Skip to the record
The gold standard in government transparency.

Council archive · source document

00157B80.001

of 6

Text shows just the words. Original shows the document exactly as it was published.

Text sections not matched to the original PDF pages. See original document to check page numbers.

NOOSA COUNCIL IDAS Development Application Decision Notice                                                3 of 6




                                    Noosa Council Conditions
                                    INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION


1.     Development undertaken in accordance with this approval must generally comply with the approved plans
       of development. The approved plans are titled and numbered Site and Ground Floor Plan, C1.0; Upper
       Floor Plan, C2.0; Elevations, C3.0 prepared by Glen Watson Building and Design and dated 27 June
       2007 and as may be amended by these conditions and annotations on the plans.

2.     The development must be undertaken and operated in a manner that causes no detrimental effect upon
       the amenity of the neighbourhood by reason of the creation of excessive noise, lighting nuisance or other
       emissions.

3.     The wall located on the boundary shall not exceed 2.0m in height above natural ground level.

4.     The wall setback approximately 1m from the frontage boundary, shall not exceed 2.6m in height and shall
       not extend further west as depicted on the approved plans.

5.     The area between the wall and the frontage boundary shall be planted in accordance with Councils
       Planing Scheme Policy 3 – Landscaping Plants & Guidelines

6.     All hot water systems installed shall be either solar systems; electric heat pump systems; or gas systems
       (LPG or natural).

7.     Buildings and structures (including swimming pools, sheds, tennis courts or outbuildings) are not
       constructed under overhead electricity transmission lines, or within any easements.

8.     External colours and finishes of the building shall comprise of muted/environmental tones

9.     The Preliminary Approval for building work lapses if the use has not happened by 18 July 2009, unless an
       application to extend the currency is approved by Council.




AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@8c0502f8\@[email protected]

Used in these records

About this file

File size
25 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

00157B80.001.pdf · 25 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.