SUPERCEDED Decision Notice - Approved by Delegation of Authority MCU23 0094, OPW23 0113 & RAL23 0014 [As Published] · MCU23/0094

of 28

Text shows just the words. Original shows the document exactly as it was published.

               47.    A total of 39kL of roofwater storage is to be provided for the development as shown on
                      drawing 33132-SW1.1 Rev C by SCG Consulting. The roofwater is to be plumbed for reuse
                      to the following non-potable fixtures, with the detail provided with the hydraulic design
                      submitted in conjunction with the development application for Building Works:
                      • Communal landscape irrigation
                      • Bin wash down
               48.    Certification must be submitted to Council from a qualified person which certifies that the
                      roofwater harvesting tanks and associated reticulation have been installed in accordance
                      with the requirements of this Decision Notice.
                      Services
               49.    Reticulated electricity and telecommunication services must be provided to each unit in
                      accordance with the standards and requirements of the relevant service provider.
               50.    Unless otherwise stipulated by telecommunications legislation at the time of construction, the
                      development must be provided with all necessary conduits, pits and pipes to accommodate
                      the future connection of optic fibre technology telecommunications.
               51.    Certification must be submitted to Council from all relevant service providers (Energex, NBN
                      and Unitywater) which certifies that the development has met the requirements of this
                      Decision Notice and all applicable legislation at the time of construction.
                      Easements
               52.    Unless otherwise agreed in writing by the relevant service provider, any public or third party
                      infrastructure located on the subject site must be placed within an easement registered
                      against the title of the property.
               53.    All easements must be designed in accordance with the planning scheme and granted at no
                      cost to the Grantee. Where the Grantee is Council or a service authority, the easement
                      documentation must be in accordance with the Grantee’s standard easement terms. Draft
                      easement documentation must be submitted to Council for endorsement.
               54.    All works must be kept clear of any existing or proposed easements on the subject land,
                      unless agreed otherwise in writing by the Grantee.
                      Earthworks and Retaining Walls
               55.    All earthworks and associated structures/batters must be contained entirely within the subject
                      site unless written permission from the respective landowner(s) is provided to Council.
               56.    All earthworks must be undertaken in accordance with the provisions of Australian Standard
                      AS3798: Guidelines on Earthworks for Commercial and Residential Developments, Building
                      Code requirements and Noosa Plan 2020.
               57.    Where the development involves excavation or filling over, or adjacent to, drainage, water
                      supply or sewerage infrastructure, all access chamber surface levels must be adjusted to
                      provide a freeboard of 100mm above the finished ground surface level.
               58.    All retaining walls must be designed and constructed in accordance with the Noosa Plan
                      2020 and must be certified by an RPEQ where exceeding 1.0m in height. All retaining walls
                      that are publicly accessible and exceed 1.0m in height must be fitted with a commercial grade
                      safety fence.
                      Damage to Services and Assets
               59.    Any damage caused to existing services and assets as a result of the development works
                      must be repaired at no cost to the asset owner at the following times:
                      a.      Where the damage would cause a hazard to pedestrian or vehicle safety, immediately;
                              or
                      b.      Where otherwise, upon completion of the works associated with the development.



                                                                                                     Page 10 of 28
Document Set ID: 22759072
Version: 6, Version Date: 11/01/2024

Used in these records

About this file

File size
245 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

SUPERCEDED Decision Notice - Approved by Delegation of Authority MCU23 0094, OPW23 0113 & RAL23 0014 [As Published].pdf · 245 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.