Skip to the record
The definitive source for everything Noosa Council.

Council archive · source document

SUPERCEDED Decision Notice - Approved by Delegation of Authority MCU23 0094, OPW23 0113 & RAL23 0014 [As Published] · MCU23/0094

of 28

Text shows just the words. Original shows the document exactly as it was published.

                                                                               Officer:          Georgina Schramm
                                                                               Direct Telephone: 07 5329 6569
                                                                               Our Reference:    MCU23/0094
                                                                                                 OPW23/0113
                                                                                                 RAL23/0014
                                                                               Your Reference:   0479

               11 January 2024


               Capital Prudential
               C/- Pivotal Perspective Pty Ltd
               4/59 Mary Street
               NOOSAVILLE QLD 4566
               [email protected]



               Dear Sir/Madam,
                                                         Decision Notice
                                                         Planning Act 2016

               I refer to your application and advise that on 8 January 2024, Council decided to approve the
               application subject to conditions.
               Details of the decision are as follows:
               1.     APPLICATION DETAILS

                Application No:               MCU23/0094, OPW23/0113 & RAL23/0014

                Street address:               79 – 83 Eumundi Noosa Road & 26 Headland Drive, Noosaville

                Real property description:    Lots 75-77 RP 71151 & Lot 3 SP 208257

                Planning Scheme:              Noosa Plan 2020 (25 September 2020)

               2.     DECISION DETAILS

               Council decided to issue the following type of approval:
               A. Development Permit for Material Change of Use - Multiple dwelling (38 units - 36 small
                  dwellings, 2 dwellings greater than 100m2);
               B. Development Permit for Reconfiguring a Lot – Subdivision by Community Title (4 lots into 38
                  lots);
               C. Development Permit for Operational Works (in part) – Roadwork, Vegetation Clearing &
                  Earthworks; and
               D. Preliminary Approval for Landscaping, Drainage, Stormwater.
               3.     CURRENCY PERIOD OF APPROVAL

               The currency period for this development approval is stated in the conditions below.




               ABN 97.969.214.121                                                             PO Box 141
               noosa.qld.gov.au                                                        Tewantin QLD 4565
               [email protected]                                                        07 5329 6500
                                                                                                      Page 1 of 28
Document Set ID: 22759072
Version: 6, Version Date: 11/01/2024
Full text of the other 27 pages

Page 2

               4.     ASSESSMENT MANAGER CONDITIONS

                           DEVELOPMENT PERMIT FOR MATERIAL CHANGE OF USE (MCU23/0094)
                      When Conditions Must Be Complied With
               1.     Unless otherwise stated, all conditions of this Decision Notice must be complied with prior to
                      the use commencing, and then compliance maintained at all times while the use continues.
                      Currency Period
               2.     This development approval lapses if the use has not happened by 8 January 2030, unless
                      an application to extend the currency period is approved by Council.
                      Approved Plans
               3.     Development authorised by this approval must be undertaken generally in accordance with
                      the Approved Plans listed in the table/s below.
                      The plans must be amended to incorporate the amendments listed within the table below
                      and resubmitted to Council prior to the issue of any Development Permit for Building Works*

                        Plan No.           Rev.    Plan/Document Name                             Date

                        WD0.05             R       Site Plan prepared          by   Blackwood 5.12.2023
                                                   Architecture & Design
                                                   (Annotated by Council)

                        WD0.06             R       Site Plan – Ground Level prepared by 5.12.2023
                                                   Blackwood Architecture & Design
                                                   (Annotated by Council)

                        WD0.07             P       Site Plan – Upper Level prepared by 5.12.2023
                                                   Blackwood Architecture & Design

                        WD0.08             O       Site Plan – Roof prepared by Blackwood 5.12.2023
                                                   Architecture & Design

                        WD.0.10            O       Site – Internal Elevations / Sections 5.12.2023
                                                   prepared by Blackwood Architecture &
                                                   Design

                        WD.1.03            O       B1 Roof Plan prepared by Blackwood 5.12.2023
                                                   Architecture & Design

                        WD.1.07            O       B1 Sections prepared        by   Blackwood 5.12.2023
                                                   Architecture & Design

                        WD.2.03            O       B2 Roof Plan prepared by Blackwood 5.12.2023
                                                   Architecture & Design

                        WD.3.01            P       B3 – General Arrangement Plans prepared 5.12.2023
                                                   by Blackwood Architecture & Design

                        WD.3.03            O       B3 – Roof Plan prepared by Blackwood 5.12.2023
                                                   Architecture & Design
                                                   (Annotated by Council)




                                                                                                      Page 2 of 28
Document Set ID: 22759072
Version: 6, Version Date: 11/01/2024

Page 3

                        WD.3.06           O      B3 – Elevations prepared by Blackwood 5.12.2023
                                                 Architecture & Design

                        WD.3.07           O      B3 – Sections prepared by Blackwood 5.12.2023
                                                 Architecture & Design

                        WD.4.01           P      B4 – General Arrangement Plans prepared 5.12.2023
                                                 by Blackwood Architecture & Design

                        WD.4.03           O      B4 – Roof Plan prepared by Blackwood 5.12.2023
                                                 Architecture & Design

                        WD.4.06           O      B4 – Elevations prepared by Blackwood 5.12.2023
                                                 Architecture & Design

                        WD.4.07           O      B4 – Sections prepared by Blackwood 5.12.2023
                                                 Architecture & Design

                        WD.5.01           P      B5 – General Arrangement Plans prepared 5.12.2023
                                                 by Blackwood Architecture & Design

                        WD.5.03           O      B5 – Roof Plan prepared by Blackwood 5.12.2023
                                                 Architecture & Design

                        WD.5.06           O      B5 – Elevations prepared by Blackwood 5.12.2023
                                                 Architecture & Design

                        WD.5.07           O      B5 – Sections prepared by Blackwood 5.12.2023
                                                 Architecture & Design

                        WD.6.03           O      B6 – Roof Plan prepared by Blackwood 5.12.2023
                                                 Architecture & Design

                        WD.7.03           O      B7 – Roof Plan prepared by Blackwood 5.12.2023
                                                 Architecture & Design

                      The following plans require amendment.

                        Plan No.          Rev.   Plan/Document Name                              Date

                        WD0.09            O      Site – Elevations prepared by Blackwood 5.12.2023
                                                 Architecture & Design

                        WD.1.19           K      Landscape prepared          by    Blackwood 5.12.2023
                                                 Architecture & Design

                        Amendments        Remove the communal recreation area facilities in its entirety,
                                          including the swimming pool, BBQ facilities and bathroom. Provide a
                                          revised landscaping plan that details this area densely planted with
                                          screening vegetation.
                                          A 5 metre wide buffer densely planted with trees and shrubs
                                          including species from 1 metre to 8 metres in height is to be detailed.

                        Plan No.          Rev.   Plan/Document Name                              Date




                                                                                                     Page 3 of 28
Document Set ID: 22759072
Version: 6, Version Date: 11/01/2024

Page 4

                        WD.1.01        P      B1 General Arrangement Plans prepared 5.12.2023
                                              by Blackwood Architecture & Design

                        WD.1.06        O      B1 Elevations prepared by Blackwood 5.12.2023
                                              Architecture & Design

                        WD.2.01        P      B2 General Arrangement Plans prepared 5.12.2023
                                              by Blackwood Architecture & Design

                        WD.2.06        O      B2 Elevations prepared by Blackwood 5.12.2023
                                              Architecture & Design

                        WD.2.07        O      B2 Sections prepared        by   Blackwood 5.12.2023
                                              Architecture & Design

                        WD.6.01        P      B6 – General Arrangement Plans prepared 5.12.2023
                                              by Blackwood Architecture & Design

                        WD.6.06        O      B6 – Elevations prepared by Blackwood 5.12.2023
                                              Architecture & Design

                        WD.6.07        N      B6 – Sections prepared by Blackwood 1.12.2023
                                              Architecture & Design

                        WD.7.01        P      B7 – General Arrangement Plan prepared 5.12.2023
                                              by Blackwood Architecture & Design

                        WD.7.06        O      B7 – Elevations prepared by Blackwood 5.12.2023
                                              Architecture & Design

                        WD.7.07        O      B7 – Sections prepared by Blackwood 5.12.2023
                                              Architecture & Design

                        WD.1.21        K      Materials and 3D Visualisation prepared by 5.12.2023
                                              Blackwood Architecture & Design

                        WD.1.24        H      3D Visualisation prepared by Blackwood 5.12.2023
                                              Architecture & Design

                        Amendments     The Ground Level “drying court” (as detailed on the ground level of
                                       Units 101, 102, 105 & 701-704) are not to be an enclosed area, the
                                       door is to be removed. Remove external walls/screens of each
                                       “drying court” and replace with a free-standing screen with a
                                       minimum of 50% transparency, and minimum of 300mm gap from
                                       the top and bottom of the screen. The fixed screen is not to exceed
                                       a height of 1.8 metres, 2.1 metres from finished ground level.
                                       The screen can be extended in front of the entryway if desired for
                                       additional privacy.
                                       The Upper Level “drying court” (as detailed on the upper level of
                                       Units 205-208, 603, 604 & 706-708) are to have an appearance of
                                       an upper level terrace, with the clothesline screened from the
                                       streetscape. In this regard, the clothesline is to be relocated to the
                                       northern wall of the terrace with the clothesline screened to 1 metre,
                                       with the remaining portion (~2 metres) of the area an open terrace.




                                                                                                 Page 4 of 28
Document Set ID: 22759072
Version: 6, Version Date: 11/01/2024

Page 5

                                                These areas are to be redesigned to not contribute to gross floor area
                                                as per the administrative term of the Noosa Plan 2020.

                        Plan No.                Rev.    Plan/Document Name                            Date

                        WD.10.03                G       Fencing Plan prepared by Blackwood 5.12.2023
                                                        Architecture & Design

                        Amendments              Front fences or walls along Eumundi Noosa Road frontage are set
                                                back an average of 1 metre and are articulated to provide visual
                                                interest by stepping the design at a maximum of 5 metre intervals.

                        Plan No.                Rev.   Plan/Document Name                             Date

                        WD.1.23                 I      3D Visualisation prepared by Blackwood 5.12.2023
                                                       Architecture & Design

                        WD.1.25                 H      3D Visualisation prepared by Blackwood 5.12.2023
                                                       Architecture & Design

                        Amendments              Introduce an additional colour to the external building façade with a
                                                deep, stronger colour tone to highlight individual dwellings and
                                                adding visual interest to the street and surrounds.

                      *(Refer to Advisory Note)
                      Nature and Extent of Approved Use
               4.     The approved development consists of Multiple dwelling (38 units – 36 small dwellings, 2
                      dwellings greater than 100m2).
                      Note: A small dwelling is defined in accordance with administrative term of the Noosa Plan
                      2020 (v. 1 – 25 September 2020).
                      Built Form and Development Appearance
               5.     Multiple Dwelling units 701-704, 101-102,105, 201-204, 209 and 501 are to have:
                              i.       accessible by a safe, continuous and step free path of travel from the street
                                       entrance of the property or from a car parking space;
                              ii.      has a step-free entrance door with opening width of at least 820 millimetres; and
                              iii.     contains a bathroom on the entry level.
               6.     All air conditioning units or other mechanical equipment must be fully enclosed or screened
                      such that they are not visible from the street frontages nor adjoining properties.
               7.     All units where adjoining an external residential allotment are to screen and batten air
                      conditioning units to assist with noise mitigation.
               8.     All deck and balcony areas above ground floor must not be enclosed by permanent fixtures
                      such as shutters, louvres, glass panelling or the like, except where required to satisfy any
                      privacy condition of this Decision Notice.
               9.     The approved colour palette of the development is to include an additional deep, stronger
                      colour tone to highlight individual dwellings and add visual interest to the street and
                      surrounds.
                      Building Height
               10.    The maximum height of the development must not exceed 8 metres above the natural and
                      finished ground levels.




                                                                                                          Page 5 of 28
Document Set ID: 22759072
Version: 6, Version Date: 11/01/2024

Page 6

               11.    Certification must be submitted to Council from a Licensed Surveyor which certifies that the
                      buildings do not exceed the maximum height requirement of this Decision Notice.
                      Performance Bond
               12.    Security in the form of a cash bond or trading bank guarantee to the sum of $30,000 must
                      be submitted to Council, to secure performance of all conditions of this approval, prior to pre-
                      start meeting. The cash bond or trading bank guarantee will be returned on performance of
                      the conditions of approval less any costs incurred by Council in respect of enforcing
                      performance of this permit. Council reserves the right to call upon the bond or guaranteed
                      sum to effect compliance with conditions.
                      Protection of Privacy
               13.    Screening devices for the upper terraces of Units 705-706 must be provided as indicated on
                      the approved plans and where necessary to meet privacy conditions of this Decision Notice.
               15.    To ensure privacy is protected between adjoining properties to the north, east and south,
                      105, 209, 304, 705-706, 501, 603 must:
                      a.      provide screening devices to upper level balconies; and/or
                      b.      have a minimum window sill height or 1.7 metres above floor level; and/or
                      c.      be fitted with translucent glazing; and/or
                      d.      be fitted with fixed external screens.
                      Street Identification
               16.    The street address of the development from Eumundi Noosa Road and Headland Drive must
                      be clearly visible and discernible from the primary frontage of the site by the provision of a
                      street number and, where appropriate, the building name.
                      Fencing and Walls
               17.    The maximum height any fences adjoining a residential use must not exceed 2.0m above
                      the natural ground level at any point. Unless is required to satisfy the acoustic condition of
                      this notice and accepted as generally in accordance by Council.
               18.    Street fencing must be provided generally as shown on the Approved Plans, and not exceed
                      1.8 metres in height along Eumundi Noosa Road.
               19.    The area of land between the fence and the front property boundary must be densely
                      landscaped to screen any fencing from the street.
               20.    There are to be no private footpath connections within Council’s road reserve to Units 101,
                      102, 105 & 701-704, this area is to be returned to grass.
               21.    A privacy fence must be constructed to the full length of the development’s boundaries.
               22.    The fence and any associated retaining walls along the boundary adjoining Lots 1 & 2
                      SP208257, Lot 75 RP71151 & Lot 49 SP298783 must be constructed to prevent nuisance
                      from car head lights and be acoustically constructed to limit the transfer of noise. Written
                      certification must be provided to Council confirming the acoustic treatments have been
                      incorporated prior to the sealing of the survey plan.
                      Clothes Drying Areas
               23.    Each dwelling must be provided with access to an outdoor clothesline which is screened from
                      public view (external to the development site) and where achievable, internal to the
                      development.
               24.    The notated “drying court” as shown on the Ground Level Plans of Units 101, 102, 105 &
                      701-704, are not to be enclosed. The outer side of each “drying court” is to achieve a
                      minimum of 50% transparent screening.




                                                                                                       Page 6 of 28
Document Set ID: 22759072
Version: 6, Version Date: 11/01/2024

Page 7

               25.    The notated “drying court” as shown on the Upper Level Plans of Units 205-208, 603, 604 &
                      706-708 are not to be enclosed, with the area to present as an upper level terrace. The
                      screening element of the “drying court” is to achieve a minimum of 50% transparency, with
                      the remaining terrace being open with a balustrade.
                      Community Management Statement
               26.    Any proposed Community Management Statement required for the development pursuant to
                      the Body Corporate and Community Management Act 1997 must be submitted to Council for
                      endorsement at the same time as submission of the Building Format Plan (or similar) to
                      Council for compliance assessment.
               27.    All clauses and by-laws of the proposed Community Management Statement must accord
                      with the requirements of this Decision Notice and, in particular, must include the following
                      additional clauses:
                      a.      The site includes a stormwater management and water quality treatment system.
                      b.      The stormwater management and water quality treatment system must be maintained
                              in accordance with the Water by Design (2009) Maintaining Vegetated Stormwater
                              Assets (Version 1).
                      c.      The full cost of maintaining the system in accordance with the Water by Design (2009)
                              Maintaining Vegetated Stormwater Assets (Version 1) must be included in the
                              proposed levies for each dwelling owner/body corporate.
                      d.      All service vehicles are to access the site from Eumundi Noosa Road only. Waste must
                              be serviced in accordance with Reference Plan 33132.OW5.1-A (vehicle turning
                              plans), the refuse bin area is to be located to allow for servicing internal to the
                              development site.
                      Landscaping Works
               28.    The development site must be landscaped. The works must be undertaken in accordance
                      with an Operational Works approval and the Noosa Plan for that specific area and must
                      include in particular:
                      a.      the works shown on the referenced landscape plans;
                      b.      vegetated screening of any electrical transformers, bin storage areas and the like from
                              the road frontage
                      c.      provision of 1 street tree within the road reserve for every 8 metres of road frontage
               29.    All landscape works must be established and maintained in accordance with the approved
                      design for the life of the development, and in a manner that ensures healthy, sustained and
                      vigorous plant growth. All plant material must be allowed to grow to full form and be
                      refurbished when its life expectancy is reached.
                      Fauna Management
               30.    Vegetation must only be removed or disturbed in accordance with a Fauna Management
                      Plan (or part thereof) prepared by a qualified person* and endorsed through an Operational
                      Works approval.
                      *(Refer to Advisory Note)
                      Noise
               31.    Written certification is required from a suitably qualified person confirming that sound
                      pressure levels from all mechanical plant and equipment comply with the following:
                      a.      Air-conditioning and Refrigeration
                                  i.   7am to 10pm: Maximum level allowable = background + 5dB(A)
                                 ii.   10pm to 7am: Maximum level allowable = background + 3dB(A)
                      b.      Pumps, Service Room


                                                                                                        Page 7 of 28
Document Set ID: 22759072
Version: 6, Version Date: 11/01/2024

Page 8

                                  i.   7am to 7pm: Maximum level allowable = background + 5dB(A)
                                 ii.   7pm to 10pm: Maximum level allowable = background + 3dB(A)
                                iii.   10pm to 7am: No audible noise.
               32.    The certification must be submitted to Council, which certifies that operational noise from any
                      fixed plant and equipment complies and with the requirements of this Decision Notice.
                      Waste Storage
               33.    The refuse areas must be of muted environmental tones to reduce the visual impact of the
                      infrastructure in the streetscape and suitably screened by landscaping where viewed from
                      the street.
               34.    The development must use muted environmental colour tones that blend with the natural
                      environment.
               35.    The developer must provide waste storage and disposal facilities in accordance with
                      Planning Scheme Policy 9, Waste Management, including an external imperviously paved
                      area correctly sized for all refuse and recycling containers and suitably screened from public
                      places and neighbouring properties. A bin wash area is required with a cold-water tap, hose
                      and drain outlet connected to sewer, via a bucket trap. The drain outlet must be designed to
                      prevent storm water entry to the sewerage system.
               36.    Refuse containers must be provided in accordance with the requirements of the
                      Environmental Protection (Interim Waste) Regulation 1996 and (Waste Management)
                      Regulation 2000, for the storage and collection of refuse.
                      External Works
               37.    Eumundi Noosa Road and Headland Drive must be upgraded for the length of their frontage
                      to the subject site. The works must include in particular:
                      a.      Extension to the central medians on Eumundi Noosa Road and Headland Drive to
                              prohibit right-turn movements into and out of the development. The works are to retain
                              the existing widths of through lanes, cycle lanes, shoulders and on-street parking.
                      b.      Construction of a pedestrian footpath in accordance with the conditions of this Decision
                              Notice.
                      c.      Removal of the existing property accesses and reinstatement of the kerb, footpath and
                              verge area to match the balance of the site frontage, including the provision of topsoil
                              and turf where the existing verge is grassed.
                      Condition 37 (a) and (c) is imposed pursuant to s145 of the Planning Act 2016 being non-
                      trunk infrastructure.
                      Condition 37 (b) is imposed pursuant to s128 of the Planning Act 2016 being trunk
                      infrastructure.
                      Site Access and Driveways
               38.    A sealed access driveway must be provided from Eumundi Noosa Road and Headland Drive
                      to all parking and manoeuvring areas of the development. The works must be undertaken in
                      accordance Council Standard Drawing RS-051.
                      Car Parking
               39.    A minimum of 50 car parking spaces must be provided and marked on the site. The works
                      must be undertaken in accordance with an Operational Works approval and must include in
                      particular:
                      a.      A minimum of 40 covered parking spaces within the total;
                      b.      10 visitor parking spaces within the total, which are clearly marked for that purpose and
                              accessible at all times for visitor use;
                      c.      1 disabled parking space/s within the total;



                                                                                                         Page 8 of 28
Document Set ID: 22759072
Version: 6, Version Date: 11/01/2024

Page 9

                      d.       dimensions, crossfalls and gradients in accordance with Australian Standard AS2890:
                               Parking Facilities.
               40.    All car parking areas and access driveways must be maintained exclusively for vehicle
                      parking and manoeuvring and kept in a tidy and safe condition at all times.
                      Pedestrian and Bicycle Facilities
               41.    Pedestrian and bicycle facilities must be provided for the development. The works must be
                      undertaken in accordance with an Operational Works approval and must include in particular:
                      a.       a 3 metre wide footpath within the road verge for the entire length of the site’s frontage
                               to Eumundi Noosa Road;
                      b.       the resealing of the existing asphalt path fronting the development.
                      Condition 41 is imposed pursuant to s128 of the Planning Act 2016 being necessary trunk
                      infrastructure identified by Council’s LGIP to service the development.
                      Stormwater Drainage
               42.    The site must be provided with a stormwater drainage system connecting to a lawful point of
                      discharge. The works must be undertaken in accordance with an Operational Works approval
                      and the Queensland Urban Drainage Manual.
                      Condition 42 is imposed pursuant to s145 of the Planning Act 2016 being non-trunk
                      infrastructure.
                      Stormwater Quality Management
               43.    A stormwater quality treatment system must be provided for the development. The works
                      must be undertaken in accordance with an Operational Works approval and the Bioretention
                      Technical Design Guidelines (Water by Design, 2014), and must include in particular:
                         (a)      stormwater quality treatment devices of a size and location generally in
                                  accordance with those shown in the approved plans listed in this Decision Notice
                         (b)      bioretention devices which:
                                  (i)     are designed generally in accordance with IPWEAQ Standard Drawing
                                          No.s DS-073, DS-075 and DS-076
                                  (ii)    are provided with a free-draining outlet from the sub-soil drainage system
               44.    The development shall be provided with approved permanent signage to educate the
                      residents on the function of the bioretention basin. The wording for the signage for each
                      bioretention basin is to include: “BIORETENTION BASIN - This bioretention basin reduces
                      the pollution of our waterways by reducing the amount of heavy metals, litter, suspended
                      solids, and nutrients discharged to the Noosa River”.
               45.    All stormwater quality treatment devices must be maintained in accordance with the Water
                      by Design (2009) Maintaining Vegetated Stormwater Assets (Version 1). The approved
                      Operational Works drawings for the stormwater quality treatment system and detailed life
                      cycle costing of the system must be attached as an addendum to this document. Records of
                      all maintenance activities undertaken must be kept and made available to Council upon
                      request.
                      Roofwater Capture and Reuse
               46.    In conjunction with the development application for Building Works, the hydraulic design of
                      the roofwater drainage system for buildings 2, 3, 4, 5, 6 and 7 is to be piped to the roofwater
                      storage tanks nominated on drawing 33132-SW1.1 Rev C by SCG Consulting. The roofwater
                      system is to be designed to convey the 1%AEP event of critical duration, with a 20% increase
                      in rainfall intensity to account for future climate change.




                                                                                                          Page 9 of 28
Document Set ID: 22759072
Version: 6, Version Date: 11/01/2024

Page 10

               47.    A total of 39kL of roofwater storage is to be provided for the development as shown on
                      drawing 33132-SW1.1 Rev C by SCG Consulting. The roofwater is to be plumbed for reuse
                      to the following non-potable fixtures, with the detail provided with the hydraulic design
                      submitted in conjunction with the development application for Building Works:
                      • Communal landscape irrigation
                      • Bin wash down
               48.    Certification must be submitted to Council from a qualified person which certifies that the
                      roofwater harvesting tanks and associated reticulation have been installed in accordance
                      with the requirements of this Decision Notice.
                      Services
               49.    Reticulated electricity and telecommunication services must be provided to each unit in
                      accordance with the standards and requirements of the relevant service provider.
               50.    Unless otherwise stipulated by telecommunications legislation at the time of construction, the
                      development must be provided with all necessary conduits, pits and pipes to accommodate
                      the future connection of optic fibre technology telecommunications.
               51.    Certification must be submitted to Council from all relevant service providers (Energex, NBN
                      and Unitywater) which certifies that the development has met the requirements of this
                      Decision Notice and all applicable legislation at the time of construction.
                      Easements
               52.    Unless otherwise agreed in writing by the relevant service provider, any public or third party
                      infrastructure located on the subject site must be placed within an easement registered
                      against the title of the property.
               53.    All easements must be designed in accordance with the planning scheme and granted at no
                      cost to the Grantee. Where the Grantee is Council or a service authority, the easement
                      documentation must be in accordance with the Grantee’s standard easement terms. Draft
                      easement documentation must be submitted to Council for endorsement.
               54.    All works must be kept clear of any existing or proposed easements on the subject land,
                      unless agreed otherwise in writing by the Grantee.
                      Earthworks and Retaining Walls
               55.    All earthworks and associated structures/batters must be contained entirely within the subject
                      site unless written permission from the respective landowner(s) is provided to Council.
               56.    All earthworks must be undertaken in accordance with the provisions of Australian Standard
                      AS3798: Guidelines on Earthworks for Commercial and Residential Developments, Building
                      Code requirements and Noosa Plan 2020.
               57.    Where the development involves excavation or filling over, or adjacent to, drainage, water
                      supply or sewerage infrastructure, all access chamber surface levels must be adjusted to
                      provide a freeboard of 100mm above the finished ground surface level.
               58.    All retaining walls must be designed and constructed in accordance with the Noosa Plan
                      2020 and must be certified by an RPEQ where exceeding 1.0m in height. All retaining walls
                      that are publicly accessible and exceed 1.0m in height must be fitted with a commercial grade
                      safety fence.
                      Damage to Services and Assets
               59.    Any damage caused to existing services and assets as a result of the development works
                      must be repaired at no cost to the asset owner at the following times:
                      a.      Where the damage would cause a hazard to pedestrian or vehicle safety, immediately;
                              or
                      b.      Where otherwise, upon completion of the works associated with the development.



                                                                                                     Page 10 of 28
Document Set ID: 22759072
Version: 6, Version Date: 11/01/2024

Page 11

                      Any repair work which proposes to alter the alignment or level of existing services and assets
                      must first be referred to the relevant service authority for approval.




                                                                                                     Page 11 of 28
Document Set ID: 22759072
Version: 6, Version Date: 11/01/2024

Page 12

                              DEVELOPMENT PERMIT FOR RECONFIGURING A LOT (RAL23/0014)
                      When Conditions Must Be Complied With
               1.     Unless otherwise stated, all works required by the conditions of this Decision Notice must be
                      completed prior to submission of the subdivision plan to Council for compliance assessment
                      Currency Period
               2.     This development approval lapses if the requirements of the conditions have not been
                      completed and an application for plan seal is not lodged with Council by 8 January 2030
                      unless an application to extend the currency period is approved by Council.
                      Approved Plans
               3.     Development authorised by this approval must be undertaken generally in accordance with
                      the Approved Plans listed in the table/s below. The plans must be amended to incorporate
                      the amendments listed within the table below and resubmitted to Council prior to the issue
                      of any Development Permit for Building Works*

                        Plan No.             Rev.    Plan/Document Name                             Date

                        NIL                  -       -                                              -

                      The following plans require amendment.

                        Plan No.             Rev.    Plan/Document Name                            Date

                        DA.8.09              A       Ground Level Reconfiguration Plan 20.07.2023
                                                     prepared by Blackwood Architects & Design

                        DA.8.10              A       Upper Level Reconfiguration Plan prepared 20.07.2023
                                                     by Blackwood Architects & Design

                        Amendments           Remove the communal recreation area facilities in its entirety,
                                             including the swimming pool, BBQ facilities and bathroom. Provide a
                                             revised landscaping plan that details this area densely planted with
                                             screening vegetation.
                                             A 5 metre wide buffer densely planted with trees and shrubs including
                                             species from 1 metre to 8 metres in height is to be detailed.

                      *(Refer to Advisory Note)
               4.     All lot numbering on the subdivision plan to be submitted to Council for compliance
                      assessment must remain as shown on the Approved Plans.
                      Boundary Encroachments
               5.     Certification must be submitted to Council from a Registered Cadastral Surveyor (Qld) which
                      certifies that:
                      a.      all constructed access and roadworks (including associated fill batters and retaining
                              walls) are fully contained within a dedicated reserve or registered easement.
                      b.      all utility services and connections (eg. electricity, telecommunications, water,
                              sewerage) are wholly located within the lot they serve or alternatively included within
                              an easement.
                      c.      all dams (including ponded water, dam walls and associated spillway structures) are
                              wholly located within the boundaries of a single lot.
                      d.      all retaining walls and structures are fully contained within the lot they retain unless
                              otherwise required by condition.



                                                                                                        Page 12 of 28
Document Set ID: 22759072
Version: 6, Version Date: 11/01/2024

Page 13

                      e.      any fill, including fill batters, are wholly contained within the subject site and not on
                              adjacent properties.
                      f.      for the community title scheme, the road pavement changes required by this Decision
                              Notice accurately demarcate the boundaries of the public and private land.
                      Water & Sewer Connections
               6.     An underground connection to reticulated water and sewerage must be provided to each
                      Multiple Dwelling in accordance with the standards and requirements of Northern SEQ
                      Distributor–Retailer Authority (Unitywater).
                      A Certificate of Completion from the Northern SEQ Distributor–Retailer Authority (Unitywater)
                      must be submitted to Council that certifies an underground connection to reticulated water
                      and sewerage has been provided to each Multiple Dwelling.
                      Services
               7.     Underground reticulated electricity and telecommunication services must be provided to
                      each lot in accordance with an approval for Operational Works and the standards and
                      requirements of the relevant service provider.
               8.     Unless otherwise stipulated by telecommunications legislation at the time of construction, the
                      development must be provided with all necessary conduits, pits and pipes to accommodate
                      the future connection of optic fibre technology telecommunications.
               9.     Certification must be submitted to Council from all relevant service providers (Energex, NBN)
                      which certifies that the development has met the requirements of this Decision Notice and
                      all applicable legislation at the time of construction.
                      Community Management Statement
               10.    Any proposed Community Management Statement required for the development pursuant to
                      the Body Corporate and Community Management Act 1997 must be submitted to Council for
                      endorsement at the same time as submission of the Building Format Plan (or similar) to
                      Council for compliance assessment.
               11.    All clauses and by-laws of the proposed Community Management Statement must accord
                      with the requirements of this Decision Notice and, in particular, must include the following
                      additional clauses:
                      a.      The site includes a stormwater management and water quality treatment system.
                      b.      The stormwater management and water quality treatment system must be maintained
                              in accordance with the Water by Design (2009) Maintaining Vegetated Stormwater
                              Assets (Version 1).
                      c.      The full cost of maintaining the system in accordance with the Water by Design (2009)
                              Maintaining Vegetated Stormwater Assets (Version 1) must be included in the
                              proposed levies for each dwelling owner/body corporate.
                      d.      All service vehicles are to access the site from Eumundi Noosa Road only. Waste must
                              be serviced in accordance with Reference Plan 33132.OW5.1-A, the refuse bin area is
                              to be located to allow for servicing internal to the development site.




                                                                                                        Page 13 of 28
Document Set ID: 22759072
Version: 6, Version Date: 11/01/2024

Page 14

                              DEVELOPMENT PERMIT FOR OPERATIONAL WORKS (OPW23/0113)
                                       (Road work, Earthworks, Signage, Vegetation Clearing)
               APPROVED PLANS
               1.     Development undertaken in accordance with this approval must generally comply with the
                      approved plans of development. The approved plans are listed in the following table unless
                      otherwise amended by these conditions.

                         Plan No.              Rev.   Plan/Document Name                         Date

                         33132-OW3.1           B      Earthworks Plan prepared       by   SCG 29.09.2023
                                                      Consulting Engineers

                         33132-OW3.2           B      Earthworks Sections prepared by SCG 29.09.2023
                                                      Consulting Engineers

                         33132-OW4.1           B      Driveway & Access Plan prepared by SCG 29.09.2023
                                                      Consulting Engineers

                         33132-OW4.2           B      Driveway Levels prepared       by   SCG 29.09.2023
                                                      Consulting Engineers

                         33132-OW6.1           C      Frontage Works: Eumundi Road prepared 5.12.2023
                                                      by SCG Consulting Engineers
                                                      (Annotated by Council)

                         33132-OW6.2           A      Frontage Works: Headland Drive prepared 29.09.2023
                                                      by SCG Consulting Engineers

                         33132-SW1.1           C      Stormwater Management Plan prepared by 5.12.2023
                                                      SCG Consulting Engineers

                         33132-SW1.4           C      SW Pipe Long Sections prepared by SCG 5.12.2023
                                                      Consulting Engineers

                         Arborist Report       -      Arborist Report, prepared by, Australian 13.09.2023
                                                      Tree     Contractors   &    Aboricultural
                                                      Consultants

               CURRENCY PERIOD
               2.     The Currency Period for this development approval lapses if the development has not
                      substantially started by 8 January 2030, unless an application to extend the currency period
                      is approved by Council.
               PRIOR TO COMMENCEMENT OF WORKS
                      Engineering
               3.     Prior to commencement of works within the development site, maintenance and rectification
                      of the underground stormwater drainage network downstream of the site is to be completed
                      and is to ensure that the capacity of the network is consistent with the capacity assumed in
                      the Stormwater Management Plan Rev C (prepared by SCG Consulting Engineers, dated
                      5.12.2023).
               4.     Submit amended plans to Council as described in the List of plans requiring amendments.
                      Plans must be submitted and approved prior to the pre-start meeting.




                                                                                                   Page 14 of 28
Document Set ID: 22759072
Version: 6, Version Date: 11/01/2024

Page 15

               5.     All necessary approvals from external service providers (eg Unitywater) and external parties
                      on which the development works are proposed have been obtained and a copy supplied to
                      Council.
               6.     Copies of the approved plans, duly signed by the consultant Registered Professional
                      Engineer of Queensland (RPEQ) must be provided to Council’s Engineering Officer
                      Construction at the “pre start” meeting.
               7.     A condition report including photographs of the frontage of the site must be completed and
                      submitted to council at the prestart meeting.
               8.     A condition report of the drainage system must be completed for agreement at the prestart
                      meeting. The condition report is to include a CCTV inspection of the existing pipe and must
                      include at least 50m upstream and downstream of all works.
               9.     Certificates demonstrating currency of public liability insurance and works insurance covering
                      the works must be submitted to Council prior to the prestart meeting.
               10.    Prior to requesting a prestart meeting:
                      a.      Receipt of amended plans approval.
                      b.      Receipt of Fauna management plan.
                      c.      Tree protection fencing must be installed under the supervision of the qualified person*.
                              (Refer to Advisory Note)
               11.    Council must be contacted at least 5 working days prior to any works commencing to
                      organise a prestart. The contact number to arrange a pre-start meeting is 5329 6500. The
                      pre-start meeting must include the relevant parties for the following aspects of the works:
                      a.      Civil engineering works;
                      b.      Erosion and sediment control works;
                      c.      Arboreal works.
                      d.      Fauna management works.
                      e.      Other relevant parties
               12.    A Construction Management Plan must be submitted to Council prior to the pre-start meeting
                      and must specifically address the following:
                      a.      Traffic Management during all aspects of the construct phase including:
                              i.       A Traffic Management Control Plan in accordance with Manual of Uniform Traffic
                                       Control Devices (MUTCD) detailing all temporary signage and traffic control
                                       measures prior to construction.
                              ii.      Maintenance of safe pedestrian access across the frontage of the site both during
                                       daily construction and after daily construction has ceased.
                              iii.     Proposed fencing to the site during the construction phase of the development.
                              iv.      Adequate parking arrangements for construction workers. Note that
                                       Construction Vehicle Parking within the Eumundi Noosa Road Reserve is
                                       unlikely to be supported due to traffic safety and damages to Council and
                                       Department of Transport and Main Roads Property. Any off-site parking
                                       proposal must provide owner’s consent and maintain adequate traffic and
                                       pedestrian safety.
                              v.       No queuing of trucks is permitted on residential streets, especially prior to
                                       7.00am. Further parked trucks must have engines turned off.
                      b.      Maintenance and protection of water quality and existing drainage lines through the
                              construction site through the implementation of appropriate erosion and sediment
                              control measures.



                                                                                                         Page 15 of 28
Document Set ID: 22759072
Version: 6, Version Date: 11/01/2024

Page 16

                      c.      Works programme identifying key components of the works and their respective
                              durations.
                      d.      Establishment of a communication protocol with the general public, adjoining owners,
                              emergency services and local businesses to advise of agreed construction times,
                              impacts on traffic and services and other relevant issues.
                      e.      Include a post out to the local residents and businesses advising of the proposed
                              development, the expected time frames and the site contact details.
                      f.      Include signage in prominent locations on the boundaries of the site advising of the
                              proposed development, the expected time frames and the site contact details.
                      g.      Identification of complaint management procedures including:
                              i.       Contact details for the on-site manager
                              ii.      Dispute resolution procedures
                      h.      For haulage operations involving significant volumes of fill material or excavated
                              material being transported onto or off the site: details on the location of external fill
                              sites/sources, the haulage route, type of vehicle to be utilised during filling operations
                              and frequency of usage. NB any damage to the existing road system as a result of
                              haulage operations shall be fully repaired at the applicant’s expense.
               13.    Any changes to the details associated with the supervising RPEQ or Principal Contractor
                      during construction, must be notified to council in writing within five business days of the
                      change occurring.
               14.    Any conflict between the development and an existing or proposed service must be referred
                      to the relevant service authority for determination prior to commencement of works.
               DURING CONSTRUCTION
                      Engineering
               15.    The developer must meet any costs to repair damage to any Council asset during
                      construction, where damage is a result of the development works. Damage to assets must
                      be repaired immediately where it creates a hazard to the community. In circumstances where
                      the damage does not create a hazard to the community, it must be repaired immediately on
                      completion of the works associated with the development.
               16.    All works must be supervised by a Registered Professional Engineer of Queensland (RPEQ)
                      who is independent of the Developer and Principal Contractor, and they must certify that all
                      works conform to the Operational Works permit. Where municipal works are involved, such
                      confirmation must be submitted for the respective hold points prior to any site inspection by
                      Council Officers.
               17.    All works must be constructed and work procedure undertaken in accordance with:
                      a.      The approved plans/documents and conditions detailed in this Decision Notice
                      b.      All relevant Noosa Council Planning Scheme Policies, standard drawings, standard
                              specifications and guidelines
                      c.      The latest version of the Healthy Waterways document “Water Sensitive Urban Design
                              Technical Design Guidelines for South East Queensland” for all water quality devices
                              to be constructed on site
                      Roadworks (External Roadworks & Road Widening Works)
               18.    All pavement widening or construction of new pavement must join neatly to the existing
                      pavement so that there are no irregularities in line or level resulting at or adjacent to the join
                      for the length of the construction. Where necessary the existing pavement must be brought
                      to a satisfactory standard to allow for the above.




                                                                                                        Page 16 of 28
Document Set ID: 22759072
Version: 6, Version Date: 11/01/2024

Page 17

               19.    The installation and/or modification of any traffic signs, street signs, line marking and Raised
                      Reflective Pavement Markings (RRPMs) must be in accordance with the Manual of Uniform
                      Traffic Control Devices (MUTCD). New or relocated signage must be installed using the VLok
                      installation system. All new signage must be Class 1 retroreflective material in accordance
                      with AS 1906.1, Retroreflective materials and devices for road traffic control purposes – Part
                      1: Retroreflective sheeting.
               20.    The developer must notify Council’s Traffic Engineer for any works involving the removal or
                      modification of existing council traffic signs and/or parking bays prior to such works
                      commencing.
               21.    Root barriers are required to be installed behind the back of kerb for all new kerbs within 5m
                      of a trunk of a tree.
                      Works within Road Reserve/Reinstatement
               22.    Safe pedestrian and vehicle access on all streets in the vicinity of the development must be
                      maintained at all times. Should footpath/road closures be necessary to carry out construction
                      works, Council’s Engineering Officer must be notified prior to the proposed closure and all
                      requirements complied with.
               23.    All frontage works must match neatly with existing road and verge/footpath features.
                      Additional works beyond the frontage may be required to provide an acceptable transition to
                      existing road and verge/footpath profiles.
               24.    Electrical conduits or other services proposed to be installed within existing and proposed
                      road reserves under existing sealed carriageways, concrete pathways, concrete/sealed
                      driveways or significant vegetation must be installed by boring. Trenching is not permitted,
                      unless specifically approved by Council.
                      Pathways
               25.    All pathways must be constructed in accordance with the following requirements:
                      a.      All footpath/cycleway must comply with Council’s Standard Drawing SEQ R-065.
                      b.      Provision must be made for disabled access at all kerb crossings associated with
                              pathways, in accordance with Council's current standards.
                      c.      All paths must have a slip resistant surface.
                      d.      Expansion and contraction joints must provide a flush finish. Installation of joints by
                              saw cutting is preferred to ensure a smooth ride for cyclists.
                      e.      The required work includes any modifications to ensure the footpath finishes flush with
                              all existing service covers and the like, or alternatively these services are raised or
                              altered, so as not to create a pedestrian safety hazard.
               26.    Pathways must:
                      a.      Terminate in a manner that ensures smooth transition to existing surfaces for public
                              safety.
                      b.      Be designed and constructed to comply with the Disability Discrimination Act (DDA),
                              Access to Premises Standard, Austroads and relevant sections of AS1428 Design for
                              access and mobility.
                      Site Access and Driveways
               27.    Driveway crossovers must be constructed in accordance with council’s Standard Drawings
                      RS-051.
               28.    Any existing unnecessary or redundant property accesses must be removed, and the kerb,
                      footpath and verge area reinstated to match the existing footpath and/or verge treatments.
                      Grassed verge areas to be reinstated must be provided with 100 mm topsoil and grass seed
                      or turf, and must be maintained by the developer until established.




                                                                                                      Page 17 of 28
Document Set ID: 22759072
Version: 6, Version Date: 11/01/2024

Page 18

               29.    The following must be complied with during the construction of the required
                      crossover/driveway:
                      a.      The driveway surfacing must consist of either an approved hot mixed asphaltic
                              concrete or patterned/plain concrete.
                      b.      The driveway must be constructed so as not to concentrate stormwater runoff onto
                              neighbouring properties.
                      c.      Underground service conduits for water supply, electricity and any other services must
                              be provided as part of the access driveway
                      d.      Where there is an existing pedestrian path, a matching crossfall must be provided for
                              the driveway on the alignment of the path, for the full width of the path.
                      e.      The property access must be located a minimum of 1m clear of existing power poles,
                              streetlights or other signage. The developer is responsible for any necessary relocation
                              of existing services to provide this clearance and must contact the relevant service
                              authorities and comply with their requirements in relation to these works.
                      Earthworks and Retaining Walls
               30.    All earthworks shall be undertaken in accordance with the provisions of AS 3798 Guidelines
                      on Earthworks for Commercial and Residential Development, with geotechnical testing
                      undertaken in accordance with the Standard. Test results as required by AS 3798, and a
                      certificate of quality and uniformity of fill shall be provided by a RPEQ and submitted to
                      Council prior to Council signing the Plan of Survey.
               31.    Safety Fencing must be provided to retaining walls that are over 1m high.
               32.    Slope and batters are a maximum grade of:
                      a.      1 in 6 where in proximity to waterbodies
                      b.      1 in 4 for grassed areas.
                      c.      1 in 3 for planted areas.
                      d.      1 in 2 for combined structural engineering and planting solutions.
               Vegetation Clearing
               General
               33.    Where damage occurs to any Council asset as a result of the development works, it must be
                      repaired immediately where it creates a hazard that presents risk to person or property. Other
                      damage must be repaired prior to completion of works.
               34.    All works must be constructed, and work procedure undertaken in accordance with:
                      a.      The approved plans/documents and conditions detailed in this Decision Notice.
                      b.      The relevant conditions of the higher order Material Change of Use approval viz
                              MCU23/0094 to which this approval relates.
                      c.      All relevant Council Planning Scheme Policies, standard drawings, standard
                              specifications and guidelines.
                      d.      The latest version of Water Sensitive Urban Design Technical Design Guidelines for
                              South East Queensland (Healthy Waterways) for all water quality devices to be
                              constructed on site.
                      Retention of Existing Trees and Vegetation
               35.    All trees and vegetation identified for retention must be protected in accordance with AS
                      4970, Protection of trees on development sites.
               36.    A qualified person * must be engaged for the duration of the works to:
                      a.      Ensure works are carried out in accordance with the approved Arborist Report



                                                                                                       Page 18 of 28
Document Set ID: 22759072
Version: 6, Version Date: 11/01/2024

Page 19

                      b.      Oversee installation of all tree protection fencing prior to commencement of any works
                              onsite (including any clearing).
                      c.      Supervise tree protection within the development site and frontages, prior to, during
                              and following construction in accordance with AS 4970, Protection of trees on
                              development sites.
                      d.      Supervise and undertake necessary tree protection for all trees affected by the
                              development on neighbouring Lots. This includes tree identified in the approved
                              arborist report as outside project scope within the neighbouring properties east of the
                              development site. Where trees within neighbouring properties are found to be unsafe
                              due to works relating to this development approval, the developer is solely responsible
                              for the removal and replacement of these trees.
                      e.      Oversee approved tree removal in proximity to retained trees.
                      f.      Undertake a risk assessment of all trees on neighbouring properties affected by the
                              development within striking distance of the development works and site and carry out
                              hazard removal and amenity pruning in accordance with AS 4373, Pruning of amenity
                              trees.
                      *(Refer to Advisory Note)

                      Fauna Management
               37.    A qualified person* must be engaged to manage fauna in accordance with a fauna
                      management plan submitted prior to a prestart meeting. The fauna management plan must
                      include the following:
                      a.      Ensure works are carried out in accordance the Nature Conservation Act 1992.
                      b.      Undertake pre-clearing inspections including fauna relocation and removal or blocking
                              of all vacant hollows.
                      c.      Co-ordinate staging and sequence of clearing with fauna protection.
                      d.      Protect and recover fauna during clearing operations.
                      e.      Manage the translocation of animals and recovery procedures in accordance with
                              relevant legislation.
                      f.      Undertake protection works for mulching of any stockpiled vegetation.
                      *(Refer to Advisory Note)
                      Removal of Existing Trees and Vegetation
               38.    Removal of existing trees and vegetation must be undertaken by a qualified person* and
                      must include:
                      a.      Stump grinding to below finished surface level.
                      b.      Rectification to the finished surface levels and materials.
                      c.      No damage to other vegetation for retention.
                      d.      Legal disposal of all removed vegetation and debris.
                      *(Refer to Advisory Note)




                                                                                                      Page 19 of 28
Document Set ID: 22759072
Version: 6, Version Date: 11/01/2024

Page 20

               FOLLOWING CONSTRUCTION / PRIOR TO COMMENCEMENT OF THE USE
                      Certification
               39.    Upon completion of the work a certificate must be issued by an RPEQ certifying that the
                      works have been constructed in accordance with the Operational Works permit.
                      Bonds
               40.    Bonds must:
                      a.      meet the requirements of council’s relevant Planning Scheme Policy for performance
                              and uncompleted works.
                      b.      be calculated using a schedule of works and relevant bond equation.
                      c.      Include GST.
                      d.      have approval of the bond calculations and amount from Council prior to lodgement
                      e.      be lodged with Council and accompanied by the Bond Administration Fee/s.
                      f.      be requested for release by writing to Council, when relevant approval requirements
                              have been met.
                      As Constructed Plans and ADAC XML Files (Council)
               41.    Prior to acceptance of civil works to become Council assets “On Maintenance”, satisfactory
                      “As-Constructed” records must be submitted to Council. The bundle of “As Constructed”
                      information shall include:
                      a.      As-Constructed Engineering Drawings. Data is to be submitted in an electronic drawing
                              file format (.dwg), with all plans clearly endorsed “As-Constructed”, along with the
                              accompanying hardcopies (PDFs of the As-Constructed .dwg drawing files), and;
                      b.      ADAC XML Digital File. ADAC File format (ADAC - Asset Design As Constructed)
                              prepared in accordance with industry standards and recorded in “MGA - UTM56 /
                              GDA94” projection.
                              Please Note: Further information and advice relating to the as-constructed drawing
                              presentation, as-constructed survey capture and associated guidelines for preparation
                              of a compliant ADAC XML digital file are available on the webpage titled “As-
                              Constructed Guidelines” and accessible at the Noosa Council Website: Planning &
                              Development / Development Tools & Guidelines / As-Constructed Guidelines.
                      c.      The “As-Constructed” drawings will require certification by a:
                              i.       Qualified experienced Civil Engineer (RPEQ) confirming design intent and
                                       conformance with applicable standards and specifications, along with the
                                       relevant descriptions of assets, services and structures and;
                              ii.      Registered Cadastral Surveyor (Qld) in regard to the cadastral and locational
                                       information, levels and applicable survey datum.
                      d.      The data must be in accordance with Council’s “Planning Scheme Policy 6 –
                              Engineering Design Standards”, and fully detail the levels for all engineering works
                              including but not limited to the drainage network and structures, finished ground and
                              pavement surface levels.
                      e.      Landscaping, including all assets and improvements within parks, open space and road
                              reserves areas are to be shown on an accompanying separate landscape plan
                              (prepared in .dwg file format with accompanying hardcopy PDFs) and include a
                              complaint ADAC XML file. Details of the landscaping and all associated assets and
                              improvements may be included in the ADAC XML digital file prepared for associated
                              civil infrastructure, or alternatively, be provided as a separate ADAC XML digital file
                              containing landscape and asset information only.




                                                                                                      Page 20 of 28
Document Set ID: 22759072
Version: 6, Version Date: 11/01/2024

Page 21

                      f.      The building envelope data must be submitted in both hardcopy and digital format
                              (ADAC XML Digital File). ADAC - Asset Design As Constructed, is to be prepared in
                              accordance with industry standards and recorded in “MGA - UTM56 / GDA94”
                              projection.
                      On Maintenance
               42.    Prior to requesting an On Maintenance inspection, the following information package
                      (prepared by respective qualified persons* and certifying compliance with approvals) must
                      be submitted to Council:
                      a.      Arborist Report documenting and certifying the findings and outcome of the arboreal
                              risk assessment.
                      b.      Fauna Report documenting the findings and outcome of the fauna protection works
                              undertaken.
               43.    All municipal works must be accepted ‘On Maintenance’ by Council in accordance with
                      Council’s relevant Planning Scheme Policy prior to plan sealing. To achieve ‘On
                      Maintenance’, the supervising RPEQ must submit to Council:
                      a.      certification that all works have been undertaken and completed in accordance with the
                              requirements of this Permit.
                      b.      as Constructed details in accordance with Council’s Planning Scheme Policy.
                      c.      maintenance and operational manuals for all proprietary or site specific devices
               Off Maintenance
               44.    Prior to requesting an Off Maintenance inspection the developer must provide a written
                      request for the Off Maintenance inspection.
               45.    A re-inspection fee in accordance with Council’s Fees and Charge Register will be charged
                      where:
                      a.      a Council inspection reveals works do not comply with approval requirements
                      b.      submitted certification falsely states works comply with approval requirements.




                                                                                                      Page 21 of 28
Document Set ID: 22759072
Version: 6, Version Date: 11/01/2024

Page 22

                              PRELIMINARY APPROVAL FOR OPERATIONAL WORKS (OPW23/0113)
                                         (Landscaping, Drainage Work, Stormwater)
               APPROVED PLANS
               1.     Development undertaken in accordance with this approval must generally comply with the
                      approved plans of development. The approved plans are listed in the following table unless
                      otherwise amended by these conditions.

                        Plan No.            Rev.   Plan/Document Name                            Date

                        NIL                 -      -                                             -

                      The following plans require amendment.

                        Plan No.            Rev.    Plan/Document Name                          Date

                        33132-SW1.2         C       Stormwater Details                          5.12.2023

                        33132-SW1.5         -       Bio Retention Layout Plan                   N/A
                                            Show the subsoil drainage layout in plan view, clarify whether the
                        Amendments
                                            150dia and 225dia collection pipes are slotted, and adjust the
                                            drainage and transition layers as necessary to ensure that the
                                            drainage layer achieves at least 50mm of cover over the largest
                                            slotted pipe

                        Plan No.            Rev.    Plan/Document Name                          Date

                        33132-SW1.2         C       Stormwater Details                          5.12.2023

                        33132-SW1.5         -       Bio Retention Layout Plan                   N/A
                                            Update the underground detention tanks to comply with
                        Amendments
                                            AS3500.3:2021 Section 7.10.2 and include minimum slope on base,
                                            sump and access ladder, screen over orifice to prevent blockage.
                                            Amend the storage volumes to match those stated on drawing
                                            33132-SW1.1C

                        Plan No.            Rev     Plan/Document Name                           Date

                        ED 23141 OPW-04     C       Planting Plan prepared by Element Design 22.11.2023

                        Amendments          Landscape treatment along the southern boundary adjacent Lot 2
                                            SP208257 is to incorporate the following species at 1 metre centres
                                            to screen the development from neighbouring properties:
                                                a) syzygium austral ‘Straight and narrow’
                                                b) Callistemon viminalis ‘Slim’.

                        Plan No.            Rev     Plan/Document Name                           Date

                        ED 23141 OPW-06     C       Planting Plan prepared by Element Design 22.11.2023

                        Amendments          Provide landscaping to bioretention basin batters that extend into
                                            Headland Drive road reserve.




                                                                                                     Page 22 of 28
Document Set ID: 22759072
Version: 6, Version Date: 11/01/2024

Page 23

                        ED 23141 OPW-08       C       Plant List prepared by Element Design          22.11.2023


                        Amendments            Substitute the following species and update plans accordingly:
                                              Callistemon vim ‘dwarf captain cook’ with Backhousia myrtifolia.
                                              Callistemon ‘Great Balls of fire’ with Acmena smithii minor

                        Plan No.              Rev     Plan/Document Name                             Date

                        ED 23141 OPW-06       C       Planting Plan prepared by Element Design 22.11.2023

                        Amendments            Remove the communal recreation area facilities in its entirety,
                                              including the swimming pool, BBQ facilities and bathroom. Provide a
                                              revised landscaping plan that details this area densely planted with
                                              screening vegetation.
                                              A 5 metre wide buffer densely planted with trees and shrubs
                                              including species from 1 metre to 8 metres in height is to be
                                              detailed.

                      *(Refer to Advisory Note)
               CURRENCY PERIOD
               2.     The Currency Period for this development approval lapses if the development has not
                      substantially started by 8 January 2030, unless an application to extend the currency period
                      is approved by Council.
               5.     REFERENCE DOCUMENTS

                Plan No.               Rev.   Plan/Document Name                                     Date

                33132-OW5.1            A      Vehicle Turning Paths         prepared     by   SCG 29.09.2023
                                              Consulting Engineers

               6.     REFERRAL AGENCIES

               Not applicable.
               7.     ADVISORY NOTES

               The following notes are included for guidance and information purposes only and do not form part
               of the assessment manager conditions:
               Material Change of Use & Reconfiguring a Lot (MCU23/0094 & RAL23/0014)
                      Aboriginal Cultural Heritage Act 2003
               1.     There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain
                      approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act).
                      The ACH Act establishes a cultural heritage duty of care which provides that: “A person who
                      carries out an activity must take all reasonable and practicable measures to ensure the
                      activity does not harm Aboriginal cultural heritage”. It is an offence to fail to comply with the
                      duty of care. Substantial monetary penalties may apply to individuals or corporations
                      breaching this duty of care. Injunctions may also be issued by the Land and Resources
                      Tribunal, and the Minister administering the ACH Act can also issue stop orders for an activity
                      that is harming or is likely to harm Aboriginal cultural heritage or the cultural heritage value
                      of Aboriginal cultural heritage.
                      You should contact the Cultural Heritage Unit to discuss any obligations under the ACH Act.


                                                                                                       Page 23 of 28
Document Set ID: 22759072
Version: 6, Version Date: 11/01/2024

Page 24

                      Equitable Access and Facilities
               2.     The plans for the proposed building work have NOT been assessed for compliance with the
                      requirements of the National Construction Code - Building Code of Australia (Volume 1) as
                      they relate to people with disabilities. Your attention is also directed to the fact that in addition
                      to the requirements of the National Construction Code as they relate to people with
                      disabilities, one or more of the following may impact on the proposed building work:
                      a.      the Disability Discrimination Act 1992 (Commonwealth);
                      b.      the Anti-Discrimination Act 1991 (Queensland); and
                      c.      the Disability (Access to Premises – Buildings) Standards.
                      Advertising Devices
               3.     All Advertising Devices must comply with Schedule 10 of Subordinate Local Law No.1
                      (Administration) 2015 including both temporary and permanent signage. All freestanding,
                      pylon or pole signs or signage that is illuminated requires approval from Council prior to being
                      installed. All signage identified in s6 of Schedule 10 of Subordinate Local Law No. 1 is
                      prohibited from being erected in the Shire.
                      Development Compliance Inspection
               4.     Prior to the commencement of the use, please contact Council's Development Assessment
                      Branch to arrange a Development Compliance Inspection.
                      Nature and Extent of Approved Development
               5.     The assessment of this development was based on a proposal having a plot ratio of 0.5:1,
                      as depicted on the Approved Plans and conditioned.
               6.     Should the outstanding matters raised in this approval be addressed to Council’s satisfaction,
                      Council may change the approval to a Development Permit through the Negotiated Decision
                      Notice process.
                      Submission of Amended Plans Required (as required by MCU23/0094 & RAL23/0014)
               7.     The conditions of this Decision Notice require resubmission of plan/s to Council with
                      amendments as per the Material Change of Use and Reconfiguring a Lot Development.
                      Please address the amended plan/s to Council’s Development Assessment Branch.
                      The revised plans are to be provided to Council for review and approval prior to the
                      issue of Building Approval.
                      Sustainability
               8.     Council encourages sustainable and energy efficient building design for all development,
                      including the use of sustainable building materials, energy efficient fittings, solar hot water,
                      photovoltaic systems (including the use of inverter/charges), solar panels, water saving
                      devices and rainwater harvesting.
               Operational Works (OPW23/0113)
                      General Advisory Notes
               1.     Council has undertaken an audit check of the Operational Works drawings in relations to the
                      proposed works. A detailed check of the calculations and drawings has not been undertaken,
                      as they have been certified by a RPEQ. The RPEQ bears full responsibility for all aspects of
                      the engineering design. Council reserves the right to require further amendments and/or
                      additions at a later date should design errors become apparent.
               2.     Council reserves the right to call up any performance bond held or levy charges against the
                      property, should emergency works be required to be undertaken by Council to make the site
                      safe due to inactivity on the development site for extended periods of time.




                                                                                                           Page 24 of 28
Document Set ID: 22759072
Version: 6, Version Date: 11/01/2024

Page 25

               3.     Should any changes or modifications to the approved plans be required as a result of
                      construction constraints, a “Request to change an existing approval” under the Planning Act
                      2016 must be made. Amended plans clearly indicating the changes must be lodged with this
                      application along with the appropriate fees.
                      Nature and Extent of Approval (OPW - Landscaping, Drainage, Stormwater)
               4.     Should the outstanding matters raised in this Preliminary Approval be addressed to Council’s
                      satisfaction, Council may change the approval to a Development Permit through the
                      Negotiated Decision Notice process.
                      Prestart, On and Off Maintenance Inspections Request
               5.     Contact Council on 5329 6500 to arrange a prestart or an inspection giving a minimum of 5
                      business days notice of preferred inspection time.
               6.     If Council officers are required to undertake additional inspections of the same works, a
                      reinspection fee will be applicable in accordance with Council’s Fees and Charges register
                      applicable at the time.
               7.     A minimum maintenance period of 12 months will apply to all municipal works and thereafter
                      until such time as the works are performing in accordance with the approved design unless
                      noted otherwise.
               8.     Accepted best practice standards include International Erosion Control Association
                      Australasia Best Practice Erosion and Sediment Control.
               9.     Qualified Person, for the purpose of erosion and sediment control is a Certified Professional
                      in Erosion and Sediment Control (CPESC) or suitably experienced Registered Professional
                      Engineer of Queensland (RPEQ).
               10.    As a general rule, a site is determined to have achieved effective short-term stabilisation if
                      at the time of the plan sealing inspection:
                      a.      Methods of stabilisation are:
                              •    appropriate for slopes and slope lengths; and
                              •    are consistent with best practice environmental management practices such as in
                                   the Manual for Erosion and Sediment Control or the IECA Manual; and
                      b.      Stormwater runoff from the site is not currently, and is not likely to result in visible
                              evidence of sedimentation or erosion, or lead to water contamination.
                              If at the time of request for final inspection, the method of short-term stabilisation has
                              not achieved a level of stability that Council's Officers believe will have a high
                              probability of achieving long term stability, Council Officers may take the following
                              matters into consideration in determining whether the site is capable of achieving
                              medium to long-term stability:
                              •    evidence that the site has been effectively stabilised in the short term;
                              •    evidence that soil has been adequately ameliorated;
                              •    evidence that seed of annual and perennial grass species has been applied at an
                                   adequate rate; and
                              •    that grass seed has germinated at a density that is likely to achieve an effective
                                   grass cover.
                      Retention of Existing Trees
               11.    The existing trees on adjoining properties must be retained and protected during construction
                      wherever achievable. To avoid doubt, this advisory note is not intended to exclude the
                      operation of Chapter 3 of the Neighbourhood Dispute Resolution Act 2011 following
                      construction of the development which is the subject of this development approval.
                      Removal of Existing Trees and Vegetation




                                                                                                        Page 25 of 28
Document Set ID: 22759072
Version: 6, Version Date: 11/01/2024

Page 26

               12.    Stockpiling mulch to the appropriate volume and separation is required for fire mitigation as
                      well as optimum weed seed sterilisation.
                      Qualified Person
               13.    Qualified Person, for the purpose of:
                      a.      Supervising landscape works and preparing a landscape certification, is considered to
                              be a landscape architect, landscape designer or horticulturist with a minimum of three
                              years current experience in the field of landscape design.
                      b.      Undertaking landscape construction and establishment works is considered to be a
                              person with five years current experience in commercial landscape construction
                              projects.
                      c.      Undertaking, supervising tree works and preparing arboriculture certification, is
                              considered to be a person with a minimum three years current experience in tree
                              protection, hazard identification/mitigation and assessment and either:
                              i.       International Society of Arboriculture (ISA) certification; or
                              ii.      A Diploma of Arboriculture.
                      d.      Undertaking Fauna site works and calculating compensatory habitat is considered to
                              be a Fauna Spotter Catcher with current certification under the Queensland Parks and
                              Wildlife Service.
                      e.      Assessing and certifying soil quality is considered to be an Agronomist or
                              Horticulturalist with three years current experience in soil testing.
               8.     PROPERTY NOTES

               Not applicable.
               9.     VARIATION APPROVAL DETAILS

               Not applicable.
               10.    FURTHER DEVELOPMENT PERMITS REQUIRED

                Type of Development Permit Required                    Subject of the required Development Permit

                Development Permit for Operational Works               Stormwater, Drainage work, Landscaping.

                Development Permit for Building Works                  All building work.

               11.    SUBMISSIONS

               Not applicable.
               12.    RIGHTS OF APPEAL

               You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
               Planning Act 2016 is attached.
               During the appeal period, you as the applicant may suspend your appeal period and make written
               representations to Council about the conditions contained within the development approval. If
               Council agrees or agrees in part with the representations, a negotiated decision notice will be
               issued. Only one negotiated decision notice may be given.
               13.    OTHER DETAILS

               If you wish to obtain more information about the decision, electronic copies are available online at
               www.noosa.qld.gov.au or at Council Offices.




                                                                                                        Page 26 of 28
Document Set ID: 22759072
Version: 6, Version Date: 11/01/2024

Page 27

               Yours faithfully,




               Georgina Schramm
               Development Planner



               Enc:   Appeal Rights
                      Infrastructure Charge Notice
                      Approved Plans/Documents
               cc.    Unitywater




                                                     Page 27 of 28
Document Set ID: 22759072
Version: 6, Version Date: 11/01/2024

Page 28

                                                                              Appeal Rights
                                                                              PLANNING ACT 2016 & PLANNING REGULATION 2017




               Chapter 6 Dispute resolution                                                   (3) The appellant or, for an appeal to a tribunal, the registrar must,
                                                                                                  within the service period, give a copy of the notice of appeal to –
               Part 1 Appeal rights
                                                                                                  (a) the respondent for the appeal; and
               229 Appeals to tribunal or P&E Court
                                                                                                  (b) each co-respondent for the appeal; and
               (1) Schedule 1 of the Planning Act 2016 states –
                                                                                                  (c) for an appeal about a development application under schedule
                   (a) Matters that may be appealed to –
                                                                                                      1, table 1, item 1 – each principal submitter for the
                         (i)   either a tribunal or the P&E Court; or                                 development application; and
                         (ii) only a tribunal; or                                                 (d) for and appeal about a change application under schedule 1,
                                                                                                      table 1, item 2 – each principal submitter for the change
                         (iii) only the P&E Court; and
                                                                                                      application; and
                   (b) The person-
                                                                                                  (e) each person who may elect to become a co-respondent for the
                         (i)   who may appeal a matter (the appellant); and                           appeal, other than an eligible submitter who is not a principal
                                                                                                      submitter in an appeal under paragraph (c) or (d); and
                         (ii) who is a respondent in an appeal of the matter; and
                                                                                                  (f)   for an appeal to the P&E Court – the chief executive; and
                         (iii) who is a co-respondent in an appeal of the matter; and
                                                                                                  (g) for an appeal to a tribunal under another Act – any other
                         (iv) who may elect to be a co-respondent in an appeal of the
                                                                                                      person who the registrar considers appropriate.
                              matter.
                                                                                              (4) The service period is –
               (2) An appellant may start an appeal within the appeal period.
                                                                                                  (a) if a submitter or advice agency started the appeal in the P&E
               (3) The appeal period is –
                                                                                                      Court – 2 business days after the appeal has started; or
                   (a) for an appeal by a building advisory agency – 10 business
                                                                                                  (b) otherwise – 10 business days after the appeal is started.
                       days after a decision notice for the decision is given to the
                       agency; or                                                             (5) A notice of appeal given to a person who may elect to be a co-
                                                                                                  respondent must state the effect of subsection (6).
                   (b) for an appeal against a deemed refusal – at any time after the
                       deemed refusal happens; or                                             (6) A person elects to be a co-respondent by filing a notice of election,
                                                                                                  in the approved form, within 10 business days after the notice of
                   (c) for an appeal against a decision of the Minister, under chapter
                                                                                                  appeal is given to the person.
                       7, part 4, to register premises or to renew the registration of
                       premises – 20 business days after a notice us published under          231 Other appeals
                       section 269(3)(a) or (4); or
                                                                                              (1) Subject to this chapter, schedule 1 and the P&E Court Act, unless
                   (d) for an appeal against an infrastructure charges notice – 20                the Supreme Court decides a decision or other matter under this
                       business days after the infrastructure charges notice is given             Act is affected by jurisdictional error, the decision or matter is non-
                       to the person; or                                                          appealable.
                   (e) for an appeal about a deemed approval of a development                 (2) The Judicial Review Act 1991, part 5 applies to the decision or
                       application for which a decision notice has not been given –               matter to the extent it is affected by jurisdictional error.
                       30 business days after the applicant gives the deemed
                                                                                              (3) A person who, but for subsection (1) could have made an
                       approval notice to the assessment manager; or
                                                                                                  application under the Judicial Review Act 1991 in relation to the
                   (f)   for any other appeal – 20 business days after a notice of the            decision or matter, may apply under part 4 of that Act for a
                         decision for the matter, including an enforcement notice, is             statement of reasons in relation to the decision or matter.
                         given to the person.
                                                                                              (4) In this section –
               Note –                                                                             decision includes-
                   See the P&E Court Act for the court’s power to extend the appeal
                                                                                                  (a) conduct engaged in for the purpose of making a decision; and
                   period.
                                                                                                  (b) other conduct that relates to the making of a decision; and
               (4) Each respondent and co-respondent for an appeal may be heard
                   in the appeal.                                                                 (c) the making of a decision or failure to make a decision; and
               (5) If an appeal is only about a referral agency’s response, the                   (d) a purported decision; and
                   assessment manager may apply to the tribunal or P&E Court to
                                                                                                  (e) a deemed refusal.
                   withdraw from the appeal.
                                                                                                  non-appealable, for a decision or matter, means the decision or
               (6) To remove any doubt. It is declared that an appeal against an
                                                                                                  matter-
                   infrastructure charges notice must not be about-
                                                                                                  (a) is final and conclusive; and
                   (a) the adopted charge itself; or
                                                                                                  (b) may not be challenged, appealed against, reviewed, quashed,
                   (b) for a decision about an offset or refund-
                                                                                                      set aside or called into question in any other way under the
                         (i)   the establishment cost of trunk infrastructure identified in           Judicial Review Act 1991 or otherwise, whether by the
                               a LGIP; or                                                             Supreme Court, another court, a tribunal or another entity; and
                         (ii) the cost of infrastructure decided using the method                 (c) is not subject to any declaratory, injunctive or other order of
                              included in the local government’s charges resolution.                  the Supreme Court, another court, a tribunal or another entity
                                                                                                      on any ground.
               230 Notice of appeal
                                                                                              232 Rules of the P&E Court
               (1) An appellant starts an appeal by lodging, with the registrar of the
                   tribunal or P&E Court, a notice of appeal that-                            (1) A person who is appealing to the P&E Court must comply with the
                                                                                                  rules of the court that apply to the appeal.
                   (a) is in the approved form; and
                   (b) succinctly states the grounds of the appeal.                           (2) However, the P&E Court may hear and decide an appeal even if
                                                                                                  the person has not complied with the rules of the P&E Court
               (2) The notice of appeal must be accompanied by the required fee.




                                                                                                                                                 Page 28 of 28
Document Set ID: 22759072
Version: 6, Version Date: 11/01/2024

Used in these records

About this file

File size
245 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

SUPERCEDED Decision Notice - Approved by Delegation of Authority MCU23 0094, OPW23 0113 & RAL23 0014 [As Published].pdf · 245 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.