Council archive · source document
07/2382 - MCU - Detached House [As Published] · 132007.2382
-NOOSA ; Checklist - Applications Involving Land
Development & Land Use Sections
IDAS APPLICATION
This checklist should be used for any IDAS application. Please check each of the following items before accepting an
application at the counter.
1.4 Form Part A
1.1.1. Ensure that the form is fully completed.
1.1.2 In the case of an MCU or Op Works below the high-water mark, owners consent is required.
1.1.2.1 If there are muftiple owners, the consent of each owner is required.
1.1.2.2 if the owner of the land is a company, either ACN No. or Company Seal required.
1.2. Form1 Part B-O Supporting Information
1.1.2 Ensure that for each box checked on Form A, the relevant additiona! Forms B-O are attached.
1.1.2.1 Ensure that each of Forms B-O which are attached are fully completed.
CSR a see CRESS ns
3.1 “Ensure that Part G is completed if EPA referral is is 5 required.
3.2 Where EPA is delegated to Council (see * in ERA checklist), ensure that the correct application
fee is paid and recorded on the application.
"Ensure that items s 1 28 | have been heed and/or completed including information regarding
applicant details and owners consent.
5.1 Ensure that at least 6 sets of the Plan of Development 16 for or Reconfiguration and Operational
Works) accompanies the application. In addition ensure that each set is complete.
5.2 Ensure that 1 of the copies of the Plan of Development is in an A3 or A4 format and.is
unbound.
ONE US
6.1 Ensure that at least 6 copies of any report accompanies the application (5 for - Reconfiguration _
and Operational Works). If the application is accompanied by a covering letter, ensure that it is
capable of reproduction.
SORTING INFORMATIONS
Ensure that the ‘application fe tos, as ss determined from he ea $ "e adopted scale of fees,
accompanies the application or has been paid. {
_7.2 Ensure that the fee which has been paid is recorded on the application form. WA
Receiving Officer ....... Fa... Qvoniee OTD cccceenee estes Date ...... Oe fo be ccecees
Having completed this form and accepted the ication, please deliver both to the following IDAS Application Receiving
trays:-
» Ifthe application is for a Material Change of Use exclusively -AOP1’s desk in the Land Use Section.
¢ Ifthe application is for an Material Change of Use & Reconfiguration - AOP1’s desk in the Land Use Section.
e, If the application is for Operational Works (for parking, access, sewerage or drainage) exclusively — AOQD2 in the
Land Development Section.
* Inaill other circumstances — AOP1’s desk in the Land Use Section.
Please DO NOT leave the application at the counter and DO NOT deliver the application to Records.
SEP! g:\ant\orms\application checklist.doc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 49 pages
Page 2
Part A, Version 2.4, 29 May 2006
The completion of all applicable questions on Part A is mandatory for all applications. Part A must be accompanied by the completed IDAS Assessment Checklist if
required, and by one (1) or more other completed parts of the Form as required. For more information on the parts of the Form refer to www. ipa.qid.gov.au.
Any information requested in the form may be provided in an attachment to the application. For further information about completing the following details, refer to Guide 1.
Description of land 1. Street address: fnefudinghouse number, street name, suburb/locality name & postcode) (if applicable}
iotfed Howovr 2 Goarpton ole ends ot [No- & kok 52. Aspera Place Noosaville 46
eee ei Reon key Ga 2. Name of water body or watercourse, within which the development is proposed: (if applicable)
Advice for completing Q2 - Q2 it —
Geveonst ts proposed within ey OF { — 7
watecourse. 3. Loton plan description (eg. Lot 123 on RP 4567)/ GPS coordinates:
Advice for compteting G3 - Most tand can be
icnlfedby alton plan coserision. These Sts [ust 52 SPIb33209 |
can be obtained from titte docurients or through the _ - -
4. The-above description is for: (tick. box)
focal government. pt (tick applicable box)
However, ithe land on which the development is (i) the land on which the development is proposed; or :
me enemas pace austen bon or fe. (Qi) the land adjoining the water body or watercourse, within which the development is
watercourse) provide — _ proposed; or
Oe eee (0 di) the water body or watercourse.
soy eat ee fan veton Bay, §. Shop / tenancy number: 6. Storey / level: 7. Total area of land: (m: or ha):
f = Q7 does ifthe \
Seva 8 wer boy ree, J Sings L'324.2 I
cere rary nena a (= government area in which the land is situated: (g. Esk Hervey Bay, Woocoo et. feo
Noto: Areas below high water mark are pot wilhin a Tewanhnn
focal government's area unless provided for under the
, Local Government Act 1993. 9. ° Port authority for the strategic port land or strategic port land tidal area on which the
bavi mae Eee cot eer a tretege development is proposed: (eg. Port of Brisbane, Port of Townsville) (if applicable)
port land tidal area. For more details refer to Guide 14 | |.
Proposal details 10. Existing use of the land: (eg. vacant, single house, shop etc.)
"Itthere fs insufficient room avaitabie, detaits may be [ va Cant |
provided in an attachment to the application. “~.
11. Proposed use of the land: (eg. 6 unit epartment building, 30 fot residential subdivision, ERA for aquaculture in
ponds with a total area of 7 ha for which wastes are released into waters etc).
| New Home.
Other applicable parts of Form 1 12. Other parts of Form 1 completed as part of this application: (eg. Part D, Part J, etc)
: Part Amust afways be accompanied ty other —_—
*Camplledparsoykomn 1, For ormotn aout | Parry & J
, When a part of Form 4 may apply refer to Guide t,
‘Applicant details 13. Applicant's name: 15. Contact person:
apr neal pettetheomer deen [Oy Leach Pry tte | [mari -anne Leach |
When stant this appl 14. Contact number: 16. Facsimile number/e-mail address:
The applicant is responsible for ensuing the
j homeaon wos is eT aot [ On S471 4 oF be] b ] |
, ihe Chief i
(where applicable) vary this information when 17. Postal address: -
Soa desttnathe on >
fine aruteantinacmoan scot person [Po Sox 1112 Noosaville DC aD 4566
musi be shown, 18. Signature: 19. Date:
MmLoa { iB -l\-o7 |
16 NOV 2007
NOOSA SHIRE COUNCIL
FRONT COUNTER
Page 3
4 . eB-01-2007 13:36 ROBERTS BROS 617 WM rrvrent ies UINVOrUsl, faa 5442 7e11 - PREEL 101 8 a0s9yI Ze wt s IS Land emai omamnc a, . AGN AS RATT, wel © FoR. An) 8 2. Douae pohatin inte Oates preutbed ante epee para aes Ste coated Speman hs 006? pecs Ove-aem - Oe the ctf eamiten cf the department edmictatartag the easmace ia eaticSed re + Cte to, tre nec ~ 90% O79 : ne 23. Bvitence cf he nesuve entiemene a Ofc he depertmam a etahiiety teeta 2, be (OAS Assenamant Checktst cornglaind and attached to fe apylicetay? 0100 -trammmrnnew ny ate bea Reape cots 88-01-2807 13:31 ROBERTS BROS 617 5442 7e12 PAGEL
Page 4
INTEGRATED PLANNING ACT 1997 Part D, Version 3.0, 3 September 2007
Form 1 Development Application
Part D
Material change of use assessable against a planning scheme
Planning schemeidentfcation eT
1. How is the premises identified / zoned in the applicable planning scheme?
Each lot making. up the premises List of applicable zone/precincts/areas * List of applicable overlays
i. ; Pelached Heosing
sate ee 1 tens tan fg lg a eS Sak Re pS ee ce te eo a amen nee i
* Nature of the material change of use (MCU) one 4
2. Is the application seeking approval for more than one MCU on the premises?
(1 No - Compiete Table A
O1 Yes - Complete a new Table A for each proposed MCU
Table A
(i) How is the proposed use defined in the applicable planning scheme? Also provide an explanation of the proposed use
Number of dwelling | Days and hours | Number of
Planning scheme definition Explanation of the proposed use / tenancy units . of operation employees
(if applicable) (if applicable) {if applicable)
Detached tase
(ii) Whatis the nature of the material change of use?
4 Start of a new use of the premises
(1 A material change in the intensity or scale of the use of the premises - Complete Table A(a)
C1 The re-establishment on the premises of a use that has been abandoned
Table A(a)
Extent of change of intensity and scale
- lnlensity and scate of the current use (e.g. additional 100ms of floor area, additional 2 dwelling units)
{iii) What type of approval is being sought?
b4 Development Permit
2 Preliminary Approval
{iv) Is there a current Preliminary Approval for this use on the premises?
No
L] Yes - Complete Table A(b)
Table A(b)
[:
List of approval reference/s . Date approved Date approval lapses
Page 5
INTEGRATED PLANNING ACT 1997 Part D, Version 3.0, 3 September 2007 No (v) il the proposed use involve the reuse of existing buildings on the premises? C1 Yes - Complete Table A(c) and submit, with the application, plans showing the size and location of the buildings to be reused Table A(c) Existing floor area Existing site cover Existing maximum number of storeys © Existing maximum height above natural ground level (vi) Does the proposed use involve new building work on the premises? - No” . : - - Yes — Complete Table A(d) and submit, with the application, plans showing the size and location of the proposed new building work ‘ Table A(d) Proposed floor area : : Proposed site cover . . @ Proposed maximum number of storeys Proposed maximum height above natural ground level (vii) Does the proposed use involve the reuse of other existing works on the premises? No LJ Yes - Complete Table A(e) and submit, with the application, plans showing the nature and location of the works to be reused Table A(e) . Existing number of on-site car parking bays Existing area of landscaping Existing type of vehicle cross-over (for non-residential uses) Existing maximum vehicular servicing arrangement for non-residential uses) (viii) oy the proposed use involve new operational work on the premises? No C1 Yes - Complete Table A(f) and submit, with the application, plans Showing the nature and location of the proposed new operational works Table A(f) e@ Proposed number of new on-site car parking bays : Proposed area of new landscaping Proposed type of new vehicle cross-over (for nonvesidentia! uses) Proposed maximum new vehicular servicing arrangement (for non-residentia! uses) GENERATE ANOTHER TABLE A -
Page 6
cee nam ee mee mn me seme ne eee oe mene or capone te te 7}
"Mar 'Mandatory information
3. Confirm the following mandatory information accompanies this application.
«. Confirmation of - | Method of lodgement
lodgement
For all applications
i) . Plans showing the nature and location of the proposed use on the premises and a statement
about the intensity and scale of the proposed use tes. ‘of employees, days and hours of operation, |[} Confirmed
number of visitors, number of seats, capacity of storage area) * : .
When, the application involves reuse of existing buildings —
(i) Plans showing the size and location of the buildings to be reused Confirmed
8 CJ Notapplicable
When the application involves new building work .
(ii) Plans showing the size and location of the proposed new building work “10 Confirmed
te 5 ERS My MS $8 ~ | Not applicable
When the application involves reuse of other existing works
(iv) Plans showing the nature and location of the works to be reused |" Confirmed
@ (1_ Not applicable
When the application involves new operational work
{v) Plans showing the nature and location of the proposed new operational works. Confirmed
: C1 Notapplicabte
OFFICE USE ONLY
[Date received | | [Reference numbers
Advice for completing Part D
General advice
* Part A must also be completed for all IDAS development applications.
¢ All questions must be answered unless following a response there is a statement to go directly to a particular question.
Table A | A development permit authorises development to occur, while a preliminary approval is a step in the approval process and does not
authorise development to occur.
Page 7
INTEGRATED PLANNING ACT 1997 - IDAS Assessment Checklist, Version 21.0, 3 September 2007 Form 1 Development Application IDAS . Assessment Checklist seen: Syne mms IDAS Devetopment Application Fon Form Mi is 5 the approved form for: alld development ‘applications ' under the integrated ‘Planning, Act 1997. Form 4 is made up of various Parts. Part A (Common details) of Form 1 must be completed for all : applications. The relevance of other Parts of Form 1 depends on the nature of the application: Form 1 also includes the IDAS Assessment Checklist, which is used to assist in determining State assessment and referral requirements, and the Parts of Form / relevant to the application. Section 4 and all other relevant sections of the IDAS Assessment Checklist must be completed for all development i applications except those for building work requiring assessment against the Building Act 1975 only. For more advice i | refer to Part B ofthe IDAS Application Form. t Answering the following questions will assist you in‘ determining which sections of the checklist must be completed for your application. if unsure, phone or visit your local government or log on to the IPA website for help. Does the application seek approval to materially change use of the premises? ; wy Yes |L] No if yes — complete Section 2 of this checkiist Does the application seek approval to reconfigure a fot? OO Yes No If yes - complete Section 3 of this checklist and Part F of IDAS Application Form 4 Assessment is by the local government Does the application seek approval to carry out operational work? C1 Yes . a No Hf yes - complete Section 4 of this checklist Does the application seek approval to carry out building work requiring assessment against the Fisheries|[_] Yes wa No Act 1994? tfyes - complete Section 5 of this checklist Does the application seek approval to carry out building work requiring assessment against a local LD Yes a No government planning scheme? ifyes - complete Part E of IDAS Application Form 1. Assessment is by the focal government 7 [ Does the application seek approval to carry out building work requiring assessment against the Building |[_) Yes a No Act 1975? if yes - go to Appendix 1 of this checklist for advice on building referrals. Complete Part B of DAS Application Form 1. Assessment is by a building certifier
Page 8
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.0, 3 September 2007 SECTION 1 Section 1 must be completed for all applications that require completion of the IDAS Assessment Checklist. HERITAGE 1.1 |\s any part of the proposal intended to be carried out on a registered place under the Queensland Henttage Act 1992? No OO Yes If yes, has an exemption certificate for the proposal! been issued under the Queensiand Heritage Act 1992? OO Yes LI No . If no, is the proposed work emergency work for the Queensiand Heritage Act 1992? 1 Yes O No If no, is the work being cartied out by the State? OO Yes (I No (Complete Part C) This application requires assessment by the Queenstand Heritage Council (QHC). If QHC is not the Assessment Manager for the application, the Council has jurisdiction as Concurrence Agency, fe 8 part 1. tadie 5, tem 2 In, Schedule 2. table 2, ilem 18 IPA, section 1.3.5 (Definitions for igems used in development) REMOVING QUARRY MATERIAL; WILD RIVER AREA eo ‘ - * ‘e 1.2 | Dogs the proposal involve removing quarry material from a watercourse or lake as defined under the Water Act 2000? No Yes If yes, is.an allocation notice required under the Water Act 2000? O No OO Yes If yes, is any part of the removal of quarry material intended to be located in a declared wild river area under the Wild Rivers Act 2005? (1 No - (Complete Part K7) This application requires assessment by the Department of Natural Resources and Water (NRW). Hf NRW is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency. O Yes ~ Unless the application is consistent with any property development plan applying to the land, the Assessment Manager must refuse to receive i. (Complete Part Kz). If NRW is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency. Subject to the declaration for the relevant wild river area, assessment is also required for the purposes of the Wild Rivers Act 2005. ‘In this IDAS Assessment Checklist, ihe term proposal refers to the proposed use, work of lot reconfiguration the subject of the application. -2-
Page 9
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checks, Version 21.0, 3 September 2007 ENVIRONMENTALLY RELEVANT ACTIVITY; WILD RIVER AREA ~ : 4 1.3 rn proposal involve an environmentally relevant activity (ERA), other than a mining aativiy or a petroleum activity? No DD Yes If yes, is any part of any-ERA intended to be located in a wild river area declared under the Wild Rivers Act 2005? LI No If no, is there a code of environmental compliance under the Environmental Protection Regulation 1998 for every aspect of each proposed ERA? C1 No- (Complete Part G) This application requires assessment by the Administering Authority. If the Administering Authority is. not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency. 1 Yes O Yes If yes, is any ERA an item 20 ERA (extracting rock or other material) intended to be located in waters? 0 Yes If yes, will the application be accompanied by an allocation notice for that ERA, as defined under the Environmental Protection Act 1994, section 73AA(9)? OD Yes - Unless the application is consistent with any property development plan applying to the land, and the application is accompanied by an allocation notice, the Assessment Manager must refuse to receive it. (Complete Part G). This application requires assessment by the Administering Authority for the purposes of both the Environmental Protection Act 1994 and, subject to the declaration for the retevant wild river area, the Wild Rivers Act 2005. if the Administering Authority is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency. (No -An application for the ERA would be taken to be not properly made and the Assessment Manager must refuse to receive it. C1 No
Page 10
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.0, 3 September 2007
If no, is any part of any ERA intended to be located in a high preservation area?
O Yes * XS
If yes, is each proposed ERA one of the following?
e ERA, item 15 (sewage treatment) . No C1 Yes
* ERA, item 16 (municipal water treatment plant) . (No () Yes
© ERA, item 19 (dredging material) [No (1) Yes
ERA, item 14 (crematorium) , [CONo Yes
e — ERA, item 28 (motor vehicle repair shop) [LJNo (Yes
© — level 2 ERA other than - LINo [] Yes
¢ item 1(a) (aquaculture)
» — item 2(a) (cattle feedlotting)
+ — item 3(a) (pig farming)
+ — item 4(a) (poultry farming)
+ — item 20 (extracting rock or other material)
« — item 22 ( screening etc. materials}
+ _ item 59 {asphalt manufacturing)
« — ERA, item 20 (extracting rock or other material) located outside [No [Yes
waters and the activity is a borrow pit of not more than 10,000m° for -
+ — specified works under the Wild Rivers Act 2005; or
+ residential complexes, as defined under the Environmental
Protection Act 1994
© ERA, item 22 ( screening etc. materials) and carried out outside waters L]No —_[] Yes
and the activity is for- -
« — specified works under the Wild Rivers Act 2005, or
+ — for residential complexes, as defined under the Environmental
Protection Act 1994
© — ERA, item 11 (crude oil or petroleum product storage) and the activity [1 No C1 Yes
is - .
. a level 2 ERA; and
+ — for residential complexes, as defined under the Environmental
Protection Act 1994; and
+ carried out outside a designated urban area, as defined under the
Wild Rivers Act 2005 ,
e —Anexempt environmentally relevant activity, as defined under [1 No LJ Yes
Environmental Protection Act 1994, in a designated urban area, as
defined under the Wild Rivers Act 2005
If yes to any one - Unless the application is consistent with any property development plan applying to the land, and the
application is accompanied by an allocation notice, the Assessment Manager must refuse to receive it
(Complete Part G) This application requires assessment by the Administering Authority for the
purposes of the Environmental Protection Act 1994. If the Administering Authority is not the
Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
Subject to any limitations in the declaration for the relevant wild river area and the Wild Rivers
code, assessment is also required for the purposes of the Wild Rivers Act 2005, In particular,
ERAs 15 and 16 and an ‘exempt environmentally relevant activity’ do not require assessment
for the purposes of the Wild River Act if proposed to be located in a designated urban area.
{f no to all - An application for the ERA/s would be taken to be not properly made and the Assessment Manager musi
refuse to receive it.
Page 11
INTEGRATED PLANNING ACT 1997
{DAS Assessment Checklist, Version 2.0, 3 September 2007
CINo
If no, is any ERA an item 20 ERA (extracting rock or other material} intended to be located outside
waters? ‘
1 No - Unless the application is consistent with any property development plan applying to the land, and the
application is accompanied by an allocation notice, the Assessment Manager must refuse fo receive it.
{Complete Part G) This application requires assessment by the Administering Authority for the
purposes of both the Environmental Protection Act 1994 and the Wild Rivers Act 2005. If the
Administering Authority is not the Assessment Manager for the application, the agency has jurisdiction
as Concurrence Agency.
1 Yes
tfyes, does the ERA meet the following? Sy
. © the activity is located inside a flood management area and a CO No C1 Yes
borrow pit of not more than 10,000m? for - : :
* specified works under the Wild Rivers Act 2005; or
+ — residential complexes, as defined under the
Environmental Protection Act 1994
,* _ the activity is located outside a flood management area L}No [Yes
if yes to either — Unless the application is consistent with any property development plan applying to the
. land, and the application is accompanied by an allocation notice, the Assessment Manager
must refuse to receive it. (Complete Part G} This application requires assessment by the
Administering Authority for the purposes of both the Environmental Protection Act 1994
and, subject to the relevant declaration for the wild river area, the Wild Rivers Act 2005. if
the Administering Authority is not the Assessment Mariager for the application, the agency
has jurisdiction as Concurrence Agency.
ff no to both - An application for the ERA would be taken to be not properly made and the Assessment
manager must refuse to receive it
WITHIN THE LIMITS OF A PORT
1.4
ri part of the premises within the fimits of a port under the Transport Infrastructure Act 1994?
No
OO Yes : .
If yes, is that part of the premises below high water mark?
O No
LI Yes - if answers to questions in other sections of this checklist indicate that the proposed development is assessable under IPA,
schedule 8 - Answer (a) to (c) below. This application requires assessment by the Port Authority for the land. Mf you
answer no {0 (a), (b} and (c) below, the Port Authority for the Port has jurisdiction as Advice Agency.
(a} Is any part of the proposal within 200m of a shipping channel or an entry and exit shipping corridor for the Port?
1 No
LJ Yes - The Port Authority for the Port has jurisdiction as Concurrence Agency.
{b) Is any part of the proposal within 1,000m of a swing basin, a commercial fishing wharf, a mooring, anchorage or
spoil grounds?
(2 No
L1 Yes - The Port Authority for the Port has jurisdiction as Concurrence Agency.
{c) _ Is any part of the proposal within 1,000m of a planned port facility identified in a land use plan?
DO No
LL Yes - The Port Authority for the Port has jurisdiction as Concurrence Agency.
iP Regulation. sshadule 2, iable 2, kems 16 and 16
Page 12
INTEGRATED PLANNING ACT 1997 (DAS Assessment Checklist, Version 21.0, 3 September 2007
DECLARED FISH HABITAT AREA :
1.5 |Does any part of the premises adjoin a declared fish habitat area under the Fisheries Act 1994? .
No
oO Yes — if answers to questions in other sections of this checklist indicate that the proposed development is assessable under IPA,
schedule 8, this application requires assessment by the Department of Primary Industries and Fisheries (DPI&F). If DPI&F is not
the Assessment Manager for the application, the agency has jurisdiction as Advice Agency.
IP Reguiation, schedule 2, fable 2, tem 26
COMMUNITY INFRASTRUCTURE
1.6 |Is any’part of the premises designated for community infrastructure?
No
OO Yes
If yes, is the community infrastructure intended to be provided by a public sector entity?
OO No
OO Yes .
If yes, is the land owned by or on behalf of the State?
Ol Yes
CI No
If no, is the development for the following?
¢ For the designated purpose ‘(No [1] Yes
© Carried out by, or on behalf of, the designator [LINo (1) Yes
If no to either or both, is the proposed development assessable under the planning scheme?
OO No
(1) Yes - This application must be referred to the Queensland Govemment department administering the Act
authorising the development for the designation as Concurrence Agency.
IP Res schedule 2 fabie jem? .
WASTE WATER MANAGEMENT
1.7 |Does‘the proposal involve the establishment or expansion of a waste water disposal system? ,
No
OO Yes
If yes, is any part of the disposal system proposed to be located in an area declared to be a catchment area under the
Water Act 2000?
OO No
C1] Yes
If yes, is the proposed waste water disposal system an environmentally relevant activity (ERA) under the Environmental
Protection Act 1994?
Ol sYes
OO No
If no, is the proposed development involving the waste water disposal system assessable under the planning
scheme?
OO No
O Yes - This application requires assessment by the Department of Natural Resources and Water (NRW) as
Concurrence Agency.
‘on, Sohedule 2,
3 ites
Page 13
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.0, 3 September 2007
SECTION 2 Section 2 must be completed when the application seeks approval to materially change the use of premises.
PLANNING SCHEME .
2.1 | ts the proposed use assessable under the planning scheme?
[1 JNo - (Go to Question 2.2)
Yes - (Complete Part D of IDAS Application Form 1 and answer Questions 2.1.1 - 2.1.14 befow)
Hf yes, does the application request that the proposal be assessed against a superseded planning scheme?
Yes - (Complete Attachment 1)
No
STATE-CONTROLLED ROAD :
2.1.1 | Is any part of the premises within 100m of a State-controlled road, or part of a future State-controlled road?
OO Yes
If yes, is the use proposed in a future State-controlled road defined by route?
OsYes- This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency.
OO No- This application must be referred to DMR as Advice Agency.
No
If no, is the proposed use listed in schedule 5 of the integrated Planning Regulation 1998 and does it exceed the specified
threshold?
Ol sYes- This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency.
No
JP Regulation, schedule 2, table 3, items t{a) and 2
ACID SULFATE SOILS
2.1.2 | Is the use proposed in a local government area listed? in State Planning Policy 2/02: Planning and Managing Development
Involving Acid Sulfate Soils?
» No
OC) Yes
If yes, is the natural ground level of any part of the premises tess than 20m AHD?
O No
Ol Yes
tf yes, will the proposed use involve the following? .
¢ — Excavating more than 1,000m? of soil or sediment at or below 5m AHD Ono [1 Yes
Filling the premises with 1,000m? or more of material with an average depth of 0.5m ]No . [1 Yes
on land, soil or sediment at or below 5m AHD
if yes to either or both - this application must be referred to the Department of Natural Resources and Water (NRW) as Advice
Agency.
IP Regulation, schedule 2, teble 3, iten: 4
State Planning Pokiey 2/02. Pr
1g and Managing Development involving Acid Sulfate Soiis, section 2.6
? Aurukun, Bowen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Burnett, Caboolture, Cairns, Calliope, Caloundra, Cardwell, Carpentaria, Cook, Cooloola, Douglas,
Fitzroy, Gladstone, Gold Coast, Hervey Bay, Hinchinbrook, Isis, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Miriam Vale, Momington, Noosa, Pine Rivers,
Redcliffe, Redland, Rockhampton, Sarina, Thuringowa, Tiaro, Torres, Townsville, Whitsunday.
7.
Page 14
INTEGRATED PLANNING ACT 1997 COASTAL MANAGEMENT DISTRICT 2.1.3 | Does the proposed use involve the following? IDAS Assessment Checklist, Version 21.0, 3 September 2007 e — Carrying out operational work, completely or parity in a coastal management district No [] Yes e — Carrying out building work, completely or partly in a coastal management district, that is the No [7] Yes construction of new premises with a gross floor area (GFA) of at least 1,000m? ; ¢ — Carrying out building work, completely or partly in a coastal management district, that is the ne LO Yes enlargement of the GFA of existing premises by more than 1,000m2 if yes to any one - this application must be referred fo the Environmental Protection Agency (EPA) as Concurrence Agency. IP Regulation, schedule 2. fable 3. tem & VEGETATION CLEARING 2.1.4 | Do the premises include a lot containing the following? * Acategory 1, 2 or 3 area shown on a Property Map of Assessable Vegetation (PMAV) de g Yes e — if there is no PMAV for a lot, remnant vegetation no C1 Yes If yes to either or both, is the size of the premises 2ha or larger? C] No OO Yes If yes, is the existing use of the premises rural or environmental? [1 No (1 Yes - (Complete Part J} This application must be referred to the Department of Natural Resources and Water (NRW) as Concurrence Agency. JP Regulation, schedule 2. table 3, tem 11 CONTAMINATED LAND - UNEXPLODED ORDNANCE 24.5 Is any part of the premises in an area for which an area management advice has been given for unexploded ordnance? Yes - (Complete Part N} This application must be referred to the Administering Authority as Concurrence Agency. No IP Raguiat chedule 2, t Het: 12 . PUBLIC PASSENGER TRANSPORT 2.1.6 | Is the proposed use listed in schedule 13C of the Integrated Planning Regulation 1998 and does it exceed the specified threshold? cy Yes - This application must be referred to Queensland Transport (QT} as Concurrence Agency. No IP Regulalion, schedule 2, table 2, tem 14 RAILWAY SAFETY AND EFFICIENCY 217 ls the proposed use listed in schedule 13D of the integrated Planning Regulation 1998 and does it exceed the specified threshold? Cy Yes - This application must be referred to Queensland Transport (QT) as Concurrence Agency. No IP Raguialion, schedule 2. table 3, dem 15
Page 15
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.0, 3 September 2007
KOALA CONSERVATION
2.1.8 | Is any part of the premises in a koala conservation area or koala sustainability area?
No
CL) .Yes
If yes, is the use for a domestic activity, as defined by the IPA?
OO Yes
LJ] Ne
If no, will the use result in the following?
© — Clearing of native vegetation over an area greater than 2,500m2 no [Yes
* Anew building and any reasonably associated structure with a total footprint greater CINo (1 Yes
than 1,000m2 .
* Anextension to an existing building and any reasonably associated structure if the [No [Yes
extension has a total footprint greater than 1,000m? . .
« — Extracting gravel, rock or sand from an area greater than 5,000m? (Ono DYes
* . Excavating or filling an area greater than 5,000m2 Lino [Yes
¢ — Additional traffic in a koala conservation area or koala sustainability area between CiNo CL) Yes
6:00pm on a day and 6:00am on the following day
» Hyes to any one - this application must be referred to the Environmental Protection Agency (EPA) as Concurrence Agency.
IP Reguiation. schedule 2, item 18
[EASEMENTS AND SUBSTATIONS
2.1.9
Is the use associated with reconfiguring a lot?
Les
No — Answer both (a) and (b) below
(a) Will any part of any structure or work that is the natural and ordinary consequence of the use, be located in an
easement?
No :
(1) Yes - Answer both (i) and (ii) below : .
{i)_ 4s there an easement in favour of a distribution entity or transmission entity under the Electricity Act 1994 for
a transmission grid or supply network under that Act?
0 No :
C1 Yes - This application must be referred to the entily as Advice Agency.
(ii) 1s there an’ easement in favour of the holder of pipeline licence number 1 issued under the Petroleum Act
1923 for the construction or operation of the Moonie to Brisbane strategic pipeline under that Act?
O No .
(1 Yes - This application must be referred to the licence holder as Advice Agency.
(b) Is any part of the premises situated within 100m of a substation site under the Electricity Act 1994?
No .
LD Yes - This application must be referred to the entity responsible for the substation as Advice Agency.
icity easemeni)
ment
Page 16
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.0, 3 September 2007
RESIDENTIAL, COMMERCIAL OR INDUSTRIAL DEVELOPMENT IN A WILD RIVER AREA
2.1.10] ls any part of the premises in a wild river area declared under the Wild Rivers Act 2005?
No
OO Yes :
If yes, is the proposed use for residential, commercial or industrial purposes outside a designated urban area, as defined
by the Wild Rivers Act 2005?
00 No
oO Yes - Subject to the declaration for the wild river area, assessment by the local government is required for the purposes of the
Wild Rivers Act 2005.
ignated ura Brea)
WETLAND
2.1.11 | Is the proposal only for the construction or use of a single residence on a lot and any reasonably associated building or structure?
Yes
No
If no, do the premises include a {ot situated in, or within 100m of, a wetland shown on the ‘Map of referable wetlands’?
1 No
C1 Yes - This application must be referred to the Environmental Protection Agency (EPA) as Advice Agency,
IP Regulation, sshedule 2, table 3. tem 2)
HERITAGE
2.1.12] Do the premises include a lot sharing a common boundary with a protected area or registered place under the Queensland
one Act 1992?
No
(] Yes - This application must be referred to the Queensland Heritage Council (QHC) as Advice Agency,
iP Regitation, schedule 2, table 3. tem 22
CERTAIN PRELIMINARY APPROVALS
2.1.13
Is preliminary approval sought for the application under the IPA, section 3.1.6?
No
LD Yes - (Complete Aitachment 2) This application must be referred to the Deparment of Local Govemmeni, Planning, Sport and
Recreation (DLGPSR) as Advice Agency.
P Regutation, schodule 2. tab! 2
-10-
Page 17
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.0, 3 September 2007
BROTHEL :
2.2 of proposed use a brothel as defined under the Prostitution Act 1999?
No :
OO Yes . \
If yes, does one or more of the following apply?
¢ — The land is in, or within 200m of the closest point on any boundary of, a primarily LiNo (1 Yes
residential area.or an area approved for residential development or intended to be
residential in character
The land is within 200m of the closest point on any boundary of land on which there is L]No (] Yes
a residential building, place of worship, hospital, schoo!, kindergarten, or any other
facility or place regularly frequented by children for recreational or cultural activities
(measured according to the shortest route a person may reasonably and lawfully take, by
vehicle or on foot, between the land proposed for the brothel and other land)
* The land is within 100m of the closest point of any boundary of land on which there is [JNo (_] Yes
a residential building, place of worship, hospital, school, kindergarten, or any facility or
place regularly frequented by children for recreational or cultural activities (measured in
a straight line)
* More than § rooms are proposed to be used for providing prostitution : OONno (Yes
¢ — The land is in a town where the Minister for Police and the local goverment have Lino (1 Yes
agreed that all applications for brothels in the local government area are to be refused
if yes to any one - an application for a brothel must be refused by the assessment manager.
ino to all - (Complete Part H) This aspect of the application is assessed by the focal govemment for the purposes of the
Prostitution Act 1999,
IPA, sotedule 3. part 1, tabie 2. ten 2
Prostitution Acl 1999, section 64
STRATEGIC PORT LAND :
2.3
\s any part of the use proposed on Strategic Port Land under the Transport Infrastructure Act 1994?
No
Oi Yes :
If yes, is the proposed use inconsistent with the approved land use plan? .
C) No
OO sYes- (Complete Part I) This application must be referred to Queensland Transport (QT) as Concurrence Agency.
8 ,
nt 1 table 2
MAJOR HAZARD FACILITY
24
Is the-proposed use a major hazard facility or possible major hazard facility under the Dangerous Goods Safety Management Act 2001?
No
CI Yes ~ {Complete Part L) This application requires assessment by the Department of Emergency Services (DES). If DES is not the
Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
item 4
6 2, tem 7
-M-
Page 18
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.0, 3 September 2007 CONTAMINATED LAND ~ REGISTERED LAND =” 25 ls any part of the land forming the premises on the Environmental Management Register or Contaminated Land Register under te nemenl Protection Act 1994? No OO Yes If yes, does one or more of the following apply? . « Assuitability statement has been given and a site management plan has been approved forthe []No (] Yes proposed use of the !and, and the proposed use involves only the following - , «the fit-out of a building on the land; or « minor site excavation, including for example, post holes for open-sided non-habitable Structures © — There is currently a notifiable activity on the land and the activity is continuing = - ~ CiNo [1] Yes The proposed use is industrial and only involves minor site excavation (e.g. post holes for open- L1No [J Yes sided non-habitable structures) . / * The land is used for a mining activity or petroleum activity LNo [1 Yes if no to all - (Complete Parl N) This application requires assessment by the Environmental Protection Agency (EPA). If EPA is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency. IPA, schedule & port 1, table 2, tem & IP Reguistion, schedule 2, table 2, item 22 CONTAMINATED LAND = NOTIFIABLE ACTIVITY 26 Is any part of the land forming the premises currently used for a notifiable activity, or if there is no existing use was it last used for a notifiable activity? No CI Yes If yes, does one or more of the following apply? ¢ A suitability statement, removing the land from the environmental management register, has [J]No [] Yes been given under the Environmental Protection Act 1994 for the existing use, or if there is no ' existing use, the last use, and the following both apply - * —nonew notifiable activity has occurred on the land since the suitability statement was issued; + the land is not otherwise contaminated by a hazardous contaminant A suitability statement has been given and a site management plan has been approved forthe ([]No [] Yes proposed use of the land, and the proposed use involves only the following - « — the fit-out of a building on the land; or « — minor site excavation, including for example, post holes for open-sided non-habitable structures © — The tand is used for a mining activity or petroleum activity . LJNo (1) Yes 'f no to all - (Complete Part N) This application requires assessment by the Environmental protection Agency (EPA). If EPA is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency. 3 part 1, fable 2. item 6 ‘ i, schedule 2, fable 2. item 22 |
Page 19
INTEGRATED PLANNING ACT 1997 (DAS Assessment Checklist, Version 21.0, 3 September 2007
CONTAMINATED LAND — INDUSTRIAL ACTIVITY
27
ls any part of the premises currently used for an industrial activity (other than for a mining activity or petroleum activity), or if there
is no,existing use was it last used for an industrial activity (other than for a mining activity or petroleum activity)?
No
OO Yes
If yes, is the proposed use for child care, educational, recreational or residential purposes (including a caretaker residence
on industrial land)?
. LI No
O Yes- (Complete Part N) This application requires assessment by the Environmental Protection Agency (EPA). If EPA is not the
2 Assessment Manager for the application, it has jurisdiction as Concurrence Agency.
IPA, schedute 8. part t,
IP Regulation, schedu
Die 2, tem 3
able 2, Rem 22
CONTAMINATED LAND - AREA MANAGEMENT ADVICE (NATURAL MINERALISATION OR INDUSTRIAL ACTIVITY)
28
ls any part of the premises in an area for which an area management advice has been given for natural mineralisation or
industrial activity (other than for a mining activity or petroleum activity)?
No
OO Yes
If yes, is the proposed use for child care, educational, recreational or residential purposes (including a caretaker residence
on industrial land)?
{] No
1 Yes- (Complete Part N) This application requires assessment by the Environmental Protection Agency (EPA). If EPA is not the
Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
10 2. tem 7
le 2. Rem 22
Page 20
INTEGRATED PLANNING ACT 1997 29 IDAS Assessment Checklist, Version 21.0, 3 September 2007 AQUACULTURE; WILD RIVER AREA . : Is th¢ proposed use for aquaculture as defined under the Fisheries Act 1994? No OO Yes \f yes, is any part of the aquaculture intended to be located in a wild river area declared under the Wild Rivers Act 2005? (D No If no, will the proposed aquaculture cause no discharge of waste into Queensland waters and be - « of indigenous freshwater fish species listed in the Fisheries (Freshwater) Management Plan 1999, schedule 6; and in a catchment listed in that schedule for that species for aquarium display or human consumption only; and «carried out in ponds, or using above-ground tanks, that have a total water surface area of no more than 5ha 1 Yes LJ No If no, will the proposed aquaculture cause no discharge of waste into Queensland waters, be of indigenous freshwater fish for aquarium display or human consumption only, or nonindigenous freshwater fish for aquarium display only, and carried out using only above-ground tanks that have - © a floor area, excluding water storage area, of no more than 50m?; and * aroof impervious to rain water Yes OO No If no, will the proposed aquaculture cause no discharge of waste into Queensland waters, be of indigenous marine fish for aquarium display only and carried out using only above-ground tanks that have a total floor area, excluding water storage areas, of no more than 50m?? Yes LI No- (Complete Part O:) This application requires assessment by the Department of Primary Industries and Fisheries (DPI&F). If DPI&F is not the Assessment Manager for the application, the agency! has jurisdiction as Concurrence Agency. OC Yes Ifyes, is any part of the aquaculture intended to be located in a wild river high preservation area? | No - Unless the application is consistent with any property development plan applying to the land, the Assessment Manager must refuse to receive it. (Complete Part O1) This application requires assessment by the Department of Primary Industries and Fisheries (DPI&F). Subject to the declaration for the relevant wild river area, assessment may also be required for the purposes of the Wild Rivers Act 2005, If DPI&F is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency. (1 Yes - An application for the aquaculture would be taken to be not property made and the Assessment Manager must refuse to receive it, -14-
Page 21
INTEGRATED PLANNING ACT 1997
AGRICULTURAL AND ANIMAL HUSBANDRY ACTIVITIES IN A WILD RIVER AREA -
IDAS Assessment Checklist, Version 21.0, 3 September 2007
2.10
ae of the premises in a wild river area declared under the Wild Rivers Act 2005?
No
OO Yes
If yes, is the proposed use for the following?
* Agricultural activities as defined under the Wild Rivers Act 2005 0 No Oi Yes
e Animal husbandry activities as defined under the Wild Rivers Act 2005 : CI No 0 Yes
if yes to either, is any part of the premises in the high preservation area in the wild river area?
LO Yes - An application for the use would be taken fo be not properly made and the Assessment Manager must refuse to receive it
0 No ; .
“Ifo, is the proposed use in relation to the production of a high risk species as defined under the Wild Rivers Act 2005?
(1) Yes - An application for the use would be taken to be not properly made and the assessment manager must refuse to receive it,
C1 No - Uniess the application is consistent with any property development plan applying to the land, the Assessment
Manager must refuse to receive it. (Complete Part Q if agriculture). (Complete Part R if animal husbandry) Subject
fo the relevant declaration for the wild river area, this application requires assessment by the Department of Natural
Resources and Water (NRW). if NRW is not the Assessment Manager for the application, the agency has
jurisdiction as Concurrence Agency.
IPA, schedule 8, part 1, table
IP Regulation, schedut
Wild Rivers Act 2605,
-15-
Page 22
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.0, 3 September 2007 SEQ REGIONAL PLAN 2.11 ee part of the premises within the South East Queensland (SEQ) Regional Plan area? No : [EJ Yes If yes, are the premises within one or more of the following areas? » A Major Development Area in the Urban Footprint CINo~ LD Yes - (Answer (a) to (c) below) e The Regional Landscape and Rural Production Area CINo [1] Yes - (Answer (d) befow) © The Rural Living Area LINo~ L7 Yes - (Answer (a) below) e The Investigation Area CINo [Yes - (Answer (f) and (g} below) For the part of the premises within the Major Development Area . (a) Does the application involve intensive animal husbandry as defined under the SEQ Regional Plan Regulatory Provisions? O No . i) Yes ~ The SEQ Regional Plan makes this use assessable under the planning scheme. (Ensure Questions 2.1 in this checklist is answered ‘yes’. This requires Questions 2.1.1 - 2.1.13 to be answered also) This application must be referred to the Office of Urban Management (OUM) as Concurrence Agency. (b) Does the application involve residential development involving a rural residential purpose as defined under the SEQ Regional Plan Regulatory Provisions? 1 No (1) Yes - The SEQ Regional Plan makes this use assessable under the planning scheme. (Ensure Questions 2.1 in this checklist is answered ‘yes’. This requires Questions 2.1.1 - 2.1.13 to be answered also) This application must be referred to the Office of Urban Management (OUM) as Concurrence Agency. (c) Does the application involve an urban activity as defined under the SEQ Regional Plan Regulatory Provisions? O No . OO Yes If yes, is the Major Development Area within a structure plan as defined under the SEQ Regional Plan Regulatory Provisions? O Yes If yes, does the IPA, section 3.1.6 apply to the application? OO No [1 Yes - The SEQ Regional Plan makes this use assessable under the planning scheme. (Ensure Questions 2.1 in this checklist is answered ‘yes’. This requires Questions 2.1.1 — 2.1.13 to be answered also) This application must be referred to the Office of Urban Management (OUM) as Concurrence Agency. OO No If no, does the following apply? e Impact assessment is required under the planning scheme CI No : C1 Yes « The IPA, section 3.1.6 applies to the application Lino [Yes * The premises exceed 10,000m? LINo (1 Yes « — The gross floor area, as defined under the SEQ Regional Plan Regulatory (No [Yes Provisions, on the premises will exceed 10,000m? iH yes to.any one - The SEQ Regional Plan makes this use assessable under the planning scheme. (Ensure Questions 2.1 in this checklist is answered yes’. This requires Questions 2.1.1 - 2.1.13 to be answered also) This application must be referred to the Office of Urban Management (OUM) as Concurrence Agency. -16-
Page 23
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.0, 3 September 2007 For the part of the premises within the Regional Landscape and Rural Production (RLRP) Area (d} Does the application involve an urban activity as defined under the SEQ Regional Plan Regulatory Provisions? O Yes If yes, is every urban activity in the application excluded from being assessable for the purposes of the SEQ Regional Plan in the RLRP Area? - O Yes O_ No - The SEQ Regional Plan makes each urban activity assessable under the planning scheme. (Ensure Questions 2.1 in this checklist is answered ‘yes’. This requires Questions 2.1.1 ~ 2.1.13 to be answered also) Each urban activity that is assessable in the RLRP Area must be referred to the Office of Urban Management (OUM) as Concurrence Agency. No , If no, does the application involve residential development involving a rural residential purpose as defined under the SEQ Regional Plan Regulatory Provisions? OJ No OO Yes If yes, are the premises located in the Mt Lindesay/North Beaudesert Study area? (1 No- The SEQ Regional Plan makes this use assessable under the planning scheme. (Ensure Questions 2.1 in this checklist is answered ‘yes’. This requires Questions 2.1.1 - 2.1.13 to be answered also) This application must be referred to the Office of Urban Management (OUM) as Concurrence Agency. 1 Yes . If yes, are the premises in a zone or equivalent designated area mentioned in a notice published by the regional planning Minister? O No - The SEQ Regional Plan makes this use assessable under the planning scheme, (Ensure Questions 2.1 in this checKlist.is answered ‘yes’, This requires Questions 2.1.1 - 2.1.13 to be answered also) This application must be referred to the Office of Urban Management (OUM) as Concurrence Agency. LO Yes For the part of the premises within the Rural Living Area . (e) Does the application involve an urban activity as defined under the SEQ Regional Plan Regulatory Provisions? No . ‘A Yes Hf yes, is every urban activity in the application excluded from being assessable for the purposes of the SEQ Regional Plan in the Rural Living Area? OO Yes () No- The SEQ Regional Plan makes this use assessable under the planning scheme. (Ensure Questions 2.1 in this checklist is answered ‘yes’. This requires Questions 2,1,1 - 2.1.13 to be answered also) Each urban activity that is assessable in the Rural Living Area must be referred to the Office of Urban Management (OUM) as Concurrence Agency. For the part of the premises within the Investigation Area (f) Does the application involve intensive animal husbandry as defined under the SEQ Regional Plan Regulatory Provisions? No LJ Yes - The SEQ Regional Plan makes this use assessable under the planning scheme. (Ensure Questions 2.1 in this checklist is answered ‘yes’, This requires Questions 2.1.1 - 2.1.13 to be answered also) This application must be referred to the Office of Urban Management (OUM) as Concurrence Agency,
Page 24
INTEGRATED PLANNING ACT 1997 'DAS Assessment Checklist, Version 21.0, 3 September 2007 (g) Does the application involve an urban activity as defined under the SEQ Regional Plan Regulatory Provisions? O Yes If yes, is every urban activity in the application excluded from being assessable for the purposes of the SEQ Regionai Plan in the Investigation Area? Ol Yes . (1) __No- The SEQ Regional Pian makes this use assessable under the planning scheme. (Ensure Questions 2.1 in this checklist is answered ‘yes’. This requires Questions 2.1.1 - 2.1.13 to be answered also} Each urban activity that is assessable in the Investigation Area requires assessment by the Office of Urban Management (OUM) es / Concurrence Agency. . No If'no, does the application involve residential development involving a rural residential purpose as defined under the SEQ Regional Plan Regulatory Provisions? OO No (Yes oo if yes, are the premises located in the Mt Lindesay/North Beaudesert Study area? C1 No- The SEQ Regional Plan makes this use assessable under the planning scheme, (Ensure Questions 2.1 in this checklist is answered ‘yes’. This requires Questions 2.1.1 - 2.1.13 to be answered also) This application must be referred to the Office of Urban Management (OUM) as Concurrence Agency, OO Yes If yes, are the premises in a zone or equivalent designated area mentioned in a notice published by the tegional planning Minister? Yes . (DO No- The SEQ Regional Plan makes this use assessable under the planning scheme. (Ensure Questions 2.1 in this checklist is answered ‘yes’. This requires Questions 2.1.1 - 2.1.13 to be answered also) This application must be referred to the Office of Urban Management (OUM) as Concurrence Agency. 2.42 ls the proposal for urban purposes, as defined under the IPA? No CI Yes co , If yes, is the use proposed on a lot situated in, or within 100m of, any of the following? ' "der the Nate Consenion tet 082 LIND CIs . « A State forest or timber reserve under the Forestry Act 1959 CI No O Yes « Amarine park under the Marine Parks Act 2004 . (1 No OC Yes e Arecreation area under the Recreation Area Management Act 1988 oO No : C1 Yes e Aworld heritage area listed under the World Heritage Convention LC No OC Yes e — Brisbane forest park under the Brisbane Forest Park Act 1977 No O Yes if yes to any one - This application must be referred to the chief executive under the relevant Act mentioned as Advice Agency. -18-
Page 25
INTEGRATED PLANNING ACT 1997 (DAS Assessment Checklist, Version 21.0, 3 September 2007
REMOVAL, DESTRUCTION OR DAMAGE OF A MARINE PLANT - this question only applies for applications not also seeking
approval to carry out operational work.
2.13 Posse proposed use involve the removal, destruction or damage of marine plants under the Fisheries Act 1994?
No
(1) Yes
If yes, indicate what the proposed operational work is reasonably necessary for (Tick applicable box/es)
e The removal, destruction or damage of dead marine wood on unallocated State land, other L)no (Ol Yes
than in a wild river area, for trade or commerce
¢ The maintenance of existing structures, including, for example, the following structures, if (JNo [1] Yes
the structures were constructed in compliance with all the requirements, under any Act,
relating to a structure of that type -
¢ boat ramps, boardwalks, drains, fences, jetties, roads, safety signs, swimming
enclosures and weirs;
¢ — existing drainage structures;
« — existing powerlines or associated powerline infrastructure
¢ — Educational or research purposes or for monitoring the impact of developmenton marine [JNo (1 Yes
plants
© Other purposes Ono (DJ Yes
If yes to “other purposes”, does a development permit exist for that proposed operational work?
OO Yes ‘
OO No
If no, has approval been sought in a separate application?
O Yes .
LI No- This application must also be for operational work for removing, destroying or damaging marine plants under
the Fisheries Act 1994. (Complete Section 4 of this checklist).
IPA section 3.2.24
IPA. sched part 1. table 4, item 8 fassessable development)
8, part 2, lable 4, 4 isel-assessabla develogment
-19-
Page 26
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.0, 3 September 2007
SECTIO N 3 Section 3 must be completed when the application seeks approval to reconfiguring a lot.
IPA, schedule 8. part 1, table 2
STATE-CONTROLLED ROAD
31
ls any part of the premises within 100m of a State-controlled road, or part of a future State-controlled road?
OO No
If no, is the proposed reconfiguration listed in integrated Planning Regulation 1998, schedule 5 and does it exceed the threshold?
1 No
(1 Yes - The application must be referred to the Department of Main Roads (OMR) as Concurrence Agency.
OO Yes
If yes, will the proposed reconfiguration result in the following?
* — Anincrease in the total number of lots [TNo (Yes
« — Anincrease in the total number of lots abutting the State-controlled road (No CO Yes
lf yes to either or both, is the reconfiguration proposed in a future State-controlled road defined by route?
(J __sYes - This application must be referred to the Department of Main Roads {DMR) as Concurrence Agency.
o No - This application must be referred to DMR as Advice Agency.
iP Regulation, schedule 2, tably 2, item 2
COASTAL MANAGEMENT DISTRICT
3.2
ls any part of the premises within a coastal management district?
OO No
CJ Yes- (Complete Part M) This application must be referred to the Environmental Protection Agency (EPA) as Concurrence Agency.
JP Regulation, schedule 2, tabig 2. item 1.4{a)
VEGETATION CLEARING
3.3
Do the premises include a fot containing the Talowing? .
* Acategory 1, 2 or 3 area shown on a Property Map of Assessable Vegetation (PMAV) LC No OO Yes
* — Ifthere is no PMAV for a lot, remnant vegetation . CO No OO Yes
If yes to either or both, are 2 or more lots proposed to be created?
C1 No
C] Yes
If yes, is any lot, before the proposed reconfiguration, 2ha or larger?
O No
C1 Yes
If yes, is the size of any lot proposed to be created, 25ha or smaller?
1 No
L1 Yes- (Complete Part J) This application must be referred to the Department of Natural Resources and Water (NRW)
as Concurrence Agency.
IP Regulation. schedule 2, tebie 2. tem 4
Page 27
| LINDSAY CONSULTING PTY LTD.
—~——-STRUCTURAL AND CIVIL ENGINEERS
ACN 070 744 808 ABN 61478 346485 GAT REGISTERED
AS TRUSTEE FOR THE LINDSAY FAMILY TRUST
Ref: 071100
28" August 2007
Leach Development Group
Dear Sir,
eo PROPOSED RESIDENCE
LOT 52 ASPERA PL, NOOSA RETREAT
As commissioned a footing, pool and structural design has been
carried out for the above project and attached are drawings 07-1100-.
01 to 13.
Should you require any further information please do not hesitate to
contact me at the above address.
On apd Behalf of
Off. 2C/82 Parker St, Maroochydore 4558
OFFICE: (07) 54 792 118 MOBILE: 0412 313 645 FAX: (07) 54 510 118
E-MAIL: [email protected]
Page 28
ae
FOUNDATION AND STRUCTURAL PLANS
SITE CLASSIFICATION — M~
ARTICULATED MASONRY VENEER
SITE CLASS FOUNDATIONS
Most sand and rock sites with little or no ground movement
CLASS - A from moisture changes.
Stightly reactive clay sites with only slight ground
CLASS - S Movement from moisture changes.
Moderately reactive clay or silt sites which can experience
CLASS - M moderate ground movement from moisture changes.
Highly reactive clay sites, which can experience high
CLASS - H ground movement from moisture changes.
Extremely reactive sites, which can experience extreme
CLASS - E ground movement from moisture changes.
CLASS - A to P {| Filled sites.
Sites which include soft soils, such as soft clay or silt or
loose sands; landslip; mine subsidence; collapsing soils;
soil subject to to erosion; reactive sites subject to abnormal
moisture conditions or sites which cannot be classified
otherwise.
CLASS
'
ua
TY | a . .
oe ee ete a i
CONSTRUCTION NOTES
1. All workmanship and materiats shall be in accordance with the requirements of the relevant current
Australian Standard Codes, Building By-Laws and the ordinances of the relevant Local Authority.
2. i) Concrete Class ~ Minimum 20 MPa at 28 days
Slab on ground - 20 nominal maximum aggregate size
- 80 maximum stump +/-10mm 4
~ Minimum 32 MPa at 28 days for internal stabs
- Minimum 40 MPa at 28 days for external stabs
- 20 nominal maximum aggregate size
- 80 maximum slump +/-t0mm
i) Concrete Class
Suspended slab
3. Minimum Cover
to Reinforcement
~ 25 to upper face of internal stabs -0 «Smm
- 45 for external exposure
= 30 to a membrane in contact with the ground
= 40 to unprotected ground ‘
4. Minimum Laps and Splices for Reinforcement
(a) Slab Fabric ~ 225 minimum overlap of transverse bars at all edges -
a {b} Trench Mesh ~77, 500 splices in all footing teams ~ :. “0
. = Laps at intersections as per the Design Drawings
tc) Reinfercing Bars - 500 splices in all footing beams
. . - - Provide “L” bars at all beam intersections with 500 laps to each leg
5. Fireplaces shall’ be supported on stab thickening extending 300 past the edges of the masonry, and
reinforced with F72 mesh top and bottom. Stab thickening shall be 150 thick for single storey construction
and 200 thick for two storey construction. ‘
Shrinkage Control 5
6. Reinforcing mesh may be reduced to F72 for stabs under 18m in length on “S" sites
7, Where the floor slab is to be tiled, the following recommendations are made, in order to
minimise the effect of shrinkage:-
~ F92 siab mesh (or equivalent) should be provided :
~ Placement of tiles should be delayed for as long as possible (preferably for at least 3 months)
EARTHWORKS NOTES:
Where any filling is carried out on the site after the completion of the site investigation, the
following recommendation shall be followed:-
8. The site shall be stripped of all vegetation prior to the placement of any filling material.
9. Compaction Standards for filling Materiat -
A. Controlled Filling :
{a) Sand filling up to 800 deep, placed in maximum 300 thick layers and compacted with a. vibrating
roller to achieve a minimum Dynamic Cone Penetrometer reading of 7 blows- per 300 penetration
(refer AS 1289.F3.3). Sand fal may be flooded if necessary to achieve this compaction standard,
provided the water can subsequently be drained from the site.
(b) Non-sand filling up to 400 deep, placed in maximum 150 thick tayers and compacted with a
mechanical roller. Clay fill shall be moist during compaction.
{c) Controtled filling shall continue for at least 1 metre past the edge of the footing beam and shall
be battered back to the original surface with a slope of no more than 12 (Vert : Hor).
{d) Where the depth of filling material exceeds that specified above, the filling material shall be
compacted as follows:-
Sand fill to 65% Oensity Index in accordance with AS1289.£6.1
Non-sand fill to 95% Maximum Ory Density (Standard Compaction) in accordance with 5.4.1
Compaction tests shall be carried out on each layer as the filling is placed. If the compaction standard
specified is not achieved, then a “Pier and Slab" and "Pier and Beam” footing design shall be adopted with
all piers founded on the underlying natural material. .
B. Rolted Filling :
(a) Sand Filling up to 600 deep, placed in maximum 300 thick layers and compacted by repeated
rolling with an excavator.
(6) Non-sand filing up to 300 deep, placed in maximum {50 thick tayers and compacted by repeated
rolling with an excavator.
{c} Where the depth of filling materiat exceeds that specified above, the filling material shall be
compacted as follows:- f
Sand fill to 65% Density Index in accordance with AS1289.66.1
Nen-sand fill to 95% Maximum Ory Density (Standard Compaction} in accordance with 5.4.1
Compaction tests shall be carried out on each layer as the filling is placed, If the compaction standard
specified is not achieved, then a “Pier and Slab” and “Pier and Beam” footing design shall be adopted with
alt piers founded on the natural underlying material.
i
wey.
A
OTT0OFP.DWG
ORAWNG WER
lo7-1100-01
Ww"
"
tw
ae
Ss
< 4
2 <
=z
= a
a) S<%
~ Cw
S wa
=e af
9 “lk
‘ <a
ao
ON <«
= wn
2
Ss oo
= 23 Zz
LEACH DEVELOPMENT GROUP | PROPOSED RESIDENCE
BUILDER & CLIENT
Be eC TURAL ANY CAMA EF MCIN EE pvt
OFF, 2C/82 PARKER STREETY
Page 29
A
a
3
< 8
ales
< a.
a) 2<%
- ew
a ut
a af
ys WY
‘a te
a
rok <«
ws "A
s|25s
= at Zz
LEACH DEVELOPMENT GROUP | PROPOSED RESIDENCE
EB!
EB1
FOUNDATION PLAN
SCALE 1.100
_| 190 mm SLAB SL82 TOP FABRIC
CURR AL AND OA/Y 7 ERIN EAR
ALL EXTERNAL MASONRY WALLS SHALL BE . :
ARTICULATED AT 5000 mm CENTERS i je.| 100 mm NON-HABITABLE SLAB SL72 FABRIC CENTRALLY
CUT/FILL LINES AND PIER LOCATIONS SHALL BE CONFIRMED ON-SITE maninen :
SUITABLE FOR MAXIMUM BUILDING LENGTH OF 25 METRES SOE] 125 mm SLAB SL62 TOP FABRIC, SL72 BOTTOM FABRIC
OFF. 26/82 PARKER STREET/MARGO YDORE
LINDSA Y CON.
Page 30
_ <
\ m
=
aL is
2 DENOTES MINMUM DEPTH BELOW +
rH Masonry veneer $L72 Fabric ; SITE LEVEL (SLY FOLLOWING am Masonry veneer ye 5
| SL82 Fabric —— : STRIPPING OF ALL VEGETATION un
| r- SL82 Fabric %
b= 400 la uy
= 125 {5 Hooton | &
7 ] 100 100 < 9
| T rrr F ; = sos
LJ ] = —
zi |e aA 400, ; = 1 on 20 fall ———- < oo
= “ . ‘ 8 —T si xx
e| | 1:20 fall : z| FSL 52%
+) 4 —~ FSL 200 MIN - , = —_ NESS Compacted sand fill = ig = a
SL ~ * 8 | 150 |) g a < a
= . MIN] | IeSn<«
an Spo. 8 PSST — 2 gs ot 600 CC o Boe
Yi) ligs at 900 C/C. s|&S8
@ 3-L11TM j ‘ YA (Ligatures not required if Beams a; * =
: 3-L11TM 330 250 are poured integrally with stab) a
S
300 TYPICAL EXTERNAL EDGE BEAM - £B1 &
Not to scale -
a
350D . =
. 100 mono, 7 | Ss
350 SL82 Fabric ——- wa vail {7
| 1800 Centres each way . TF Internal load - bearing wall
I 1 co
ALTERNATIVE EXTERNAL EDGE BEAM ~ EB2 & G
Not to scale s| 4
Conpacted sand fil) —==3———— <a z
I 7 | 400
No construction joint
4 Masonry veneer V)
@ — SL82 fabric 350 -L11TM WE
: . . ‘ KS
pS Fabric a) TYPCAL TERA. BEAM - Bt ei
i Not to scate N
100 => i :
wswn| a fal 1 bE nes cree R
i _5. _— j ) x
xX <— t ~ Compacted sand filt |
‘ i Ho i a
400 MIN. Pp 5 =] 5 Load bearing wall O
y—— 10 tgs at 600 C/C or | 200 HIN.2Ke {MN } i s
—= YA ligs at 900 C/C. S—— 2 igs at 600 €/C or Slab mesh
Yi2 ligs at 900 CC, ie x
~~ / {Ligatures not required if Beams : Fe
3-L11TM 350 50 are poured integrally with stab) Slab mesh 175 A
40 bottom cover —__-—~ = = Dy
EXTERNAL EDGE BEAM-£B4 EXTERNAL EDGE BEAM-EB3 , oI _ 7 Ls 4
a)
TYPICAL EXTERNAL EDGE BEAM AND VERANDAH EDGE BEAM i
TYPICAL SLAB THICKENING UNDER LOAD BEARING WALLS - STB
AT_VERANDAH AREA
. Not to scale
Not to scate
Page 31
Slab mesh {refer to external edge beam) ——,
Lo
20 x 40 Joint sealant
Danley Key joint
J M12 dowels at 300 CRS
Compacted sand fill! ——==s
Yi2 ligs at 900 C/C.
(ligatures not required if Beams
are poured integrally with slab)
t
T 400
R1D ligs at 600 C/C or ———-—T]
350 3-11TM trench mesh, 40 bottom :
and side cover.
TYPICAL KEY JONT ~ Kit
Not to scale
External
Edge Beam
NY
300
Piers under Footings at
1500 mm maximum centres
350 DIA
==>]
EXTERNAL EDGE BEAM ADJACENT POOL - EBS
Not to Scale
Water Level
zii<
zl, 3
+ is
=
h tis
ry
n
5g
a:
Qa <
2] 5a
= —
s <
= es
& Ld
= a. =
a o2
2 oe
o ~
oles
s - oO
So oo
= az
LEACH DEVELOPMENT GROUP | PROPOSED RESIDENCE
BUILDER & CLIENT
bie GAL AND CUM Pi csc ee p
Page 32
oP eee
|
mee Bs
e
~Natural.. ., 277
Surface
=z
\ =
ol=z s
m|=
W + 400 mm
xl + 400 mm
W_ (WIDTH)
& (LENGTH)
Finished Th
Surface t
Tie-~down Rod
Refer Architectural Drawings
(N12 bor mininum)
™
w|
TYPICAL
BRIK PIER PAD FOOTING DETAR - BP3
Not to scale
Water Level
ptesoe
eed)
W (WIDTH)
L (LENGTH)
Finished
Surface
W (WIDTH)
L_ (LENGTH)
PLAN
Finished I
Surface I
5
Tie-down Rod
Refer Architectural Drawings
(Y12 bar mininum)
L
600
N
\
x
\
MI
1
4
%
300 |
PROJECT DESCRIPTION AND ADDRESS [==
OTIOOFP.DWG
DRAWINGS PSE
LOT 52. ASPERA PLACE
NOOSA’ RETREAT
07-1100-05 | A
Ne
atural
Surface
W + 400 mm
x L + 400 mm
TYPICAL BRICK PIER PAD FOOTING DETAIL - BP!
Not to scale
Tie-down Rod
Refer Architectural Drawings
(Y12 bar mininum)
1500 MIN
\
Natural
Surface
W + 400 mm
x L + 400 mm
TYPICAL BRICK PIER PAD FOOTING DETAIL - BP2
Not to scale
LEACH DEVELOPMENT GROUP | PROPOSED RESIDENCE
ATY {BUILDER & CLIENT
als CUR AT AND SOIT ENN pet pe
To ee ee a erent eet nteeittinenpwarene
Page 33
ache
Corner Bars shall be provided
at all corners as per corner A
07-1100-06 | A
r— Trench mesh (refer bar lap detail. ]
edge beam detail) Construction joint
3 YI2 bars or extend 4
rR
B2 mesh to far side t Sher itcetbeon top steel w
of external footing beam mesh =” is provided 8 uy
"t ———— ' Slab mesh Jv<
4 [ y 4 j > =< a |.
ely "15°20 fall - 3S =<
| L La a t ges
< = ° / . TIRES | Internal Footing Beam & 5 &
] a] , Internal footing beam = — oo 3 ~ =
TYPICAL EDGE REBATE DETAIL TT external Footing Beam Externat Footing beam ~~] nmoten — Trench mesh {refer c un S
Not to scale i = internal footing beam) | tc Keo
Sot Corner Bars shall be provided & S $
Trench mesh (refer fat all corners as per corner 40 Cover
edge beam detail) bar lap detail, {
NAA :
LL Ys | TYPICAL FOOTING BEAM INTERSECTION DETAIL SECTION 1 - 1
S$ Ss Not toScale Not to Scale
PICAL BAY W DETAI
Not to scale
BUILDER & CLIENT
500 typical
: »
<
Pp
AD
Trench mesh {refer
2D (eg. 1200) , edge beam detail)
@ 1.
(eg. 600) {00
I VY12
; Corner
MIN. 75mm sand ‘ lap bar 4
nes an surround. WW
External Edge Beam
weer
Corner Bars shall be provided
at ail corners as per corner :
bar lap detail. Approved pipe wrapping,
6 mm for S & M Sites
i
}
i
20 mm for H Sites {
300 nin. or as rennin , ‘oo. 50 cearance OUTSIDE CORNER LAP BAR DETAL
i N
TYPICAL OFFSET FOOTING DETAIL | Ey lel Ateiy rom all reinforcemen ot to Scale
TYPICAL FOOTING PENETRATION DETAIL
Not to Scale
S
Page 34
{fo
t
-—Step < 200 — Step< 200 ‘ ~
— — . ; ; mo
SF SSS ee ee ee
i ee : | a ee Ss
| ee ; ! SSS CO
Lore 1 in 10 150 Li \L 2135
. lab mes z
ALTERNATIVE. STEP DETAIL A ALTERNATIVE STEP DETAIL B- oes
Wot to Scate ERN Nat fo Scale TYPICAL SLAB RECESS DETAM {SUITABLE FOR RECESSES LESS THAN 50mm DEEP = fe
a ee es ee ba ne a "Nok to Scale” 4.98<2
ae <p Step 700 -lon<
% ~n
L } : s S 8
@ 0 i .—__-s 100 Slab mesh ia
EY ree |
——— r [ : /
150 : Fo 50 to 200 9
ALTERNATIVE STEP DETAIL C NX —==——S — —/
LEACH DEVELOPMENT GROUP | PROPOSED RESIDENCE
TYPICAL FOOTING BEAM STEPS LESS THAN 200 am \ -
q
Not to Scale . 400 2 —_ 400 Zz
40 cover 300 ; 3
| F Cop | . 2 Layers slab mesh g
= TYPICAL SLAB RECESS DETAIL @
Fang tp 3 7 bas : & fg SUTABLE FOR RECESSES GREATER THAN 50 om BUT LESS THAN 200 nn Deep) |
aK. height - each face Not fo Scale
@ sises ee i je vs
i
;
350 nr
0 ‘— Trench mesh or reinforcing bars . MAX. od :
< os specified fa. — AL.
i
j
15xD . 0 500
450 min,
TYPICAL SLAB STEP DETAIL
TYPICAL FOOTING BEAM STEP (STEP GREATER THAN 200 mn (SUITABLE FOR STEP LESS THAN 350 mm DEEP)
Not to Scale Not to Scale 4
i
i
a
4
j
Page 35
NOTES
—
|
1. STRUCTURAL
a) Concrete - F’c = 32MPa at 28 days.
Concrete shall comply with AS2783.
~ Concreting shail be carried out in one continuous operation by pneumatic Spraying process.
- Shade concrete and keep moist for 7 days.
Exposure Classification (AS2783} - B2.
b) Reinforcement Fy = 250MPa, $12 bars throughout, lap 400 where required.
- Bars shail be tied securely in position.
- Cover shall be 65mm to vertical reinforcement to the inside face.
c) Foundations - Excavation shall follow contours of pool shape. Where over excavation occurs fill with concrete.
~ Foundation material shall be uniform over entire pool base, if not refer to Engineer.
~ Inclay or rocky ground use 75mm thick layer of 20mm nominal gravel under base.
- Minimium safe bearing capacity ~ 100kPa
Pool walls shall be poured against undisturbed natural ground, if not refer to Structural Engineer.
Al
300 : Total length 16700 MAX
~ Design suitable for sites up to and including Class H (AS2870 Parts 1 and 2)
If pool is located in fill or aboveground refer to Structural Engineer.
- Drawing not to be used for pools in Exposure Classification C (AS27783)
-- Walls have not been designed for cantilever walkways. {
‘2, CONSTRUCTION
* a} Construction shall comply with AS2783.
3. GENERAL os
a) Ground water pressure shall be relleved by Hydrostatic valve as shown.
b) Surface water shall be prevented from penetrating down beside pool wall by
grading surrounding areas away from the pool. -
c) Security fencing shalt be as required by the Local Authority.
d) Finishes to pool surface shall be as detailed by Pool Contractor.
e) Alt hydraulic equipment (eg. pump, filter, hydrostatic relief valve, skimmer box etc.)
shall be as specified by the Pool Contractor
B|
d) Design
‘
900 wide x 75 thick slab all round with F52
fabric CP or pavers with cement stabilized
filling sand. Refer Note 3{b.————
3 |
Maximium surface area - 100m?
Finish to Clients or : |
Contractors requirements oN
y_ Water Level
~ 3 /S12
inbond beam =
Washed gravel to underside
of pool, refer Note tc}
600
Overall depth (D}
~ ZE50 MAX
DIA 200 Anti vortex
cover Unreinforced cutoff wall
(ONLY Class H sites)
Waterproof
Earth wire to reinforcement menbrane
J Connect to dwelling earth system
Varies
Water Level >
NOTE S
Where pool walt height {H) exceeds 3
x 1200 but tess than 1500
provide intermediate vertical $12 bars
as shown dotted.
(ie. $12 bars in this area at 150 c/c}
00
aN
& it
SECTION B-B
—" o
Hydrostatic rellef valve _—§ =~ | ~ e S
300
Dia 40 suction line 300
to filter
Pde
Sump containing 3 4 7
crushed rock ag Pa wn
nominal size 50 mm S| S
Se
LONGITUDINAL SECTION COPING VARIATION WET EDGE DETAIL
seer Pa Pa me | panne CD interarm
y 300 Varies 4
rT Tt
XZ
© —_——— &
SECTION A-A
ert
LINDSA Y CONSGLTING
ge<
eo
£1,
*
b it ee
eS.
Wn
ig
8
< 4
o] 4 <
=| 2 a
zi/Oo-r
Sag <
a] Wu Ww
e| ea =
Zia Yt
<
sa. =
bg is
s|1oro
og] & a &
elas =
a
a.
>
Ss
~
o
—
gi
=| 8
a] >
Ss
| 3
a
oj =<
5| 3
2
ao =
TN S
ANID (|
tC TR Al Z
OFF. 2C/82 PARKER STREET,
Page 36
WG
mE.
Filter and : Spa
pumping unit {optional}
semen cman Ol rac ie te 6,
Skimmer box 1
07-1100-09 | A
Outlet to stormwater a ~ a
drainage or sewer as =
required by council a w
< yg
Main sump 2 4 <
for emptying i z 3 a
SCHEMATIC FOR WATER CIRCULATION aqas%
All pipework shall be Dia 40 uPVC Class 9 and re w tas w
all fittings shall be uPVC Class 18 all to AS1475 . = 3 —
1 300 Varies 150 , [al Q.< : ty .
come fer ye Breads af 300 pe pp eee a , SG aw
: . Ki On <
ey
eo 3 g s|£&SS
“ +
8 a
3 3
sf S
$ gi] =
——_ us
=
$12-300 EW CP 5 Ss
STEP DETAILS 3 é
. oe
a 3S
— =| 3
LY SPA DETAIL 5] 4
8 ° s2-200EWCP RS a |F
s : Qi x
—t Ss Poal reinforcement a ~
OHNS
@ ¢ [aoe c Bs
$12 - 300 EWP —_-4 ye c| q 2 a
5
BENCH DETAIL | ap SN
Extra S12 1500 long _ —_ DP
spaced 300 vertically a { = kK}
75 cover to inside face PLAN : Hy
}——— $12-300 EW CP
SKIMMER BOX DETAIL | CF
5 hone of recess |
Line of ONO 0 suit shimmer box. } ~ H
excavation e $12 - 200 EW CP | y
rl AP
MIN'50 tr | Fentorcement | a Wy
a
: “i
ml
7 ~Position outside horizontal
reinforcing with 60 MIN cover L
to excavated face MIN 150
PLAN
WALL CORNER DETAIL PLAN ;
BOND BEAM CORNER DETAIL SECTION C-C ;
FOR RECTANGULAR POOLS FOR RECTANGULAR POOLS | SKIMMER BOX DETAIL | gl
j
Page 37
ze:
SSIXGOV ONY NOWdIdIS3Id LI3rOdd
ANSIT) 2 YadTINe
| V | 01-01-20 1V3ULIU VSOON aut 262 BYOUAHIOSUVW “L3RULS UBVd 28/92 “40 ah
om JV1d VuadSV ZS 107
JNIOISIY CISOdOUd | dNOWD LNINdOTIAIG HOW3] | CSN SNe ve
o da ONELTOSNOO 4 VSANIT
Articulation joint 15 wide
: SA
@ L Sy
f - 5
_- b == = |
|! a ds a
{ — | Fr
pled
a
) > |
- ———h
an (i
Gl a Hl J
=H!
r= —_J ta
ob >
° <<
9 —_—
Qa.
@ a ® a S.
@ <u
—_/ =
Da
= oS
&
a _f —l = — <
constructed from footing level
Articulation joints shall be
to top of brickwork.
Page 38
LL-OOLL-20 LV38L38 ¥SOON Si 264 9S Wd JYOOAHIONMY yw “LaaaLS waAaVd 28/32 “40
mememvn! = -3)VId VuadSV ZS 101 :
BONECISY C3SOdOUd | NOW LNAHdOTAAIO HOVIT | EEE TAL SETS
ad wre] SSRIOTY GNV NOILdINDSIC 193/0dd Ind 2 YIN Sid ta ONI, A TD Ni OD A VSCNI T
V
“Am
oan
112.7 kN
117.1 kN
103.9 kN
111.4 kN
—_—>
Bracing Required
Bracing Provided
Bracing Required
Bracing Provided
i
Wes neem OX, - Boe sn. _ 7 eer
emcee - - a oo or easter ae ee Oger,
wn
z
2
=
S
=z
So.
Nad
ma
=z
ox
S
va
tas
_/
2
<
=
=]
7)
=
oe
ua
Ss
uw
—_d
=
=
vn
oe
4
—)
—
<
5s
Zz
<=
=z
~”
”
=
—
z
=
o
=
wn
—
>
So
>=
<
sa
w
“as
=><s
<>
NM <«
z= —_l
°o ~
e2-3
wee
AGE
<
a Q
las
325
i
- —
Zzn<a
=_
a
-_
< 2
ea
tad
—
orz
Zu a
_ - ee act xn | “| sou we = | a xo
f eo | “I, | J sexott : | | | | TI | | lle
BINS Ty eee oe
pel PLL TEE PL em adg
[. {fl|_ aaa J Lon; MS s
jE fi tiitig yl
Lath oe _—— 7 1 of | [~ |
$ —— == yh,
SM A.M bot — vil A 5S
| sti gown” oS - br 4 OE | 531 | Uk i : ~~ .
ae pe ee oS 197 SSxO0E cea I)
a7" oo See a | en
aT AI gf x *40) 101 S4¥x00z V ' aaa $
Su Le = a te Le mt JT eT tt - — bs
! 3 | . a , | 33)
~ {__w 92 L_
R77
140x35
]
a4
!
90x35
mI OT SHSTe TF .
wi. SIL Late —+— — -. =
goof = 3
veer ~4d | ~ =
Nr ee ee ash — | Qo
ta (Es | Chee hax. . _. _. __ [8 os
NI BE%08icexostvz E ‘ | “fey [ES ; ‘ = 5
ey ae | | ie El EN een set oa =
lg oe FRO TTT
AE oh SE | - 22
oem | et am ie Si Se
|F traf A $ex06) TF a SExOGY NV / 7 t ho S
| EL’ | 2 ir—- ao a 8 =
- _ | ge tt ma 2 8
I a ae
_ olde a
ye TT La le Loz) fis iL a
[ CA LoL EPS seeeT374 hy |e - of
s | Se%04 sexog _| a a ~ | Ill ley a
cars iL fl _ ai iS, sie |_| otal Ta ae 3S =:
i PO I Ey ee holo. MN LF | | pei “90 wo 3
Oawsd
Page 39
.
wan | ey dt
“eee
2 <
NN
-
‘ ~ E H a
4 -
! =
=
. -
‘ ‘
b tes
i oo
wv
wv
i a
~ BRACING LEGEND ‘ S
—eeeor————o—eor tas
FRAMING SCHEDULE - SHEET ROOF ALL GIRDER TRUSS TIE-DOWN SHALL ° INDICATES M12 CYCLONE ROD al “4 &
BE IN ACCORDANCE WITH © novares wn =| Za
WIND CLASSIFICATION - N3 MANUFACTURER'S SPECIFICATIONS f CYREONE RO 2) 9a
x INDICATES M16 BOLT = 2S Ss
1.8 . =
MAXIMUM ROOF LOAD WIDTH - 3500mm NOGGINGS - 1350mm CRS MAXIMUM INDICATES 180mm LENGTH OF STRUCTURAL PLY BRACING WALL (6.5KN/ml. 4.5mm F27 EXTERNAL PLY SHEETING FIXED 5 = s FE
Mat. , 70 ONE SDE OF STUD WALL stuns TO BE AT 600mm CENTRES MAXIMUM.’ VERTICALLY INSTALLED SHEETING 10 BE Bo} Ga << &
. . . eo ME WITH 30mm:x 2.8-3.15Q CLOUTS OR FLATHEAD NAILS: TO: tees “n
STUD HEIGHTS & SIZES . AROUND ALL EDGES AND BUTT JOnTs "AND AT eon CENTRES ALONE INTERMEDIATE SWS Seapets came e* 6 aq & 3 5
oo ~ ; ALL STUBS-NOT NOTCHED nap LTH Stn OF EACH END OF THE BRACING WALL CONTINUOUS FROM TOP PLATE TO SLAB/FLOOR FRAMING AND “S583
Sips . wo A . M BOTTOM PLATE TO SLAB/FLOOR FRAMING AT 1200mm CENTRES MA . 2 oo.
2450 - 90x35 MGP10 @ 450 CRS eT aj c=
7 18 m
a eee Mcp ° rep rhe STUDS AT OPENINGS —-— INDICATES {80000 bencTi OF SYPROCK BRACING WALL B.tkN/ 0mm PLASTERBOARD LINING FIXED TO ONE SIDE OF a
- 90x . mm MUM. TOP AND BOTTOM PLATES TO BE 45mm DEEP. HORIZONTALLY
3600 - 90x35 MGP12 @ OPENING WIDTH No. OF STUDS INSTALLEO SHEETING TO BE NAILED TO TIMBER FRAMING, WITH 40mm PLASTERBOARD CLOUTS. CLOUTS ARE TO BE &
- 90x 450 CRS LOCATED AT 100mm CENTRES ALONG TOP AND BOTTOM PLATES AND SHEET EDGES AND AT 22Smm CENTRES ALONG oS
4200 -'90x45 MGP1S @ 300 CRS 900 1 INTERMEDIATE STUDS. PROVIDE M12 CYCLONE RODS WITHIN SOmm OF EACH. END OF THE BRACING WALL CONTINUOUS -
1500 - 2/9035 MGP12 @ 300 CRS 1200 2 FROM TOP PLATE TO SLAG/FLOOR FRAMING AND AT 1800mm CENTRES MAXIMUM IN BETWEEN. z
; : =
1500 2 12% inpicates 1a00mm LENGTH OF EXTERNAL FIBRE CEMENT BRACING WALL. (44 S
L. (4.4kN/m) 4.5mm HARDIFLEX OR 6mm F.C. SHEETS So
TOP PLATES - 90x45 MGP12 1800 2 “EXTERNAL CLADDING FIXED TO ONE SIDE OF, STUD WALL, STUDS TO BE AT 600mm CENTRES MAXIMUM. VERTICALLY
9 INSTALLED CLADDING TO BE NAILED TO TIMBER FRAMING WITH 30mm x 2.0% FIBRE CEMENT NAILS (GALVANISED). NAILS
. 2100 ARE TO BE LOCATED AT 150mm CENTRES ALONG CLADDING SHEET EDGES'AND AT 200mm CENTRES ALONG INTERMEDIATE
TIE-DOWN SPACING - 1200mm 2400 3 STUDS. PROVIDE M12 CYCLONE ROD WITHIN SOmm OF EACH END OF BRACING WALL CONTINUOUS FROM TOP PLATE TO 8
3 SLAB/FLOOR FRAMING AND HY2 BOLTS FROM BOTTOM PLATE TO SLAB/FLOOR FRAMING AT 1200mm CENTRES MAXIMUM IN Jon] aS
2700 g| <
BOTTOM PLATE - 90x35 MGP10 (13.4) va . S| 4
3000 3 eTzmztz-+ INDICATES 150mm BLOCK WALL WITH A RACKING RESISTANCE OF 13.4kN. Y12 RODS TO BE PLACED VERTICALLY AT m| —
TRUSS TIE-DOWN <.Mtz RODS AT 4,800 h CORNERS, EACH SDE oF OPENNGS AND AT 1800 CENTRES MAXIMUM IN BETWEEN. PROVIDE 2 COURSE (MIN) BOND BEAM x E
- - * r =
. : ist -
1.8m i 2 s
CORNERS, EACH SIDE OPENINGS. "= MAU BRACED WiTH STRUCTURAL PLY BOTH SIDES ACHEVE A RACKING SY P| | e
RESISTANCE OF 12.8kN/m, (NOTE M16 RODS REQUIRED EACH END) | PY a
ROOF BATTENS 8. ; ANNE
=== ==. WALLS BRACED WITH PLASTERBOARD 80TH SIDES ACHIEVE A RACKING 2 \
METAL ROOF BATTENS FIXED IN ~— RESISTANCE OF 6.4KN/m iS
iZ
ACCORDANCE WITH MANUFACTURER'S skN . i
SPECIFICATIONS O OATES 3008 R.C. COLUMN WITH A RACKING RESISTANCE OF SkN IN EACH N
RAFTERS & ROOF TRUSSES SHALL BE TIED . ft CANTLEVERED POST BRACING FORCE IN EACH DIRECTION. FORCES SUITABLE FOR DIA = 4
DOWN WITH 1/30 x 0.8 mm GI STRAP 6 kN OTINGS. REFER TABLE BELOW FOR VALUES S a
POST HEIGHT BRACING FORCE 4 4
@ RESISTED OC | @
x
0 10 600 mm 6 KN > id] «
' 600 TO 1200 mm 5 kN ‘ x v4 ¥
1200 TO 1800 mm 4 kN : D} &
j i W A a
\ { “ | 3
} O g
3 | ‘\
} <M
i — 1 uw
7 uw
: nm] 6
ewes
Page 40
Fr, ennai ft V | €l-00H1-L0 1V3UL38 VSOON Oi 261 Wy/Hd _ FROOAHDDBUYH “ERIS UDG 20/3030 am] __meenmeee) Vd VuSESY 75 107 LL FONIGISIY C3SOdOud | dNOYD ININdOTIAIO HOV Ch me[ SSRU00V ONY NOMANISIO_parOud INH @ UadUNG t et PINE ROOF TRUSSES 9 TO MANUF. DESIGN AND SPECIFICATION. GALV. BRIOK TES _ Sj S & it i “oS acs “pein ae SESS ee ee SSS 2 - . a esSea : 2 a Jet ete tae coeas e isi “ 7 Na 65 e ne e\ |F z fe ge \\\ i as xe © : E
Page 41
wks
On. Vaadsv
1324m?
LOT52 §
t
’
--------------!
20.021
00mm Downpipes
Provide rainwater catchment from roof
5000 Litres of ram water storage Required
Refer Local Authority for details
regarding tank water allocation
Sewer lines , Sewer Access , Connection point, invert level and
site level information provided by others. MRA Design Is not
responsible for their accuracy.
‘ 6,000 6004, + O : © 17,020 417724
Site Plan
1:200
@senerar NOTES TERMITE PROTECTION CORROSION PROTECTION STANDARDS REFERENCE
LICENCED CONTRACTOR TO PROVIDE TERMITE BARRIER ALL METAL USED IN STRUCTURAL TIMBER DESIGN SHALL COMPLY TO ALL RELEVANT
ALL CONSTRUCTION TO COMPLY WITH THE TO PERIMETER OF SLAB AND ALL PENETRATIONS IN CONNECTIONS, SHALL BE PROVIDED WITH AUSTRALIAN STANDARDS & GENERAL
BUILDING CODE OF AUSTRALIA, ACCORDANCE WITH A.S 3660.1, PART 3.1.3 OF THE BCA CORROSION PROTECTION APPROPRIATE FOR BUILDING PRACTICE REFRENCES SOME
THE QUEENSLAND BUILDING ACT AND TO THE
REQUIREMENTS OF THE
LOCAL AUTHORITY.
SEWERAGE AND FLOOR WASTES TO DISPOSAL
. SYSTEM AS APPROVED BY THE LOCAL
AUTHORITY, AND IN ACCORDANCE WITH THE
SEWERAGE AND WATER SUPPLY ACT.
CONNECT DOWNPIPES TO STREET VIA 100MM
PVC PIPE OR AS REQUIRED BY THE LOCAL
AUTHORITY.
ENSURE THE GROUND LEVEL FALLS MIN 1:20 -
900mm AWAY FROM THE BUILDING LINE,
PROVIDE AND MAINTAIN EROSION AND
SEDIMENT CONTROL STRUCTURES TO
PERIMETER OF WORK AREA. .
DO NOT SCALE FROM DRAWING. THE
CONTRACTOR SHALL VERIFY ALL DIMENSIONS,
SETBACKS, AND LEVELS OF SERVICES ON SITE,
BEFORE COMMENCING WORK . CONTRACTOR IS
RESPONSIBLE FOR MAINTAINING STABILITY OF
THE STRUCTURE UNTIL COMPLETION ANS SHALL
ENSURE THAT NO PART OF THE STRUCTURE IS
OVERSTRESSED 8Y CONSTRUCTION LOADING.
AND RELEVANT AMENDMENTS.
eATTACHMENTS TO BUILDING SUCH AS DOWN PIPES
MUST HAVE A NOMINAL GAP TO ALLOW CLEAR AND
UNINTERUPPTED VISUAL INSPECTION ACCROSS THE
INSPECTION ZONE. .
STRUCTURES SUCH AS STEPS, VERANDAHS, PORCHES,
ACCESS RAMPS, CARPORTS, TRELLISES, DECKS, HOT
WATER SYSTEMS, AIR CONDITIONERS, OR THE LIKE
WHICH ARE NOT PRIVIDED WITH ONE OF THE BARRIER
SYSTEMS DESCRIBED IN THIS PART, MUST BE
SEPARATED FROM THE BUILDING BY A GAP OF NOT LESS
THAN 25mm, TO ALLOW CLEAR AND UNINTERUPPTED
VISUAL INSPECTION ACCROSS THE INSPECTION ZONE.
WHERE ATTACHMENTS OR STRUCTURES AS OUTLINED
ABOVE ABUT A BUILDING AND THERE IS NO CLEAR GAP,
ABARRIER MUST BE PROVIDED TO THE ATTACHMENT,
REGARDLESS OF THE SIZE OF THE ATTACHMENT.
BARRIERS MUST NOT BE BRIDGED BY STRUCTURES,
FITTINGS OR OTHER ATTACHED TO THE MAIN BUILDING,
NOR SHALL THEY BE BREACHED BY THE INSTALLATION
OF SERVICE ENTRY POINT, DOWN PIPES ADDITIONAL
SLABS AND PATHS, LANDSCAPING, GARDENS OR
SIMILAR UNLESS ADDITIONAL BARRIERS ARE USED TO
ELIMINATE CONCEALED ACCESS BY TERMITES TO THE
STRUCTURE.
THE PARTICULAR CONDITIONS OF USE. WHERE
CORROSION PROTECTION OF STEEL IS
REQUIRED IT SHALL BE IN ACCORDANCE WITH
. ASINZS 4791, A.S. 1397 and A.S.1214, THE LEVEL
OF CORROSION PROTECTION PROVIDED SHALL
TAKE INTO CONSIDERATION WEATHER
EXPOSURE, TIMBER TREATMENT, MOISTURE
AND PRESENCE OF SALT.THESE SHALL
SATISFY THE REQUIREMENTS OF THE
RELEVANT AUTHORITY. WHERE OTHER TYPES
OF CORROSION PROTECTION ARE PROVIDED,
ENERGY EFFICIENCY
THESE PLANS ARE SUBJECT TO B.E.R.S. ASSESSMENT
INSULATION. NOTES :-
+ PROVIDE Min R2.5 TO CEILING.
+ PROVIDE MIN R1.5 TO EXTERNAL WALLS
-40% OF FLOOR AREA TO HAVE APPROVED
ENERGY EFFICIENT LIGHTING
-WATER HEATER TO BE AN APPROVED ENERGY EFFICIENT
GAS, SOLAR, OR HEAT PUMP INSTALLED BY LISCENCED
TRADESPERSON.
LISTED BELOW
BUILDING CODE OF AUSTRALIA 2006
AS1684.2 - 1999 - RESIDENTIAL TIMBER-FRAMED
CONSTRUCTION .
AS3600 - CONCRETE STRUCTURES
AS4100 - STEEL STRUCTURES
AS3700 - MASONRY STRUCTURES
AS3500 - WATER SUPPLY
AS37868 - SMOKE ALARM
AS3660 - TERMITE PROTECTION
AS1926 - POOL FENCING
CONSULTANTS.
REFER STRUCTURAL ENGINEERS SPECIFICATION FOR
© SOIL TEST / SITE CLASSIFICATION
@ SLAB AND FOOTING DESIGN
¢ TIMBER FRAMING + LINTELS
@ POOL DESIGN
REFER TRUSS MANUFACTURERS SPECIFICATION FOR
@ TIMBER TRUSSES AND ROOF FRAMING.
REFER ROOF CONTRACTORS SPECIFICATION FOR
¢ SHEET ROOF FIXING AND ACCESSORIES.
ae | acter
AN
WY
SITE PLAN
Lot: §2
eat
SP : 163309
Parish: Tewantin
County: March
Area: 1324m?
Building
FootPrint 317 m?
Site Coverage 23.94%
+
AREA SCHEDULE
Internal Floor Area - 277.5 ma
South Deck - 9.0 me
North Deck - 11.0 mz
Outdoor Pavillion 19.5 mz
Access decking 6.5 m2
Entry - 6.0 ma
Total Floor Area - 329.50 mz
y :
w oR A Dp
GQBBA Lic. No. 07044
Kawana Junct
1/33 Premior Circuit.
Queanstand 457
7
lon
3.
8
1
adesign.com.au
Gorn
RTC si]s)
Rate
Project Description
Bulking 8 Real Estate levesiment
Leach Development Group
Ce ee
Proposed Residence
alec
eee
CURA cuk Led
Site Address.
Aspera
Lot 52
~Noosa Retreat~
Place
ertton consent by the author.
hese drawings remain copyright of MRA Design
land may not be used in pest orn whole without
Scale; 1:200
States:
Drawn: RDG
Date: 6/07/2007
[Checked By:
Project No:
2007 - 063
[Shoet No.
01 of 8
pot Dats:
Page 42
nel
23,900
41,345
+
240, 2
+
490 T
190.
41345 346001 1600, 1190
2,000
Zz 120__|.
6,480
TT
TT
3,980
TT
pS
T
240, )
1,910
Lztoo_]
240, 3
6,000
TT
3,980 2401 4
204,
TT)
24 4
t?
1,200,.
90
904 1,113 yy 1,230 4
6,480
560049007 75120;
6,900 4600,
6,000,
2,910
2,623
TT)
904 1,800 240 bono,
8,920
8,920
¥.
44004 4240
Pool Fant
T
—N
_ 2406 N-2406 Iv .
90y,
v
3
&
=
Entertainment Niche |
2404,
Tv
VA
v
\
3,310
4,110 904 2.220240) i
2424 LV-FG-LV
1Bsd
1
Pool Gate
Poot Fence
rT
Hy !
tort
roi
oO
z=
x
1
(J
-Agouoooo
1,
3
2424LV-FGLV
1,370 90
2,407
2448 Panal lift door
2401 3
Store
1
—-_—- See Ker
'
'
'
1
-------- Le
if
—_- eH
1
1
le
R406 DH
ly
We
240 31,710 904)8204,90 1,600 44800
TE nie
\
Cp
A, Note - 2400 High Joinery
TT
+
te -
240, 4
240)
2,400
a Ee
2,400
7
nie
1,299 90
90u
6,400
2442 Iv
4-991. 4
T
T
3,670
|
|
|
|
|
|
|
{
I
|
4,530.
a
90
240; 3
——_y
2408 lv
3
a
OFLU
=r
ot
rat
—
mah.
c
Lh tid]
20,059
8,279
WARS ood
Wy
11,979
12,459
PACE
2408 lv
i
Ty
Bench
J=P4I-EI-FI-E-
Robe
at
4 900 4 4300
rt
2424 oxxo sw
2,500
Ty
6,480
Floor Plan
1:100
=. oS
1,800 904, 1,200 4 4240
— + TT
904 1,820 90,
3,620
5,290 4.
>
--12
1
23,900
<
904) 900
1206 dh 1515 xo sw
10,630
90 1,900 204
3,370 4
3,620 4,620
8,420
240, 2
Tr trot
46001600,
T T
360 240 360
240, 4 43 4 4240
T
+
T
AREA SCHEDULE
Internal Floor Area - 277.5 m2
South Deck - 9.0 mz
North Deck - 11.0 mz
Outdoor Pavillion 19.5 mz
4 Access decking 6.5 mz
Entry - 6.0 m2
Total Floor Area - 329.50 mz
QBSA tle, No. 079417
4/34 Pramier Circuil,
Kawana Junction
Queansland 4575.
Pri 07 $483 5908
Fi? 07 54939 69714
El) [email protected]
00 NOT SCALE FROM DRAWING.
THE CONTRACTOR SHALL VERIFY ALL
DIMENSIONS, SETBACKS, AND LEVELS OF
SERVICES ON SITE, BEFORE
COMMENCING WORK
ALL CONSTRUCTION TO COMPLY WITH
THE BUILDING CODE OF AUSTRALIA,
THE QUEENSLAND BUILDING ACT AND TO
THE REQUIREMENTS OF THE LOCAL
AUTHORITY.
ALL GLAZING TO BE INACCORDANCE
WITH A.S, 1288, AND SHALL COMPLY WITH
BCA.
ALL WATERPROOFING TO PROVIDED IN
ACCORDANCE TO PART 3.8.1 OF THE BCA
WET AREAS, ROOM HEIGHTS, LIGHT AND
VENTILATION, AND SOUND INSULATION TO
COMPLY WITH PART 3.8 OF THE BCA.
REFER TO CONSULTANTS FOR
RELEVANT DETAILS AND SPECIFICATIONS,
SMOKE DETECTORS TO BE HARDWIRED
INACCORDANCE WITH A.S 3786 AND BCA
PART 3.7.2 .
9.0 « square set opening
1.0.h - lifl off hinges to all wc,
ISA - Smoke Alarm
REFER STRUCTURAL ENGINEERS
SPECIFICATION FOR
}» SOIL TEST / SITE CLASSIFICATION
¢ SLAB AND FOOTING DESIGN
}* TIMBER FRAMING + LINTELS
} TIMBER FLOOR FRAMING
* POOL DESIGN
REFER TRUSS MANUFACTURERS,
SPECIFICATION FOR :
TIMBER TRUSSES AND ROOF FRAMING.
REFER ROOF CONTRACTORS SPECIFICATION
FOR
}¢ SHEET ROOF FIXING AND ACCESSORIES,
a
. VW putting 8 Reet Extsta trestment
Leach Development Group -
ATCA aL
CER rarer
efoSteacgroup.com au
(actus Accuens ed
Description 5
Proposed Residence ~
Site Address.
Lot 52
Aspera Place
~Noosa Retreat~
Thesa drawings remain copyright of MRA Design
and may not be used in part or in whale without
written consont by the euthor.
Scater 15100 ©
Status:
Deen: ROG
Pmject No:
2007 - 063
Bea:
(Date: 6/07/2007
[Checked By:
Sheet No.:
02 of 8
SORT
Page 43
Raised Entry r OP G00 mm Eave / FC Soffit Lining ColorBond Fascia and Flatback oP or Half Round Gutter system ween ten eee epee villio °P’.ColorBond CustomOrb co roof sheet over timber roof trusses. 25° Pitch 900c. ‘ Rainwater! Matar tl tel rash tice Poteet imaeatte | we, } - a aA a ] s00mmt Roof Plan : 1:100 DBSA Lic. Ne, O7949T 1433 Premier Circuit. Kawana Junction Queensland 4 se Q Pit Fil 07 Efi ad adesign.com.au Roofing Notes Refer to Truss Manufacturer Specification For Timber Trusses and Roof Framing. Refer Roof Contractors Specification for Sheet Roof Fixing, Fascia, Gutters and |Accessofies. Ceiling Height at 2700 mm Joinery Height at 2400 mm Fascla mounted gutters with 90MM downpipes : Half round gutter (125mm) : 4 downpipe per 40m2 of mof area Note : valley gutters on roofs tess than 12,5 degs to be designed as box gutters én accordance with AS3500.3.2 Down pipes to be positoined no more than 1200 fram any valley Vo gene ptantte Leach Development Group OAC eC Sc LaPeer lag ene nee sd Proposed Residence Site Address Lot 52 Aspera Place ~Noosa Retreat~ These drawings remain copyright of MRA Design lend may not be ised in pert oF in whole without written consent by the autor. Seale: 1:400 Stats: \Date: 6/07/2007 Deen: ROG Checked By: Project Wo: 'Sheat No.: 2007 - 063 03 of 8 Bate: Bia | abe
Page 44
20,059
+e
|
wo
Sy
v
>
°
s
=)
ol
4
QT
S|
ol
=
+
a
1]
|
a 2
er)
4 oe
aod
Sa
~$-
oI
1]
|
+ xe
wo
N
v
S|
=)
wo
oe
23,500
6.480 48004 8,920
+ TT
Reinforced
Concrete Slab
R.L 6.0
5,230 4
23,500
6,480
> T
ao
~4
Slab Setout
1:100
3,370
>
6,900
8,420
4800,
tt
+ 4
La at nel li at tat BS et En
mera
Qesa Lie. Ne. O79097
1433 Premier Chrewit.
Kawana Junction
Quoensiand 4575
o8
a7i
read
adasign,com.au
TERMITE PROTECTION
LICENCED CONTRACTOR TO PROVIDE
TERMITE BARRIER TO PERIMETER OF
SLAB AND ALL PENETRATIONS IN
ACCORDANCE WITH A.S 3660.1, PART
3.1.3 OF THE BCAAND RELEVANT
|AMENDMENTS.
¢ ATTACHMENTS TO BUILDING SUCH
IAS DOWN PIPES MUST HAVE A
NOMINAL GAP TO ALLOW CLEAR AND
UNINTERUPPTED VISUAL INSPECTION
|ACCROSS THE INSPECTION ZONE.
¢ STRUCTURES SUCH AS STEPS,
VERANDAHS, PORCHES, ACCESS
RAMPS, CARPORTS, TRELLISES,
DECKS, HOT WATER SYSTEMS, AIR
CONDITIONERS, OR THE LIKE WHICH
ARE NOT PRIVIDED WITH ONE OF THE
BARRIER SYSTEMS DESCRIBED IN
THIS PART, MUST BE SEPARATED
FROM THE BUILDING BY A GAP OF NOT,
LESS THAN 25mm, TO ALLOW CLEAR
[AND UNINTERUPPTED VISUAL.
INSPECTION ACCROSS THE
INSPECTION ZONE.
@ WHERE ATTACHMENTS OR
STRUCTURES AS OUTLINED ABOVE
ABUT A BUILDING AND THERE iS NO
CLEAR GAP, A BARRIER MUST BE
PROVIDED TO THE ATTACHMENT,
REGARDLESS OF THE SIZE OF THE
ATTACHMENT.
je BARRIERS MUST NOT BE BRIDGED
BY STRUCTURES, FITTINGS OR OTHER
ATTACHED TO THE MAIN BUILDING,
NOR SHALL THEY BE BREACHED BY
THE INSTALLATION OF SERVICE
ENTRY POINT, DOWN PIPES
ADDITIONAL SLABS AND PATHS,
LANDSCAPING, GARDENS OR SIMILAR
UNLESS ADDITIONAL BARRIERS ARE
USED TO ELIMINATE CONCEALED
ESS BY TERMITES TO THE
UCTURE
Leach Development Group
07 5474 0996 | 0417 501 742
‘new site under construction - view our plans
Proposed Residence
Site Address,
Lot §2
Aspera Place
~Noosa Retreat~
These drewings remain copyright of MRA Design
ered may not be «sed in pert of in whole without
written consent by the atithor.
Scate: 12100
Stetus: [Date: 67/2007
Drew: ROG [Checked By:
Project to: Sheet No:
2007 - 063 04 of 8
eT
Page 45
alae
450 sq Hardwood Post Fixed ColorBond CustomOrb Roof sheet [Tl C el
10-290 Masonry Column over timber-roof-trusses-26* Pitch |} 5-8 ——
: mw oR OA Deseitiga
280 Column ColorBond Fascia and psa tie. a. 070417
Flatback or ¢ 14393 Proa ar Cleceult,
Halfround Gutter, Enby Cettng sewer tiand ASTS,
Terrase sees sores se oe ger ~~ Pi} OF 5493 5008
Fil 07 5493 6971
__ Gelling fine = ee SEH THETA ts ee ; Ei [email protected]
Ceffing fing. - ost H+H Ht Ht HY HEH Et re-¢.
- Zan $ Pte
240mm Brick Veneer. 3
RROD They areas ‘3 90mm Frame |
] 40mm Cavity ge
~ 110 Brickwork. yi
Render and Paint Finish
. : en mec are tehecrsynpes- 1
Aue: MEAT SRT ANT armies Nn rez C A ea (AE wt 12 Aa atat: a “ce -amh
East Elevation 1:100
E.G Cladaing witn . . . : ,
240mm Brick Veneer. finrber cover stips. Fixed high glazing ColorBond CustomOrb Roof sheet
90mm Frame . 450 sq Hardwood Post Fixed over timber roof trusses. 25° Pitch 4
40mm Cavity —_ to 350 Masonry Column
110 Brickwork. 2400 x 4800 Panel Lift Door ‘
a Ca 350 Column : .
Render and Paint Finish : a _. eel eee ene ee eee ene nap o Enty Colllng 9 .
@ c ms s | ColorBond Fascia and :
Gelling line__ 2 eee 2 La Ea EH Flatback or Halfround Gutter.
Gellingline_. . 5 LH LI L414 :
1
Cara
ery 1 ,
ll op : |
HEH HL tHE a 2 Soatnerygne © 7 4 tent
y 4 4 oe f ‘“
5
erga
3
wt
™
: : Yo osiy \
4 - - . ae | Leach Development Group
tion 1:100 ATCO CMM SEA C4
240mm Brick Veneer. . 4 . a 2
90mm Frame : anette
40mm Cavity —————arim CotorBond CustomOrb Roof sheet _ baile billalh coe
110 Brickwork. ] “ over timber roof trusses. 25° Pitch
Render and Paint Finish Proposed Residence
im ColorBond Fascia and Teh
ea i} Flatback or Halfround Gutter. : bot 52
rf
TTT TTT TI ee STU ee a TE Te EHP TEIT IETF ee
a ! . Aspera Place
i . ~Noosa Retreat~
vo : so ne -- These drawings remain copyright af MRA Design
2 end may not be used tn pert arin whole without
a! 3 , writen consent by the author:
“| ae ' Scat: 1400
- Omen: ROG IChocked By.
¥ Project No; . Ishest No.:
+ aa Hee 2007 - 063 05 of 8
4 _
Dae, or
Page 46
240mm Brick-Veneer- j 4 j 90mm Frame 40mm Cavity . . Fixed high glazing | Ce a ce 110 Brickwork. ; ft Render and Paint Finish 150 sq Hardwood Post Fixed ColorBond CustomOrb Roof sheet $o34s bremter Cireult. over timber roof trusses. 25° Pitch Kawaoa Junction 4 Queensland 4575. to 350 Masonry Column ColorBond Fascia and Geling sine... = -- = 5 peeccecceccne ° Flatback or Halfround Gutter. 290 Column Raised pavillion Roof 2aornm Brick Veneer. 160 sq Hardwood Post Fixed ColorBond CustomOrb Roof sheet 40mm Cavity to 350 Masonry Column over timber roof trusses. 25° Pitch 110 Brickwork, 350 Column Render and Paint Finish Cefng line. 2 we ~~ --- Celtng tine NE Ss deinen the. ITLL IS == ==. a a a rs wales Lk . Leach Development Group Proposed Residence a eS ae ——— Dill Behar ask = a eee . Lot 52 - = 4 ” Aspera Place ~Noosa Retreat~ These drawings remain copyright of MRA Design ‘and may not be used in part or in whole without . soreent by the author. ‘ ee wenn eee woe ede = _ _ol nee e e . 4:100 Status: 810712007 : Sy ie 3 nos ct W004 SOY. YA ‘ 7 - 063 06 of
Page 47
ColorBond GustomOrb. Roof sheet Fixed to trusses via Steel Roof battens in accordance with Truss Manufacturers and Reof contractors Specification trusses connected to Top plate via G.1. looped strap. 4 2.8 Dia Nails each Leg. cee tinae, | an trusses connected to Beam via G.I. looped strap. 4 2.8 Dia Nails each Leg. Beam fixed to each Post Via 2 (M12 Bolts. ColorBond Fascia and gutter System S > 5 T— awa 6 et Src a . A” | maqf|......--.--------- we ences tE = WU) fe dee. F.C Soffit T | Fesom — ; : 4 Plasterboard | FC ceiling . ceiling lining | lining . | : | 1 240mm Brick Veneer. Beam / Truss Detail 1:10 Top plate / truss Detail 1:10 450mm Hardwood Post supporting Roof Beams QBBA Lie. No, O7D4IT 4/33 Premier Circuit. Kawane Junction Queensiand 4575. 908 971 49 49 in fradesign.com.au poo ann Baw e 5 F 6 3 m 3 3 @ CORROSION PROTECTION ALL METAL USED IN STRUCTURAL TIMBER, CONNECTIONS, SHALL BE PROVIDED WITH CORROSION PROTECTION APPROPRIATE FOR THE PARTICULAR CONDITIONS OF USE, WHERE CORROSION PROTECTION OF STEEL IS REQUIRED IT SHALL BE IN ACCORDANCE WITH ASINZS 4791, 4.5. 4397 and A.S.1214, THE LEVEL OF CORROSION PROTECTION PROVIDED SHALL TAKE INTO CONSIDERATION WEATHER EXPOSURE, TIMBER TREATMENT, MOISTURE AND PRESENCE OF SALT.THESE SHALL SATISFY THE REQUIREMENTS OF THE RELEVANT AUTHORITY.WHERE OTHER TYPES OF CORROSION PROTECTION ARE PROVIDED, STANDARDS REFERENCE DESIGN SHALL COMPLY TO ALL RELEVANT AUSTRALIAN STANDARDS & GENERAL BUILDING PRACTICE REFRENCES SOME LISTED BELOW BUILDING CODE OF AUSTRALIA 2006 “AS 1684.2 - 1999 - RESIDENTIAL TIMBER-FRAMED CONSTRUCTION AS32600 - CONCRETE STRUCTURES. -ASA100 - STEEL STRUCTURES -AS3700 - MASONRY STRUCTURES: +AS3500 - WATER SUPPLY -AS3786 - SMOKE ALARM. ~AS3660 - TERMITE PROTECTION -AS1926 - POOL FENCING CONSULTANTS. REFER STRUCTURAL ENGINEERS SPECIFICATION FOR © SOIL TEST / SITE CLASSIFICATION @ SLAB AND FOOTING DESIGN ¢ TIMBER FRAMING + LINTELS @ RAFTERS # POOL DESIGN REFER TRUSS MANUFACTURERS SPEC. ¢ TIMBER TRUSSES AND ROOF FRAMING, REFER ROOF CONTRACTORS SPEC. FOR @ SHEET ROOF FIXING AND ACCESSORIES, 90mm Frame / 40mm Cavity / 110 Brickwork. ———— Render and Paint Finish v i 5 M12 Bolt Counter bore Slab and footing in accordance with Engineers Specification Prefab GI Flat Stirrup Conceated in Post t Client masts ere eee ee ee ex oO oy Tee Brick / Block Column Y o °° as noted. jo (2 ° Ke Concrete Core fill Dy ° Oe vi omar! , = = Leach Development Group Prefab GI Flat Stirrup jo o jo °g ” Set in Core Fill y) bE 4 Oe “4 Ie a LY - ° oO Dey . ID Poffo %o Ta A anrikearia re uae a be O° Proposed Residence o ° v Sa Pe 1B 9 Lot 52 ) ° Oe Aspera Place > = ~Noosa Retreat~ e wd a These drawings remain copright of MRA Design Do Oc and may not ba used in part or in whole without jeritien consent by the author. ° ° » ° Scale: 1:10 4 e °n © °Al Stats: Date: 8107/2007 i Drew: RDG [Checked By. . . : j Project No: Sheet No: Footing Detail - Column Detail , a 1:10 4:19 (2007-083 07 of 8 . ‘ . Dats TOT
Page 48
A
R
QOSA Lic. Ne 070417
1/33 Premier Circuit.
Kawana Junction
5.
8
1
J
Queensland 48%
Pri 07 $493 59
Fil OF 5493 69
Efi [email protected]
‘CTRICAL SYOMBOL KEY
No.
0
7
Q
7
‘Z| Note - 2400 High Joinery
DESCRIPTION
SYMBOL
SUB BOARD
EXTERNAL LIGHT
WALL LIGHT
DOWN LIGHT
TY. POINT
. >
Proposed $ TW BOOTTER
Pool 3 PHONE pow
g SINGLE GPO
DOUBLE GPO
SINGLE FLOURO
DOUBLE FLOURD
HEAT LAMP / EXAUST FAN
SPOTLIGHT
CEILING FAN
WECHANIGAL VENT,
BCA 2006 PART 3.8.5
te eta ee ea gt pe mF pe | onan
|
|
|
!
|
|
I
|
|
|
ow DISHWASHER
RANGEHOOO POINT
aH
MICROWAVE POINT
uw
‘SPA
sa
SPA BATH POINT
ALARM -AS $700
Pump
Meee oe
©
nana VEGAV
‘.
a
S
a
g
Leach Development Group
2424 oxxo sw
Proposed Residence
1518 xo sw
_ 206 dh 1615%0 TT : Lot 52
meee ' Aspera Place
, ~Noosa Retreat~
OO These drawings remain copyright of MRA Design
oo lend may not be used in part or in whole without
consent by the author,
42100
SI0712007
Electrical Plan:
1:100
Daren: RDG
Project No:
7 - 063
No:
08 of 8
Page 49
aGn 7 ‘LAND USE SECTION FEES NOOSA RECEIPT TYPE SALE OF DOCUMENTS Superseded Planning Scheme’ Documentation . 520 Copy of Permit/Approval Letter ‘ 110 The Noosa Plan Documentation . 111 APPLICATION FEES Material Chan Use Codelimpact L , atisitont Av 521, iStent onsi 621 - Assessment under Superseded Planning Scheme . . 521° Modification to a Development Permit . 521 Extension of a Currency Period . §21 Operational Works - Landscaping ‘ . 521 } Bldg Work assessable against the Planning Scheme 521 PRE LODGEMENT REVIEW Half Hour 522 One Hour 522 ADVERTISING ‘ Purchase Advertised Applications ~ §23 JETTIES © : : Jetty Application Fee 524 "Jetty Bond ‘ 51 : : (Category 4) BONDS : Performance Bond : . . $41 . (Category 9) SIGNS . . . Lo Registration Fee ‘ . : co . 222 seu FEE . Search of Land Use Section file 112 Liquor Licensing Request : 113 | TOTAL. $ b so name: PT leack Pie ADDRESS: BPO Gee Tina NOOSA ne LS FILENO: — O72] 233), DATE: Refi, / er RECEIPTNO: —_! Z34¢1 4D _ signature of TP Officer: 7) Attar AUTHORITY NO: [3] rot fro
Page 50
CALCULATION OF FEES APPLICATION FEE TOTAL | ‘ FEES MCU - CODE ASSESSMENT Details of Development : Consistent 1.0° Inconsistent 3.0 FEE CALCULATION MCU - IMPACT ASSESSMENT @ Details of Development , Consistent 1.0 [Inconsistent 3.0 FEE CALCULATION OPERATIONAL WORKS Details of Development FEE CALCULATION: . / ) TOTAL FEES — $
Used in these records
07/2382 - MCU - Detached House [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.