07/2382 - MCU - Detached House [As Published] · 132007.2382
ae
FOUNDATION AND STRUCTURAL PLANS
SITE CLASSIFICATION — M~
ARTICULATED MASONRY VENEER
SITE CLASS FOUNDATIONS
Most sand and rock sites with little or no ground movement
CLASS - A from moisture changes.
Stightly reactive clay sites with only slight ground
CLASS - S Movement from moisture changes.
Moderately reactive clay or silt sites which can experience
CLASS - M moderate ground movement from moisture changes.
Highly reactive clay sites, which can experience high
CLASS - H ground movement from moisture changes.
Extremely reactive sites, which can experience extreme
CLASS - E ground movement from moisture changes.
CLASS - A to P {| Filled sites.
Sites which include soft soils, such as soft clay or silt or
loose sands; landslip; mine subsidence; collapsing soils;
soil subject to to erosion; reactive sites subject to abnormal
moisture conditions or sites which cannot be classified
otherwise.
CLASS
'
ua
TY | a . .
oe ee ete a i
CONSTRUCTION NOTES
1. All workmanship and materiats shall be in accordance with the requirements of the relevant current
Australian Standard Codes, Building By-Laws and the ordinances of the relevant Local Authority.
2. i) Concrete Class ~ Minimum 20 MPa at 28 days
Slab on ground - 20 nominal maximum aggregate size
- 80 maximum stump +/-10mm 4
~ Minimum 32 MPa at 28 days for internal stabs
- Minimum 40 MPa at 28 days for external stabs
- 20 nominal maximum aggregate size
- 80 maximum slump +/-t0mm
i) Concrete Class
Suspended slab
3. Minimum Cover
to Reinforcement
~ 25 to upper face of internal stabs -0 «Smm
- 45 for external exposure
= 30 to a membrane in contact with the ground
= 40 to unprotected ground ‘
4. Minimum Laps and Splices for Reinforcement
(a) Slab Fabric ~ 225 minimum overlap of transverse bars at all edges -
a {b} Trench Mesh ~77, 500 splices in all footing teams ~ :. “0
. = Laps at intersections as per the Design Drawings
tc) Reinfercing Bars - 500 splices in all footing beams
. . - - Provide “L” bars at all beam intersections with 500 laps to each leg
5. Fireplaces shall’ be supported on stab thickening extending 300 past the edges of the masonry, and
reinforced with F72 mesh top and bottom. Stab thickening shall be 150 thick for single storey construction
and 200 thick for two storey construction. ‘
Shrinkage Control 5
6. Reinforcing mesh may be reduced to F72 for stabs under 18m in length on “S" sites
7, Where the floor slab is to be tiled, the following recommendations are made, in order to
minimise the effect of shrinkage:-
~ F92 siab mesh (or equivalent) should be provided :
~ Placement of tiles should be delayed for as long as possible (preferably for at least 3 months)
EARTHWORKS NOTES:
Where any filling is carried out on the site after the completion of the site investigation, the
following recommendation shall be followed:-
8. The site shall be stripped of all vegetation prior to the placement of any filling material.
9. Compaction Standards for filling Materiat -
A. Controlled Filling :
{a) Sand filling up to 800 deep, placed in maximum 300 thick layers and compacted with a. vibrating
roller to achieve a minimum Dynamic Cone Penetrometer reading of 7 blows- per 300 penetration
(refer AS 1289.F3.3). Sand fal may be flooded if necessary to achieve this compaction standard,
provided the water can subsequently be drained from the site.
(b) Non-sand filling up to 400 deep, placed in maximum 150 thick tayers and compacted with a
mechanical roller. Clay fill shall be moist during compaction.
{c) Controtled filling shall continue for at least 1 metre past the edge of the footing beam and shall
be battered back to the original surface with a slope of no more than 12 (Vert : Hor).
{d) Where the depth of filling material exceeds that specified above, the filling material shall be
compacted as follows:-
Sand fill to 65% Oensity Index in accordance with AS1289.£6.1
Non-sand fill to 95% Maximum Ory Density (Standard Compaction) in accordance with 5.4.1
Compaction tests shall be carried out on each layer as the filling is placed. If the compaction standard
specified is not achieved, then a “Pier and Slab" and "Pier and Beam” footing design shall be adopted with
all piers founded on the underlying natural material. .
B. Rolted Filling :
(a) Sand Filling up to 600 deep, placed in maximum 300 thick layers and compacted by repeated
rolling with an excavator.
(6) Non-sand filing up to 300 deep, placed in maximum {50 thick tayers and compacted by repeated
rolling with an excavator.
{c} Where the depth of filling materiat exceeds that specified above, the filling material shall be
compacted as follows:- f
Sand fill to 65% Density Index in accordance with AS1289.66.1
Nen-sand fill to 95% Maximum Ory Density (Standard Compaction} in accordance with 5.4.1
Compaction tests shall be carried out on each layer as the filling is placed, If the compaction standard
specified is not achieved, then a “Pier and Slab” and “Pier and Beam” footing design shall be adopted with
alt piers founded on the natural underlying material.
i
wey.
A
OTT0OFP.DWG
ORAWNG WER
lo7-1100-01
Ww"
"
tw
ae
Ss
< 4
2 <
=z
= a
a) S<%
~ Cw
S wa
=e af
9 “lk
‘ <a
ao
ON <«
= wn
2
Ss oo
= 23 Zz
LEACH DEVELOPMENT GROUP | PROPOSED RESIDENCE
BUILDER & CLIENT
Be eC TURAL ANY CAMA EF MCIN EE pvt
OFF, 2C/82 PARKER STREETY
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2382 - MCU - Detached House [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.