory attachments and
supporting information accompanying this application, not identified in those other form parts?
Description of attachment or information Title (applicable) Method of delivery to
(e.g. Part C of Form 1, owner's consent, evidence of (e.g. General Authority, James Street Date assessment manager
resource allocatiorventtfement, plans, drawings, reports) Traffic Report) ag
1. WEES CONCENT, G/U[67| LOSTED.:
(nS ; Hakan 14 Sler, FOF
Portable Long Service Leave (PLSL) levy for building and construction work
13. Is payment of a Portable Long Service Leave (PLSL) levy required for building and construction work before a development permit
for the gppfication can be given?
No
13(a) Indicate the reason PLSL is not applicable.
(_ The application is not for building and construction work under the Building and Construction Industry (Portable
Long Service Leave) Act 1997, section 3AA (e.g. the application is only for a change of use or for the following types of
work carried out solely for farming purposes: land clearing, site preparation, earthworks, fences, fodder harvesting,
am of encroaching vegetation, clearing of regrowth, thinning vegetation or controlling weeds or pests); or
All costs, that relate to the work both directly and indirectly, are less than $80,000, inclusive of GST; or
C1 The work is being carried out under an owner-builder permit issued under the Queens/and Building Services
Authority Act 1991 - Complete and subrmit a QLeave Nobification and Payment Farm (no payment required if owner-builder permit
number stated). The receipted form must be sighted by the assessment manages before a development permit can be given.
DO Yes
13(b) Has the PLSL levy been paid?
(J No- Complete and submit a QLeave Notification and Payment Form. The receipted form must be sighted by the
assessment manager before a development permit can be given.
(J Yes- Complete Table L and submit, with the application, the "yellow" (Local Government's (Council) / Private Contt fier’s}
copy of the receipted QLeave Form.
Page 7
INTEGRATED PLANNING ACT 1997 Part A, Version 3.0, 3 September 2007 Table L A . QLeave Project Number Amount paid Date paid (6 digits, starting with A.B, EL or P) [ 1. OFFICE USE ONLY [Date received | ] [Reference numbers | o7/ 223% ] t FOR COMPLETION BY ASSESSMENT MANAGER ls a QLeave Notification and Payment Form required for this application? C] No (1 Yes - Complete Table M Table M Column 4 Column 2 Column 3 Column 4 Column 5 Column 6 i Date receipted form Description of the work Amos | Date paid Leave Project Number | shied by escent Narn [4 NOTIFICATION OF ENGAGEMENT OF PRIVATE CERTIFIER To: [ Council. I have been engaged as the private certifier for the building work referred to in this application. e vane an Accreditation number Name BSA Certification number Building classification Advice for completing Part A General advice « — Under IPA, section 3.2.1(7) mandatory requirements must be correctly completed for a development application to be a ‘properly made application’. The assessment manger may refuse to receive an application that is not properly made. = — Completion of Part A of Form 1 is required for all development applications. Other mandatory requirements, applicable to certain types of applications, are stated in other Parts of Form 1. . * — The IDAS Assessment Checklist must also be completed for alt development applications, other than those requiring assessment against the Building Act 1975 only. « — For further information about completing this form go to IDAS Guide 1 (Making and IDAS application’ ai « The premises, the subject of the application, may be identified in a number of ways. Street address and lot on plan are most common. Lot on pian details can be obtained from tite documents or through the local government. «The term ‘premises’ is defined by the IPA, schedule 10 to mean a building or other structure, and land (whether or not a building or other structure is situated on the land). The term ‘land’ is also defined to include the estate in, on, over or under the land. « A description of the land is not required if the application relates to a mobile and temporary Environmentally Relevant Activity (ERA) only. Instead complete Q1(a). + Strategic Port Land is within a local government area but a local government's planning scheme does not apply on Strategic Port Land. Strategic Port Land is declared under the Transport infrastructure Act 1994. For further information go to IDAS Guide 11 (Development on strategic port land) and the Queensland Transport (Ports) website. Q2 * Coordinates often provide the best means of accurately identifying the location of development proposed in waters, or on a relatively smat! development site distant from property boundaries. Sufficient coordinates need to be provided to identify the boundary of the premises the subject of the application. « Eastings and northings using GDA94 datum is preferred, but longitude and latitude and other (specified) datum may be provided.
Page 8
INTEGRATED PLANNING ACT 1997 Past A, Version 3.0, 3 September 2007
Q3
« Asingle development application may involve land both within and outside waters.
« A ‘watercourse’ is defined by the Water Act 2000, schedule 4 and generally means a river, creek or stream upstream of the point to
which high spring tide ordinarily floes and reflows (unless a regulation has declared a limit for the watercourse). Generally, a watercourse
is in the jurisdiction of the Department of Natural Resources and Water.
« ‘Tidal water is defined in the Coastal Protection Act 1995 (Schedule) and ‘tidal area’ for a local government and for strategic port land is
defined in the IPA (schedule 10). Generally, the area below ‘high-water mark’ (defined by the Coastal Protection Act in relation to high
water mark at spring tides) establishes the boundary of a tidal area.
Land below high water mark is not within a tocat government's area unless provided for under the Loca! Government Act 1993. Unless
otherwise provided for by legislation, a local government has no jurisdiction below high water mark. A tidal area for strategic port land is
within the jurisdiction of the relevant port authority, while the Environmental Protection Agency generally has jurisdiction for a local
govemment tidal area. However, the IPA gives local govemments jurisdiction for assessing and deciding applications for prescribed tidal
works within the tidal area for a local government, and the planning scheme may be applied to that assessment (to the extent provided
for in the code for prescribed tidal work).
Qs
The applicant need not be the owner of the land. However, the applicant is responsible for ensuring the information provided on the
Form 1 Application Form (including this Part and any other relevant Part) is correct.
¢ Ifthe applicant is a company or organisation, a contact person must be nominated.
« Evidence of this consent may need to be provided before the application will be accepted as property made by the Assessment
Manager, during the processes of the application or in the event of an appeal about the outcome of the application.
ato
« Section 3.2.1(5) of the IPA requires evidence of resource entittement be given for applications involving a prescribed State resource,
Schedule 10 of the /ntegrated Planning Regulation 1998 (IPR) prescribes the State resources, including State-owned land, where
evidence is required to be given, and the evidence required to support the application. Link to Integrated Planning Regulation
* Section 3.2,1(10)(a){ii) states an application cannot be taken to be properly made without the required evidence.
« Evidence may be required from more than one Department responsible for a State-owned resource, e.g. from the Environmental
Protection Agency for quarry material below high water mark, and the Department of Natural Resources and Water in relation to the
State-owned land above high water mark...
«Inthe case of applications involving the taking or interfering with water under the Water Act, the development application may be
made at the same time as the request for resource entitlement.
* Inthe case of State-controlled roads, a resource entitlement is not required for an activity that is exempt ancillary works or
encroachment (identified by gazette notice under the Transport Infrastructure Act 1994, section 50), or if the activity requires referral to
the Department of Main Roads.
Qi
Section 3.2.1(3) of the IPA prescribes that an application must contain, or be supported by, the written consent of the land owner's, if the
application involves any of the following:
(i) a material change of use;
(ii) reconfiguration of a lot;
{iii) work on land below high-water mark and not within a canal as defined under the Coastal Protection and Management Act 1995, ot
{iv) work on rail corridor land defined under the Transport infrastructure Act 1994.
‘Owner for the purpose of a lodging an IDAS development application means the person at the time of lodging the application, entitled to
receive the rent for the land (or would be entitled to receive the rent for it if it were let to a tenant at a rent).
« Owner’ consent is not required for a mobile and temporary ERA.
Q12
Only information not identified in other Parts of Form 1 needs to be listed in this section of Part A.
Q13
The Building and Construction Industry Portable Long Service Leave Scheme provides tong service leave entitlements to workers in the
building and construction industry who would be unlikely to accrue enough service with one employer to qualify for long service leave. To
fund the scheme, a levy is collected on all building and construction work carried out in Queensland where the total cost of the work,
whether direct or indirect, is $80,000 or more inclusive of GST. This amount and other prescribed percentages and rates for calculating
the levy are stated in the Building and Construction Industry (Portable Long Service Leave) Regulation 2002. Included in the amount
collected by QLeave is the Workplace Health and Safety Fee and the Building and Construction Industry Training Levy.
« The Building and Construction Industry (Portable Long Service Leave) Act 1991 {PLSL Act) defines the building and construction industry
for the purposes of the levy and includes, for example, renovating, relocating, constructing, altering, demolishing, maintaining or repairing
buildings, pools, roads, jetties, pipelines, fences or earthworks, and works for subdividing, irrigating or draining land.
* The PLSL Act requires the portable tong service leave levy (PLSL levy) be paid before the assessment manager may give a development
permit for certain building or operational work. The assessment manager must sight an approved form issued by QLeave advising of the
status of the payment of the levy.
Building and Construction Industry Notification and Payment Forms are available from any Queensland post office or agency, on request
from QLeave, or can be completed on the QLeave website at www.gleave.ald.qov.au
For further information contact QLeave (Tel: 1800 803 481 Web: www.qleave.ald.gov.au }
Privacy Statement
The information collected on Form 1 will be used by the Department of Local Govemment, Planning, Sport and Recreation in accordance
with the processing and assessment of your Application. Your personal details will not be disclosed for a purpose outside of the IDAS
process, except where required by legisiation {including the Freedom of information Act 1992) or as required by Parliament. This
information may be stored in a Department of Local Government, Planning, Sport and Recreation database. The information collected will
be retained as required by the Public Records Act 2002. For further information on your privacy, contact the Privacy Contact Officer for
the Department of Local Government, Planning, Sport and Recreation at (07) 3237 1860.
-6-
Page 9
NCCS4C COAICIL
INTEGRATED PLANNING ACT 1997 Part E, Version 3.0, 3 September 2007
Building &/or operational work assessable against a planning scheme
Nature of the works
1. Is te fain seeking approval of building work assessable against a planning scheme?
No
OO Yes
1(a) _ Ifyes, is the application seeking approval for more than one type of building work?
a No - Complete Table A
(C1 Yes— Complete a new Table A for each type of building work
Table A
(i) What aspect of the building work is made assessable by the planning scheme (e.g. building height greater than 8.5m, building work on high
fandslip risk areay?
(i) Are cl works subsequent to a previous Development Permit or Preliminary Approval for another aspect of development?
No
C1 Yes - Complete Table A(a)
Table A(a)
List of approval reference/s Date approved Date approval lapses
[ 4.
[ GENERATE ANOTHER TABLE A
2. 4s the application seeking approval of operational work assessable against a planning scheme?
No
Yes
2(a) If ye is the application seeking approval for more than one type of operational work?
No ~ Complete Table B
(1 Yes - Complete a new Table B for each type of operational work
Page 10
INTEGRATED PLANNING ACT 1997 3. Part E, Version 3.0, 3 September 2007 Table B (i) What is the nature of the operational work? 0 Roadworks [CDs Stormwater [1 Water infrastructure (1 Sewerage infrastructure C1 Landscaping (0 Clearing vegetation under the planning scheme (1 Earthworks (0 Drainage works ([[] Signage [Other - Specify below Wew TIMBEL JETTY PLiVATE WE (i) Is the application for operational work involving the creation of new lots? lo 1 Yes - Specify number below CT (ii) wna of approval is being sought? Development Permit (C1 Preliminary Approval iv) Is gh current Preliminary Approval for this operational work on the premises? No CO Yes - Complete Table B(a) Table B(a) List of approval references Date approved | Date approval lapses [ 1. (v) nang es subsequent to a previous Development Permit or Preliminary Approval for another aspect of development? No 1] Yes- Complete Table B(b} Table B(b) List of approval references Date approved | Date approval lapses [ 1. GENERATE ANOTHER TABLE B Mandatory information Confirm the following mandatory information accompanies this application ement Confirmation of Method of lodgement I Plans, and specifications if applicable, showing the nature and location of the proposed works AGrckuding the extent of any cut and £2) "3 [Confirmed Pe NT FORM (0S OFFICE USE ONLY [Date received | ‘| [Reference numbers Advice for completing Part E General advice Part A must also be completed for all IDAS development applications. All questions must be answered unless, following a response, there is a statement to go directly to a particular question. Q1&2 development to occur. A development permit authorises development to occur, while a preliminary approval is a step in the approval process and does not authorise -2-
Page 11
Queensland Government 5 November 2007 / Maritime Safety Queensland Queensland Transport Emma Reed m Noosa Jetty Builders PO Box 299 Noosaville Qid 4566 Dear Emma Tidal Works — Request for comments Proposed Jetty for F De Pasquale ~ 35 Wyuna Drive Noosa heads (Lot 17 on RP.N.1057.6) Thank you for your letter of 24 October 2007 about your proposal to construct a jetty at the location mentioned above. As a concurrence agency, Maritime Safety Queensland has no objection to the proposal provided the following navigation and marine safety conditions are complied with. 1, The contractor must build the jetty according to John Norden & Associates Drawings No: 07/65-1 and 07/65-2 attached to your letter dated 24 October 2007. 2. No part of the structure or any ship berthed at this structure, is to come closer than 1.5metres from the side boundaries of the allocated water space as shown on the submitted water allocation plan 07/65-1. 3. In the absence of a designated quayline, the structure and any part thereof must not extend beyond that of neighbouring approved structures. 4. The jetty and all freestanding piles must be lit and clearly visible to approaching vessels. The contractor must position all lighting so it does not cause a risk to the safe navigation of other vessels. 5. The applicant or his agent is responsible for the removal of any existing structure above or below the waterline, and must contain and remove any debris. Any pile that needs to be removed must be totally extracted. Maritime Safety Queensland Our ref 710/01487(7) P37071 £23684 F78 Marine Operations (Brisbane) Your ref MacArthur Avenue East Enquiries Geoff Smith Pinkenba Queensland 4008 Telephone +61 7 3860 3538 Facsimile +61 7 3860 3571 ABN 13 200 330 520 Website www.msq.qid.gov.au Email [email protected]
Page 12
6. The existing pontoon at this property is to be removed. 7. The owner is to ensure that the ship berthed at this structure must maintain sufficient under keel clearance at all stages of tide. The ship must comply with any local restrictions placed on channel depths and draft restrictions. 8. Any ships and equipment you or your agent use must comply with the Transport Operations (Marine Safety) Act 1994, the Transport Operations (Marine Safety) Regulation 2004 and the Transport Operations (Marine Pollution) Act 1995. 9. Any ships using this structure must comply with the Transport Operations (Marine Safety) Act 1994 and the Transport Operations (Marine Safety) Regulation 2004. 10. Any ship moored at this jetty must not impede the safe navigation of other ships or restrict safe access to or from neighbouring structures. 11. Any ship moored or dry berthed at this structure must not exceed the following sizes: Wet Berth Dry Berth ~ Length Overall - 5.0 metres N/A Beam - 2.0 metres 12. The contractor must construct the jetty within two years from the date of approval. If construction is not completed, you will need additional or amended comments from the Regional Harbour Master. Maritime Safety Queensland does not need to be further consulted if all of the above conditions are met. The above conditions must be included in your application to the assessment manager. This agency will also forward a copy of this letter to the Assessment Manager. Yours sincerely v Maritime Safety Queensland Page 2 of 2
Page 13
PILE-IT Pty Ltd Trading as Noosa Jetty Builders LETTER ABN: 55099036736 No: 0001 BSA: 1111115 DATE:24/09/2007 FROM: Noosa Jetty Builders PO Box 299 Phone: (07) 5474 3480 Noosaville Fax: (07) 5474 3480 QLD, 4566 Mobile: 0408 137 526 To Whom It May Concern, I [Rance Ne bh» ale ¢ L Dinec7vk ) ' __, give Pile-It Pty Ltd t/a Noosa Jetty Builders permission to submit an application for prescribed title works on my behalf. : Address: YE Anrcé Secet Haier Post Code: 427 Phone: (07 | 32 Cags23: Mobile: _0¥24A¢ ORS * Email: Eras © _ oak mee GLOUP - Cort -ceny: Yours Sincerely, malt
Page 14
L- S9/L0 | ZL LOP¥G 40 Od seca Tensei wor eeaory Paspctlaeed
“Duc puwom | “aie We) sava vsoon | he w
" mew | aan Nn 1b 101 suaaina LNOAW ONINVYS
soqejs0ssy 8 ALLar dasodoud | ALLar SOON
oe te “| uepion wuc uuor £ a1wnosvd 30 ‘4 QL ALd LrStd
HOUVAN ALNNOOD ot
WaA3M HSIuvd NW 1d NOILVOOTIV YSLVM
9'2S01'N dul
4b 101
ee L
ae TO = sere _
7_—oT | oe
—
!
| = Aur |
Q3SO0d0ud
=a
=— A Eb .
+ TY
\ v
4 +
oats )
g 433ND, VEARM
8
Bre8t!.
“SONIMVHO SHL
WOUJ GaTVOS 38 LON TIVHS S13A37 ONY SNOISN3NIC °S
“GAIONIY YO
G3HSV145 d¥D ATINS GNV G3 TV3as 3d TWHS Salld JO dOl ‘
“AALS SSS INIVLS YO GaSINVA TVS O3ddi0 LOH 38 TWHS
“9.13 'STIVN 'SM3YOS 'SUSHSVM 'S.L106 ‘S.LAN ONIGNTONI
YOM 134LS YAHLO Ti ‘8b€ ACWYHO SNIMWW G3A0udd¥
30 TIWHS “O13 'SdOu 'S110d TaalS SSAINIVLS TIV “€
«S)RIOM WGLL YOs SCUVONVLS
ONINZANIONS ONY ONICTING. ~ ADM0d TYNOLLVaadO
SAONSOV NOLLOSLOUd TwLNSWNOUIANS SH HLM AIdWOO
TIWHS NOLLONELSNOS Tv SSIMYSHLO CaLON SSFINN ‘2
bi
Grae
aAIY¥aG VWNNAM
‘NIN ¥b4 40 J0WeD SSSULS V
‘GH'V OL 3ALLVT3Y BAVH ONW S3I03dS GaA0udd 40 | SSWTD ALTIaWeNG
SLHOISH 30LL ONY $13A31 Tv 3@ TIWHS MSSWLL TV SSIMUSHLO G3LON SSZINN +
*SSLLON
Page 15
APPROVED HANDRAIL
TO ONE SIDE (MINIMUM)
= aS
TOP OF WALL RL 1.05
RO)
SIDE ELEVATION
1:80
DECKING:
125 x 38 HWD
SCREWED TO
75x38 HWD
1/18 x No14 TYPE 17
AINLESS STEEL
SCREWS @ 450 CRS
PILES:
@ 200 H6 MARINE HWD
POLES
NOTE THAT ALL POLES TO COMPLY
WITH AS 2180 - PILING CODE
DETAIL ( | \
BEARERS:
150 x 76 HWD
FIX TO EACH PILE
WITH 24416 S/S BOLT
PILES:
2 HWD POLES
NOTE THAT ALL
10 PL ANGLE BRACKET-
216 9/5 TO EACH MEMBER \ \
180 x 75 HWD
Rg
225 x75 HWD
DETAIL : :
SECTION A
“ LY
__DECK RL 1416
cr
FRONT ELEVATION
F. DE PASQUALE
PROPOSED JETTY
LOT 17
WYUNA DRIVE
NOOSA HEADS
JETTY USE:
SINGLE USER, PRIVATE
NO VEHICULAR ACCESS
John Norden
DESIGN LIVE LOAD - 2.0 kPa
& Associates
MAXIMUM MOORED VESSEL - 5m ACN 010 263 877
aioe
7 PO Box 205
Tewertin Q 4666
RABRINK PTY LTD T/A
Ph: 07 54407137 Fax: 07 54497172
Emel:
=" WORKING DRG
P"o7165-2 |
Page 16
—_—S xm LAND USE SECTION FEES ort NOOSA RECEIPT TYPE SALE OF DOCUMENTS Superseded Planning Scheme Documentation 520 Copy of Permit/Approval Letter 110 The Noosa Plan Documentation 111 APPLICATION FEES Material Change of Use - Code/Impact Consistent 521 Inconsistent 521 Assessment under Superseded Planning Scheme 521 Modification to a Development Permit . 521 Extension of a Currency Period : 521 Operational Works - Landscaping 521 e@ Bldg Work assessable against the Planning Scheme 521 PRE LODGEMENT REVIEW Half Hour §22 One Hour 522 ADVERTISING Purchase Advertised Applications §23 JETTIES © Jetty Application Fee Zo7s 524 Jetty Bond 51 (Category 4) BONDS : Performance Bond Sco $41 : (Category 9) SIGNS Registration Fee . 222 seen FEE . Search of Land Use Section file 112 Liquor Licensing Request 113 TOTAL $ 257 NAME: /cte. Le PL, Lec ADDRESS: fo Gem. 1 244 MOcBAV Lee ¥SbG FILENO: C1] 2323 DATE: 'Wy/u (ot RECEIPT NO: Ce Uy Signature of TP Officer: (> rena 4 iw X AUTHORITY NO: 2) i / 2227] 3333 |
Used in these records
07/2333 - Prescribed Tidal Works - Transport Type 5 - Domestic Marine (Private Jetty) [As Published]Related documentApplication case desk ↗
About this file
- File size
- 760 KB (small file)
- File type
No other editions are linked here.