Liquor
Store
Tiled ledge
CG-01 Step REV DESCRIPTION DRN DATE
Open Shelves
HD
FW HD CH CH SM Shelves EX-HYD A MCU DA Issue MS 25.02.20
Skirt full length 20 New 1:10
of partition. step step ramp B MCU DA Issue MS 02.03.20
WB C MCU DA Issue MS 06.03.20
BM Female Shr.
SD AP Change D Client Revisions MS 14.04.20
Comms.
SD WB RSR E MCU DA MS 05.08.20
Lockers riser
WB
BM Seat
over Information Response
BM dn
Open Shelves
TL-07a SD LP-02 F GIA Issue MS 07.04.21
New Staff G GIA Variations MS 24.06.21
Tiled ledge
SD
Un
FW LP-02
Room &
HD
BM New Back-Of-
ifo
Seat RSR H GIA Variations MS 11.08.21
rm
Lockers over Kitchenette House Area
s
WB
TRH Skirt full length Insulation to Staff Rm party walls.
of partition. Shr.
WC 1
REF.
Male 20 -
Hot Desk
Change
HD CH CH
step
SM
Bulkhead over.
GENERALLY IN ACCORDANCE
APPROVED PLAN
Open Shelves
DR Bulkhead over to
1:200 New conceal plumbing.
MCU13/.0081.02
Slide
fall Cold Rm
MV S.
NOOSA COUNCIL
13 SEPTEMBER 2021
AP under DR
N-FWG
Store Shelves EX-HYD Open Shelves
Overhead cupboards EX-HYD -
EX-COL EX-COL
Cool Rm
EX-
AC over
EX-COL
HYD
fall
screen over
75mm Cool room wall panel. Conceal Water main.
Side access panel in
Gate Select epoxy coated ply over 75mm joinery to valve.
insulation by coolroom contractor.
FHR
fall High level timber bar to be retained.
100 x 25 RHS powdercoated Remove during new construction
TL-12 aluminium batten screen spanning works and make good all surfaces
from top of existing upstand wall Existing Cafe prior to re-installingExisting blade columns to
New anodised New anodised aluminium- New feature signage panels Feature timber seat on
(no works)
Screen
extend to underside of
Refuse
SC-15
to underside of new roof over
aluminium-framed framed full-height glass suspended between blade recessed concrete base,
new awning over. Select
N-FWG
TL-07 Existing cafe shopfront glazing corner window walls to future detail downlighting under
Fire Hose Reel to be relocated to render and paint finish
servery to be
suit egress requirements retained
THR Path of egrees to be
contrast tiled to ensure Generally throughout:
1.0 m clear width - New render and paint finish to all external walls
TL-12
EX-COL - New anodised aluminium (25µm coating)
EX-COL EX-COL
sliding doors to terraces / balconies
N-DP THR Demolish part exist. brickwall. - New anodised aluminium (25µm coating) windows
New blockwork wall extension
Gate - New frameless glass balustrade with
to existing to finish to underside
of new roof over, to eng.details. anodised aluminium (25µm coating) uprights
Install a proprietary-type
- New tiles to walkways, terraces and balconies
waterproof membrane system
to the slab surface and wall.
fall 1:40 max
fall
1:20
max
N-RWO Provide tile finish to gas type lid to
grease trap to hydraulic engineers
detail.
Existing blade columns to be
EX-COL
retained. New select paint finish
fall 1:40 max
fall Tenancy 1 Tenancy 2
1:20
max EX-COL EX-COL
EX-DP
Suite 2,
Cnr Gard
New anodised
aluminium-framed Alexand
glass bi-fold
shopfront doors
PO Box
R 2730
P 07 54
fall 100 x 25 RHS powdercoated
N-RWO
fall 1:40 max 1:20 New awning cantilevered off New anodised admin@
aluminium batten screen spanning
max existing wall and supported aluminium-framed glass
from top of existing upstand wall
by blade wall extensions bi-fold shopfront doors
to underside of new roof over
SUNCOAST RESORT BUSINESS CENTRE
New anodised
EX-HYD EX-COL SUITE 2 CNR GARDAK ST & SURF RD
aluminium-framed glass
bi-fold shopfront doors ALEXANDRA HEADLAND Qld 4572
2500 EX-COL PO BOX 6232 MAROOCHYDORE BC Qld 4558
approx. (varies) PH : 07 5443 5028 FAX:07 5479 2380
ABN 23 123 917 724
Threshold Threshold Gate
EMAIL: [email protected]
N-DP
project
New anodised
fall 1:40 max
approx. (varies)
New anodised TL-01
aluminium-framed Line of new awning 100° PROPOSED ALTERATIONS &
2325
aluminium-framed
fall 1:40 max fall 1:20 New blockwork planter over shown dotted
ADDITIONS TO EXISTING
2535
full-height glass shopfront glazing
max wall with stone-clad
corner window finish to match existing N-RWO Existing trees to N-COL RESORT BUILDING
be retained.
N-FWG FWG for
NETANYA RESORT
2.300
FFL 2.230
at
2695
N-GD
TL-02 9380 TOW 2.580 TL-02 75 HASTINGS STREET
NOOSA HEADS
N-RWO
drawing
Line of new awning
New tree
over shown dotted 290 DETAILED AREA - SOUTH-
3730
Seat Seat 2.250 WEST TENANCIES / REFUSE
New
Ex Tree Ex Tree 500 2700 AREA
500
landsc.
planter
1200
N-GD
TOW 2.580 AS SHOWN
N-GD date 11/08/2021 drawn JP scale @A1
N-COL
drawing no. 19021 SD60.00 revision H
FFL 2.180 2.180
Feature timber seat on
Select feature granite New feature stone Select feature granite tiles
recessed concrete New deep landscaping Feature timber seat on Select stone tiles over Existing trees to be retained.
tiles TL.02 over new planter walls to match TL.02 over new concrete LED strip lighting under
base, LED strip light planter in ground recessed concrete base, existing concrete slab / Provide new additional landscaping Copyright of this document remains the exclusive
concrete slab / footpath slab / footpath seat as per future detail
N
under to future details existing downlighting under footpath as per landscape architect's details property of SPROUT ARCHITECTS PTY LTD
ABN 23 123 917 724.
Storm Water
Connection
GROUND LEVEL Contractors are to verify all dimensions and levels on
site prior to commencing. Report all discrepancies to
the Architect. Use figured dimensions in preference
Scale 1:50 0 5 10 to scaled.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Approved Plans - MCU13-0081.02.pdfRelated documentApplication case desk ↗
About this file
- File size
- 16.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.